Pilbara Minerals (PLS) — Stock Analysis 2026 [3.8]

Lithium Battery Metals Company Analysis
AUD

Analysis as of 26 August 2026. Pilbara Minerals stock analysis. Price deck: base spodumene concentrate (SC6, CIF China) US$1,750/t — the representative trailing average (12-month US$1,698/t on the China benchmark monthly series of the Resources and Energy Quarterly, months to July 2026) on the fixed grid — with every grid price run as a scenario: deep bear US$1,250, bear US$1,500, base US$1,750, bull US$2,000 and deep bull US$2,250/t; no forecast and no single-day price enter the value. At A$5.29 a share the market-implied deck is US$2,412/t. Rating: ★★★★ Solid / Overvalued (wide band). Refreshed on each annual report and on material events. All figures in Australian dollars unless marked US$. For information only, prepared with AI assistance — see the disclaimer at the end.

Pilbara Minerals, now PLS Group, is a lithium producer on one mine: Pilgangoora in Western Australia, 100% owned, which made a record 879.5 kt of spodumene concentrate in FY2026. The thesis in one line: a long-life, net-cash, one-mine producer whose share price already pays for spodumene well above its trailing average. It is worth a look now because FY2026 turned the cycle — revenue of A$1,934 million against A$769 million, underlying EBITDA of A$1,137 million and a 5-cent final dividend — while the shares closed at A$5.29 on 26 August 2026, up from A$1.97 on 11 September 2025. To screen PLS against every lithium name on the same fields, go to Metal Pilot’s lithium mining stock screener.

1. Snapshot & thesis

Figure 1. Pilbara Minerals in numbers, as of 26 August 2026

A$5.29 /sh
Share price — ASX, 26 Aug 2026
A$17.1 bn
Market capitalisation (shares on issue)
A$2.73 /sh
NAV per share — US$1,750/t, 10% real
A$3.09 /sh
Blended fair value (base deck)
Overvalued
Valuation read (wide band) — implied −41.6%
3.8/5
Quality — Solid
879.5 kt
Spodumene concentrate (FY2026)
A$1.93 bn
Revenue (FY2026)
A$1.14 bn
Underlying EBITDA (FY2026, 59% margin)
A$569/t
Unit operating cost, FOB (FY2026)
A$1.06 bn
Net cash after notes and leases (30 Jun 2026)
202.7 Mt
Ore Reserve @ 1.16% Li₂O (30 Jun 2026)

Figure data: Table 1, this analysis.

Table 1. Pilbara Minerals in numbers

Metric Value Basis / date
Share price A$5.29 ASX close, 26 Aug 2026
Market capitalisation A$17,059 m 3,224.790 m shares on issue, 30 Jun 2026
Diluted shares 3,257.167 m FY2026 weighted average
Net cash after notes and leases A$1,057.8 m cash A$2,290.0 m − borrowings and leases A$1,232.2 m, 30 Jun 2026
Revenue A$1,934.0 m FY2026 (FY2025 A$768.9 m)
Underlying EBITDA margin 59% (A$1,137 m) FY2026; 13% in FY2025
Net profit after tax A$526 m FY2026; FY2025 loss A$196 m
Free cash flow A$1,035.3 m FY2026, operating cash flow A$1,364.7 m − capex A$329.4 m
Spodumene concentrate production 879.5 kt FY2026 (FY2025 754.6 kt)
NAV per share A$2.73 (P/NAV 1.94×) US$1,750/t SC6, 10% real, 30 Jun 2026 bridge
Blended fair value A$3.09 (A$1.30–4.75) US$1,750/t base; US$1,250–2,250/t grid
Valuation read Overvalued (wide band), implied −41.6% 26 Aug 2026
Quality rating 3.8/5 Solid Section 9
Dividend 5 cps final, fully franked (~A$161 m) FY2026

Source: PLS Group Annual Report 2026 and Appendix 4E (balance sheet p.167, cash flow p.169, shares notes 2.7 and 5.4); FY26 Full Year Results release (24 Aug 2026, p.1: production, EBITDA, profit, dividend); ASX close of 26 Aug 2026 (Yahoo Finance); NAV, fair value and read from Section 7. Underlying EBITDA is the company’s non-IFRS measure.

Identity. PLS Group Ltd (ASX: PLS), formerly Pilbara Minerals, is a producer (mining) in lithium, headquartered in Perth, Western Australia: one producing asset — the Pilgangoora Operation in the Pilbara, with the Pilgan plant running and the Ngungaju plant’s restart approved in February 2026 — one expansion study (P2000), one Brazilian project without a study (Colina) and an 18% stake in POSCO’s lithium hydroxide plant in South Korea (P-PLS).

Thesis in brief. The bull case is the asset and the balance sheet: a 202.7 Mt reserve that lasts about 32 years at the guided rate, A$1,057.8 million of net cash after the US$600 million notes and leases, and FY2027 guidance of 1,030–1,100 kt. The bear case is the price: at A$5.29 the shares ask for US$2,412/t of SC6 for the life of the mine, 42% above the 12-month average, and PLS sells a lower-grade product at 87% of the SC6 price. What tips it is whether spodumene holds above US$1,934/t, where the read rises to Modestly overvalued.

How to read this analysis: the statcards and Section 9 carry the verdict; Sections 2–7 carry the evidence, and Section 7 the valuation.

2. Assets & operations

Spodumene is the feed of the lithium chain and carries its widest swings: the China benchmark ran from US$6,108/t in November 2022 to US$674/t in May 2025, and averaged US$1,698/t in the twelve months to July 2026. For supply, demand and the cost curve, see the Lithium — A Complete Market Guide.

2.1 Portfolio overview

Table 2. Portfolio at 30 June 2026

Asset Country Stage Interest Output (FY2026) Reserves (P&P) Life Unit cost (FY2026) Listing / operator
Pilgangoora Operation (Pilgan, Ngungaju plants) Australia (WA) Producing 100% 879.5 kt concentrate 202.7 Mt @ 1.16% Li₂O ~32 years A$569/t FOB ASX: PLS · PLS operates
P2000 expansion Australia (WA) Feasibility, due Dec 2026 100% — inside Pilgangoora — — ASX: PLS · PLS operates
Colina Project Brazil No study 100% — n/d — — ASX: PLS · PLS operates
P-PLS hydroxide plant South Korea Producing 18% (call to 30%) n/d — — — Unlisted JV · POSCO

Source: PLS Group Annual Report 2026, Mineral Resources and Ore Reserves (JORC Code 2012, 30 Jun 2026) p.34 and the operating review p.25; FY26 Full Year Results release p.1. Life from the FY2025 Annual Report, confirmed by Section 7’s reserve-over-guided-rate derivation.

Concentration is the defining feature. Pilgangoora is the company: all FY2026 revenue, all production and every valued tonne in Section 7. Behind its reserve sits a 440 Mt resource at 1.28% Li₂O, so the mine is deep — but there is no second operation to cushion a pit, plant or price shock, and the balance sheet does that job instead. The resource, P2000 and Colina are where the next decade’s volume would come from, and none of them has a filed capital cost yet; Section 7 values the reserve, the Measured and Indicated tonnes beyond it, and nothing else.

2.2 Revenue split

Figure 2. Revenue by product, FY2026

Spodumene concentrate (incl. tantalite by-product)
100% (A$1,934 m)
Share of FY2026 revenue by product (100%)

Figure data: PLS Group Annual Report 2026, Appendix 4E p.2; the tantalite share is not reported separately.

Figure 3. Revenue by asset, FY2026

Pilgangoora Operation
100% (A$1,934 m)
Share of FY2026 revenue by asset (100%)

Figure data: PLS Group Annual Report 2026, Appendix 4E p.2.

One product from one mine: both splits are a single bar, and P-PLS reaches the accounts only as an equity-accounted share.

2.3 Pilgangoora

Pilgangoora sits in the Pilbara of Western Australia, held 100% and operated by PLS through two plants: Pilgan, which carried FY2026, and Ngungaju, whose restart was approved in February 2026. Every tonne pays a 5% state royalty and a 1% native-title royalty on FOB value, and a 5% private royalty applies to the part of the deposit that came with Altura.

The JORC Code 2012 Ore Reserve at 30 June 2026 is 202.7 Mt at 1.16% Li₂O — 10.1 Mt Proved at 1.24% and 192.6 Mt Probable at 1.16% — down from 207.2 Mt at 1.17% a year earlier. In FY2026 the plants processed 4,141,108 dmt of ore at 1.3% Li₂O with a 76.5% lithia recovery (71.9% in FY2025), for 879.5 kt of concentrate at A$569/t FOB. FY2027 guidance is 1,030–1,100 kt at A$575–625/t FOB, with capital of A$630–685 million: sustaining A$85–100 million, mine development A$250–280 million, infrastructure and projects A$110–130 million and A$175 million of pre-FID spend on P2000. Mine development is the largest line: the waste stripping that keeps ore exposed, which Section 7 treats as sustaining capital for the life of the mine. The recovery gain matters as much as the grade: 76.5% against 71.9% is about 6% more concentrate from the same ore.

The one asset risk is product quality against the benchmark. PLS sells a concentrate of about 5.2% Li₂O; in FY2026 it realised US$1,488/t against US$1,708/t SC6-equivalent, 87% of the benchmark, so a wider discount cuts every tonne.

2.4 Pilgangoora M&I beyond the reserve

The Mineral Resource at 30 June 2026, inclusive of the reserve at a 0.2% cut-off, is 440 Mt at 1.28% Li₂O (445 Mt a year earlier): 16 Mt Measured at 1.27%, 354 Mt Indicated at 1.28% and 70 Mt Inferred at 1.25%. Section 7 carries the Measured and Indicated tonnes beyond the reserve at a conversion factor of 0.25, worth A$1,824.5 million or 20.2% of enterprise NAV; the Inferred tonnes carry nothing.

2.5 Other assets: P2000, Colina and P-PLS

P2000, a new plant to lift Pilgangoora’s output, has a feasibility study due in December 2026; its capital and first-production date are not yet published. Colina in Brazil came with the Latin Resources acquisition; no resource statement or study sits in the FY2026 filings. P-PLS is an 18% equity-accounted stake in POSCO’s hydroxide plant, with a call option to 30% and funded by a A$79.6 million convertible bond issued to POSCO. None of the three is valued in Section 7.

2.6 Production, reserves & costs

Figure 4. Spodumene concentrate production, FY2025–FY2027 guidance (kt)

kt concentrate
1,200
900
600
300
0
754.6
879.5
1,065
FY2025
FY2026
FY2027 (guidance midpoint)
Fiscal year (ended 30 June)

Figure data: FY26 Full Year Results release p.1; June Quarter FY26 Activities Presentation p.18 (FY2027 guidance 1,030–1,100 kt).

Sales rose from 760.1 kt to 891.6 kt and the realised SC6-equivalent price from US$769/t to US$1,708/t. The FOB unit cost fell from A$627/t to A$569/t, while the CIF China cost, after freight and royalties, held at A$739/t (A$735/t). Tantalite output rose from 144,417 lb to 220,585 lb, a by-product credit inside the unit cost. The reserve fell by 4.5 Mt over the year, about the ore the plants processed, so FY2026 did not replace its depletion. The cost story is the FOB line: 9% lower per tonne on 17% more output, before the freight and royalties that the CIF figure adds back.

2.7 Peer positioning

Peer set: Albemarle (NYSE: ALB), SQM (NYSE: SQM), Ganfeng Lithium (SZSE: 002460 / HKEX: 1772) and Mineral Resources (ASX: MIN) — listed lithium producers spanning hard rock and brine, none in a pending deal. Every star in Section 9 is read against this set.

Table 3. Quality metrics against the peer set

Company Lithium output Margin Reserve life Balance sheet Listing
PLS Group 879.5 kt concentrate (FY2026) EBITDA 13% (FY2025), 59% (FY2026) ~32 years (Pilgangoora, JORC P&P) Net cash A$1,057.8 m (30 Jun 2026) Public (ASX: PLS)
Albemarle 223.6 kt LCE attributable (2025) Energy Storage adjusted EBITDA 25.7% (2025) Greenbushes 37.1, Wodgina 38.6 years (SK-1300) Net debt US$472.1 m incl. leases (30 Jun 2026) Public (NYSE: ALB)
SQM 257.9 kt LCE sold (2025) Lithium gross margin 26% (2025) Atacama control ends after 2030 n/d Public (NYSE: SQM)
Ganfeng Lithium n/d n/d n/d n/d Public (SZSE: 002460 / HKEX: 1772)
Mineral Resources n/d n/d n/d n/d Public (ASX: MIN)

Source: PLS from Tables 1–2; Albemarle and SQM from the Albemarle analysis (Form 10-K 2025, Form 10-Q Q2 2026, SQM Form 20-F 2025). Ganfeng’s 2025 annual report and Mineral Resources’ FY2026 annual report are not in this source set, so their cells are n/d. Output bases differ — concentrate tonnes against LCE — so the column compares scale, not like for like.

PLS is the purest hard-rock exposure in the set and the only one with net cash; Albemarle carries the wider asset base and the higher trough margin.

3. Financials & balance sheet

Table 4. Five-year financial summary (A$ millions except per share; years to 30 June)

Metric FY2022 FY2023 FY2024 FY2025 FY2026
Revenue 1,190 4,064 1,254 769 1,934
Revenue YoY % — +242% −69% −39% +152%
Underlying EBITDA margin n/d n/d n/d 13% 59%
Net profit after tax 562 2,391 257 (196) 526
Basic EPS (A¢) 18.98 79.91 8.54 (6.33) 16.33
Operating cash flow 647.6 3,456.7 (440.2) 146.2 1,364.7
Capex, cash (sustaining / growth n/d) 128.3 385.5 810.0 634.7 329.4
Free cash flow 519.3 3,071.2 (1,250.2) (488.5) 1,035.3
Net debt / (net cash) n/d n/d n/d n/d (1,057.8)
Net debt / EBITDA n/d n/d n/d n/d net cash
Diluted shares, weighted (m) 3,041.1 3,029.5 3,038.9 3,163.0 3,257.2
Dividend per share (A¢) nil n/d (A$750.3 m paid) nil nil 5.0

Source: PLS Group Annual Report 2026 (Appendix 4E p.2; five-year performance table p.151; cash flow p.169; balance sheet p.167; note 2.7 p.179); Annual Reports 2024 and 2023 (Appendix 4E; cash flow pp.138, 164; earnings per share pp.148, 182); FY26 Full Year Results release p.1. n/d: not in the filings read.

Table 5. Cost deck — FY2026 actual and FY2027 guidance

Line FY2026 FY2027 guidance
Production (kt concentrate) 879.5 1,030–1,100
Unit operating cost, FOB ex royalties (A$/t) 569 575–625
Unit operating cost, CIF China (A$/t) 739 n/d
Royalties (% of FOB value) 5% state + 1% native title; 5% private on the Altura part unchanged
Sustaining capital / mine development (A$ m) n/d 85–100 / 250–280
Infrastructure & projects / P2000 pre-FID (A$ m) n/d 110–130 / 175
Total capex (A$ m) 328 (accruals) 630–685

Source: FY26 Full Year Results release pp.1, 5; June Quarter FY26 Activities Presentation p.18.

Revenue ran from A$4,064 million at the FY2023 peak to A$769 million in FY2025 and back to A$1,934 million, with the EBITDA margin from 13% to 59%. Operating cash flow of A$1,364.7 million ran well ahead of the A$526 million profit, helped by A$74.4 million of income taxes refunded; tax pools are n/d. Royalties are the price-linked cost line, 6% of FOB value on most tonnes. Free cash flow followed the cycle: outflows of A$1,250.2 million in FY2024 and A$488.5 million in FY2025, when capex of A$634.7 million ran against A$146.2 million of operating cash, and an inflow of A$1,035.3 million in FY2026 as capex halved. Adjusted earnings are the underlying EBITDA line; the impairment history is n/d in this source set.

Balance sheet. At 30 June 2026 cash was A$2,290.0 million against borrowings and leases of A$1,232.2 million — mostly the US$600 million 6.875% senior notes due 2031, raised as A$836.8 million of borrowings came in and A$375.0 million was repaid in FY2026 — leaving net cash of A$1,057.8 million. Liquidity was A$2,790 million with A$500 million undrawn; the policy caps net senior debt at 1.5× twelve-month EBITDA. Stress test: at FY2025’s A$97 million EBITDA the gross borrowings would be 12.7× — the net cash, not the earnings, carries a trough. The rehabilitation provision is A$64.3 million.

Hedging and returns. Spodumene is unhedged; the US-dollar receipts are managed with FX options and forwards, volumes n/d. The dividend policy pays 20–30% of free cash flow: nil in FY2024 and FY2025, then a 5-cent final for FY2026 (~A$161 million), about 16% of the year’s free cash flow, below the policy band and leaving room for FY2027’s A$630–685 million capital program. Shares on issue were 3,224.790 million at 30 June 2026. The Financial Metrics for Commodity Investing guide explains each line.

4. Management, strategy & corporate structure

4.1 Management & governance

Dale Henderson has been Managing Director and CEO since July 2022. Kathleen Conlon joined the board on 1 January 2024 and became Non-Executive Chair on 31 January 2024, so the Chair and CEO roles are split — unlike Albemarle’s combined role. Alex Willcocks joined as CFO in FY2026. Board size, independence, the committee list and related-party amounts sit in the FY2026 directors’ report and note 6.2, not read for this analysis, so they are n/d.

4.2 Strategy

The strategy is volume from the one mine first: FY2027 guidance of 1,030–1,100 kt as Ngungaju restarts, then a P2000 decision on the feasibility study due in December 2026. Capital management runs on two stated targets — leverage below 1.5× and a 20–30% payout of free cash flow. Downstream exposure stays minority, through the P-PLS stake and its call option to 30%, and Colina waits for a study.

4.3 Ownership & structure

The most material transaction is the all-scrip acquisition of Latin Resources, which brought Colina; its consideration is not carried in this source set. Weighted basic shares rose from 3,094.0 million in FY2025 to 3,220.5 million in FY2026. POSCO is the cornerstone partner: the P-PLS stake is funded by a A$79.6 million convertible bond issued to POSCO. In FY2026 PLS received a US$100 million offtake prepayment. Holders above 5% are n/d. Shares on issue were 3,224.790 million at 30 June 2026, 3,257.167 million diluted on the FY2026 weighted basis.

5. ESG & sustainability

Safety improved: the total recordable injury frequency rate was 2.77 in FY2026, down from 3.41 in FY2024. Group scope 1 and 2 emissions were 158,822 tCO₂-e in FY2026 (167,564 in FY2025), in an AASB S2 climate report. Decarbonisation targets with a baseline, tailings data and community spend are n/d in the FY2026 renderings, so the score rests on safety and disclosure, not on targets. The licence also rests on the Pilbara’s native-title and state agreements — the 1% native-title royalty is one filed term of them — and no contested point appears in the FY2026 filings read here.

6. Risks

Table 6. Risk register

Risk Type Likelihood / impact Exposure Mitigant
Spodumene below the US$1,750/t base Commodity High / High Each US$250/t moves NAV/share by about A$0.77 Net cash; A$575–625/t FOB guidance
Product discount to SC6 widens Commodity Medium / Medium Price received was 87% of SC6 in FY2026 Recovery up to 76.5%
One mine Operational Medium / High All revenue and all valued NAV Two plants; Ngungaju restart approved
FY2027 volume misses 1,030–1,100 kt Operational Medium / Medium Volume in every method Record 879.5 kt in FY2026
P2000 capital and dilution Balance sheet Medium / Medium A$175 million pre-FID in FY2027; full capex n/d A$2,790 million liquidity; study before FID
Stronger Australian dollar Currency Medium / Medium FX ±10% moves NAV/share to A$2.23 / A$3.33 FX options and forwards
China demand and offtake counterparties Counterparty Medium / High US$100 million offtake prepayment; sales CIF China P-PLS stake in Korea
Licence to operate in the Pilbara ESG Low / Medium Native-title and state royalty terms TRIFR 2.77 in FY2026

Source: PLS Group Annual Report 2026; FY26 Full Year Results release; exposures from Section 7 of this analysis.

Figure 5. Risk matrix

Impact if it happens
High
Medium
Low
Spodumene below base
One mine
China demand
Product discount
FY2027 volume
P2000 capital
Stronger A$
Licence to operate
Low
Medium
High
Likelihood →

Figure data: Table 6, this analysis.

The spodumene price dominates, and Section 7 prices it across the grid; the product discount, the Australian dollar and the one-mine concentration are the risks behind it. The net cash is what lets PLS sit through a trough without raising equity. Two risks are priced directly: the grid runs the deck from US$1,250 to US$2,250/t, and the out file runs the Australian dollar ±10%. The rest — one mine, P2000 capital, offtake counterparties — sit outside the number and are the reason the read carries its wide band.

7. Valuation

Valuation as of 26 August 2026, built in Australian dollars against the A$5.29 ASX close of 26 August 2026, with the US$ deck converted at A$1.00 = US$0.7165. Horizon: spot fair value. Price deck: base spodumene SC6 US$1,750/t (CIF China), the representative of the trailing averages — 3-month US$2,517, 6-month US$2,344 and 12-month US$1,698/t, months to July 2026 (the monthly benchmark prices of the Resources and Energy Quarterly, September 2026) — with every grid price from US$1,250 to US$2,250/t as the scenario set. Discount rate 10% real after-tax. Shares 3,257.2 million, fully diluted.

PLS Group is valued as a lithium producer on one mine, following the How to Value Commodity Stocks guide. Pilgangoora carries the value: the FY27 guided volume of 1,030–1,100 kt of concentrate at the guided A$575–625/t FOB cost, run for 30 years against a reserve that lasts about 32 at that rate, with the measured and indicated resource beyond the reserve added at the band-low conversion factor. P2000 and Colina have no study yet, so neither is in the number; the P-PLS hydroxide stake is an unvalued investment. Three methods carry weight — NAV at a 1.08× target, EV/EBITDA at 7.6× and FCF-yield support at 6.5%, the 1.00×, 7.0× and 7% anchors lifted by the scorecard’s +0.08 — weighted 50 / 30 / 20.

Enterprise NAV at the base deck is A$9.0 billion: Pilgangoora A$7.2 billion and the resource row A$1.8 billion (20% of the total). The bridge takes A$224 million off: A$1,058 million of net cash after the US$600 million notes and leases is more than used up by the rehabilitation provision, current tax payable, the POSCO convertible and A$138 million a year of corporate and other costs carried for the life of the mine. NAV per share is A$2.73 — about half the price.

Three choices set the level. The base leans low: the 3- and 6-month averages sit on the run from US$674/t in May 2025 to the US$2,689/t September-quarter estimate, so the base snaps from the 12-month average. The deck sits 26% below the 60-month average of US$2,364/t, so every target multiple is held at mid-cycle and only the deck moves across the columns. And the series is a monthly government compilation to July 2026, not a daily assessment to the as-of date: the most recent months are quarter averages, and the July cell is a quarter estimate above the report’s own ~US$2,200/t July point. A US$250/t step moves NAV per share by about 77 cents, so the deck is the whole question here.

The price received is built from the deck, not taken from it. PLS sells a lower-grade concentrate than the SC6 benchmark — about SC5.2 in FY26 — and its FY26 realised price was 87% of the SC6 equivalent (US$1,488 against US$1,708/t), so every grid price is cut by that ratio before it is converted into Australian dollars. Royalties of 6% of FOB value come off the top. The cost is the FY27 FOB guidance plus a freight line taken from the gap between FY26 CIF and FOB costs, and sustaining capital and mine development come off at their FY27 guidance midpoints. Tax is the 30% statutory rate with no shield. The same unit margin drives all three methods, so they move together across the grid. The cash-flow methods sit a little above NAV because they capitalise one year of guided volume at mid-cycle multiples, not a capped life.

Table 7. Load-bearing inputs — the filed figures the valuation moves on (full source register: Table 21)

Input Value Where §7 uses it Source
Spodumene China spot (REQ Sept 2026, monthly) averages, months to Jul 2026 3-month US$2,517/t; 6-month US$2,344/t; 12-month US$1,698/t; 60-month US$2,364/t Opening block — the US$1,750/t grid price Market | REQ Sept 2026 historical data workbook, monthly benchmark prices | “Lithium spodumene China spot price” (US$/t) | Jan 2018–Jul 2026
FY26 realised price — ~SC5.2 CIF China and SC6 equivalent US$1,488/t; US$1,708/t Table 10, block 1 — price received Filed | FY26 Full Year Results release | Summary operational and financial metrics | “Realised price” | p.1
AUD/USD, 26 Aug 2026 A$1.00 = US$0.7165 Table 10 — the A$ price received Market | Yahoo Finance | “AUDUSD=X daily close” | 26 Aug 2026
FY27 guidance — production and unit operating cost (FOB) 1,030–1,100 kt; A$575–625/t Table 10, block 1; Table 14 Filed | June Quarter FY26 Activities Presentation | FY27 guidance | “Production volume” | p.18
FY26 unit operating cost — FOB and CIF China A$569/t; A$739/t Table 10 — freight; Table 14 — corporate and other Filed | FY26 Full Year Results release | Summary operational and financial metrics | “Unit operating cost (FOB)" | p.1
Royalties on FOB value — state / native title 5% / 1% Table 10, block 1 Filed | FY26 Full Year Results release | End notes | “Royalty costs include a 5% state government royalty” | p.5
FY27 sustaining capital and mine development guidance A$85–100 M; A$250–280 M Table 10; Table 16 Filed | June Quarter FY26 Activities Presentation | FY27 guidance | “Sustaining capital” | p.18
Pilgangoora Ore Reserve, 30 Jun 2026 202.7 Mt @ 1.16% Li2O Table 10 — life; block 2 Filed | FY2026 Annual Report | Mineral Resources and Ore Reserves — Table 6 (Ore Reserves) | “Total” | p.34
Pilgangoora Measured and Indicated Resource (inclusive), 30 Jun 2026 16 Mt @ 1.27%; 354 Mt @ 1.28% Table 10, block 2 Filed | FY2026 Annual Report | Mineral Resources and Ore Reserves — Table 5 (Mineral Resources) | “Pilgangoora Measured” | p.34
FY26 underlying EBITDA and revenue A$1,137 m; A$1,934,018 k Table 14 — corporate and other Filed | FY26 Full Year Results release | Summary operational and financial metrics | “Underlying EBITDA” | p.1; Filed | FY2026 Annual Report | Appendix 4E | “Revenue from ordinary activities” | p.2
Cash, borrowings and leases, 30 Jun 2026 cash A$2,289,977 k; borrowings and leases A$153,216 k + A$1,078,993 k Table 12, net cash Filed | FY2026 Annual Report | Consolidated statement of financial position | “Cash and cash equivalents” | p.167
Rehabilitation, current tax and non-controlling interests A$64,265 k; A$236,989 k; A$3,799 k Table 12, claim lines Filed | FY2026 Annual Report | Note 3.5 Provisions | “Rehabilitation provision” | p.188; Filed | FY2026 Annual Report | Consolidated statement of financial position | “Current tax liabilities” | p.167
Diluted shares, FY26 weighted 3,257,167 k Table 12 — per-share values Filed | FY2026 Annual Report | Note 2.7 Earnings per share | “Weighted average number of ordinary shares used in calculating diluted earnings per” | p.179

Source: the PLS Group FY2026 Annual Report, FY26 results release and June Quarter FY26 presentation named in each row (full source register: Table 21); the spodumene series from the monthly benchmark prices of the Resources and Energy Quarterly, September 2026; FX and the close from Yahoo Finance.

Metal Pilot Premium

Valuation workings — Premium

The workings behind this valuation — the method, the models, the sensitivity grids and the scenarios, 11 tables and 3 figures in all — are for Metal Pilot Premium members.

  • 7.1 Method selection
  • 7.2 Net asset value
  • 7.3 Relative valuation
  • 7.4 Further weighted methods
  • 7.5 Cross-checks
  • 7.6 Scenarios & fair value

Want to see one first? These valuations are open to every reader: BHP Group (BHP), Cameco (CCJ), ExxonMobil (XOM), Newmont (NEM) and Wheaton Precious Metals (WPM).

Create a Metal Pilot accountLog in

See Premium plansRead a free example

You are signed in, and your plan does not include valuation workings. They come with Metal Pilot Premium.

Upgrade to Premium

The premium section could not be loaded right now.

Premium — unlocked

8. Near-term catalysts (1–3 years)

Table 19. Near-term catalysts

Catalyst Timing Why it benefits PLS
P2000 feasibility study December 2026 Sets the capital for an expansion Section 7 leaves unvalued
FY2027 volume of 1,030–1,100 kt Year to 30 June 2027 17–25% more concentrate than FY2026 at A$575–625/t FOB
Ngungaju plant ramp-up Pre-care-and-maintenance capacity within the first four months of FY2027 The second plant back in the volume
Dividends at 20–30% of free cash flow Each half-year Cash returned as free cash flow builds

Source: June Quarter FY26 Activities Presentation pp.6, 18; PLS Group Annual Report 2026 p.25; FY2025 Annual Report, capital management framework. Timing is company guidance, not a guarantee.

All four are the company’s to deliver; the spodumene price, which moves the value most, is not. The P2000 study is the one that moves Section 7: until it prints capital and a start date the expansion is worth nothing in this build, and a study at a reasonable capital intensity would add value the share price may already assume.

9. Rating & verdict

Figure 9. Scorecard by dimension, 26 August 2026

Assets & scale★★★★15%
Cost & margins★★★15%
Reserves & life★★★★15%
Balance sheet★★★★★15%
Capital allocation★★★15%
Growth★★★★6.25%
Management★★★6.25%
Jurisdiction★★★★6.25%
ESG★★★★6.25%
Score by dimension Weighted composite ★★★★ (3.79)
Each ring is one star; the outer ring is ★★★★★. Weights in Table 20.

Figure data: Table 20. Each spoke prints its stars and weight; the dashed ring is the weighted composite, 3.79/5.

Table 20. Scorecard — Pilbara Minerals, 26 August 2026

Dimension Weight Score Sourced rationale
1. Asset quality & scale 15% ★★★★ Pilgangoora, 100% owned: 879.5 kt of concentrate in FY2026 from a 202.7 Mt reserve at 1.16% Li₂O — tier-one scale, but one mine against Albemarle’s four producing assets; above the peer median (Annual Report 2026 p.34; results release p.1; 30 Jun 2026)
2. Cost position & margins 15% ★★★ A$569/t FOB and A$739/t CIF in FY2026; EBITDA margin 13% in FY2025 against Albemarle Energy Storage’s 25.7%, 59% in FY2026 at US$1,708/t SC6-equivalent; a ~5.2% product at 87% of SC6 — the peer median (results release p.1; FY2026)
3. Reserves, life & replacement 15% ★★★★ JORC 2012 Proved 10.1 Mt and Probable 192.6 Mt (30 Jun 2026), about 32 years on JORC Proved and Probable at the guided rate; 207.2 Mt a year earlier, so FY2026 mining was not replaced — above the median (Annual Report 2026 p.34)
5. Balance sheet & liquidity 15% ★★★★★ Net cash A$1,057.8 m after the US$600 m notes and leases, A$2,790 m liquidity, A$500 m undrawn — the only net-cash name in the set, against Albemarle’s US$472.1 m net debt; top of the set (Annual Report 2026 pp.6, 167, 195; 30 Jun 2026)
6. Capital allocation & returns 15% ★★★ Dividends A$750.3 m in FY2023, nil in FY2024–FY2025, 5 cps for FY2026 on a 20–30% FCF policy; capex cut from A$634.7 m to A$329.4 m; diluted shares 3,163.0 m to 3,257.2 m — the sector median, alongside Albemarle (Annual Report 2026 pp.151, 169, 179)
4. Growth & optionality 6.25% ★★★★ FY2027 guidance 1,030–1,100 kt (+17–25%), the Ngungaju restart, the P2000 study due Dec 2026; Colina without a study — above the median (June Quarter FY26 presentation p.18)
7. Management & governance 6.25% ★★★ CEO since July 2022 and a separate Chair since 31 Jan 2024, against Albemarle’s combined role; board independence and committees n/d — scored at the median (Annual Report 2026, directors’ report)
8. Jurisdiction & geopolitics 6.25% ★★★★ Every valued tonne in Western Australia, against Albemarle’s 62.8% in Western Australia and 20.1% in Chile; Colina in Brazil unvalued — above the median (Section 7)
9. ESG & licence to operate 6.25% ★★★★ TRIFR 2.77 in FY2026 from 3.41 in FY2024; scope 1 and 2 158,822 tCO₂-e; an AASB S2 report — fuller disclosure than Albemarle’s (Annual Report 2026 pp.20, 37, 115)
Composite 100% ★★★★ 3.8/5 Solid

Source: this analysis; every score cites its filing and date, against the Albemarle, SQM, Ganfeng and Mineral Resources peer set of Section 2.7. Producer (mining) archetype: Dimensions 1, 2, 3, 5 and 6 at 15%, the other four at 6.25%. Σ(weight × stars) = 0.60 + 0.45 + 0.60 + 0.75 + 0.45 + 0.25 + 0.1875 + 0.25 + 0.25 = 3.79/5 → ★★★★ Solid.

The two-axis verdict, 26 August 2026: ★★★★ Solid × Overvalued (wide band), implied −41.6% at A$5.29 against a blended fair value of A$3.09 — full; the market-implied deck is US$2,412/t, 38% above the US$1,750/t base and above the 60-month average of US$2,364/t, and the target multiples (P/NAV 1.08×, EV/EBITDA 7.6×, FCF yield 6.5%) carry +0.08 from Dimensions 1, 3, 5 and 8 — an 8% lift that does not close the distance to the price.

The bull case is that the price is the 2026 recovery holding: at US$2,250/t the blend reaches A$4.75, FY2027 volume rises up to 25%, and P2000 and Colina are worth something this build gives them nothing for. The bear case is the base itself — the 12-month average is US$1,698/t and the top grid column still sits below the share price; at the US$1,500/t bear column the blend is A$2.12, and FY2025’s realised US$769/t SC6-equivalent shows how far the price can fall. What tips it is spodumene above US$1,934/t, where the read rises to Modestly overvalued; the scorecard is held at Solid by cost, capital allocation and governance disclosure, not by the mine.

To rank PLS against every lithium producer on the same nine dimensions, screen the sector on Metal Pilot’s lithium mining stock screener.

10. Sources, methodology & disclaimer

10.1 Sources, methodology & data vintage

Company filings. The PLS Group Annual Report 2026 and Appendix 4E (ASX, 24 August 2026), including the Mineral Resources and Ore Reserves statement at 30 June 2026; the FY26 Full Year Results release and presentation (24 August 2026); the June Quarter FY26 Activities Presentation (30 July 2026) for FY2027 guidance; the Annual Reports 2025, 2024 and 2023 for the earlier cells.

Market data. The ASX close of A$5.29 and A$1.00 = US$0.7165 on 26 August 2026 (Yahoo Finance). Spodumene: the China benchmark monthly series in the Resources and Energy Quarterly, September 2026 (Office of the Chief Economist), January 2018 to July 2026; its recent months are quarter averages repeated monthly.

Peers. Albemarle and SQM figures from the Albemarle analysis and its filings; Ganfeng and Mineral Resources n/d.

Methodology. As of 26 August 2026. Base deck US$1,750/t SC6 on the US$1,250–2,250/t grid (step US$250), every grid price run as a scenario; 10% real after tax; weights NAV 50%, EV/EBITDA 30%, FCF-yield support 20%, with the +0.08 driver line from the Section 9 scorecard; per-share values on 3,257.167 million diluted shares. The scorecard uses the producer (mining) weights against the four-company peer set. Refreshed on each annual report and on material events. The model’s further working tables (deck sensitivity, P/NAV map, cross-checks) are in claude/valuation-models/pilbara-minerals-pls.out.md.

Re-run log. 19 October 2026: rebuilt on the FY2026 Annual Report, the REQ monthly deck (US$1,750/t base, from US$1,500/t), the A$5.29 close of 26 August 2026 (the earlier version printed A$2.45) and the scorecard’s +0.08 driver line; NAV/share A$2.70; blended fair value A$3.07 (A$1.28–4.73), implied −42.0%, read moved to Overvalued (wide band) from Fairly valued (wide band); market-implied SC6 US$2,417/t; composite 3.8/5 Solid (from 4.3 High quality). 19 October 2026, gate fixes: the POSCO convertible is no longer deducted twice (its A$97.5 million carrying value sits in net cash) and minorities of A$3.8 million are taken — NAV/share A$2.73, blended fair value A$3.09 (A$1.30–4.75), implied −41.6%, read unchanged at Overvalued (wide band); market-implied SC6 US$2,412/t.

Omitted figures. The asset map is not built; Table 2 carries the footprint. The optional financial line in Section 3 and the safety trend in Section 5 are not built; Figure 4 carries production.

Data gaps and the documents that close them. The P2000 feasibility study (December 2026) and a Colina resource or study for the unvalued growth; the FY2026 directors’ report and note 6.2 for the board and related parties; ASX substantial-holder notices; year-end net debt FY2022–FY2025 for Table 4 and the own-multiple history; note 2.2 for D&A and the tax pools; Ganfeng’s 2025 and Mineral Resources’ FY2026 annual reports for the peers; an archived consensus capture.

Table 21. Full source register for the valuation

InputValueAs ofWhere §7 uses itSource
Annual Report 2026 and Appendix 4E, year to 30 June 2026
Pilgangoora Ore Reserve — Proved, 30 Jun 202610.1 Mt @ 1.24% Li2O30 Jun 2026NAV reserve base; lifeFiled | FY2026 Annual Report | Mineral Resources and Ore Reserves — Table 6 (Ore Reserves) | "Pilgangoora Proved" | p.34
Pilgangoora Ore Reserve — Probable, 30 Jun 2026192.6 Mt @ 1.16% Li2O30 Jun 2026NAV reserve base; lifeFiled | FY2026 Annual Report | Mineral Resources and Ore Reserves — Table 6 (Ore Reserves) | "Probable" | p.34
Pilgangoora Ore Reserve — Total P&P, 30 Jun 2026 (30 Jun 2025)202.7 Mt @ 1.16% Li2O (207.2 Mt @ 1.17%)30 Jun 2026NAV reserve base; reserve life; YoY depletionFiled | FY2026 Annual Report | Mineral Resources and Ore Reserves — Table 6 (Ore Reserves) | "Total" | p.34
Pilgangoora Mineral Resource — Measured, 30 Jun 202616 Mt @ 1.27% Li2O30 Jun 2026EV/resource; inclusive basisFiled | FY2026 Annual Report | Mineral Resources and Ore Reserves — Table 5 (Mineral Resources) | "Pilgangoora Measured" | p.34
Pilgangoora Mineral Resource — Indicated, 30 Jun 2026354 Mt @ 1.28% Li2O30 Jun 2026EV/resource; inclusive basisFiled | FY2026 Annual Report | Mineral Resources and Ore Reserves — Table 5 (Mineral Resources) | "Indicated" | p.34
Pilgangoora Mineral Resource — total, 30 Jun 2026 (30 Jun 2025)440 Mt @ 1.28% Li2O (445 Mt @ 1.28%)30 Jun 2026EV/resource; resource baseFiled | FY2026 Annual Report | Mineral Resources and Ore Reserves — Table 5 (Mineral Resources) | "Sub total" | p.34
P-PLS (POSCO JV lithium hydroxide) interest; call option to18% ; 30%30 Jun 2026investments — P-PLS 18% and the call optionFiled | FY2026 Annual Report | Operating and financial review | "call option to increase its ownership interest in P-PLS from 18% to 30%" | p.25
Revenue from ordinary activities, FY26 / FY25A$1,934,018 k / A$768,850 k30 Jun 2026five-year tableFiled | FY2026 Annual Report | Appendix 4E | "Revenue from ordinary activities" | p.2
Net cash inflow from operating activities, FY26 / FY25A$1,364,686 k / A$146,215 k30 Jun 2026five-year tableFiled | FY2026 Annual Report | Consolidated statement of cash flows | "Net cash inflow from operating activities" | p.169
Payments for property, plant, equipment and mine properties, FY26 / FY25(A$329,430 k) / (A$634,720 k)30 Jun 2026five-year table; FCFFiled | FY2026 Annual Report | Consolidated statement of cash flows | "Payments for property, plant, equipment and mine properties" | p.169
Cash and cash equivalents, 30 Jun 2026 / 30 Jun 2025A$2,289,977 k / A$974,417 k30 Jun 2026net debtFiled | FY2026 Annual Report | Consolidated statement of financial position | "Cash and cash equivalents" | p.167
Borrowings and lease liabilities — currentA$153,216 k30 Jun 2026net debtFiled | FY2026 Annual Report | Consolidated statement of financial position | "Borrowings and lease liabilities" | p.167
Borrowings and lease liabilities — non-currentA$1,078,993 k30 Jun 2026net debtFiled | FY2026 Annual Report | Consolidated statement of financial position | "Borrowings and lease liabilities" | p.167
Trade and other receivables (current)A$158,385 k30 Jun 2026working capitalFiled | FY2026 Annual Report | Consolidated statement of financial position | "Trade and other receivables" | p.167
Inventories — current / non-currentA$171,119 k / A$116,394 k30 Jun 2026working capitalFiled | FY2026 Annual Report | Consolidated statement of financial position | "Inventories" | p.167
Trade and other payables — current / non-currentA$384,780 k / A$50,954 k30 Jun 2026working capitalFiled | FY2026 Annual Report | Consolidated statement of financial position | "Trade and other payables" | p.167
Current tax liabilitiesA$236,989 k30 Jun 2026EV bridge — tax payableFiled | FY2026 Annual Report | Consolidated statement of financial position | "Current tax liabilities" | p.167
Rehabilitation provision, 30 Jun 2026 / 30 Jun 2025A$64,265 k / A$72,901 k30 Jun 2026rehabilitationFiled | FY2026 Annual Report | Note 3.5 Provisions | "Rehabilitation provision" | p.188
US$ Senior Notes (6.875%, due 2031)US$600M30 Jun 2026debt; maturitiesFiled | FY2026 Annual Report | Directors' report — highlights | "Senior Notes" | p.144
Convertible bond to POSCO (funds 18% of P-PLS), faceA$79.6M30 Jun 2026gap register item 2 (P-PLS funding); carried inside net cashFiled | FY2026 Annual Report | Note 3.2 Equity-accounted investment | "Convertible Bond"
Convertible bonds within current borrowings, 30 Jun 2026A$97,535 k30 Jun 2026Table 12 — inside net cash, not deducted againFiled | FY2026 Annual Report | Borrowings | "Convertible bonds" | p.194
Non-controlling interests, 30 Jun 2026A$3,799 k30 Jun 2026Table 12 — minority interestsFiled | FY2026 Annual Report | Consolidated statement of financial position | "Non-controlling interests" | p.167
Weighted average shares — diluted, FY26 / FY253,257,167 k / 3,163,030 k30 Jun 2026fully-diluted countFiled | FY2026 Annual Report | Note 2.7 Earnings per share | "Weighted average number of ordinary shares used in calculating diluted earnings per" | p.179
Ordinary shares on issue, 30 Jun 20263,224,790 k30 Jun 2026basic count for market capFiled | FY2026 Annual Report | Note 5.4 Contributed equity | "On issue at 30 June" | p.193
P-PLS equity-accounted interest (POSCO JV)18%30 Jun 2026§4 JVs / strategic investorsFiled | FY2026 Annual Report | Note 3.2 Equity-accounted investment | "18% interest in P-PLS" | p.184
FY26 Full Year Results, ASX release 24 August 2026
Spodumene concentrate production, FY26 / FY25879.5 kt / 754.6 kt30 Jun 2026volume row; statcardFiled | FY26 Full Year Results release | Summary operational and financial metrics | "Production" | p.1
Spodumene concentrate sales, FY26 / FY25891.6 kt / 760.1 kt30 Jun 2026volume rowFiled | FY26 Full Year Results release | Summary operational and financial metrics | "Sales" | p.1
Average realised price, SC6 equivalent, FY26 / FY25US$1,708/t / US$769/t30 Jun 2026price deck cross-checkFiled | FY26 Full Year Results release | Summary operational and financial metrics | "US$/t SC6" | p.1
Average estimated realised price (~SC5.2 CIF China), FY26US$1,488/t30 Jun 2026price deck cross-checkFiled | FY26 Full Year Results release | Summary operational and financial metrics | "Realised price" | p.1
Unit operating cost (FOB Port Hedland ex. royalties), FY26 / FY25A$569/t / A$627/t30 Jun 2026unit cost row; Dim 2Filed | FY26 Full Year Results release | Summary operational and financial metrics | "Unit operating cost (FOB)" | p.1
Unit operating cost (CIF China), FY26 / FY25A$739/t / A$735/t30 Jun 2026unit cost incl. freight and royaltiesFiled | FY26 Full Year Results release | Summary operational and financial metrics | "Unit operating cost (CIF)" | p.1
Lithia recovery, FY26 / FY2576.5% / 71.9%30 Jun 2026recoveryFiled | FY26 Full Year Results release | Appendix — Physicals summary | "Lithia recovery" | p.5
Tantalite concentrate produced, FY26 / FY25220,585 lb / 144,417 lb30 Jun 2026by-product creditFiled | FY26 Full Year Results release | Appendix — Physicals summary | "Tantalite concentrate" | p.5
Royalties on FOB price: state / native title / private (Altura part only)5% / 1% / 5%30 Jun 2026price-linked cost linesFiled | FY26 Full Year Results release | End notes | "Royalty costs include a 5% state government royalty" | p.5
Underlying EBITDA, FY26 / FY25A$1,137 m / A$97 m30 Jun 2026five-year table; EV/EBITDA baseFiled | FY26 Full Year Results release | Summary operational and financial metrics | "Underlying EBITDA" | p.1
June Quarter FY26 Activities Presentation, 30 July 2026
FY27 production guidance1,030–1,100 kt30 Jul 2026guidance-year volumeFiled | June Quarter FY26 Activities Presentation | FY27 guidance | "Production volume" | p.18
FY27 unit operating cost (FOB) guidanceA$575–625/t30 Jul 2026guided unit costFiled | June Quarter FY26 Activities Presentation | FY27 guidance | "Unit operating cost (FOB)" | p.18
FY27 capex guidance (base + P2000 pre-FID)A$630–685 M30 Jul 2026capex rowFiled | June Quarter FY26 Activities Presentation | FY27 guidance | "Capex" | p.18
FY27 sustaining capital guidanceA$85–100 M30 Jul 2026sustaining lineFiled | June Quarter FY26 Activities Presentation | FY27 guidance | "Sustaining capital" | p.18
FY27 mine development guidanceA$250–280 M30 Jul 2026sustaining line (waste)Filed | June Quarter FY26 Activities Presentation | FY27 guidance | "Mine development" | p.18
FY27 infrastructure & projects guidanceA$110–130 M30 Jul 2026growth capitalFiled | June Quarter FY26 Activities Presentation | FY27 guidance | "Infrastructure & projects" | p.18
FY27 P2000 pre-FID capitalA$175 M30 Jul 2026growth capital by projectFiled | June Quarter FY26 Activities Presentation | FY27 guidance | "P2000 (pre-FID)" | p.18
Annual Report 2025 and Appendix 4E, year to 30 June 2025
Pilgangoora mine life~32 years30 Jun 2025life basis, JORC Proved and Probable (the reserve-derived life in Table 10 agrees)Filed | FY2025 Annual Report | Operating and financial review | "year mine life"
Registry
Pilgangoora interest / operator100% · operator PLS30 Jun 2025NAV attributable basisInput | Metal Pilot company registry (interest and operator)
FY26 Full Year Financial Results presentation, 24 August 2026
Offtake prepayment received in FY26US$100M30 Jun 2026§4 offtakesFiled | FY26 Full Year Results presentation | FY26 operational highlights — notes | "offtake prepayment" | p.6
Market data
PLS.AX close on the as-of dateA$5.2926 Aug 2026price; market capMarket | Yahoo Finance | "PLS.AX daily close" | 26 Aug 2026
AUD/USD on the as-of dateA$1.00 = US$0.716526 Aug 2026FX rateMarket | Yahoo Finance | "AUDUSD=X daily close" | 26 Aug 2026
Market capitalisation at the as-of closeA$17,059 m26 Aug 2026market capDerived | the as-of close × shares on issue (FY2026 Annual Report note 5.4)
Resources and Energy Quarterly, September 2026 — historical data workbook (recent months are quarter averages)
Spodumene China spot 3-month average, May–Jul 2026 (REQ monthly; quarter averages)US$2,517/t31 Jul 2026§7 deckMarket | REQ Sept 2026 historical data workbook, monthly benchmark prices | "Lithium spodumene China spot price" (US$/t) | Jan 2018–Jul 2026
Spodumene China spot 6-month average, Feb–Jul 2026 (REQ monthly; Apr–Jul quarter averages)US$2,344/t31 Jul 2026§7 deckMarket | REQ Sept 2026 historical data workbook, monthly benchmark prices | "Lithium spodumene China spot price" (US$/t) | Jan 2018–Jul 2026
Spodumene China spot 12-month average, Aug 2025–Jul 2026 (REQ monthly; Oct–Dec 2025 and Apr–Jul 2026 quarter averages)US$1,698/t31 Jul 2026§7 deckMarket | REQ Sept 2026 historical data workbook, monthly benchmark prices | "Lithium spodumene China spot price" (US$/t) | Jan 2018–Jul 2026
Spodumene China spot 60-month average, Aug 2021–Jul 2026 (REQ monthly)US$2,364/t31 Jul 2026§7 deck — five-year referenceMarket | REQ Sept 2026 historical data workbook, monthly benchmark prices | "Lithium spodumene China spot price" (US$/t) | Jan 2018–Jul 2026
Spodumene China spot 60-month high (REQ monthly, Aug 2021–Jul 2026)US$6,108/t (Nov 2022)31 Jul 2026§1 cycle range; §7Market | REQ Sept 2026 historical data workbook, monthly benchmark prices | "Lithium spodumene China spot price" (US$/t) | Jan 2018–Jul 2026
Spodumene China spot 60-month low (REQ monthly, Aug 2021–Jul 2026)US$674/t (May 2025)31 Jul 2026§1 cycle range; §7Market | REQ Sept 2026 historical data workbook, monthly benchmark prices | "Lithium spodumene China spot price" (US$/t) | Jan 2018–Jul 2026
Spodumene July 2026 point (REQ report text) vs the monthly benchmark prices Jul 2026 cell (Sep-26 quarter estimate)~US$2,200/t (report) vs US$2,689/t (monthly benchmark prices)31 Jul 2026§7 deck cross-check (quarter-average caveat)Market | Resources and Energy Quarterly, September 2026, Lithium chapter | "US$2,200 a tonne in July 2026"; monthly benchmark prices Jul 2026 cell

Source: the filings and market series named in each row, read back against the filings by this analysis; the load-bearing rows open Section 7 as Table 7.

10.2 Disclaimer & disclosure

This analysis is for information only and is not investment advice; do your own research or consult a licensed adviser. It is a point-in-time snapshot as of 26 August 2026 — the share price, the spodumene price and the valuation read all move, and reserves, resources and NAV are estimates at the dates stated; resources are less certain than reserves. The scorecard and the two-axis verdict are an analytical read of quality and price, not a buy or sell instruction. It was prepared with AI assistance from the company’s filings and market data; verify before acting. As of 19 November 2026, the author holds no position in the company this analysis covers.