Birchcliff Energy (BIR) — Stock Analysis 2026 [3.1]
Analysis as of 9 October 2026. Birchcliff Energy stock analysis. Price deck: base Henry Hub US$3.00/MMBtu — the representative trailing average on the fixed US$2.00–4.00 grid — with every grid price run as a scenario (deep bear US$2.00, US$2.50, base US$3.00, US$3.50, deep bull US$4.00), WTI held at US$80/bbl, and the reserve evaluator’s escalating 2025 forecast as a 0% cross-check — no spot price. Shares at C$6.63 a share (TSX close); the market-implied deck is ~US$3.16/MMBtu Henry Hub. Canadian dollars at US$1.00 = C$1.4271. Refreshed on each annual report and each quarterly report. Rating: ★★★ Average / Modestly overvalued (wide band).
Birchcliff Energy is an E&P producer in the natural-gas sector: a 100%-operated Alberta Montney company producing about 80,000 boe/d, with 946.0 mmboe of proved plus probable reserves — 32.4 years at its 2025 rate. The thesis in one line: a long-lived, low-operating-cost reserve base that the market already prices slightly above what a US$3.00 Henry Hub deck supports. It is worth a look now because the first-half 2026 netback rose to C$17.84/boe, guidance points to a fourth-quarter exit near 88,500 boe/d, and the sanction decision on the Goodfare gas plant is due in late 2026 or early 2027. To screen Birchcliff against every North American upstream name on the same fields, go to Metal Pilot’s upstream oil & gas stock screener.
1. Snapshot & thesis
Figure 1. Birchcliff in numbers, as of 9 October 2026
overvalued
Figure data: Table 1, this analysis.
Table 1. Birchcliff in numbers
| Metric | Value | Basis / date |
|---|---|---|
| Listing | TSX: BIR (OTC: BIREF) | primary listing first |
| Share price | C$6.63 | TSX close, 9 Oct 2026 (C$6.27 on 30 Jul 2026) |
| 52-week closing range | C$5.77 – C$8.01 | 10 Oct 2025 – 9 Oct 2026 |
| Shares | 274.5 m basic · 275.7 m fully diluted | 11 Aug 2026 basic; options by the treasury method on the 31 Dec 2025 bands — the valuation’s share basis |
| Market capitalisation · enterprise value | C$1,819.6 m · C$2,289.5 m | 9 Oct 2026; total debt at 30 Jun 2026 |
| Production | 80,086 boe/d FY2025 · 79,607 boe/d H1 2026 | 84% gas guided for 2026 |
| Reserves | 946.0 mmboe P+P · 644.7 mmboe total proved | gross, 31 Dec 2025, NI 51-101 (Deloitte) |
| Operating netback (margin) | C$14.66/boe FY2025 · C$17.84/boe H1 2026 | before G&A and interest |
| Total debt / adjusted funds flow | 1.09× | FY2025 |
| NAV per share | C$6.75 (P/NAV 0.98×) | 2P-basis, risked; US$3.00 Henry Hub, 10% |
| Blended fair value | C$5.91 (range C$0.59 – C$11.81) | US$2.00 – US$4.00 Henry Hub |
| Valuation read | Modestly overvalued (wide band) · implied −10.8% | §7 |
| Quality rating | ★★★ Average | §9 |
Source: Birchcliff Q2 2026 report and AIF 2025 (production, netback, shares, total debt, reserves); Yahoo Finance BIR.TO history and the Bank of Canada, 9 Oct 2026; NAV, blend and read from Section 7.
Birchcliff Energy Ltd. (TSX: BIR) produces natural gas, condensate, NGLs and light oil from the Montney formation in Alberta: two producing areas, Greater Pouce Coupe and Gordondale, and the Elmworth development area, on 383 (375 net) Montney sections. It operates both areas’ gas plants, carries no joint venture and no stream or royalty financing, and sells gas into AECO, Dawn and Henry Hub. Gas is 82% of volume and 61% of revenue. Its reserves are evaluated each year by Deloitte under NI 51-101, and it reports in Canadian dollars under IFRS.
Thesis in brief. The bull case: 22.1 years of total proved life, a C$2.88/boe operating cost, 103% PDP replacement in 2025 and a netback up 22% in the first half put NAV/share at C$6.75 on US$3.00 Henry Hub — and C$9.89 at US$3.50. The bear case: 65.7% of proved reserves are undeveloped and need C$3,157.7 m of future capital, funding is bank-only, and below ~US$2.72 Henry Hub the read turns Overvalued. What tips it is the gas price against the ~US$3.16 the shares assume, then Goodfare’s sanction.
How to read this analysis: the statcards and Section 9 carry the verdict; Sections 2–7 carry the evidence, Section 7 the valuation.
2. Assets & operations
Birchcliff’s gas is priced off three hubs — Alberta’s AECO, Dawn in Ontario and NYMEX Henry Hub; for the market behind them, see the Natural Gas — A Complete Market Guide. Its 2026 gas exposure is guided at 44% AECO, 38% Dawn, 16% Henry Hub and 2% Alliance, and a new contract sends 35,000 MMBtu/d to the Malin hub in Oregon from 1 January 2027 to the end of 2030 at the NGI Malin index.
2.1 Portfolio overview
Table 2. Portfolio at 31 December 2025
| Asset | Country | Stage | Interest | FY2025 output | Reserves | Life | Unit cost | Listing / operator |
|---|---|---|---|---|---|---|---|---|
| Greater Pouce Coupe | Canada (Alberta) | Producing | 200 of 220 sections net; gas plant 100% | 58,249 boe/d | 76% of P+P | in group | in group | Birchcliff (TSX: BIR), operator |
| Gordondale | Canada (Alberta) | Producing | 95 of 126 sections net | 21,817 boe/d | 23% of P+P | in group | in group | Birchcliff (TSX: BIR) operates AltaGas’s plant |
| Elmworth (Goodfare plant) | Canada (Alberta) | Pre-FID development | 100% of the plant | — | n/d | — | n/d | Birchcliff (TSX: BIR), planned operator |
| Group | 375 of 383 sections net | 80,086 boe/d | 946.0 mmboe P+P | 32.4 yrs P+P | C$2.88 operating · C$5.68 transport /boe |
Source: AIF 2025, Principal Properties (p.16–17); Annual report 2025, 2025 Financial & Operational Summary (p.3); 2026 budget release (p.3). Area production sums to 80,066 boe/d against the reported 80,086 boe/d. The company reports reserves by area only as shares of P+P and unit costs only for the group.
Concentration is total: one formation, one province, and 73% of 2025 output from Greater Pouce Coupe, which also holds 76% of P+P reserves. Gordondale’s gas runs through AltaGas’s plant under a 100 MMcf/d take-or-pay, which Birchcliff has operated since 1 July 2024.
2.2 Revenue split
Figure 2. Revenue by product, FY2025
Figure data: FY2025 volumes × realized prices per the Annual report 2025 (p.3, p.13): gas C$433.6 m, condensate C$168.1 m, NGLs C$59.4 m, light oil C$48.8 m — C$709.9 m against reported revenue of C$709.9 m.
Figure 3. Production by area, FY2025
Figure data: Table 2, this analysis.
Liquids are 17.6% of volume (14,085 bbl/d) but 38.9% of revenue, because condensate and light oil realised C$85.74 and C$86.25/bbl in 2025 against C$3.00/Mcf for gas.
2.3 Greater Pouce Coupe
Greater Pouce Coupe produced 58,249 boe/d in 2025 from 220 (200 net) sections, processed through the company’s own 100%-working-interest gas plant. The 2026 budget gives C$300–350 m to it and Gordondale together, at an average drilled, completed and tied-in well cost of about C$7.1 m (C$6.9 m in 2025); the company describes more than twenty years of locations at 30 wells a year here. No stream, royalty financing or other encumbrance sits on the area — the royalty is the Crown’s, C$1.58/boe in the first half of 2026. The evaluator expects 21,768 Mboe of proved production from it in 2026. The asset risk is the plant: one outage stops three-quarters of the company.
2.4 Gordondale
Gordondale produced 21,817 boe/d in 2025 from 126 (95 net) sections and holds 23% of P+P reserves; the evaluator expects 8,248 Mboe of proved production from it in 2026. Its gas is processed at AltaGas’s Gordondale facility under a take-or-pay obligation of 100 MMcf/d, and Birchcliff has run the plant since 1 July 2024. The asset risk is that commitment: the fee is owed whether or not the area fills it.
2.5 Elmworth and Goodfare
Elmworth is the growth project. Its first phase is the 100%-owned Goodfare gas plant at 100 MMcf/d, targeted to bring about 16,000–18,000 boe/d on production in late 2028, with a final investment decision targeted for late 2026 or early 2027; about C$25 m of the 2026 budget goes to it. Remaining capital, the ramp by year and the approvals in hand are not disclosed in the files read (n/d), so Section 7 carries Goodfare at no value beyond reserves the evaluator already booked. The plant would be the company’s third processing hub and would lift capacity beyond the roughly 87,500 boe/d the five-year outlook holds flat on sustaining capital.
2.6 Production, reserves & costs
Table 3. Production and unit costs
| Metric | FY2025 | H1 2026 | 2026 guidance |
|---|---|---|---|
| Production (boe/d) | 80,086 | 79,607 | 83,000–84,000 (Q4 ~88,500) |
| Natural gas (Mcf/d) | 396,010 | 398,511 | 84% of the mix |
| Realized revenue (C$/boe) | 24.28 | 27.64 | — |
| Royalty (C$/boe) | 1.06 | 1.58 | 1.95–2.15 |
| Operating (C$/boe) | 2.88 | 2.92 | 2.75–2.95 |
| Transportation & other (C$/boe) | 5.68 | 5.30 | 5.20–5.40 |
| Operating netback (C$/boe) | 14.66 | 17.84 | — |
Source: Annual report 2025 (p.3); Q2 2026 report, summary (p.2) and 2026 Guidance (p.3, updated 12 Aug 2026). Netback is before G&A and interest.
Figure 4. Production run-rate, thousand boe/d
Figure data: Table 3, this analysis.
The first-half netback gain of C$3.18/boe is price: realized revenue rose C$3.36/boe, royalty took C$0.52 of it back, operating cost added C$0.04 and transportation gave back C$0.38. The 2026 guide keeps operating cost near C$2.85/boe at its midpoint, so the netback from here moves with the realized price rather than with cost.
Table 4. Reserves and NPV by category, 31 December 2025
| Category | Gross reserves (mmboe) | Share of P+P | NPV10 before tax (C$ m) | Unit value (C$/boe, net) |
|---|---|---|---|---|
| Proved developed producing | 218.0 | 23.0% | 2,320.3 | 11.75 |
| Proved developed non-producing | 3.3 | 0.3% | 29.1 | n/d |
| Proved undeveloped | 423.4 | 44.8% | 2,026.2 | n/d |
| Total proved | 644.7 | 68.1% | 4,375.7 | 7.55 |
| Probable | 301.3 | 31.9% | 1,240.9 | 4.74 |
| Proved + probable | 946.0 | 100% | 5,616.7 | 6.68 |
Source: AIF 2025, Summary of Reserves and Summary of Net Present Values (p.27); Deloitte LLP, NI 51-101, effective 31 Dec 2025, on its escalating 2025 forecast. Non-producing NPV is total proved less producing and undeveloped. Before income tax; Section 7 rebuilds each category at its own deck.
Reserve life on 2025 production is 32.4 years P+P, 22.1 years total proved and 7.5 years PDP. PDP replacement was 103% in 2025, but 65.7% of proved reserves are undeveloped: future development capital is C$3,157.7 m for total proved and C$4,648.5 m for P+P, C$238.6 m of it in 2026. The evaluator’s 2026 proved production estimate is 30,390 Mboe — about 83,260 boe/d, inside the company’s own 83,000–84,000 boe/d guide. The 657 net locations in the August 2026 presentation back the undeveloped book. On cost, transportation is the largest line at C$5.68/boe — about twice operating cost — because selling gas outside Alberta means paying to get it there.
2.7 Peer positioning
Peer set: Advantage Energy (TSX: AAV), Peyto Exploration & Development (TSX: PEY) and Tourmaline Oil (TSX: TOU) — gas-weighted Western Canadian producers on FY2025 filings, none in a pending deal; every star in Section 9 uses this set. Kelt Exploration was considered and left out because its figures were not resolved.
Table 5. Quality metrics against the peer set, FY2025
| Company | Listing | Production | P+P reserves (mmboe) | P+P life (yrs) | Operating netback (C$/boe) |
|---|---|---|---|---|---|
| Tourmaline Oil | TSX: TOU | ~638,200 boe/d | 3,866.2 (gross) | 16.6 (gross) | n/d |
| Peyto Exploration & Development | TSX: PEY | 134.1 thousand boe/d | 1,313.6 (net) | 26.8 (net) | n/d |
| Birchcliff Energy | TSX: BIR | 80,086 boe/d | 946.0 gross · 841.1 net | 32.4 gross · 28.8 net | 14.66 |
| Advantage Energy | TSX: AAV | 78,267 boe/d | 689.2 | 24.1 | 15.99 |
Source: Advantage Annual Report 2025, Peyto AIF 2025 and Tourmaline AIF 2025 on SEDAR+, as filed; Birchcliff per Tables 2–4. Life is P+P over FY2025 production; Advantage’s reserves as reported.
Birchcliff sits level with Advantage on scale, behind it on netback, and ahead of all three peers on reserve life. Peyto’s reserves are quoted net of royalties and Advantage’s as reported, so the life comparison is indicative rather than exact; Tourmaline is the scale reference at roughly eight times Birchcliff’s output, with a gross P+P life of 16.6 years against Birchcliff’s 32.4. To run these fields across the North American upstream universe, use the Metal Pilot upstream screener.
3. Financials & balance sheet
Table 6. Five-year financial summary (C$ m except per share)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
| Revenue (P&NG) | 932.4 | 1,340.2 | 740.4 | 586.9 | 709.9 |
| Revenue YoY % | +76.4%1 | +43.7% | −44.8% | −20.7% | +21.0% |
| Cash margin (adjusted funds flow) | 539.7 | 953.7 | 306.8 | 236.8 | 422.8 |
| Net income | 310.5 | 653.7 | 9.8 | 56.1 | 64.9 |
| EPS (C$) | 1.172 | 2.462 | 0.04 | 0.21 | 0.24 |
| Operating cash flow | 515.4 | 925.3 | 320.5 | 203.7 | 407.7 |
| Capex, F&D3 | 230.5 | 364.6 | 304.6 | 273.1 | 305.9 |
| FCF (free funds flow) | 309.3 | 589.1 | 2.2 | (36.3) | 116.9 |
| Net debt (total debt) | 499.4 | 138.5 | 382.3 | 535.6 | 459.9 |
| ND/EBITDA (total debt / AFF)4 | 0.93× | 0.15× | 1.25× | 2.26× | 1.09× |
| Diluted shares (m, weighted) | n/d | 275.2 | 272.5 | 272.2 | 274.2 |
| DPS (C$) | 0.025 | 0.27 | 0.80 | 0.40 | 0.12 |
Source: Annual report 2025, Selected Annual Information (p.13) and Note 9 (p.66); Q4 2022 MD&A, Selected Annual Information (p.6); Annual report 2023 (p.92).
Notes to Table 6
- Against FY2020 P&NG revenue of C$528.5 m (Q4 2022 MD&A, p.6).
- Basic; the Q4 2022 MD&A table prints no diluted figure for FY2021–FY2022.
- The company does not split F&D capital into sustaining and growth by year.
- No EBITDA is reported; total debt is the credit facilities plus the working-capital deficit.
Figure 5. Adjusted funds flow, C$ m
Figure data: Table 6, this analysis.
Cash flow follows gas: adjusted funds flow peaked at C$953.7 m in 2022 and bottomed at C$236.8 m in 2024. Operating cash flow of C$407.7 m against net income of C$64.9 m in 2025 is mostly depletion and depreciation (C$261.3 m). The 2025 capital of C$305.9 m was C$219.1 m drilling and completions, C$71.1 m facilities, C$9.7 m workovers and C$5.8 m land. For the first half of 2026, adjusted funds flow was C$246.5 m against C$228.6 m of capital; the full-year guide is C$455 m of adjusted funds flow, C$350–375 m of capital and C$80–105 m of free funds flow. Metric definitions follow Financial Metrics for Commodity Investing.
Table 7. Debt, liquidity and commitments
| Item | Value | Date |
|---|---|---|
| Total debt (facilities + working-capital deficit) | C$469.9 m | 30 Jun 2026 |
| Credit facilities drawn / available | C$464.2 m of C$850.0 m — C$385.8 m (45%) unused | 30 Jun 2026 |
| Maturity and covenants | 11 May 2028; no financial maintenance covenants | AIF 2025 |
| Decommissioning provision | C$110.7 m carrying · ~C$306.3 m undiscounted | 30 Jun 2026 · 31 Dec 2025 |
| Firm transportation and fractionation | 2026 C$176.9 m · 2027 C$149.5 m · 2028–2030 C$221.7 m · later C$207.3 m | 31 Dec 2025 |
| Tax pools · statutory rate | C$1,286.8 m · 23%; no cash income tax paid in 2025 | 31 Dec 2025 |
Source: Q2 2026 report (p.12, p.33, p.48); AIF 2025 (p.36, p.41); Annual report 2025 (p.25, p.27, p.65). Lease liabilities sit inside C$108.8 m of other liabilities and are not split out.
Cost deck and leverage. The 2026 guide is C$2.75–2.95/boe operating and C$5.20–5.40/boe transportation; royalty is price-linked, 5.7% of revenue in the first half. Total debt was 1.09× 2025 adjusted funds flow; stressed to the model’s US$3.00 Henry Hub deck, forward adjusted funds flow of C$419.3 m puts it at 1.12×, and 2024’s weak year put it at 2.26×. The company guides year-end 2026 total debt to C$410–435 m. Tax pools of C$1,286.8 m — about three years of 2025’s adjusted funds flow — mean no cash income tax in the forward year at this deck; the valuation taxes each reserve block at the 23% statutory rate with the pools as their own shield.
Table 8. Hedge book at 30 June 2026 (sold AECO 7A basis swaps)
| Period | Volume | Price |
|---|---|---|
| Jul–Dec 2026 | 70,000 MMBtu/d | NYMEX Henry Hub less US$0.961/MMBtu |
| 2027 | 25,000 MMBtu/d | NYMEX Henry Hub less US$0.788/MMBtu |
| 2030–2031 | 25,000 MMBtu/d | NYMEX Henry Hub less US$1.090/MMBtu |
Source: Q2 2026 report, Commodity Price Risk (p.26). No fixed-price commodity hedges.
The policy hedges the AECO discount, not the gas price: the level of Henry Hub stays unhedged. Capital returns: the dividend is C$0.03 a quarter (C$0.12 a year), down from C$0.80 in 2023, a year with C$2.2 m of free funds flow; free funds flow covered the C$0.12 dividend — about C$32.9 m a year on the current share count — 3.6 times in 2025, and a normal course issuer bid allows up to 26,769,197 shares. There were 274,453,678 shares and 24,344,941 options at 11 August 2026.
4. Management, strategy & structure
4.1 Management & governance
Chris Carlsen, 47, has been President and CEO since 1 January 2024, succeeding founder A. Jeffery Tonken, and joined the board on 11 February 2026. Bruno Geremia is Executive Vice President and CFO; he was a director of Manitok Energy from 2010 to 2018. Tonken, a director since 2004 and Chairman since May 2017, is not independent. The board has seven directors, five independent — Dennis Dawson (Independent Lead Director since 2015), Debra Gerlach, Stacey McDonald, Cameron Proctor and James Surbey — and four committees: Audit, Compensation, Nominating, and Reserves Evaluation. Directors and officers hold 5,738,957 shares, about 2%. No related-party transaction is disclosed.
4.2 Strategy
The plan is to fill existing plants, then grow through Elmworth. Guidance targets a fourth-quarter 2026 rate near 88,500 boe/d; the five-year outlook holds about 87,500 boe/d on sustaining capital trending to C$275–300 m a year; and Goodfare adds 16,000–18,000 boe/d from late 2028 if sanctioned in late 2026 or early 2027. Market diversification continues with the Malin contract from 2027. Acquisitions are tuck-ins: C$8.2 m in Q4 2024 for lands producing about 250 boe/d.
4.3 Ownership & structure
No shareholder holds more than 10%. There is no strategic investor, joint venture, earn-in or contingent consideration; the last 404,967 performance warrants were bought back in January 2025 for C$1.1 m. The share count is 274,453,678 basic at 11 August 2026; the fully diluted basis was 289.1 m at 31 December 2025, including 14.3 m in-the-money options.
5. ESG & sustainability
Birchcliff publishes no standalone sustainability report among the files read, and none of them carries a recordable-injury or lost-time rate, so safety is n/d. The disclosed record is short: more than C$4 m to Indigenous community programs, emissions reported under Alberta’s TIER regime for the Gordondale facility, and climate reporting under IFRS S2 not yet mandatory. As a gas producer it has no tailings. This analysis infers no figure the filings do not print; the gap is scored in Dimension 9.
Table 9. ESG snapshot
| Pillar | Program or measure | Attribute | Status |
|---|---|---|---|
| Social | Indigenous community programs | more than C$4 m | Disclosed (presentation) |
| Environment | TIER emissions reporting, Gordondale facility | facility emissions reported | In force |
| Disclosure | IFRS S2 / Canadian sustainability standards | not yet mandatory | No framework report |
| Safety | Recordable-injury and lost-time rates | n/d | Not disclosed |
Source: AIF 2025, Climate Change Regulation (p.24); corporate presentation, August 2026 (p.29); documents checked for safety listed in Section 10.1.
6. Risks
Table 10. Risk register
| Risk | Type | Likelihood / impact | Exposure | Mitigant |
|---|---|---|---|---|
| Henry Hub below ~US$2.72 | Commodity | High / High | NAV/share moves C$3.14 per US$0.50 step | Sales at Dawn, Henry Hub and Malin |
| AECO discount widens | Commodity | Medium / High | 46% of gas on AECO and Alliance | Basis swaps, 70,000 MMBtu/d to Dec 2026 |
| WTI and condensate prices fall | Commodity | Medium / Medium | Liquids 42.9% of net revenue; NAV/share moves C$1.19 per US$10/bbl | Gas carries the other 57.1% of revenue |
| Canadian dollar strengthens | FX | Medium / Medium | Sales priced off US$ hubs; blend C$4.31 at a 10% stronger dollar | Costs, capital and bank debt are in Canadian dollars |
| Undeveloped reserves need capital | Funding | Medium / High | 65.7% of proved; C$3,157.7 m to develop | Spending is paced; 22.1-year proved life |
| Bank-only funding | Balance sheet | Low / High | C$464.2 m drawn, maturity May 2028 | C$385.8 m unused; no maintenance covenants |
| Single-basin concentration | Operational | Medium / Medium | 73% of output in one area | Operated, owned plant |
| Gordondale take-or-pay | Counterparty | Low / Medium | 100 MMcf/d to AltaGas | Birchcliff runs the plant |
| Goodfare sanction slips | Project | Medium / Medium | 16,000–18,000 boe/d by late 2028 | Carried at no value in Section 7 |
| Thin ESG disclosure | ESG | Medium / Low | No safety rate or framework report | Indigenous programs |
Source: Q2 2026 report and AIF 2025 as cited in Sections 2–5; the price exposure from Section 7.
Figure 6. Risk matrix
Figure data: Table 10, this analysis.
The two risks Section 7 prices are the first two: the Henry Hub level and the AECO discount to it. The third — C$3,157.7 m of development capital — is why the NAV risks undeveloped and probable barrels below producing ones. The fourth, bank-only funding, matters only in a low-price year: the facilities carry no maintenance covenant, and C$385.8 m of unused room covers the 2026 capital guide on its own.
7. Valuation
Valuation as of 9 October 2026, in Canadian dollars at US$1.00 = C$1.4271 (Bank of Canada, 9 October 2026). Horizon: spot fair value. Gas deck: Henry Hub US$2.00, 2.50, 3.00, 3.50 and 4.00/MMBtu, base US$3.00/MMBtu — the trailing averages of the daily Henry Hub price (3-month US$2.86, 6-month US$2.91, 12-month US$3.55, to 6 October 2026) snapped to the nearest grid price, leaning on the two shorter windows because the 12-month carries January’s storm spike. Second deck: WTI US$80/bbl (3-month US$83.06, 6-month US$90.50, 12-month US$75.87, Alberta Economic Dashboard monthly WTI, to August 2026), held in every scenario. Realized gas is Henry Hub less a held AECO basis of US$1.90 and a Dawn basis of US$0.30 on the company’s 46% and 38% exposures. Discount rate 10% real after-tax. Share basis 275.735 m fully diluted (treasury method on the filed option bands); market data at the 9 October 2026 close (C$6.63 on the TSX).
Birchcliff is valued as a gas-weighted exploration and production company with the method set of the commodity stock valuation guide: a net asset value on its booked reserves at the target P/NAV (50%), a forward EV/DACF (30%) and a forward P/CF (20%). The base Henry Hub price sits 18.9% below the US$3.70 five-year average, so both the deck and the target multiples move across the scenarios.
Three choices shape the numbers. First, the reserve report’s net present values are struck on the evaluator’s own escalating price forecast, which this valuation does not carry: each of the evaluator’s three totals — producing, total proved, proved plus probable — is rebuilt at this deck from its filed volume, its filed development capital and the life its own discounted and undiscounted totals imply, and the categories are read off by difference. Second, liquids are 42.9% of net revenue at the base deck even though gas is 84% of production, so WTI is a second deck in its own right: it is held at US$80 in every scenario, and the model’s out file prints the Henry Hub × WTI grid. Third, the Goodfare gas plant at Elmworth is not yet sanctioned; it carries no value beyond whatever reserves the evaluator already booked there.
Table 11. Load-bearing inputs — the filed figures the valuation moves on
| Input | Value | Where §7 uses it | Source |
|---|---|---|---|
| Reserves by category, 31 Dec 2025 (gross) | P+P 946,018 Mboe · total proved 644,674 Mboe · PDP 217,991 Mboe | Tables 14–15, blocks 1–3 | Filed | AIF 2025 | Summary of Reserves at December 31, 2025 | “Total Proved Plus Probable” | p.27; Filed | AIF 2025 | Summary of Reserves at December 31, 2025 | “Developed Producing” | p.27 — full register Table 25 |
| P+P reserves by product (gross) | shale gas 4,692,884 MMcf · conventional gas 13,759 MMcf · NGLs incl. condensate 141,636 Mbbls · light oil 19,942 Mbbls | Table 14 netback mix | Filed | AIF 2025 | Summary of Reserves at December 31, 2025 | “Total Proved Plus Probable” | p.27 — full register Table 25 |
| Evaluator NPV before tax, undiscounted / 10% (C$000s) | PDP 3,696,581 / 2,320,349 · total proved 10,461,479 / 4,375,734 · P+P 16,563,020 / 5,616,665 | Table 14, life of each block | Filed | AIF 2025 | Summary of Net Present Values of Future Net Revenue | “Developed Producing” | p.27; Filed | AIF 2025 | Summary of Net Present Values of Future Net Revenue | “Total Proved” | p.27; Filed | AIF 2025 | Summary of Net Present Values of Future Net Revenue | “Total Proved Plus Probable” | p.27 — full register Table 25 |
| Future development costs, undiscounted (C$000s) | total proved 3,157,680; P+P 4,648,547: 2026 238,570 · 2027 541,696 · 2028 423,194 · 2029 894,895 · 2030 500,569 · thereafter 2,049,622 | Table 14, capital lines | Filed | AIF 2025 | Future Development Costs | “Total Undiscounted” | p.34 — full register Table 25 |
| 2026 guidance (12 Aug 2026) | 83,000–84,000 boe/d (Q4 ~88,500); 84% gas; operating $2.75–2.95/boe · transportation $5.20–5.40/boe; adjusted funds flow C$455 m | Tables 14 and 18 | Filed | Q2 2026 report | 2026 Guidance | “Annual average production (boe/d)" | p.3 — full register Table 25 |
| Guidance price deck and gas exposure | WTI US$79.00 · AECO C$1.80/GJ · Dawn US$3.20 · HH US$3.50 · C$1.39/US$; AECO 44% · Dawn 38% · HH 16% · Alliance 2% | Table 18 calibration; realized gas | Filed | Q2 2026 report | 2026 Guidance | “Average AECO price (CDN$/GJ)" | p.3 — full register Table 25 |
| Free funds flow sensitivity (2026) | WTI US$1.00 C$3.7 m · HH US$0.10 C$3.3 m · Dawn US$0.10 C$8.2 m · AECO C$0.10/GJ C$7.7 m | heat factor in the realized gas price | Filed | Annual report 2025 | 2026 Guidance | “Change in AECO CDN$0.10/GJ” | p.12 — full register Table 25 |
| FY2025 realized prices; H1 2026 royalty | light oil $86.25 · condensate $85.74 · NGLs $22.71/bbl · gas $3.00/Mcf; H1 2026 revenue $27.64 and royalty $1.58/boe | Table 14 netback | Filed | Annual report 2025 | Selected Annual Information | “Natural gas (per Mcf)" | p.13; Filed | Q2 2026 report | Q2 2026 Unaudited Financial and Operational Summary | “Operating netback” | p.2 — full register Table 25 |
| Sustaining capital, five-year outlook | ~C$275–300 m a year to hold ~87,500 boe/d | Tables 20 and 21, FCF memo | Filed | 2026 budget release | Five-year outlook | “declines moderate, to approximately $275 million to $300 million annually." | p.4 — full register Table 25 |
| Debt, cash and decommissioning, 30 Jun 2026 | facilities drawn C$464.2 m of C$850.0 m; cash C$126k; decommissioning C$110,674k | Table 16, lines 1 and 3 | Filed | Q2 2026 report | Capital Resources and Liquidity | “unutilized credit capacity” | p.33; Filed | Q2 2026 report | Condensed Statements of Financial Position | “Cash” | p.48; Filed | Q2 2026 report | Condensed Statements of Financial Position | “Decommissioning obligations (Note 6)" | p.48 — full register Table 25 |
| AECO basis swaps (sold), 30 Jun 2026 | 70,000 MMBtu/d H2 2026 at HH less US$0.961 · 25,000 MMBtu/d 2027 at less US$0.788 · 25,000 MMBtu/d 2030–2031 at less US$1.090 | Table 16, line 2 | Filed | Q2 2026 report | Commodity Price Risk | “AECO 7A basis swap” | p.26 — full register Table 25 |
| Tax pools and rate | pools C$1,286,843k at 31 Dec 2025; combined statutory rate 23% | Table 14, block 4; tax lines | Filed | Annual report 2025 | Income Taxes | “Estimated income tax pools” | p.25; Filed | Annual report 2025 | Income Taxes | “combined Canadian” | p.65 — full register Table 25 |
| Shares and options | 274,453,678 basic (11 Aug 2026); options at 31 Dec 2025 5,624,051 at C$5.12 (in the money) · 14,473,217 at C$6.81 · 5,018,200 at C$9.37 | Table 16, divisor (treasury method) | Filed | Q2 2026 report | Share Information | “At August 11, 2026, there were 274,453,678 common shares” | p.34; Filed | Annual report 2025 | Stock-Based Compensation | “Awards Outstanding” | p.70 — full register Table 25 |
Source: the filings named in each row; the full source register is Table 25 in Section 10.1. Birchcliff reports and filings.
8. Near-term catalysts (1–3 years)
Table 23. Near-term catalysts
| Catalyst | Timing (company guidance) | Why it benefits Birchcliff |
|---|---|---|
| Fourth-quarter rate near 88,500 boe/d | Q4 2026 | Fills existing plants; above the 83,000–84,000 boe/d annual guide |
| Goodfare final investment decision | Late 2026 or early 2027 | Starts 16,000–18,000 boe/d of growth for late 2028 |
| Year-end total debt C$410–435 m | 31 Dec 2026 | Down from C$469.9 m at 30 June 2026 |
| Malin sales begin | 1 Jan 2027 | 35,000 MMBtu/d priced at NGI Malin rather than AECO |
| 2027 basis swaps | 2027 | 25,000 MMBtu/d at Henry Hub less US$0.788, narrower than 2026’s US$0.961 |
Source: Q2 2026 report, 2026 Guidance (p.3), Market Diversification and Commodity Price Risk (p.26); 2026 budget release (p.3). Timing is the company’s, not a guarantee.
Goodfare is the swing item: it is the only catalyst that adds volume beyond today’s plants, and the only one that needs new capital. The debt and Malin items are largely in the company’s hands, and the basis swaps are already contracted; none of them moves the read as much as a US$0.50 step in Henry Hub.
9. Rating & verdict
Figure 10. Scorecard by dimension, 9 October 2026
Figure data: Table 24. Each spoke prints its stars and weight; the dashed ring is the weighted composite, 3.06/5.
Table 24. The Metal Pilot Company Scorecard — Birchcliff Energy
| Dimension | Weight | Score | Sourced rationale |
|---|---|---|---|
| 1. Asset quality & scale | 15% | ★★★ | 80,086 boe/d in FY2025 — level with Advantage (78,267), below Peyto (134.1 thousand) and Tourmaline (~650,000); 100% operated, but one formation and 73% of output from one area (§2.1, AIF 2025) |
| 2. Cost position & margins | 15% | ★★★ | Operating netback C$14.66/boe in FY2025 against Advantage’s C$15.99, rising to C$17.84 in H1 2026; operating cost C$2.88/boe, transportation C$5.68/boe (§2.6, Annual report 2025) |
| 3. Reserves, life & replacement | 15% | ★★★★ | P+P life 32.4 years gross (28.8 net) against Peyto’s 26.8 net and Advantage’s 24.1; total proved 22.1 years; PDP replacement 103% in 2025 (§2.6, AIF 2025) |
| 5. Balance sheet & liquidity | 15% | ★★★ | Total debt C$469.9 m, 1.09× FY2025 adjusted funds flow and 1.12× at the US$3.00 deck; C$385.8 m unused, no maintenance covenants, but bank-only to May 2028; peer leverage not compared (§3, Q2 2026 report) |
| 6. Capital allocation & returns | 15% | ★★ | C$0.80/share paid in 2023 on C$2.2 m of free funds flow, then cut to C$0.40 and C$0.12; total debt rose to C$535.6 m in 2024; weighted shares +2.5% since 2021; scored on its own payout history, peer records not compared (§3, Annual report 2025) |
| 4. Growth & optionality | 6.25% | ★★★★ | 2026 guide 83,000–84,000 boe/d (+3.6–4.9%), Q4 near 88,500; Goodfare adds 16,000–18,000 boe/d from late 2028, pre-FID; peer growth plans not compared (§2.5, Q2 2026 report) |
| 7. Management & governance | 6.25% | ★★★ | Seven directors, five independent, an Independent Lead Director and a Reserves Evaluation committee; founder Chair not independent; insiders about 2%; peer boards not compared (§4.1, Circular 2026) |
| 8. Jurisdiction & geopolitics | 6.25% | ★★★★ | All assets in Alberta under NI 51-101; no stream or royalty financing; the AECO discount is shared with every peer (§2, AIF 2025) |
| 9. ESG & licence to operate | 6.25% | ★★ | No safety rate or sustainability report in the files read; more than C$4 m to Indigenous programs; TIER reporting at Gordondale; sector peers’ disclosure not compared (§5) |
| Composite | 100% | ★★★ | Average |
| Value read | — | Modestly overvalued (wide band) | Blend C$5.91 against C$6.63; implied −10.8% (§7) |
| Verdict | — | Full | Average quality × Modestly overvalued |
Σ(weight × stars) = 0.15 × (3 + 3 + 4 + 3 + 2) + 0.0625 × (4 + 3 + 4 + 2) = 2.25 + 0.81 = 3.06/5 → ★★★ Average.
Source: this analysis; every score cites its home section. Scored as an E&P producer — all nine dimensions apply, Dimension 3 on P+P and proved life, Dimension 2 on netback — against the peer set in §2.7; the five dominant dimensions at 15%, the other four at 6.25%.
The two-axis verdict (9 October 2026). ★★★ Average × Modestly overvalued (wide band) — Full: at C$6.63 the blend of C$5.91 implies −10.8%, and the price assumes ~US$3.16/MMBtu Henry Hub (the market-implied deck), above the 3- and 6-month averages. The target multiples carry Dimension 3 (+0.03) and Dimension 8 (+0.01) against Dimension 6 (−0.03), a net +0.01. This is an analytical read, not an instruction. Dimension 3 is the only dominant dimension above the median; Dimensions 6 and 9 sit below it, both on the company’s record rather than its rock.
The bull case is the reserve book: 32.4 years of P+P, a low operating cost and C$6.75 of NAV per share at US$3.00, rising to C$9.89 at US$3.50. The bear case is the leverage to that same price: the blend falls to C$0.59 at US$2.00, and the capital-allocation record leaves less room for error. Henry Hub settling above ~US$3.01 tips the read to Fairly valued; below ~US$2.72 it turns Overvalued. To rank Birchcliff against North American gas producers on these dimensions, screen the sector on Metal Pilot’s upstream oil & gas stock screener.
10. Sources, methodology & disclaimer
10.1 Sources, methodology & data vintage
Company filings. Birchcliff’s reports and filings: the 2025 annual report (MD&A and audited statements), the AIF for 2025 with Deloitte’s NI 51-101 evaluation effective 31 December 2025, the Q1 and Q2 2026 reports, the 2026 budget release (20 January 2026), the 2025 results and reserves release (11 February 2026), the Q2 2026 release, the 2026 circular and the August 2026 presentation; the 2024 and 2023 annual reports and the Q4 2022 MD&A for the earlier years. Peers from their FY2025 filings on SEDAR+.
Market data. TSX closes from Yahoo Finance; Henry Hub from the EIA; WTI and AECO from the Alberta Economic Dashboard; FX from the Bank of Canada — all to 9 October 2026 or the latest print before it.
Methodology. The valuation runs a base Henry Hub deck of US$3.00/MMBtu on the fixed US$2.00–4.00 grid, WTI held at US$80/bbl, AECO and Dawn basis held at US$1.90 and US$0.30, a 10% real after-tax rate, and weights of 50% NAV, 30% EV/DACF and 20% P/CF. The scorecard uses the E&P weights against the three peers in §2.7. Refreshed on each annual report and each quarterly report. The model’s out file, claude/valuation-models/birchcliff-energy-bir.out.md, holds the deck sensitivity, the P/NAV map, the cross-checks, the FX and stage-risk cases and the Henry Hub × WTI grid.
Re-run log. 9 October 2026 (run 10 October 2026): rebuilt from the 30 July 2026 post (C$6.27, read Undervalued) as a standalone valuation — price C$6.63, NAV/share C$7.42, blend C$5.86, implied −11.6%, Modestly overvalued (wide band); composite 3.21 → 3.06. 10 October 2026 (fix round): total-proved development capital on its own filed schedule, FY2025 G&A charged in the bridge, interest added back in DACF and the options on the treasury method — NAV/share C$7.42 → C$6.75, blend C$5.86 → C$5.91, implied −11.6% → −10.8%; read unchanged, Modestly overvalued (wide band).
Omitted figures and data gaps. The asset map is not built; revenue by area is not disclosed, so Figure 3 shows production. Not in the files read (n/d): safety rates (AIF 2025, annual reports 2023–2025, circular, 2026 quarterly reports and presentation checked), strikes for individual options (filed by band only), a Dawn basis series, the lease split, analyst consensus, Goodfare’s capital and approvals, and Peyto’s and Tourmaline’s netbacks.
The load-bearing inputs (Table 11) open Section 7; the full source register below closes this section.
Table 25. Full source register for the valuation
| Input | Value | As of | Where §7 uses it | Source |
|---|---|---|---|---|
| Annual Information Form, year ended 31 December 2025 (11 March 2026) | ||||
| Proved + probable reserves, 31 Dec 2025 (gross / net) | 946,018 Mboe gross, 841,071 Mboe net (total proved 644,674 gross / 579,259 net; probable 301,344 gross); evaluator Deloitte, 2025 IQRE price forecast | 31 Dec 2025 | §7 NAV build — reserve block | Filed | AIF 2025 | Summary of Reserves at December 31, 2025 | "Total Proved Plus Probable" | p.27 |
| Proved reserves by development status, 31 Dec 2025 (gross Mboe) | developed producing 217,991 · developed non-producing 3,252 · undeveloped 423,432 | 31 Dec 2025 | §7 NAV build — reserve block | Filed | AIF 2025 | Summary of Reserves at December 31, 2025 | "Developed Producing" | p.27 |
| P+P reserves by product, 31 Dec 2025 (gross) | light and medium crude oil 19,942 Mbbls · conventional natural gas 13,759 MMcf · shale gas 4,692,884 MMcf · NGLs incl. condensate 141,636 Mbbls | 31 Dec 2025 | §7 NAV build — reserve block | Filed | AIF 2025 | Summary of Reserves at December 31, 2025 | "Total Proved Plus Probable" | p.27 |
| NPV before income tax — total proved plus probable | undiscounted C$16,563,020k · at five / ten / fifteen / twenty per cent C$9,067,274k / C$5,616,665k / C$3,813,949k / C$2,771,440k | 31 Dec 2025 | §7 NAV build — reserve block | Filed | AIF 2025 | Summary of Net Present Values of Future Net Revenue | "Total Proved Plus Probable" | p.27 |
| NPV before income tax — total proved | undiscounted C$10,461,479k · at five / ten / fifteen / twenty per cent C$6,502,641k / C$4,375,734k / C$3,146,224k / C$2,381,756k | 31 Dec 2025 | §7 NAV build — reserve block | Filed | AIF 2025 | Summary of Net Present Values of Future Net Revenue | "Total Proved" | p.27 |
| NPV before income tax — proved developed producing | undiscounted C$3,696,581k · at five / ten / fifteen / twenty per cent C$2,894,186k / C$2,320,349k / C$1,935,041k / C$1,665,287k | 31 Dec 2025 | §7 NAV build — reserve block | Filed | AIF 2025 | Summary of Net Present Values of Future Net Revenue | "Developed Producing" | p.27 |
| NPV before income tax — proved undeveloped | undiscounted C$6,713,474k · at five / ten / fifteen / twenty per cent C$3,571,159k / C$2,026,239k / C$1,187,278k / C$696,207k | 31 Dec 2025 | §7 NAV build — reserve block | Filed | AIF 2025 | Summary of Net Present Values of Future Net Revenue | "Undeveloped" | p.27 |
| NPV before income tax — probable | undiscounted C$6,101,542k · at five / ten / fifteen / twenty per cent C$2,564,633k / C$1,240,931k / C$667,725k / C$389,684k | 31 Dec 2025 | §7 NAV build — reserve block | Filed | AIF 2025 | Summary of Net Present Values of Future Net Revenue | "Total Probable" | p.27 |
| NPV after income tax — total proved plus probable | undiscounted C$12,979,020k · at five / ten / fifteen / twenty per cent C$7,130,876k / C$4,412,458k / C$2,990,298k / C$2,169,617k | 31 Dec 2025 | §7 NAV build — reserve block | Filed | AIF 2025 | After Income Taxes Discounted At | "Total Proved Plus Probable" | p.27 |
| NPV after income tax — total proved | undiscounted C$8,285,078k · at five / ten / fifteen / twenty per cent C$5,182,799k / C$3,491,295k / C$2,510,275k / C$1,900,630k | 31 Dec 2025 | §7 NAV build — reserve block | Filed | AIF 2025 | After Income Taxes Discounted At | "Total Proved" | p.27 |
| NPV after income tax — proved developed producing | undiscounted C$3,085,419k · at five / ten / fifteen / twenty per cent C$2,476,336k / C$2,015,403k / C$1,701,485k / C$1,479,798k | 31 Dec 2025 | §7 NAV build — reserve block | Filed | AIF 2025 | After Income Taxes Discounted At | "Developed Producing" | p.27 |
| Future development costs deducted (undiscounted, C$000s) | total proved 3,157,680; P+P 4,648,547 — P+P by year 2026 238,570 · 2027 541,696 · 2028 423,194 · 2029 894,895 · 2030 500,569 · thereafter 2,049,622; total proved by year 2026 182,350 · 2027 541,696 · 2028 402,663 · 2029 894,287 · 2030 462,980 · thereafter 673,704 | 31 Dec 2025 | §7 NAV build — reserve block | Filed | AIF 2025 | Future Development Costs | "Total Undiscounted" | p.34 |
| Abandonment and reclamation deducted in the P+P future net revenue | C$503 m undiscounted; C$18 m at 10% | 31 Dec 2025 | §7 rehabilitation row | Filed | AIF 2025 | Abandonment and Reclamation Costs | "million (undiscounted) and $18 million (10% discount)" | p.34 |
| Income taxes paid, FY2025 | nil — the Corporation was not required to pay any cash income taxes in 2025 | FY2025 | §7 tax basis | Filed | AIF 2025 | Tax Horizon | "was not required to pay any cash income taxes" | p.36 |
| 2025 Annual Report — MD&A and audited financial statements, year ended 31 December 2025 | ||||
| Production by product, FY2025 (and Q4 2025) | total 80,086 boe/d (Q4 83,028); light oil 1,551 bbls/d · condensate 5,372 bbls/d · NGLs 7,162 bbls/d · natural gas 396,010 Mcf/d | FY2025 | §2; §7 volume base | Filed | Annual report 2025 | 2025 Financial & Operational Summary | "Total (boe/d)" | p.3 |
| 2026 free funds flow sensitivity (January guidance) | WTI US$1.00/bbl C$3.7 m · NYMEX HH US$0.10 C$3.3 m · Dawn US$0.10 C$8.2 m · AECO C$0.10/GJ C$7.7 m · C$0.01 FX C$4.2 m | 20 Jan 2026 | §7 FX and deck sensitivity rows | Filed | Annual report 2025 | 2026 Guidance | "Change in AECO CDN$0.10/GJ" | p.12 |
| Netback and unit costs, FY2025 ($/boe) | revenue 24.28 · royalty 1.06 · operating 2.88 · transportation and other 5.68 · operating netback 14.66 · adjusted funds flow 14.46 | FY2025 | §2 cost star; §7 | Filed | Annual report 2025 | 2025 Financial & Operational Summary | "Operating netback" | p.3 |
| Average realized sales prices, FY2025 (CDN$) | light oil $86.25/bbl · condensate $85.74/bbl · NGLs $22.71/bbl · natural gas $3.00/Mcf · total $24.28/boe | FY2025 | §2; §7 realization | Filed | Annual report 2025 | Selected Annual Information | "Natural gas (per Mcf)" | p.13 |
| Adjusted funds flow (cash margin), FY2023–FY2025 (C$000s) | 2025 422,766 · 2024 236,794 · 2023 306,827 | FY2025 | §3 five-year table; §7 FCF/share profile | Filed | Annual report 2025 | Selected Annual Information | "Adjusted funds flow ($000s)" | p.13 |
| Total debt at year end, FY2021–FY2025 (C$000s) | 2025 459,948 · 2024 535,557 · 2023 382,306 | FY2025 | §3 five-year table; §7 FCF/share profile | Filed | Annual report 2025 | Selected Annual Information | "Total debt ($000s)" | p.13 |
| Weighted average basic common shares, FY2021–FY2025 (000s) | 2025 272,721 · 2024 269,081 · 2023 266,465 | FY2025 | §3 five-year table; §7 FCF/share profile | Filed | Annual report 2025 | Selected Annual Information | "Weighted average basic common shares (000s)" | p.13 |
| Estimated income tax pools, 31 Dec 2025 (C$000s) | total 1,286,843: COGPE 238,616 · CDE 330,897 · CEE 303,297 · UCC 178,456 · non-capital losses 186,959 (expire 2040–2044) | 31 Dec 2025 | §7 tax basis | Filed | Annual report 2025 | Income Taxes | "Estimated income tax pools" | p.25 |
| Statutory combined tax rate; cash tax | 23% combined federal and provincial; no cash income taxes paid in 2025 | FY2025 | §7 tax basis | Filed | Annual report 2025 | Income Taxes | "combined Canadian" | p.65 |
| Decommissioning — undiscounted estimate and basis | ~C$306.3 m undiscounted at 31 Dec 2025 (2026 C$2.9 m, 2027 C$2.7 m, thereafter C$300.7 m) | 31 Dec 2025 | §7 rehabilitation row | Filed | Annual report 2025 | Contractual Obligations and Commitments | "undiscounted cash flow to settle its decommissioning obligations" | p.27 |
| Stock options outstanding by grant-price band, 31 Dec 2025 | C$4.60–6.00: 5,624,051 at C$5.12 · C$6.01–9.00: 14,473,217 at C$6.81 · C$9.01–11.65: 5,018,200 at C$9.37 (weighted-average exercise prices) | 31 Dec 2025 | §7 per-share (Tier 1), treasury method | Filed | Annual report 2025 | Stock-Based Compensation | "Awards Outstanding" | p.70 |
| General and administrative, net, FY2025 (C$000s) | 39,686 (2024 40,653) | FY2025 | Table 16, capitalised G&A | Filed | Annual report 2025 | Administrative Expense | "General and administrative, net" | p.67 |
| Interest on the credit facilities, FY2025 (C$000s) | 33,863 (2024 36,827); C$1.16/boe | FY2025 | Table 18, DACF interest add-back | Filed | Annual report 2025 | Finance Expense | "Interest expense" | p.24 |
| Q4 2022 MD&A, year ended 31 December 2022 | ||||
| Adjusted funds flow, FY2022 and FY2021 (C$000s) | 2022 953,683 · 2021 539,733 | FY2022 | §3 five-year table; §7 FCF/share profile | Filed | Q4 2022 MD&A | Selected Annual Information | "Adjusted funds flow ($000s)" | p.6 |
| Total debt at year end, FY2022 and FY2021 (C$000s) | 2022 138,549 · 2021 499,397 | FY2022 | §3 five-year table; §7 FCF/share profile | Filed | Q4 2022 MD&A | Selected Annual Information | "Total debt ($000s)" | p.6 |
| Weighted average basic common shares, FY2022 and FY2021 (000s) | 2022 265,548 · 2021 265,990 | FY2022 | §3 five-year table; §7 FCF/share profile | Filed | Q4 2022 MD&A | Selected Annual Information | "Weighted average basic common shares (000s)" | p.6 |
| 2026 budget and guidance release, 20 January 2026 | ||||
| Elmworth — Goodfare Gas Plant (pre-FID growth project) | first phase 100 MMcf/d, 100% owned; ~16,000–18,000 boe/d targeted on production in late 2028; Elmworth budget in a-elmworth-capital; FID targeted late 2026 or early 2027 | 20 Jan 2026 | §7 growth option row; §2 | Filed | 2026 budget release | Five-year outlook | "bringing approximately 16,000 to 18,000 boe/d on production in late 2028" | p.3 |
| 2026 F&D capital allocation (January budget) | DCCET C$240–280 m · facilities C$40–45 m · maintenance C$22–25 m · other C$23–25 m; average DCCET well cost ~C$7.1 m; 2025 well cost ~C$6.9 m | 20 Jan 2026 | §7 capex line; §2 type-well | Filed | 2026 budget release | 2026 F&D Capital Budget | "Total F&D Capital Expenditures" | p.5 |
| Sustaining capital to hold ~87,500 boe/d | trending toward ~C$275 m a year by the end of the five-year plan (C$275–300 m as base declines moderate) | 20 Jan 2026 | §7 FCF-yield build | Filed | 2026 budget release | Five-year outlook | "declines moderate, to approximately $275 million to $300 million annually." | p.4 |
| Q2 2026 report — MD&A and interim financial statements, quarter ended 30 June 2026 (12 August 2026) | ||||
| Production, Q2 2026 and H1 2026 | Q2 77,562 boe/d; H1 79,607 boe/d (natural gas H1 398,511 Mcf/d) | 30 Jun 2026 | §2; §7 volume base | Filed | Q2 2026 report | Q2 2026 Unaudited Financial and Operational Summary | "Total (boe/d)" | p.2 |
| 2026 guidance (updated 12 Aug 2026) | production 83,000–84,000 boe/d (Q4 2026 ~88,500 boe/d); natural gas 84% of mix; royalty $1.95–2.15/boe · operating $2.75–2.95/boe · transportation and other $5.20–5.40/boe; adjusted funds flow C$455 m; F&D capital C$350–375 m; free funds flow C$80–105 m; year-end total debt C$410–435 m | 12 Aug 2026 | §7 forward year; §5 guidance | Filed | Q2 2026 report | 2026 Guidance | "Annual average production (boe/d)" | p.3 |
| 2026 guidance price deck (12 Aug 2026) | WTI US$79.00/bbl · AECO C$1.80/GJ · Dawn US$3.20/MMBtu · NYMEX HH US$3.50/MMBtu · C$1.39 per US$1; gas exposure AECO 44% · Dawn 38% · NYMEX HH 16% · Alliance 2% | 12 Aug 2026 | §7 deck read | Filed | Q2 2026 report | 2026 Guidance | "Average AECO price (CDN$/GJ)" | p.3 |
| Netback and unit costs, H1 2026 ($/boe) | revenue 27.64 · royalty 1.58 · operating 2.92 · transportation and other 5.30 · operating netback 17.84 | 30 Jun 2026 | §2 cost star; §7 | Filed | Q2 2026 report | Q2 2026 Unaudited Financial and Operational Summary | "Operating netback" | p.2 |
| Malin hub physical sales (new market) | 35,000 MMBtu/d to Malin, Oregon, 1 Jan 2027 – 31 Dec 2030, NGI Malin monthly index net of tolls | 30 Jun 2026 | §7 realization; §2 | Filed | Q2 2026 report | Market Diversification and Risk Management | "Malin hub in Oregon for 35,000 MMBtu/d" | p.26 |
| H1 2026 results (C$000s) | P&NG revenue 398,257 · cash flow from operating activities 253,673 · adjusted funds flow 246,470 · F&D capital 228,550 · free funds flow 17,920 · net income 82,768 | 30 Jun 2026 | §3; §7 forward build | Filed | Q2 2026 report | Q2 2026 Unaudited Financial and Operational Summary | "Adjusted funds flow ($000s)" | p.2 |
| Cash | C$126k | 30 Jun 2026 | §7 bridge | Filed | Q2 2026 report | Condensed Statements of Financial Position | "Cash" | p.48 |
| Accounts receivable | C$81,382k | 30 Jun 2026 | §7 bridge | Filed | Q2 2026 report | Condensed Statements of Financial Position | "Accounts receivable" | p.48 |
| Prepaid expenses and deposits | C$33,585k | 30 Jun 2026 | §7 bridge | Filed | Q2 2026 report | Condensed Statements of Financial Position | "Prepaid expenses and deposits" | p.48 |
| Financial instruments (derivative assets), current / non-current | C$23,915k / C$17,348k | 30 Jun 2026 | §7 bridge | Filed | Q2 2026 report | Condensed Statements of Financial Position | "Financial instruments (Note 14)" | p.48 |
| Investments | C$12,505k | 30 Jun 2026 | §7 bridge | Filed | Q2 2026 report | Condensed Statements of Financial Position | "Investments" | p.48 |
| Accounts payable and accrued liabilities | C$125,727k | 30 Jun 2026 | §7 bridge | Filed | Q2 2026 report | Condensed Statements of Financial Position | "Accounts payable and accrued liabilities" | p.48 |
| Other liabilities, current / non-current (Note 10 — lease liabilities and post-employment obligations inside; split n/d, Note 10 table not read) | C$15,129k / C$93,695k | 30 Jun 2026 | §7 bridge | Filed | Q2 2026 report | Condensed Statements of Financial Position | "Other liabilities (Note 10)" | p.48 |
| Revolving term credit facilities (carrying, net of fees) | C$459,232k | 30 Jun 2026 | §7 bridge | Filed | Q2 2026 report | Condensed Statements of Financial Position | "Revolving term credit facilities (Note 5)" | p.48 |
| Decommissioning obligations (rehabilitation provision; non-current, discounted) | C$110,674k (31 Dec 2025 C$103,086k) | 30 Jun 2026 | §7 rehabilitation row | Filed | Q2 2026 report | Condensed Statements of Financial Position | "Decommissioning obligations (Note 6)" | p.48 |
| Deferred income taxes (liability) | C$422,754k | 30 Jun 2026 | §7 bridge | Filed | Q2 2026 report | Condensed Statements of Financial Position | "Deferred income taxes" | p.48 |
| Lines not on the face: inventories, restricted cash, current tax liability, convertibles, NCI | none on the 30 Jun 2026 face (each nil); no preferred shares outstanding | 30 Jun 2026 | §7 bridge | Estimate | nil on the face — Q2 2026 report | Condensed Statements of Financial Position (p.48) checked |
| Total debt, 30 Jun 2026 (credit facilities + working capital deficit + current derivative asset − current other liabilities) | C$469,866k (31 Dec 2025 C$459,948k); working capital deficit C$1,848k | 30 Jun 2026 | §7 net debt (Tier 1) | Filed | Q2 2026 report | Non-GAAP and Other Financial Measures | "Total debt" | p.12 |
| Credit facilities — drawn, size, headroom | drawn C$464.2 m of C$850.0 m; unutilized C$385.8 m (45%) | 30 Jun 2026 | §3 liquidity | Filed | Q2 2026 report | Capital Resources and Liquidity | "unutilized credit capacity" | p.33 |
| Hedge book at 30 Jun 2026 (sold AECO 7A basis swaps; no fixed-price commodity hedges) | 70,000 MMBtu/d Jul–Dec 2026 at NYMEX HH less US$0.961 · 25,000 MMBtu/d 2027 at less US$0.788 · 25,000 MMBtu/d 2030–2031 at less US$1.090 | 30 Jun 2026 | §7 hedge row (Tier 1) | Filed | Q2 2026 report | Commodity Price Risk | "AECO 7A basis swap" | p.26 |
| Dividend policy | quarterly C$0.03 per share (annual base ~C$0.12); declared for the quarter ending 30 Sep 2026 | 12 Aug 2026 | §3; §7 cross-check | Filed | Q2 2026 report | Birchcliff Energy Ltd. Announces Strong Q2 2026 Results | "quarterly cash dividend of $0.03 per common share" | p.1 |
| Common shares outstanding (basic), 11 Aug 2026 | 274,453,678; stock options outstanding 24,344,941 | 11 Aug 2026 | §7 per-share (Tier 1) | Filed | Q2 2026 report | Share Information | "At August 11, 2026, there were 274,453,678 common shares" | p.34 |
| Market and price series | ||||
| Market capitalisation and EV (computed) | market cap C$1,819.6 m (C$6.63 × 274.454 m basic, 11 Aug 2026); EV C$2,289.5 m (+ total debt C$469.9 m, 30 Jun 2026) | 9 Oct 2026 | §1 statcard; §7 | Derived | Market price 9 Oct 2026 × Q2 2026 report Share Information (p.34); Q2 2026 report Total debt (p.12) |
| USD/CAD | C$1.4271 per US$1 | 9 Oct 2026 | §7 FX (Tier 1) | Market | Bank of Canada | "FXUSDCAD" | 9 Oct 2026 |
| NYMEX Henry Hub spot trailing averages (US$/MMBtu) | 3-month 2.86 · 6-month 2.91 · 12-month 3.55 (daily spot, windows ending 6 Oct 2026) | 6 Oct 2026 | §7 deck (Phase B settles) | Market | EIA | "Henry Hub Natural Gas Spot Price (RNGWHHD)" | 6 Oct 2026 |
| Henry Hub 12-month daily high and low (US$/MMBtu) | high 30.72 (23 Jan 2026, winter-storm spike); low 2.54 (24 Apr 2026) | 6 Oct 2026 | §7 cycle high/low | Market | EIA | "Henry Hub Natural Gas Spot Price (RNGWHHD)" | 7 Oct 2025 – 6 Oct 2026 |
| Analyst consensus target | n/d — no archived capture dated on or before 9 Oct 2026 in Metal Pilot Data; the prior post's consensus row is not re-used (bias: unknown) | 9 Oct 2026 | §7 cross-check (never weighted) | Estimate | Metal Pilot Data/Posts and Work checked |
Source: the filings and market series named in each row, as of 9 October 2026; the model claude/valuation-models/birchcliff-energy-bir.py and its facts file claude/analysis-facts/birchcliff-energy-bir.py. Birchcliff reports and filings.
10.2 Disclaimer & disclosure
This analysis is for information only and is not investment advice; do your own research or consult a licensed advisor. It is a point-in-time snapshot as of 9 October 2026: the share price, the multiples and the valuation read move, and reserves are NI 51-101 estimates on forecast prices that do not represent market value; probable reserves are less certain than proved. The scorecard and the two-axis verdict are an analytical read of quality and price, not a buy or sell instruction. This report was prepared with AI assistance (Claude Opus 5.5) from the filings cited, under this blog’s company-analysis template, and reviewed before publication.