Analysis as of 20 October 2026. Price deck: base uranium US$90/lb U₃O₈ — the representative trailing average of the industry month-end price, snapped to the fixed US$60–120/lb grid — with every grid price run as a scenario (deep bear US$60, bear US$75, base US$90, bull US$105, deep bull US$120) and analyst consensus as a 0% cross-check (not available) — no spot price. The shares closed at US$8.21 on NYSE American on 20 October 2026; at that price the market-implied uranium deck is US$240.59/lb. Fair value US$3.76, implied −54.2%. Fundamentals from the Q2 2026 Form 10-Q (30 June 2026) and the FY2025 Form 10-K. Refreshed on each annual report and on material events. Rating: ★★½ Average / Overvalued (wide band).

Energy Fuels mines uranium in Arizona and Utah, processes it at its White Mesa Mill, and is turning that mill into a rare-earth refinery fed by mineral-sands projects in Madagascar, Australia and Brazil. The thesis in one line: the uranium business is small and short-lived on its reserves, so the value rests on two unbuilt studies — Vara Mada and the Phase 2 rare-earth circuit — and even with both counted, NAV is US$6.55 a share against a US$8.21 price. Why now: the shares have fallen from a US$27.72 closing high on 28 January 2026, the Australian Strategic Materials (ASM) acquisition closed on 28 August 2026, a merger with VAC is pending, and Vara Mada’s feasibility study targets an investment decision in December 2026. To screen Energy Fuels against every listed uranium name on reserves, cost and stage, go to Metal Pilot’s uranium mining stock screener.

1. Snapshot & thesis

Energy Fuels Inc. (NYSE American: UUUU; TSX: EFR), headquartered in Lakewood, Colorado, is a uranium and rare-earths company. By archetype it is a producer (mining): three uranium mines — Pinyon Plain in Arizona and La Sal and Pandora in Utah — feed the White Mesa Mill in Utah, which also separates neodymium-praseodymium (NdPr) oxide and recovers vanadium. Beside them sit the Vara Mada mineral-sands project in Madagascar, the White Mesa Phase 2 rare-earth circuit, Bullfrog in Nevada, Roca Honda in New Mexico (permitting), Sheep Mountain and Nichols Ranch in Wyoming (standby), a 9.48% stake earning to 49% in the Donald project in Australia, the Bahia project in Brazil and ASM. (lb = pounds; Mlb = million pounds; P&P = proven and probable reserves; M&I = measured and indicated resources; HM = heavy mineral.)

Figure 1. Energy Fuels in numbers, as of 20 October 2026

US$8.21
Share price — 20 Oct 2026
US$2.17 bn
Market capitalisation — basic
1.66 Mlb
U₃O₈ processed — H1 2026
1.5–2.0 Mlb
Sales guidance — 2026
20.9 Mlb
Uranium reserves — P&P
904 Mt
Vara Mada ore reserve
US$961.7 m
Cash and securities — 30 Jun 2026
US$700.0 m
Convertible notes due 2031
US$6.55
NAV per share — Section 7
US$3.76
Fair value — implied −54.2%
2.7/5
Quality rating — Average
Overvalued
Valuation read — wide band

Figure data: Energy Fuels SEC filings — Q2 2026 10-Q (production, cash, securities, notes), FY2025 10-K (reserves); share price per Yahoo Finance (20 October 2026 close); NAV and fair value per Section 7, rating per Section 9.

Table 1. Energy Fuels in numbers

Metric Value As of
Share price / market capitalisation (basic) US$8.21 / US$2,173.4 m 20 Oct 2026
52-week closing range US$8.16 (19 Oct 2026)–27.72 (28 Jan 2026) 20 Oct 2026
Basic shares 264.728 m (249.919 m + 14.809 m ASM shares) 20 Oct 2026
Revenue / cash margin US$65.9 m / 20.9% FY2025
Revenue / cash margin, first half US$60.9 m / 47.2% H1 2026
Net loss / free cash flow −US$85.6 m / −US$141.3 m FY2025
U₃O₈ processed / 2026 sales guidance 1,655,000 lb / 1.5–2.0 Mlb 30 Jun 2026
Uranium reserves / M&I resources 20.9 Mlb P&P / 44.1 Mlb exclusive 31 Dec 2025
Cash and securities / convertible notes US$961.7 m / US$700.0 m at face 30 Jun 2026
NAV per share / P/NAV US$6.55 / 1.25× 20 Oct 2026
Quality rating 2.7/5, Average 20 Oct 2026
Valuation read / implied return Overvalued (wide band) — fair value US$3.76, implied −54.2% 20 Oct 2026

Source: Energy Fuels SEC filings — Q2 2026 10-Q (balance sheet p.11, statement of operations p.9, production p.38), FY2025 10-K (statements p.216–220, reserves p.83, resources p.85); share price and range per Yahoo Finance; NAV, fair value and P/NAV per Section 7. Cash margin is revenue less costs applicable to revenue. Listed: Public (NYSE American: UUUU; TSX: EFR).

Thesis in brief. Bull: Vara Mada’s feasibility study shows a US$1,415 million NPV at 10% and the Phase 2 circuit’s study US$1.9 billion at 8%; built together, they would give Energy Fuels its own monazite feed and a U.S. rare-earth refinery, and US$961.7 million of cash and securities covers the near-term spend. Bear: Pinyon Plain has about 22 months of reserves left, about US$97 million a year of operating costs outside cost of sales leave forward EBITDA negative at US$90/lb, Vara Mada still lacks its investment agreement, a monazite permit and any financing, and diluted shares rose 40% from FY2023 to FY2025. What tips it: Vara Mada’s investment agreement and investment decision — the largest stage factor in the model. Full rating in Section 9.

How to read this analysis: the statcards and Section 9 carry the verdict; Sections 2–6 carry the evidence, and Section 7 the valuation.

2. Assets & operations

For how the uranium market works — long-term contracts, the spot market and the month-end price series used here — see the uranium market guide.

2.1 Portfolio overview

Table 2. Energy Fuels asset portfolio, by value

Asset Listing / operator Country Stage Interest Output Reserves / resources Life Unit cost Enterprise NAV
Vara Mada (Toliara) Energy Fuels (operator) Madagascar Feasibility study 100% FS: US$387 m/yr average EBITDA 904 Mt ore, 55 Mt HM P&P FS life of mine US$138/t costs + royalties US$750.2 m
White Mesa Phase 2 REE circuit Energy Fuels (operator) United States (UT) Bankable feasibility study 100% 5,513 tpa NdPr modelled bought-in monazite 15 years modelled US$29.39/kg NdPr-eq US$659.8 m
Uranium beyond the plans Energy Fuels (operator) United States (NM, WY) Permitting / standby 100% — 18.4 Mlb probable (Sheep Mountain); 44.1 Mlb M&I no plan — US$71.5 m
Pinyon Plain Energy Fuels (operator) United States (AZ) Producing 100% 1.53 Mlb mined (2024) 2.57 Mlb P&P at 1.04% proven 22 months left AISC US$30.71/lb US$61.4 m
Bullfrog Energy Fuels (operator) United States (NV) Initial assessment 100% — 10.5 Mlb indicated; 3.4 Mlb inferred study — US$5.1 m
La Sal and Pandora Energy Fuels (operator) United States (UT) Producing on inferred 100% 44,869 t ore, La Sal (2025) 4.0 Mlb inferred (La Sal) no reserve Mill blend 0.0
White Mesa Mill and Phase 1 circuits Energy Fuels (operator) United States (UT) Operating 100% 1.66 Mlb U₃O₈ (H1 2026); 1,000 tpa NdPr capacity — — Mill run ~US$23/lb in rows
Donald Astron (JV) Australia Technical report 2026 9.48% → 49% — 825 Mt ore, 37 Mt HM P&P (100%) — — bridge
ASM Energy Fuels (acquired) Australia Acquired 28 Aug 2026 100% — n/d — — bridge
Bahia Energy Fuels (operator) Brazil No study 100% potential 3,000–5,000 tpa monazite — — — 0.0

Source: Energy Fuels SEC filings — FY2025 10-K reserve and resource tables (pp.83–85), Q2 2026 10-Q MD&A (pp.37–43); the Pinyon Plain (2026), Vara Mada (Jan 2026) and Bullfrog (May 2025) technical report summaries; the Phase 2 BFS release (15 Jan 2026); enterprise NAV per Section 7, Table 9 (risked, base case).

Two unbuilt studies carry over nine-tenths of enterprise NAV: Vara Mada 48.5% and the Phase 2 circuit 42.6%. The only mine with reserves and a plan, Pinyon Plain, is 4.0%, and Madagascar alone outweighs every U.S. asset combined. Donald and ASM sit in the equity bridge at book and at their deal consideration.

2.2 Revenue split

FY2025 revenue was US$65.9 million: uranium US$50.1 million and heavy mineral sands US$15.8 million, the last product sales from Kwale in Kenya, where mining ceased at the end of 2024; the rare-earth segment booked none. Revenue is not disclosed by asset, so Figure 3 substitutes the split of enterprise NAV.

Figure 2. Revenue by commodity, FY2025

Uranium
Heavy mineral sands
76.0%
24.0%
Share of FY2025 revenue of US$65.9 m (segment note); rare earths nil

Source: FY2025 10-K, Note 18 — segment information, p.205.

Figure 3. Enterprise NAV by asset (base case, % of US$1,548.0 m)

Vara Mada (Madagascar)
Phase 2 REE circuit (UT)
Uranium beyond the plans
Pinyon Plain (AZ)
Bullfrog (NV)
48.5%
42.6%
4.6%
4.0%
0.3%
Share of enterprise NAV at US$90/lb and 9% real, risked (Section 7, Table 11)

Source: Section 7, Table 11 — the model on the Energy Fuels filings and technical reports in Table 6.

2.3 Vara Mada (Madagascar)

Vara Mada (formerly Toliara) is a mineral-sands project held 100% since Energy Fuels bought Base Resources. Its January 2026 feasibility study carries proved and probable reserves of 904 Mt of ore at 6.1% heavy mineral (55 Mt HM; monazite 1.9% of HM) at 31 December 2025, an NPV of US$1,415 million at 10% post-tax real at 30 June 2025 (US$1,757 million at the investment decision) and a 22.1% IRR. Life-of-mine revenue is US$20,289 million, 73% from ilmenite, rutile and zircon sold to third parties and 27% from monazite fed to White Mesa. Capital is US$121 million before the decision, US$862 million construction, US$50 million mobile equipment, US$50 million national and regional development and US$467 million sustaining — US$1,550 million in all. The schedule runs from an investment decision in December 2026 to first shipment in April 2029 and Stage 2 completion in December 2032. The study assumes 20% corporate tax and a 5% royalty. In hand: Exploitation Permit PE 37242 and the Environmental Permit. Outstanding: monazite’s addition to the permit, and an investment agreement — the stability mechanism — that Parliament must pass before the decision; a new President was sworn in on 17 October 2025. No financing is arranged. Book value was US$208.1 million at 30 June 2026. The asset risk is that agreement.

2.4 White Mesa Phase 2 REE circuit

The Phase 2 circuit would expand separation at White Mesa to 5,513 tpa of NdPr oxide plus 48 tpa of terbium and 165 tpa of dysprosium, on up to 50,000 tpa of monazite bought at arm’s length. Its bankable feasibility study (15 January 2026) gives an NPV of US$1.9 billion at 8% (tax basis not stated), a 33% after-tax IRR, US$410 million of initial capital and US$311 million a year of average EBITDA over the first 15 years stand-alone (US$765 million with Vara Mada). All-in cost is US$29.39/kg NdPr-equivalent on Vara Mada feed and US$59.80/kg across all sources. Regulatory approval is expected by mid-2027 and commissioning in the first quarter of 2029; the Q2 2026 10-Q says completion in mid-2029. Debt would come from a conditional US$725 million, 20-year OSC loan offered on 15 June 2026, equity from about US$996 million of working capital. The existing Phase 1 circuit has 1,000 tpa of NdPr capacity, and a US$104 million Phase 1 expansion adds heavy rare earths. Benchmark NdPr oxide was US$110/kg at 30 June 2026. The asset risk is feed: the circuit depends on Vara Mada, Donald and Bahia, none of them producing.

2.5 Pinyon Plain and the White Mesa Mill

Pinyon Plain in Arizona, 100% owned, is the highest-grade asset: proven reserves of 17.5 kt at 1.04% eU₃O₈ (365.3 k lb) and probable reserves of 115.6 kt (2,206 k lb) at 31 December 2025, 96% recovery, at a US$65/lb reserve price. The 2026 technical report gives a 32-month life at a nominal 166 short tons a day, AISC of US$30.71/lb, US$10.6 million of remaining capital and an after-tax NPV of US$78.3 million at 5%. The mine produced 1,534,000 lb from 47,200 tons in 2024. The White Mesa Mill in Utah processes Pinyon Plain, La Sal and Pandora ore: 865,000 lb of finished U₃O₈ in the second quarter of 2026. Its Pinyon Plain run from late 2025 made 1.7 Mlb at about US$23/lb. The mill also holds 905,000 lb of finished V₂O₅. The asset risk is life: without new reserves, Pinyon Plain is mined out within three years.

2.6 Other assets

Roca Honda (New Mexico, permitting) holds 17,622 k lb M&I at 0.48% and 13,842 k lb inferred. Sheep Mountain (Wyoming, standby) has probable reserves of 9,248 k lb in the Congo pit and 9,117 k lb underground, with no mine plan. Nichols Ranch (Wyoming) is a standby in-situ recovery plant with 6,183 k lb M&I at 0.106%. Bullfrog’s 2025 initial assessment, on 10.5 Mlb indicated and 3.4 Mlb inferred (10-K FY2025 p.85), gives an after-tax NPV of US$31.2 million at 8% on US$36 million of initial capital (±50%). La Sal and Pandora (Utah) produce on inferred resources only. At Donald (Australia), operated with Astron, Energy Fuels can invest A$183.00 million (US$126.17 million) to earn 49% with the offtake of all monazite and xenotime; its 2026 technical report gives a pre-tax NPV of about US$800 million (100%) and peak funding of about US$473 million in mid-2027. Bahia (Brazil) has no study. ASM was bought on 28 August 2026 for US$243.3 million, US$217.2 million of it in shares.

2.7 Production, reserves & costs

The 2026 guidance is 2.0–2.5 Mlb of contained U₃O₈ mined, 1.5–2.5 Mlb of finished U₃O₈ processed and 1.5–2.0 Mlb sold; the first half processed 1,655,000 lb. Group uranium reserves at 31 December 2025 (S-K 1300, in situ) are 365.3 k lb proven and 20,571 k lb probable; resources exclusive of reserves are 44,090 k lb M&I and 22,696 k lb inferred at a US$90/lb resource price. At 30 June 2026 the company held 2,265,000 lb of U₃O₈ in inventory, 1,640,000 lb finished at a weighted cost of about US$34/lb; 2026 cost of goods sold has run at about US$39/lb. No reserve replacement ratio is filed.

Figure 4. Uranium output — 2024, first half 2026 and 2026 guidance (Mlb U₃O₈)

Mlb U₃O₈
2.5
2.0
1.5
1.0
0.5
0
1.53
1.66
2.00
2.25
Pinyon Plain mined 2024
Processed H1 2026
Processed 2026 guide
Mined 2026 guide
Contained pounds mined or finished pounds processed, as labelled (2026 at guidance midpoints)

Source: FY2025 10-K, note 10 to the reserve table (p.84); Q2 2026 10-Q, MD&A (p.38) and 2026 guidance (p.49).

Figure 5. Uranium reserves plus M&I resources by asset (Mlb eU₃O₈)

Sheep Mountain (WY)
Roca Honda (NM)
Bullfrog (NV)
Nichols Ranch (WY)
Pinyon Plain (AZ)
27.9
17.6
10.5
6.2
2.8
P&P reserves plus M&I exclusive of reserves, 31 Dec 2025, 100%; inferred 22.7 Mlb not shown

Source: FY2025 10-K, mineral reserve (p.83) and resource (p.85) tables.

2.8 Peer positioning

The peer set is four listed uranium names with filed scale, reserves or cost: Cameco (NYSE: CCJ) and Paladin (ASX: PDN) as producers, and Uranium Energy (NYSE American: UEC) and enCore Energy (NYSE American: EU) as the closest U.S. comparators. None is in a pending deal. No listed peer pairs uranium with rare-earth separation, so the rare-earth business is scored on its own studies.

Table 3. Peer positioning — quality metrics

Company Listing Stage Scale Reserves / resources Cost
Energy Fuels Public (NYSE American: UUUU) Producer, conventional + mill 1.66 Mlb processed H1 2026 20.9 Mlb P&P; 44.1 Mlb M&I ~US$39/lb cost of goods sold 2026; Pinyon Plain AISC US$30.71/lb
Cameco Public (NYSE: CCJ) Producer Tier-1 Athabasca mines 433.0 Mlb P&P attributable n/d
Paladin Energy Public (ASX: PDN) Producer 4.82 Mlb FY2026 PLS 93.7 Mlb probable US$43.3/lb cost of production
Uranium Energy Public (NYSE American: UEC) Advanced explorer, ISR ramp 0.23 Mlb FY2026 no reserves; 330.1 Mlb M+I+Inf US$34.24/lb total cash cost
enCore Energy Public (NYSE American: EU) U.S. ISR producer 655,000 lb sold 2025 n/d n/d

Source: Energy Fuels SEC filings (FY2025 10-K pp.83–85; Q2 2026 10-Q pp.38, 50); Cameco 2025 AIF p.98; Paladin FY2026 MD&A pp.4, 6 and AIF p.28; UEC FY2026 Form 10-K pp.39, 97; enCore 2025 Form 10-K. Quality metrics only; cost bases differ.

3. Financials & balance sheet

Revenue rose from US$3.2 million in FY2021 to US$78.1 million in FY2024, then fell 15.6% to US$65.9 million in FY2025; the first half of 2026 brought US$60.9 million. The cash margin fell from 52.1% in FY2023 to 20.9% in FY2025 and recovered to 47.2% in the first half on the low-cost Pinyon Plain ore. Operating cash flow was negative in every year, −US$89.5 million in FY2025 against a US$85.6 million net loss, so the loss is cash, not accounting. FY2023’s US$99.9 million profit came from a US$119.3 million gain on the Alta Mesa ISR sale. The filings split capex into property, plant and equipment and mineral properties, not sustaining and growth; the FY2025 10-K restates FY2023 mineral-property additions at US$29.3 million against US$6.8 million originally.

Cost deck. No unit-cost or capital guidance is filed; the guidance table carries volumes only. Cost of goods sold ran at about US$39/lb in 2026, the Pinyon Plain mill run at about US$23/lb and its technical-report AISC at US$30.71/lb. Operating costs outside cost of sales were US$99.1 million in FY2025 excluding share-based pay and accretion: selling, general and administration US$53.1 million, exploration, development and processing US$38.0 million and standby US$8.0 million. Canadian non-capital losses of US$61.0 million expire from 2027.

Net debt and liquidity. At 30 June 2026 cash was US$58.4 million and marketable securities US$878.3 million current plus US$24.9 million non-current. The only debt is the 0.75% convertible notes due 2031, US$700.0 million at face (carrying US$677.7 million), convertible at US$20.34 with capped calls bought for US$53.55 million; there are no bank facilities or covenants. Net debt to EBITDA is not meaningful: EBITDA is negative at US$90/lb and below. The rehabilitation provision is US$23.5 million, backed by US$22.8 million of restricted cash.

Hedge book and capital returns. None is disclosed — the book is unhedged. No dividend has been paid. Equity funds the gap: 40.6 million at-the-market shares raised US$280.0 million in FY2025, a new US$500 million program opened on 13 October 2026, and shares outstanding rose from 240.4 million at the end of 2025 to 249.9 million at 30 June 2026. For how these lines fit together, see the Financial Metrics guide.

Table 4. Five-year financial summary (US$m unless stated)

US$m FY2021 FY2022 FY2023 FY2024 FY2025
Revenue 3.2 12.5 37.9 78.1 65.9
YoY % — +293.1% +203.1% +106.0% −15.6%
Cash margin 43.0% 37.3% 52.1% 28.4% 20.9%
Net income (loss) to owners 1.5 −59.8 99.9 −47.8 −85.6
Diluted EPS (US$) 0.01 −0.38 0.62 −0.28 −0.38
Operating cash flow −29.3 −49.7 −15.4 −44.0 −89.5
Capex: PP&E / mineral properties 1.4 / 0.0 2.0 / 0.0 15.4 / 29.3 22.2 / 7.2 19.3 / 32.5
Free cash flow −30.7 −51.7 −60.1 −73.4 −141.3
Net debt (− = net cash) −113.0 −75.0 −190.5 −119.5 −186.2
Net debt / EBITDA n/m n/m n/m n/m n/m
Diluted shares (m, weighted) 149.7 157.3 160.2 172.0 224.7
DPS (US$) 0.00 0.00 0.00 0.00 0.00

Source: Energy Fuels Form 10-K FY2025 (pp.216–220, 241), FY2023 (pp.164–167, 182) and FY2022 (p.171). Cash margin = revenue less costs applicable to revenue; free cash flow = operating cash flow less both capex lines; net debt = convertible notes at carrying value less cash and current marketable securities.

Notes to Table 4

  1. FY2023 mineral-property additions as restated in the FY2025 10-K; the FY2023 10-K printed US$6.8 m.
  2. FY2023 and FY2021 net income include gains on asset sales of US$119.3 m and US$35.7 m.
  3. n/m: EBITDA negative or the company in net cash.

4. Management, strategy & structure

4.1 Management & governance

Ross Bhappu, 65, became President and Chief Executive Officer and a director on 15 April 2026, after serving as President from 4 August 2025; he succeeded Mark Chalmers, who retired. On the board, Michael Stirzaker, former Chair of Base Resources, joined on 2 October 2024, and longtime director Robert W. Kirkwood stepped down on 15 October 2025. Nathan R. Bennett signs the Q2 2026 10-Q as Chief Financial Officer (p.72). The Chair, board size and independence, the committee list and any related-party dealings are not in the source set: no proxy statement was in hand for this analysis (FY2025 10-K and Q1–Q2 2026 10-Qs checked).

4.2 Strategy

Energy Fuels reports three segments — uranium, rare earths and heavy mineral sands — and its strategy ties them together: sell uranium from its own mines through White Mesa, expand the mill into a U.S. rare-earth refinery (the US$104 million Phase 1 expansion, then Phase 2 with approval due by mid-2027), and secure its own monazite through Vara Mada (first shipment April 2029), the Donald earn-in and Bahia. The conditional OSC loan would also fund a U.S. metals and alloys plant. Growth comes by acquiring companies with feed or processing.

4.3 Ownership & structure

The most material deal is the pending merger with VAC, signed on 23 June 2026: US$718.0 million in cash and 65,853,000 shares, about US$1.8 billion at the US$11.35 close of 25 September 2026. ASM closed on 28 August 2026 for US$243.3 million (US$217.2 million in 14.809 million shares, US$26.1 million cash). Base Resources brought Vara Mada and Kwale in 2024. Energy Fuels sold the Alta Mesa ISR project in 2023 for a US$119.3 million gain. The one joint venture is Donald, with Astron. Holders of 5% or more are not in the source set. Outstanding obligations are the 2031 notes, US$1.8 million of contingent consideration and a US$4.2 million non-controlling interest. Basic shares at the as-of date are 264.728 million: 249.919 million at 30 June 2026 plus the ASM shares, before any at-the-market sales since.

5. ESG & sustainability

Disclosure in the SEC filings is thin. The company signed an agreement with the Navajo Nation, announced on 29 January 2025. Mining at Kwale in Kenya ended on 31 December 2024 and the site is in reclamation. Rehabilitation provisions total US$23.5 million, with US$22.8 million of restricted cash posted as bonding. The filings carry no safety rate, no greenhouse-gas figures and no decarbonisation target, so the licence-to-operate score is set low for missing evidence, not for an incident.

6. Risks

Table 5. Risk register

Risk Type Likelihood / impact Exposure Mitigant
Price far above modelled value Market High / High US$8.21 against a US$3.76 blend Approvals would lift the stage factors
Vara Mada investment agreement and funding Jurisdiction High / High 48.5% of enterprise NAV; decision due December 2026 Exploitation and environmental permits held; US$80 m government funding MOU
Phase 2 approval and feed Operational Medium / High 39.8% of enterprise NAV; approval mid-2027 Conditional US$725 m OSC loan
Short uranium reserve life Operational High / Medium Pinyon Plain about 22 months left 44.1 Mlb M&I outside the plans
Uranium and NdPr prices, unhedged Commodity Medium / High EBITDA positive only above about US$95/lb US$961.7 m cash and securities
Dilution Balance sheet High / Medium 40.6 m ATM shares in FY2025; US$500 m program; 65.853 m VAC shares Securities fund near-term spend
VAC merger and OSC loan terms Counterparty Medium / Medium US$718.0 m cash; loan conditional VAC excluded from the valuation
Reclamation and community ESG Low / Medium US$23.5 m provision; Kwale closure US$22.8 m bonding; Navajo Nation agreement

Source: Energy Fuels SEC filings — Q2 2026 10-Q (pp.11, 40–43, 50), FY2025 10-K and the 13 Oct 2026 pro forma; Vara Mada FS TRS (Jan 2026); Section 7 for the valuation figures. Likelihood and impact are this analysis’s assessment.

Figure 6. Risk matrix — likelihood × impact

Impact if it happens
High
Medium
Low
Price vs value
Vara Mada agreement
Phase 2 feed
Unhedged prices
Dilution
Reserve life
VAC and OSC
Reclamation
Low
Medium
High
Likelihood over the next five years →

Source: Table 5; likelihood and impact are this analysis’s assessment.

The two top-right risks are one fact seen twice: the share price assumes the studies get built, and Vara Mada’s investment agreement is the first gate. Section 7 prices three of these risks directly — Vara Mada’s agreement and funding through its 0.40 stage factor, Phase 2’s approval and feed through its 0.35 factor, and the unhedged deck by running every grid price as a scenario.

7. Valuation

Valuation as of 20 October 2026, in US dollars (Energy Fuels’ reporting currency) against the US$8.21 NYSE American close of 20 October 2026. Horizon: spot fair value. Price deck: base uranium US$90/lb U₃O₈ — the representative of the trailing averages (3-month US$88.56, 6-month US$86.87 and 12-month US$85.34/lb, Cameco’s month-end series, to September 2026) on the fixed US$60–120/lb grid — with every grid price run as a scenario (deep bear US$60 to deep bull US$120/lb). Vara Mada’s mineral sands (US$382/t) and monazite (US$6,061/t) sit at the feasibility study’s life-of-mine averages, and the Phase 2 rare-earth circuit at its study’s deck, in every column. Discount rate 9% real. The pending VAC merger is not in the numbers.

Energy Fuels is valued as a uranium producer following the How to Value Commodity Stocks guide, on a sum of the parts. Pinyon Plain, the one mine with reserves and a plan, is run to its reserve, depleted to the valuation date, on the technical report’s cost; about 22 of its 32 months remain. Two studies carry most of the value. Vara Mada in Madagascar enters at its feasibility-study NPV, re-struck to 9%, rolled to the valuation date and cut by a stage factor of 0.40: its mining and environmental permits are held, but the investment agreement, the monazite permit and the financing are not. The White Mesa Phase 2 rare-earth circuit enters at its feasibility NPV, re-struck to 9%, rolled from the January 2026 release and cut by 0.35: approval is expected in mid-2027, its loan is conditional, and its feed depends on mines not yet built. Bullfrog and the uranium beyond every plan add little. Net asset value carries half the weight; EV/EBITDA and an FCF-yield build on the next twelve months carry the rest.

Enterprise NAV at the base deck is US$1,548.0 million: Vara Mada US$750.2 million, the Phase 2 circuit US$659.8 million, the conversion row US$71.5 million, Pinyon Plain US$61.4 million and Bullfrog US$5.1 million. The bridge adds US$185.7 million net: US$910.7 million of cash and current securities plus the ASM and Donald stakes, less the US$700.0 million convertible notes at face and US$360.0 million of capitalised overhead. That gives NAV of US$6.55 per share, a P/NAV of 1.25×.

Three choices set the level. The two stage factors carry most of it. Vara Mada across its band moves NAV per share between US$6.19 and US$7.61, and the Phase 2 circuit at 0.25 or 0.55 between US$5.84 and US$7.97. The uranium deck sits 29% above its five-year average of US$69.53/lb, so every anchor is held at mid-cycle and the deck flexed alone. And the business burns cash at today’s prices. On the 2026 cost of goods sold of US$39/lb and US$97.2 million a year of other operating costs, forward EBITDA turns positive only at about US$95/lb. Below that deck the EV/EBITDA leg is the bridge alone and the FCF leg is zero.

Table 6. Load-bearing inputs — the filed figures the valuation moves on (full register: Table 20)

Input Value Where §7 uses it Source
Uranium price, trailing averages to September 2026 (month-end) 3-month US$88.56/lb; 6-month US$86.87/lb; 12-month US$85.34/lb Opening block — the US$90/lb grid price Derived · means of the month-end price row above (Cameco uranium price page)
Pinyon Plain reserves, 31 Dec 2025 (in situ) proven 365.3 k lb; probable 2,206 k lb eU₃O₈ Table 9, block 1 Filed · FY2025 10-K · Mineral Reserve Estimates - In Situ Uranium · “Pinyon Plain” · p.83
Pinyon Plain technical report (2026) AISC US$30.71/lb; mine life 32 months; remaining capital US$10.6 m Table 9, block 1 Filed · Pinyon Plain TRS 2026 · 1.2 Economic Analysis · “All-in Sustaining Costs” · p.18; Filed · Pinyon Plain TRS 2026 · Section 1 — summary · “Mine life” · p.16; Filed · Pinyon Plain TRS 2026 · Section 18 — capital costs · “remaining capital costs for the Mine are estimated to be” · p.150
Vara Mada (Toliara) feasibility study NPV US$1,415 m at 10% post-tax real, 30 Jun 2025; IRR 22.1%; carrying value US$208,056 k (30 Jun 2026) vs US$191,508 k Table 9, block 2 Filed · Vara Mada FS TRS 2026 · Section 1 — economic analysis · “NPV at June 30, 2025, 10% discount rate” · p.30; Filed · Q2 2026 10-Q · Note 6 — mineral properties · “Vara Mada Project” · p.20
White Mesa Phase 2 REE circuit BFS NPV US$1.9 bn at 8%; IRR 33% after-tax; initial capital US$410 m Table 9, block 4 Filed · Phase 2 BFS release · Highlights · “NPV8%, or $7.96 per share” · p.1
Bullfrog initial assessment after-tax NPV US$59.8 m at 5%; US$31.2 m at 8%; US$7.6 m at 12% Table 9, block 3 Filed · Bullfrog TRS 2025 · Section 1 — economic analysis · “After-tax NPV @ 5%" · p.20
Uranium beyond the plans, 31 Dec 2025 M&I 44,090 k lb (exclusive); Sheep Mountain probable reserves 9,248 + 9,117 k lb Table 9, block 5 Filed · FY2025 10-K · Mineral Resource Estimates – In Situ Uranium · “Total Mineral Resources” · p.85; Filed · FY2025 10-K · Mineral Reserve Estimates - In Situ Uranium · “Sheep Mountain (Congo Pit)" · p.83
2026 uranium sales guidance 1,500,000–2,000,000 lb Table 13 Filed · Q2 2026 10-Q · MD&A — outlook, guidance · “The Company’s guidance for 2026 is as follows” · p.49
Uranium cost of goods sold and inventory cost 2026 to date ~US$39/lb; all finished inventory ~US$34/lb; Mill run ~US$23/lb Table 13; Table 17 field 11 Filed · Q2 2026 10-Q · MD&A — finished uranium costs decline · “costs of goods sold of approximately” · p.50
Operating costs, first half 2026 (ex share-based pay) SG&A US$29,292 k; exploration, development and processing US$16,209 k; standby US$6,208 k; additions to PP&E US$6,771 k Tables 11, 13 and 15 Filed · Q2 2026 10-Q · Note 19 — reportable segments · “Selling, general and administrative (2)" · p.35; Filed · Q2 2026 10-Q · Condensed consolidated statement of operations · “Standby” · p.9; Filed · Q2 2026 10-Q · Statement of cash flows · “Net cash used in operating activities” · p.14
Cash and securities, 30 Jun 2026 cash US$58,416 k; marketable securities US$878,338 k current, US$24,905 k non-current; ASM cash paid US$26.1 m Table 11 Filed · Q2 2026 10-Q · Balance sheet · “Cash and cash equivalents” · p.11; Filed · Pro forma 8-K 2026 · Introduction · “total Deed Cash Consideration of approximately” · p.1
Claims and investments, 30 Jun 2026 convertible notes US$700.00 m at face; asset retirement obligations US$2,496 k + US$21,035 k; non-controlling interest US$4,228 k; Donald JV US$35,432 k; ASM consideration US$243.3 m Table 11 Filed · Q2 2026 10-Q · Note 9 — convertible senior notes · “Convertible Senior Notes due 2031” · p.21; Filed · Q2 2026 10-Q · Balance sheet · “Asset retirement obligations (Note 10)" · p.11; Filed · Pro forma 8-K 2026 · Introduction · “total Deed Cash Consideration of approximately” · p.1
Shares 249,919 k at 30 Jun 2026 + 14,809 k ASM consideration shares Table 11 Filed · Q2 2026 10-Q · Balance sheet · “shares issued and outstanding” · p.11; Filed · Pro forma 8-K 2026 · Pro forma weighted average shares · “Additional shares issued in connection to ASM consideration” · p.28

Source: Energy Fuels SEC filings — the FY2025 10-K, the Q2 2026 10-Q, the Pinyon Plain (2026), Vara Mada (Jan 2026) and Bullfrog (May 2025) technical report summaries, the Phase 2 BFS release (15 Jan 2026) and the 13 Oct 2026 pro forma; uranium prices per Cameco’s uranium price series. Each row’s full citation is in Table 20.

Metal Pilot Premium

Valuation workings — Premium

The workings behind this valuation — the method, the models, the sensitivity grids and the scenarios, 11 tables and 3 figures in all — are for Metal Pilot Premium members.

  • 7.1 Method selection
  • 7.2 Net asset value
  • 7.3 Relative valuation
  • 7.4 Further weighted methods
  • 7.5 Cross-checks
  • 7.6 Scenarios & fair value

Want to see one first? The Cameco (CCJ) valuation is open to every reader.

Create a Metal Pilot accountLog in

See Premium plansRead a free example

You are signed in, and your plan does not include valuation workings. They come with Metal Pilot Premium.

Upgrade to Premium

The premium section could not be loaded right now.

Premium — unlocked

8. Near-term catalysts (1–3 years)

Over the next three years the catalysts are approvals and financing rather than output; each moves a stage factor or the share count in Section 7.

Table 18. Near-term catalysts

Catalyst Timing Why it matters
Q3 2026 10-Q — ATM sales and ASM’s balance sheet early November 2026 Closes two gaps in the share count and the bridge
Vara Mada investment agreement and investment decision FS target December 2026 The largest stage factor (0.40) in the model
VAC merger closing pending; no date filed 65.853 m new shares and US$718.0 m of cash out
Phase 2 circuit regulatory approval and the OSC loan mid-2027 Moves the 0.35 stage factor
Donald peak funding mid-2027 Earn-in toward 49% and monazite offtake
Vara Mada first shipment April 2029 First own feed for the Phase 2 circuit

Source: Energy Fuels SEC filings — Q2 2026 10-Q (pp.40–43), FY2025 10-K (p.29), the 13 Oct 2026 pro forma; Vara Mada FS TRS (Jan 2026), Section 22; Donald TRS (Feb 2026), Section 1.

9. Rating & verdict

Table 19. Scorecard rationale — Energy Fuels, 20 October 2026

Dimension Weight Score Rationale
1. Asset quality & scale 15% ★★★ Pinyon Plain at 1.04% proven grade; 20.9 Mlb uranium P&P and 44.1 Mlb M&I plus Vara Mada’s 904 Mt reserve — below Cameco’s 433.0 Mlb and Paladin, above UEC (no reserves) and enCore; peer median (10-K FY2025 pp.83–85, 31 Dec 2025)
2. Cost position & margins 15% ★★★ Pinyon Plain AISC US$30.71/lb and 2026 cost of goods sold ~US$39/lb, against Paladin’s US$43.3/lb and UEC’s US$34.24/lb; but US$97.2 m a year of operating costs outside cost of sales — peer median (TRS 2026 p.18; 10-Q Q2 2026 pp.35, 50)
3. Reserves, life & replacement 15% ★★ About 22 of Pinyon Plain’s 32 reserve months remain at 20 October 2026; Sheep Mountain’s 18.4 Mlb probable reserve has no plan; no replacement ratio filed — below the peer median (TRS 2026 p.16; 10-K FY2025 p.83)
5. Balance sheet & liquidity 15% ★★★ Cash and securities US$961.7 m against US$700.0 m of 0.75% notes due 2031, no covenants; Vara Mada’s US$862 m construction capital unfunded and FY2025 operating cash flow −US$89.5 m — peer median (10-Q Q2 2026 pp.11, 21)
6. Capital allocation & returns 15% ★★ No dividend; 40.6 m ATM shares for US$280.0 m in FY2025; diluted shares +40% FY2023–25; losses in FY2024–25 — below the peer median (10-K FY2025 pp.219, 241)
4. Growth & optionality 6.25% ★★★★ Vara Mada (NPV US$1,415 m at 10%), Phase 2 (US$1.9 bn at 8%), Donald to 49%, Bahia, Roca Honda — above the median, unfunded (FS TRS p.30; BFS release p.1)
7. Management & governance 6.25% ★★★ New CEO Ross Bhappu from 15 Apr 2026 after Mark Chalmers retired; CFO Nathan R. Bennett; board and committees not in the source set — held at the median (8-K 3 Mar 2026)
8. Jurisdiction & geopolitics 6.25% ★★★ Mines and mill in Arizona and Utah; 48.5% of enterprise NAV in Madagascar with the investment agreement pending — level with Paladin’s Namibia, below Cameco’s Saskatchewan (10-Q Q2 2026 p.42)
9. ESG & licence to operate 6.25% ★★ Navajo Nation agreement (Jan 2025); no safety rate or emissions figures filed; Kwale in reclamation — thinner disclosure than Cameco or Paladin (10-K FY2025 pp.27, 29)
Composite 100% ★★½ Average

Source: as cited per row — Energy Fuels SEC filings, the Pinyon Plain and Vara Mada technical reports and the Phase 2 BFS release; peers per Table 3. Every score is against the peer set in Section 2.8.

The arithmetic: 0.15 × 3 + 0.15 × 3 + 0.15 × 2 + 0.15 × 3 + 0.15 × 2 + 0.0625 × 4 + 0.0625 × 3 + 0.0625 × 3 + 0.0625 × 2 = 2.70/5 → ★★½, Average. Producer weights: asset quality, cost, reserves, balance sheet and capital allocation at 15% each; growth, management, jurisdiction and ESG share the remaining 25%.

The two-axis verdict. As of 20 October 2026, Energy Fuels rates ★★½ Average with a read of Overvalued (wide band) — the verdict is Full: at US$8.21 the blended fair value of US$3.76 implies −54.2%, and the market-implied uranium deck of US$240.59/lb is more than two and a half times the twelve-month month-end high of US$94.28/lb (range US$75.80–94.28/lb). The target multiples — P/NAV 0.96×, EV/EBITDA 6.7× and an FCF yield of 7.3% — carry a −4% driver line: reserves and life and capital allocation at ★★, asset quality, cost, balance sheet and jurisdiction at the median.

The bull case needs Madagascar to sign the investment agreement, Vara Mada to be financed and built, and the Phase 2 circuit to win approval and run on that feed — then most of the stage discount on US$1,368.1 million of risked study value falls away. The bear case is the record so far: a uranium business that burns cash at US$90/lb, under two years of reserves left at its best mine, and equity issued every year to fund the gap. The investment agreement tips it; the uranium price alone does not. To rank Energy Fuels against every peer on these nine dimensions, screen the sector on Metal Pilot’s uranium mining stock screener.

10. Sources, methodology & disclaimer

10.1 Sources, methodology & data vintage

Company filings. Energy Fuels SEC filings: Form 10-K for FY2025 (filed 26 February 2026), FY2024, FY2023 and FY2022; Form 10-Q for the second quarter of 2026 (filed 5 August 2026; the as-of anchor for the balance sheet) and the first quarter; the Form 8-K of 3 March 2026 (CEO), the 13 October 2026 pro forma (ASM and VAC) and ATM opinion, and the ASM scheme booklet (28 July 2026). Technical reports: Pinyon Plain TRS (2026), Vara Mada feasibility study TRS (January 2026), Donald technical report (February 2026), Bullfrog initial assessment (9 May 2025). Releases: Vara Mada FS (8 January 2026) and Phase 2 BFS (15 January 2026).

Peer and market data. Cameco 2025 AIF; Paladin FY2026 MD&A and AIF; UEC FY2026 Form 10-K; enCore 2025 Form 10-K; UUUU daily closes per Yahoo Finance to 20 October 2026; uranium month-end prices per Cameco’s uranium price series to 30 September 2026.

Methodology. Data as of 20 October 2026; price at the 20 October 2026 close of US$8.21; balance sheet at 30 June 2026 with ASM added; reserves at 31 December 2025. Deck: base uranium US$90/lb on the fixed US$60–120/lb grid in US$15 steps, every grid price run as a scenario, consensus at 0% (not available); Vara Mada’s mineral sands and monazite on the study’s life-of-mine averages. Grid: uranium price × 7%, 9% and 11% real. Peers: Cameco, Paladin, UEC and enCore, on filed quality metrics. Scorecard: producer weights (Section 9). Valuation: NAV at target P/NAV 50%, EV/EBITDA 30%, FCF yield 20%. Cadence: refreshed on each annual report and on material events — the Vara Mada investment agreement, the VAC closing or the Phase 2 approval.

Re-run log. 21 October 2026: new analysis — facts, model and draft; scorecard stars handed to the driver line (−0.04): at US$8.21 the fair value is US$3.77 (US$3.90 at the anchors), implied −54.1%, range US$2.79–4.45, Overvalued (wide band); NAV/share US$6.56; rating 2.7/5 Average. 21 October 2026, after the gate: Pinyon Plain depleted to the valuation date, the Phase 2 study rolled from 15 January 2026, the contingent consideration moved out of working capital, the Arizona tax bound added — NAV/share US$6.56 → US$6.55, fair value US$3.77 → US$3.76, implied −54.1% → −54.2%, read unchanged. The model’s full output, including the deck sensitivity, the P/NAV map and the cross-checks, is claude/valuation-models/energy-fuels-uuuu.out.md.

Omitted figures. The asset map is not built (Table 2 carries the portfolio). Figure 3 substitutes enterprise NAV by asset for revenue by asset, which is not disclosed. No optional financial or safety figure is built: the filings carry no safety rate.

Data gaps. The Chair, board size, independence, committees and holders of 5% or more (no proxy statement in the source set); safety and emissions figures; unit-cost and capital guidance; a Phase 1 rare-earth circuit NPV; Vara Mada’s per-product price deck; ASM’s own balance sheet; at-the-market shares sold since 30 June 2026; analyst consensus and the company’s own multiple history; Donald’s post-tax NPV; a reserve replacement ratio. Each is bounded or given a direction in Section 7, Table 17.

The register below holds the filed figures behind the valuation, one band per document; Table 6 at the head of Section 7 lists the load-bearing rows drawn from it.

Table 20. Source register — the filed figures behind the valuation (load-bearing inputs: Table 6)

InputValueAs ofWhere §7 uses itSource
Form 10-K, year ended 31 December 2025 (filed 26 Feb 2026)
Total uranium Mineral Reserves — proven; probable (000s lb eU3O8)365.3; 20,57131 Dec 2025§2 reserves & resources by asset — group reservesFiled · FY2025 10-K · Mineral Reserve Estimates - In Situ Uranium · "Total Mineral Reserves" · p.83
Pinyon Plain reserves — proven 17.5 kt at 1.04%, 365.3 k lb; probable 115.6 kt, 2,206 k lb; recovery 96%17.5 kt · 1.04% · 365.3 k lb; 115.6 kt · 2,206 k lb31 Dec 2025§2 reserves & resources by asset — Pinyon PlainFiled · FY2025 10-K · Mineral Reserve Estimates - In Situ Uranium · "Pinyon Plain" · p.83
Sheep Mountain probable reserves — Congo pit; underground (kt · % eU3O8 · k lb)3,498 · 0.132% · 9,248; 3,955 · 0.115% · 9,11731 Dec 2025§2 reserves & resources by asset — Sheep Mountain (standby, not producing)Filed · FY2025 10-K · Mineral Reserve Estimates - In Situ Uranium · "Sheep Mountain (Congo Pit)" · p.83
Total uranium Mineral Resources — measured; indicated; M+I; inferred (000s lb eU3O8)2,025; 42,065; 44,090; 22,69631 Dec 2025§2 reserves & resources by asset — group resourcesFiled · FY2025 10-K · Mineral Resource Estimates – In Situ Uranium · "Total Mineral Resources" · p.85
Bullfrog — indicated 1,740 kt at 0.30%, 10,510 k lb; inferred 3,420 k lb1,740 kt · 0.30% · 10,510 k lb; 3,420 k lb31 Dec 2025§2 reserves & resources by asset — BullfrogFiled · FY2025 10-K · Mineral Resource Estimates – In Situ Uranium · "Bullfrog" · p.85
Phase 2 Circuit — BFS released; regulatory approval expected; construction and commissioning by15 Jan 2026; mid-2027; Q1 202931 Dec 2025§2 REE schedule (the Q2 2026 10-Q says mid-2029 completion)Filed · FY2025 10-K · Item 1 — Phase 2 Circuit Bankable Feasibility Study · "Regulatory approval for the Phase 2 Circuit is expected by mid-2027" · p.29
Form 10-Q, quarter ended 30 June 2026 (filed 5 Aug 2026)
Weighted average cost of the Mill run's finished U3O8~$23/lb30 Jun 2026§7 unit costFiled · Q2 2026 10-Q · MD&A — finished uranium costs decline · "resulted in a total weighted average cost of approximately" · p.50
Weighted average cost of all finished U3O8 inventories at 30 Jun 2026 (1,640,000 lb; not a tranche — production and purchases over the years, excluding the unprocessed Pinyon Plain ores)~$34/lb30 Jun 2026§7 inventory value and Table 13 cost of salesFiled · Q2 2026 10-Q · MD&A — finished uranium costs decline · "had a weighted average cost of approximately" · p.50
U3O8 inventory 30 Jun 2026 — ore/raw (contained); WIP; finished; total (lb)590,000; 35,000; 1,640,000; 2,265,00030 Jun 2026§7 inventory valueFiled · Q2 2026 10-Q · MD&A — inventories · "Total pounds of finished and contained U" · p.49
Uranium cost of goods sold per lb, 2026 to date (weighted average of finished inventories)~$39/lb30 Jun 2026Table 13 forward cost of salesFiled · Q2 2026 10-Q · MD&A — finished uranium costs decline · "costs of goods sold of approximately" · p.50
Vara Mada status 30 Jun 2026 — permit allows ilmenite, rutile, zircon; monazite addition pending; investment agreement for Parliament (stability mechanism) required before FID; new President sworn in 17 Oct 2025; EF reaffirming terms the prior administration had substantially finalizedapprovals outstanding · President sworn in 17 Oct 202530 Jun 2026§2 approvals outstanding; stage factorFiled · Q2 2026 10-Q · MD&A — HMS — Vara Mada Project · "a new President of Madagascar was sworn in" · p.42
Vara Mada mineral property carrying value — 30 Jun 2026; 31 Dec 2025$208,056 k; $191,508 k30 Jun 2026§7 Vara Mada capital spent since the FS base date (book, not a roll-forward)Filed · Q2 2026 10-Q · Note 6 — mineral properties · "Vara Mada Project" · p.20
Cash and cash equivalents (31 Dec 2025)$58,416 k ($64,736 k)30 Jun 2026§7 bridge — cashFiled · Q2 2026 10-Q · Balance sheet · "Cash and cash equivalents" · p.11
Marketable securities — current; non-current$878,338 k; $24,905 k30 Jun 2026§7 bridge — cash and securitiesFiled · Q2 2026 10-Q · Balance sheet · "Marketable securities (Notes 3 and 16)" · p.11
Trade and other receivables, net$15,071 k30 Jun 2026§7 working capitalFiled · Q2 2026 10-Q · Balance sheet · "Trade and other receivables" · p.11
Inventories$75,037 k30 Jun 2026§7 working capitalFiled · Q2 2026 10-Q · Balance sheet · "Inventories (Note 5)" · p.11
Investments, net (Donald Project JV equity method)$35,432 k30 Jun 2026§7 bridge — investmentsFiled · Q2 2026 10-Q · Balance sheet · "Investments, net (Note 7)" · p.11
Accounts payable and accrued liabilities$29,185 k30 Jun 2026§7 working capitalFiled · Q2 2026 10-Q · Balance sheet · "Accounts payable and accrued liabilities (Note 14)" · p.11
Contingent consideration$1,767 k30 Jun 2026§7 bridge — other liabilitiesFiled · Q2 2026 10-Q · Balance sheet · "Contingent consideration (Notes 16 and 18)" · p.11
Asset retirement obligations — current; non-current$2,496 k; $21,035 k30 Jun 2026§7 rehabilitation provisionFiled · Q2 2026 10-Q · Balance sheet · "Asset retirement obligations (Note 10)" · p.11
Non-controlling interest$4,228 k30 Jun 2026§7 bridge — NCIFiled · Q2 2026 10-Q · Balance sheet · "Non-controlling interest" · p.11
Common shares issued and outstanding, 30 Jun 2026; 31 Dec 2025 (thousands)249,919 k; 240,366 k30 Jun 2026§7 share count — basicFiled · Q2 2026 10-Q · Balance sheet · "shares issued and outstanding" · p.11
0.75% Convertible Senior Notes due 2031 — principal at face; net proceeds; capped calls$700.00 m; $674.67 m; $53.55 m30 Jun 2026§7 bridge — convertible notes at faceFiled · Q2 2026 10-Q · Note 9 — convertible senior notes · "Convertible Senior Notes due 2031" · p.21
Notes conversion: holders may convert before 1 Aug 2031 only on specified eventssee note30 Jun 2026§7 diluted count — conversion rate 49.1672 shares per $1,000 per Q1 2026 10-Q p.21Filed · Q2 2026 10-Q · Note 9 — convertible senior notes · "Prior to August 1, 2031, holders may convert" · p.22
Anti-dilutive stock options and RSUs excluded, Q2 2026 (weighted, millions)3.52 m30 Jun 2026§7 diluted countFiled · Q2 2026 10-Q · Note 11 — net loss per share · "have been excluded from the calculation of diluted net income per common share" · p.24
H1 2026 net cash used in operating activities; additions to PP&E; additions to mineral properties($17,750 k); ($6,771 k); ($17,287 k)30 Jun 2026§3 interim cash flowFiled · Q2 2026 10-Q · Statement of cash flows · "Net cash used in operating activities" · p.14
FX sensitivity: +1% change in U.S. dollar / major foreign currency → net earnings$63 k30 Jun 2026§7 FX sensitivityFiled · Q2 2026 10-Q · Item 3 — market risk · "Strengthening net earnings" · p.63
2026 guidance — mined (contained lb U3O8); processed (finished lb); sales (lb), low–high2,000,000–2,500,000; 1,500,000–2,500,000; 1,500,000–2,000,00030 Jun 2026§7 guidance-year volumeFiled · Q2 2026 10-Q · MD&A — outlook, guidance · "The Company’s guidance for 2026 is as follows" · p.49
Standby Q2 2026; Q2 2025; H1 2026; H1 2025$2,872 k; $1,780 k; $6,208 k; $3,647 k30 Jun 2026Table 13 other cash costs — standbyFiled · Q2 2026 10-Q · Condensed consolidated statement of operations · "Standby" · p.9
SG&A excl. share-based compensation H1 2026 — uranium; REE; HMS; total$6,202 k; $8,691 k; $14,399 k; $29,292 k30 Jun 2026Table 13 other cash costs — SG&A by segmentFiled · Q2 2026 10-Q · Note 19 — reportable segments · "Selling, general and administrative (2)" · p.35
EDP excl. share-based compensation H1 2026 — uranium; REE; HMS; total (incl. D&A $1.55 m; $1.36 m; $0.19 m)$12,528 k; $1,084 k; $2,597 k; $16,209 k30 Jun 2026Table 13 other cash costs — EDP by segmentFiled · Q2 2026 10-Q · Note 19 — reportable segments · "Exploration, development and processing (2)(3)" · p.35
Technical report summary — Pinyon Plain Project, 2026
Pinyon Plain — after-tax undiscounted cash flow; after-tax NPV at 5%$97.7 m; $78.3 m2026§7 asset NPV — Pinyon PlainFiled · Pinyon Plain TRS 2026 · Section 1 — economic analysis · "The after-tax NPV at 5% discount rate is" · p.17
Pinyon Plain — All-in Sustaining Costs$30.71/lb U3O82026§7 unit costFiled · Pinyon Plain TRS 2026 · 1.2 Economic Analysis · "All-in Sustaining Costs" · p.18
Pinyon Plain — mine life32 months2026§2 life basisFiled · Pinyon Plain TRS 2026 · Section 1 — summary · "Mine life" · p.16
Pinyon Plain — remaining capital$10.6 m2026§7 remaining capitalFiled · Pinyon Plain TRS 2026 · Section 18 — capital costs · "remaining capital costs for the Mine are estimated to be" · p.150
Technical report summary — Vara Mada (Toliara) feasibility study, Jan 2026
Vara Mada (Toliara) FS — NPV (10%, post-tax, real, at 30 Jun 2025); IRR$1,415 m; 22.1%30 Jun 2025§7 asset NPV — Vara MadaFiled · Vara Mada FS TRS 2026 · Section 1 — economic analysis · "NPV at June 30, 2025, 10% discount rate" · p.30
Vara Mada FS — NPV at project FID (10%, post-tax, real); IRR at FID; capital payback, Stages 1 and 2 (years)$1,757 m; 24.9%; 4.830 Jun 2025§7 Vara Mada NPV basisFiled · Vara Mada FS TRS 2026 · Section 22 — DCF results · "NPV at project FID, 10% discount rate" · p.278
Vara Mada FS model — discount rate; inflation; USD:MGA; corporate tax rate; mineral royalties; VAT10%; 0% (real); 4,500; 20%; 5%; 20%30 Jun 2025§7 Vara Mada fiscal terms in the FS (pending the investment agreement)Filed · Vara Mada FS TRS 2026 · Section 22 — financial model assumptions · "Corporate tax rate" · p.279
Vara Mada FS schedule — FID; Stage 1 construction complete; first finished product shipment; Stage 2 construction completeDec 2026; Mar 2029; Apr 2029; Dec 203230 Jun 2025§7 Vara Mada slip sensitivityFiled · Vara Mada FS TRS 2026 · Section 22 — key project milestones · "First finished product shipment" · p.279
Vara Mada LOM revenue (US$m, real) — mineral sands (ilmenite, rutile, zircon); rare earths (monazite); total$14,865 m; $5,425 m; $20,289 m30 Jun 2025§7 basket deck — revenueFiled · Vara Mada FS TRS 2026 · Section 22 — LOM financial model summary · "Mineral Sands (ilmenite, rutile, zircon)" · p.281
Vara Mada FS capital (US$m, real) — pre-FID; construction; mobile equipment; national & regional development; sustaining; total$121; $862; $50; $50; $467; $1,550 m30 Jun 2025§7 Vara Mada capital and roll-forwardFiled · Vara Mada FS TRS 2026 · Section 22 — LOM financial model summary · "Capital Expenditure - Construction" · p.281
Vara Mada permits in hand — Exploitation Permit PE 37242 and Environmental Permit (2015 PGE)PE 3724230 Jun 2025§2 approvals in handFiled · Vara Mada FS TRS 2026 · Section 1.12 — permitting · "Key permits and authorizations already obtained include Exploitation Permit PE 37242" · p.28
Technical report summary — Bullfrog Project initial assessment, 9 May 2025
Bullfrog IA — after-tax NPV at 5%; 8%; 12%$59.8 m; $31.2 m; $7.6 m9 May 2025§7 asset NPV — Bullfrog (initial assessment, inferred-inclusive)Filed · Bullfrog TRS 2025 · Section 1 — economic analysis · "After-tax NPV @ 5%" · p.20
Bullfrog IA — initial direct capital (±50%)US$36 m9 May 2025§7 Bullfrog capitalFiled · Bullfrog TRS 2025 · Section 1 — capital · "The initial direct capital cost estimate is estimated to be" · p.15
News release, White Mesa Phase 2 Circuit BFS, 15 Jan 2026 (PRNewswire; not on Form 8-K)
Phase 2 Circuit BFS — NPV at 8% (tax basis not stated); per share at the then share count; IRR (after-tax); initial capital$1.9 bn; $7.96/share; 33%; $410 m15 Jan 2026§7 REE circuits NPV — stand-alone, excludes Vara Mada and other HMS feed economicsFiled · Phase 2 BFS release · Highlights · "NPV8%, or $7.96 per share" · p.1
Phase 2 Circuit — average annual EBITDA, first 15 years (stand-alone); combined with Vara Mada$311 m; $765 m15 Jan 2026§7 REE circuitsFiled · Phase 2 BFS release · Highlights · "of average annual EBITDA for first 15 years from the Phase 2 Circuit standalone" · p.1
Phase 2 Circuit modelled annual output (tpa) — NdPr; Tb; Dy; SEG concentrate; Ho+ concentrate5,513; 48; 165; 748; 1,08015 Jan 2026§2 REE circuitsFiled · Phase 2 BFS release · Highlights · "5,513 tpa NdPr" · p.1
Phase 2 BFS deck — base case Q3 2025 forecasts (Adamas Intelligence REE, TradeTech uranium); full capacity 50,000 tpa monaziteQ3 2025; 50,000 tpa15 Jan 2026§7 REE circuits deckFiled · Phase 2 BFS release · Highlights · "The BFS utilizes base case Q3 2025 price forecasts" · p.1
Derived
Vara Mada LOM average realised price — mineral sands basket (ilmenite, rutile, zircon)$382/t30 Jun 2025§7 basket deck — mineral sands baseDerived · LOM revenue US$14,865 m ÷ LOM volume 38,884 kt (36,124 + 284 + 2,476 kt)
Vara Mada LOM average realised price — monazite$6,061/t30 Jun 2025§7 basket deck — monazite baseDerived · LOM revenue US$5,425 m ÷ LOM volume 895 kt
Basic shares at the as-of date (30 Jun 2026 count + ASM shares; Q3 ATM sales n/d until the Q3 10-Q)264,728 k20 Oct 2026§7 share count — basic (ATM issuance since 30 Jun 2026 not yet filed: bias low)Derived · 249,919 k at 30 Jun 2026 + 14,809 k ASM consideration shares
Form 8-K Ex. 99.3, unaudited pro forma condensed combined, 13 Oct 2026
ASM acquisition, completed 28 Aug 2026 — total consideration; share part; cash part$243.3 m; $217.2 m; $26.1 m13 Oct 2026§7 share count and bridge — ASMFiled · Pro forma 8-K 2026 · Introduction · "total Deed Cash Consideration of approximately" · p.1
VAC merger, signed 23 Jun 2026 (pending) — cash consideration; common shares; total (at $11.35, 25 Sep 2026)$718.0 m; 65,853,000 shares; ~$1.8 bn13 Oct 2026§7 pending-deal treatment — excluded until it closes (not closed at 20 Oct 2026)Filed · Pro forma 8-K 2026 · Introduction · "Merger Cash Consideration" · p.1
Additional shares issued — ASM; VAC (thousands)14,809 k; 65,853 k13 Oct 2026§7 share countFiled · Pro forma 8-K 2026 · Pro forma weighted average shares · "Additional shares issued in connection to ASM consideration" · p.28
Form 8-K exhibit, ASM scheme booklet 8-K 2026, 28 Jul 2026
Conditional OSC financing (15 Jun 2026) — proposed 20-year loan for the Mill's REE expansion and a U.S. metals and alloys facility; Vara Mada and Donald financings to be completed separatelyUS$725 m28 Jul 2026§7 REE circuits funding; Vara Mada funding n/dFiled · ASM scheme booklet 8-K 2026 · Section 5.2 — Conditional OSC Financing · "conditional US$725 million financing commitment from the OSC, comprising a proposed 20-year loan" · p.20
Market data, read 21 Oct 2026
UUUU close, NYSE American, 20 Oct 2026US$8.2120 Oct 2026§7 priceMarket · Yahoo Finance · "UUUU daily history, Close" · 20 Oct 2026
Uranium spot price, month-end, Oct 2025 – Sep 2026 (US$/lb)80.00 · 75.80 · 81.55 · 94.28 · 86.95 · 84.25 · 86.35 · 84.18 · 85.00 · 86.38 · 89.68 · 89.6330 Sep 2026§7 deck baseMarket · Cameco · "Uranium price — spot / long-term, month-end" · 31 Oct 2025 – 30 Sep 2026
Uranium spot trailing averages to Sep 2026 (US$/lb): 3 / 6 / 12-month88.56 / 86.87 / 85.3430 Sep 2026Opening block; Table 17 field 2 — the US$90/lb grid priceDerived · means of the month-end price row above (Cameco uranium price page)
Uranium spot, 12-month high and low to Sep 2026 (month-end)high US$94.28 (Jan 2026); low US$75.80 (Nov 2025)30 Sep 2026Table 17 field 2 — cycle high and lowMarket · Cameco · "Uranium price — spot / long-term, month-end" · 31 Oct 2025 – 30 Sep 2026
Uranium spot five-year average, Oct 2021 – Sep 2026 (US$/lb)69.5330 Sep 2026Table 17 field 2 — anchors held at mid-cycleDerived · mean of 60 month-end spot values, Cameco uranium price page (UxC/TradeTech), saved 10 Oct 2026

Source: each row’s document as cited, one band per document; Table 6 at the head of Section 7 lists the load-bearing rows drawn from this register — Energy Fuels SEC filings (FY2025 10-K, Q2 2026 10-Q, the 13 Oct 2026 pro forma, the ASM scheme booklet), the Pinyon Plain, Vara Mada and Bullfrog technical report summaries, the Phase 2 BFS release, and Cameco’s uranium price series.

10.2 Disclaimer & disclosure

This analysis is for information only and is not investment advice. It is a point-in-time snapshot as of 20 October 2026: the price, NAV and verdict move with the market and the uranium price. Reserves and resources are S-K 1300 estimates, and the two studies that carry most of the value are not yet approved or financed; the valuation is a model on stated assumptions, not a measurement. The rating and read are analytical judgements, not a recommendation to buy or sell. This report was prepared with AI assistance from primary filings. The author holds no position in any company named here.