Cameco (CCJ) — Stock Analysis 2026 [4.1]

Uranium Energy Metals Company Analysis
CAD

Analysis as of 12 August 2026. Cameco stock analysis. Price deck: base uranium US$90/lb — the representative trailing average on the fixed US$60 · 75 · 90 · 105 · 120/lb grid — with every grid price run as a scenario (deep bear US$60 to deep bull US$120) and the long-term contract indicator as a 0% cross-check — no spot price. At the as-of price the market implies a uranium deck of ~$597/lb. Fundamentals from Cameco’s 2025 annual filings, the NI 43-101 technical reports and the Q2 2026 results; market data at the 11 August 2026 close; all figures in Canadian dollars unless marked US$. Refreshed on each annual report and on material events. Rating: ★★★★ Solid / Overvalued (wide band).

Cameco mines the two highest-grade uranium orebodies in the world — Cigar Lake at 16.33% U₃O₈ and McArthur River at 6.48% — holds 433.0 Mlb of attributable reserves, carries net cash and owns 49% of Westinghouse. The thesis in one line: the quality is real, but at C$137.51 the shares price a uranium deck of ~$597/lb, while a model on filed plans finds C$28.75 a share at US$90/lb. Why now: the second-quarter results reset the 2026 outlook, and a Westinghouse IPO — which the US Government may require at a US$30 bn valuation or more before January 2029 — would put the first public price on the stake the bull case leans on. To screen Cameco against every listed uranium name on reserves, grade, cost and production, go to Metal Pilot’s uranium mining stock screener.

1. Snapshot & thesis

Cameco Corporation (NYSE: CCJ; TSX: CCO) is a uranium producer — archetype producer (mining), sector uranium and nuclear fuel — headquartered in Saskatoon, Saskatchewan. It runs three producing uranium assets (McArthur River/Key Lake and Cigar Lake in Saskatchewan, 40% of Inkai in Kazakhstan), a fuel-services segment of refining, conversion and fuel fabrication in Ontario, and a 49% equity stake in Westinghouse Electric Company. Development and idle ground — the US in-situ recovery (ISR) operations, Yeelirrie and Kintyre in Australia, and 49% of Global Laser Enrichment — carries no filed economics. (U₃O₈ is uranium concentrate; Mlb = million pounds; kgU = kilograms of uranium.)

Figure 1. Cameco in numbers

C$137.51 /sh
Share price — TSX, 11 Aug 2026 · US$98.73
C$59.9 bn
Market capitalisation — 435.6 m diluted shares
C$3,482 m
Revenue — FY2025 · +11.0% YoY
C$1,929 m
Adjusted EBITDA — FY2025 · 55.4% margin
433.0 Mlb
Reserves, Cameco share — 31 Dec 2025
21.0 Mlb
Production, Cameco share — FY2025
C$116 m
Net cash — 30 Jun 2026
C$29.70 /sh
NAV per share — US$90/lb, 8% · 4.53× P/NAV
C$28.75 /sh
Blended fair value — implied −79.1%
~$597 /lb
Market-implied uranium deck — 12 Aug 2026
4.1/5
Quality rating — Solid
Overvalued
Valuation read — wide band · 12 Aug 2026

Figure data: Table 1; NAV, blend and market-implied deck per Section 7, rating per Section 9.

Table 1. Cameco in numbers

Metric Value As of Source
Share price, TSX / NYSE C$137.51 / US$98.73 11 Aug 2026 close Market | Yahoo Finance | “CCO.TO”, “CCJ” daily history, “Close” | 11 Aug 2026
Market capitalisation C$59,895.5 m on 435.6 m diluted shares 11 Aug 2026 Derived | price × 435,572,041 diluted shares
Revenue C$3,481.9 m (+11.0% YoY) FY2025 Filed | FY2025 audited FS | Income statement | “Revenue from products and services” | p.7
Adjusted EBITDA; margin C$1,929 m; 55.4% of revenue FY2025 Filed | FY2025 MD&A | Consolidated financial results | “Adjusted EBITDA (non-IFRS, see page 66)” | p.17
Net earnings; diluted EPS C$589.5 m; C$1.35 FY2025 Filed | FY2025 audited FS | Income statement | “Net earnings” | p.7
Reserves, Cameco share 433.0 Mlb U₃O₈ 31 Dec 2025 Filed | FY2025 MD&A | Mineral reserves table | “Total” | p.110
Production, Cameco share 21.0 Mlb; 2026 plan 19.5–21.5 Mlb FY2025 Filed | FY2025 MD&A | Uranium production table | “Total” | p.77
Uranium unit cost of sales incl. D&A C$63.00–67.50/lb 2026 outlook Filed | Q2 2026 MD&A | 2026 Financial Outlook | “Average unit cost of sales (including D&A)” | p.19
Net cash C$116.0 m 30 Jun 2026 Derived | cash 1,112,718 − long-term debt 996,750 (Q2 2026 interim FS p.4)
NAV per share; P/NAV C$29.70; 4.63× 12 Aug 2026 Derived | Table 12
Blended fair value C$28.75 (range C$16.16–35.96) 12 Aug 2026 Derived | Table 17
Valuation read; implied return Overvalued (wide band); −79.1% 12 Aug 2026 Derived | Table 17 and the Section 7 conclusion
Market-implied uranium deck ~$597/lb 12 Aug 2026 Derived | Section 7 conclusion
Quality rating 4.1/5 Solid 12 Aug 2026 Derived | Table 20

Source: Cameco financial information — FY2025 audited financial statements and MD&A, Q2 2026 interim statements and MD&A; share prices per Yahoo Finance daily history at the 11 August 2026 close.

Thesis in brief. Bull: no listed peer owns grades like these — life-of-mine operating costs of C$21.72/lb at McArthur River and C$23.94/lb at Cigar Lake against a 2026 realized price guided at C$91.00–96.00/lb, about 21 years of reserves at the 2026 production midpoint, and a balance sheet with net cash. Bear: the contract book holds the realized price below the market for years — near US$69/lb over the next twelve months at a US$90 market — so every grid price from US$60 to US$120 values the shares at no more than 27% of the price. What tips it: a long-term contract price far above any month on record written into the book after 2030, or a Westinghouse listing at a multiple well above one year’s guided EBITDA at a services anchor. Full rating in Section 9.

How to read this analysis: the statcards and Section 9 carry the verdict; Sections 2–7 carry the evidence, Section 7 the valuation.

2. Assets & operations

Uranium trades on two prices: the month-end spot price averaged US$83.54/lb over the twelve months to July 2026, while the long-term contract indicator — the price utilities sign at — averaged US$89.04/lb and closed July at US$95.50/lb. How the term and spot markets work is covered in Uranium — A Complete Market Guide; this section spends its words on the company.

2.1 Portfolio overview

Table 2. Asset portfolio, sorted by value

Asset Country Stage Interest Output (Cameco share) Reserves (share) Life Unit cost Listing / operator
McArthur River/Key Lake Canada (Sask.) Producing 69.805% 10.5 Mlb FY2025; 10.0–11.5 Mlb 2026 plan 241.9 Mlb at 6.48% to 2044 C$21.72/lb LOM operating Cameco (Public, NYSE: CCJ / TSX: CCO)
Cigar Lake Canada (Sask.) Producing 54.5% 10.4 Mlb FY2025; 9.5–10.0 Mlb 2026 plan 94.1 Mlb at 16.33% to 2036 C$23.94/lb LOM operating Cameco (Public, NYSE: CCJ / TSX: CCO)
Inkai Kazakhstan Producing (ISR) 40% 3.7 Mlb purchased FY2025 96.5 Mlb at 0.03% to 2045 C$12.94/lb LOM operating (100%) JV Inkai; Kazatomprom 60% (Public, LSE / AIX: KAP)
Westinghouse United States Operating (reactor services) 49% US$370–430 m adj. EBITDA, 2026 outlook — — — Brookfield 51% (Private)
Fuel services Canada (Ont.) Operating 100% 13–14 million kgU, 2026 outlook — — C$33.50–35.80/kgU Cameco (Public, NYSE: CCJ / TSX: CCO)
GLE, US ISR, Yeelirrie and Kintyre US; Australia Development / care and maintenance 49% (GLE); 100% — — — — Cameco; Silex Systems 51% of GLE

Source: Cameco 2025 annual report and MD&A — mineral reserves table (p.110, NI 43-101, effective 31 December 2025), uranium production table (p.77); 2025 AIF life-of-mine tables (p.40, p.56, p.77); Q2 2026 MD&A, 2026 Financial Outlook (p.19). Rows sorted by enterprise NAV (Table 10).

Concentration is the first fact: McArthur River/Key Lake and Cigar Lake hold 336.6 Mlb — 77.7% of attributable reserves — and produced 20.9 of the 21.0 Mlb Cameco mined in 2025. The three mines carry C$11,366.9 m, 76.9%, of the C$14,785.1 m enterprise NAV, and McArthur River/Key Lake alone 41.9%.

2.2 Revenue split

Figure 2. 2026 guided revenue by segment (midpoints)

Uranium
Fuel services
Other
81.4% (C$2,805m)
18.3% (C$630m)
0.3% (C$10m)
Share of the C$3,445m consolidated revenue midpoint — Westinghouse (49%, equity-accounted) sits outside this total

Figure data: Q2 2026 MD&A, 2026 Financial Outlook, revenue (p.19) — consolidated C$3,320–3,570 m, uranium C$2,700–2,910 m, fuel services C$610–650 m; other is the remainder of the midpoints.

Figure 3. FY2025 uranium pounds by asset, Cameco share

McArthur River/Key Lake
Cigar Lake
Inkai (40%)
42.7% (10.5 Mlb)
42.3% (10.4 Mlb)
15.0% (3.7 Mlb)
Share of 24.6 Mlb — mined pounds for the two Saskatchewan mines, the purchase entitlement for equity-accounted Inkai

Figure data: FY2025 MD&A, uranium production table (p.77); 2025 AIF, Inkai production purchases (p.68).

Uranium is four-fifths of revenue, and two Saskatchewan mines supply 85% of the pounds Cameco controls.

2.3 McArthur River/Key Lake

The world’s largest high-grade uranium mine, milled at Key Lake; Cameco holds 69.805% and operates both. Reserves are 2,426.2 kt at 6.48% U₃O₈ for 346.5 Mlb (100%), 241.9 Mlb attributable (Table 3), with 4.7 Mlb of exclusive measured and indicated resource at 2.25% behind them. The life-of-mine plan mills 346.6 Mlb from 2026 to 2044 at C$21.72/lb operating cost with C$1,790.0 m of capital (100%, constant 2025 dollars). Production fell to 10.5 Mlb (Cameco share) in 2025 from 14.2 Mlb in 2024; the 2026 plan is 10.0–11.5 Mlb. Saskatchewan takes a basic royalty of 5% of gross sales less a 0.75% resource credit, a profit royalty of 10% up to C$13.03/lb and 15% above, and a 3% resource surcharge. The asset risk is ore access underground: Cameco reported disruptions at McArthur River and Cigar Lake after the second quarter, with guidance unchanged.

2.4 Cigar Lake

The highest-grade uranium mine in the world: 479.0 kt at 16.33% U₃O₈ for 172.4 Mlb (100%), 94.1 Mlb attributable (Table 3), with 14.3 Mlb of exclusive measured and indicated resource at 5.05%. Cameco holds 54.5% and operates; ore is jet-bored at 115–150 tonnes a day at peak and milled at McClean Lake. The remaining plan mills 170.5 Mlb to 2036 at C$23.94/lb with C$1,310.6 m of capital (100%). Production was 10.4 Mlb in 2025 (Cameco share), up from 9.2 Mlb; the 2026 plan is 9.5–10.0 Mlb. The same Saskatchewan royalty set applies. The asset risk is the clock: the plan ends in 2036, and Cameco has sanctioned no successor of this grade.

2.5 Inkai

An in-situ recovery operation in Kazakhstan held through JV Inkai — Cameco 40%, Kazatomprom 60% and operator. Reserves are 359,692.2 kt at 0.03% U₃O₈ for 241.2 Mlb (100%), 96.5 Mlb attributable. The licence allows 10.4 Mlb a year (100%), 4.2 Mlb Cameco’s share; during the ramp-up Cameco may buy 57.5% of the first 5.2 Mlb and 22.5% of the increment, 40% once ramp-up is complete — in 2025 that was 3.7 Mlb, 44.1% of 8.4 Mlb. The plan runs 2026–2045 at C$12.94/lb operating (C$2,538.4 m) with C$1,331.0 m of capital (100%), and Cameco buys at spot less a transfer discount of 5% of the price (US$4.85/lb at the technical report’s US$97). The risk is fiscal: the mineral extraction tax rose from 6% in 2023 to 9% in 2025, and 2026 brings volume tiers of 4–18% plus a 0.5–2.5% price add-on, ahead of a 20% corporate income tax.

2.6 Westinghouse

Cameco owns 49% of Westinghouse Electric Company, Brookfield 51%; it is equity-accounted and Cameco does not control it. The 2026 outlook guides Cameco’s share of adjusted EBITDA at US$370–430 m and of capital at US$160–200 m. Westinghouse carries a US$3.5 bn term loan to January 2031, and Cameco’s 49% of its net debt was C$2,187.0 m at 31 December 2025 against a carrying amount of C$2,671.8 m. Under the October 2025 US Government term sheet, a Participation Interest — vesting only on a final investment decision for at least US$80 bn of new Westinghouse reactors before January 2029 — would take 20% of Westinghouse cash distributions above US$17.5 bn and could require an IPO at a US$30 bn valuation or more. No market has priced the stake yet.

2.7 Fuel services & other assets

Fuel services — refining at Blind River, conversion at Port Hope and fuel fabrication — guides 13–14 million kgU in 2026 on C$610–650 m of revenue at C$33.50–35.80/kgU. Global Laser Enrichment (49%), the US ISR operations and Yeelirrie and Kintyre in Australia are held without filed economics and carry no value in Section 7.

2.8 Production, reserves & costs

Table 3. Reserves and resources by asset (NI 43-101, 31 December 2025)

Asset Proven (100%) Probable (100%) P&P (100%) Grade P&P, Cameco share M&I exclusive, share Inferred, share
McArthur River 284.6 Mlb 61.8 Mlb 346.5 Mlb 6.48% 241.9 Mlb 4.7 Mlb at 2.25% 1.7 Mlb at 2.81%
Key Lake (stockpiles) — — 0.7 Mlb 0.52% 0.6 Mlb — —
Cigar Lake 99.2 Mlb 73.2 Mlb 172.4 Mlb 16.33% 94.1 Mlb 14.3 Mlb at 5.05% 10.9 Mlb at 5.55%
Inkai 194.1 Mlb 47.2 Mlb 241.2 Mlb 0.03% 96.5 Mlb 37.1 Mlb at 0.03% 8.9 Mlb
Total 760.8 Mlb 433.0 Mlb 56.1 Mlb 21.5 Mlb

Source: Cameco 2025 annual report and MD&A, mineral reserves table (p.110) and property summaries (p.78, p.82, p.86); resources are exclusive of reserves (2025 AIF p.96). Reserves estimated at a constant US$63/lb and US$1.00 = C$1.28; the share column sums to 433.1 Mlb before rounding.

Figure 4. Uranium production, Cameco share (Mlb U₃O₈)

Production (Mlb U₃O₈)
25
20
15
10
5
0
23.4
21.0
20.5
FY2024
FY2025
2026 plan
Fiscal year (2026 at the midpoint of the 19.5–21.5 Mlb plan)

Figure data: FY2025 MD&A, uranium production table (p.77).

Three facts define the group. Longevity: 433.0 Mlb of attributable reserves (760.8 Mlb at 100%) is about 21 years at the 2026 production midpoint. Replacement: Cameco publishes no replacement ratio. Cost: contracts outrun the mines — commitments average about 28 Mlb a year from 2026 to 2030 against 19.5–21.5 Mlb of planned production — so Cameco buys up to 3 Mlb in the market and draws its Inkai entitlement, and unit cost of sales including depreciation is guided at C$63.00–67.50/lb against a realized C$91.00–96.00/lb.

Figure 5. Uranium reserves and resources by mine, Cameco share, 31 December 2025

McArthur River/Key Lake
Inkai
Cigar Lake
242.5 Mlb
247.2 Mlb (+4.7 M&I)
96.5 Mlb
133.6 Mlb (+37.1 M&I)
94.1 Mlb
108.4 Mlb (+14.3 M&I)
Proven and probable reserves Reserves + measured and indicated resources (exclusive of reserves)
Uranium, Mlb U₃O₈, Cameco share — one scale for both bars; the second bar prints the M&I added on top of the reserve

Figure data: Table 3 — Cameco 2025 annual report and MD&A mineral reserves table and property summaries, and the 2025 AIF, which reports resources exclusive of reserves; NI 43-101, effective 31 December 2025, Cameco share (69.805% McArthur River/Key Lake, 54.5% Cigar Lake, 40% Inkai). McArthur River/Key Lake includes the Key Lake stockpiles (0.6 Mlb). Not drawn: Cameco’s other properties, which carry no reserves (their resources make up most of the roughly 404 Mlb of M&I the AIF reports in total), Westinghouse and the fuel-services assets, and inferred resources (21.5 Mlb at the three mines).

By mine (Figure 5), the Saskatchewan reserves have almost nothing behind them — 4.7 Mlb of M&I at McArthur River/Key Lake, 2% of its reserve, and 14.3 Mlb at Cigar Lake — so their lives rest on the reserves already defined. Inkai holds two-thirds of the M&I drawn, 37.1 Mlb, 38% on top of its reserve.

2.9 Peer positioning

The peer set is the listed uranium producers and developers with filed production, cost and reserve figures — Kazatomprom, NexGen, Denison and Paladin, none in a pending deal; it is used for every star in Section 9.

Table 4. Peer quality comparison

Company Listing Production Unit cost Reserves Asset base
Cameco Public (NYSE: CCJ / TSX: CCO) 19.5–21.5 Mlb, 2026 plan (share) C$21.72–23.94/lb LOM operating (US$15.60–17.20) 433.0 Mlb P&P (share) Three mines, two countries
Kazatomprom Public (LSE / AIX: KAP) 37.70–40.30 Mlb attributable (71.49–75.39 Mlb at 100%), 2026 guidance US$29.00–30.50/lb AISC, 2025 guided range n/d (not disclosed comparably) ISR joint ventures, Kazakhstan
NexGen Energy Public (TSX / NYSE: NXE) nil — Rook I in development C$13.86/lb (US$9.98) LOM cash operating, study 240 Mlb probable (Rook I, 100%) Single asset
Denison Mines Public (TSX: DML / NYSE American: DNN) McClean Lake 22.5% interest US$18.41/lb (C$24.92) all-in, Phoenix study 97.8 Mlb probable (share; 103.0 Mlb at 100%) Phoenix-led
Paladin Energy Public (ASX / TSX: PDN) 4.82 Mlb, FY2026 (to 30 Jun 2026) US$43.3/lb cost of production, FY2026 n/d (no reserve table in the FY2025 report or the June 2026 quarterly) Langer Heinrich

Source: Cameco 2025 annual report and MD&A; Kazatomprom 2025 integrated annual report; NexGen 2025 AIF; Denison 2025 AIF; Paladin Energy quarterly report to 30 June 2026. Cost bases differ — mine-gate operating, all-in sustaining, study all-in and cost of production — so the column ranks approximately; US$ conversions of Cameco’s costs at US$1.00 = C$1.392.

Only Kazatomprom produces more, at an all-in sustaining cost near US$30/lb against Cameco’s mine-gate US$15.60–17.20/lb from grades of 6–16% rather than 0.03%. Cameco’s 433.0 Mlb is 1.8 times NexGen’s probable reserve and 4.4 times Denison’s share; NexGen’s and Denison’s study costs are lower, on single assets not yet built. To rank all five on reserves, grade, cost and stage, screen the sector on Metal Pilot’s uranium mining stock screener.

3. Financials & balance sheet

Table 5. Five-year financial summary, FY2021–FY2025

Metric (C$ m unless stated) 2021 2022 2023 2024 2025
Revenue 1,475.0 1,868.0 2,587.8 3,135.8 3,481.9
Revenue YoY % — +26.6% +38.5% +21.2% +11.0%
Cash margin (adj. EBITDA ÷ revenue) n/d 23.1% (431) 32.1% (831) 48.8% (1,531) 55.4% (1,929)
Net income attributable (102.6) 89.4 360.8 171.8 589.5
EPS, diluted (C$) (0.26) 0.22 0.83 0.39 1.35
Operating cash flow 458.3 304.6 688.1 905.3 1,408.4
Capex (sustaining + replacement / growth) 98.8 143.4 153.6 211.6 333.0 (265 / 68)
FCF (OCF − capex) 359.5 161.2 534.5 693.7 1,075.4
Net debt, year-end (parentheses = net cash) (336.1) (1,284.8) 1,217.4 680.8 (218.1)
Net debt ÷ adj. EBITDA net cash net cash 1.46× 0.44× net cash
Shares outstanding, year-end (m) n/d n/d 434.2 435.3 435.5
Dividend per share (C$) 0.08 0.12 0.12 0.16 0.24

Source: Cameco annual reports — FY2022–FY2025 audited financial statements (income statement p.7, cash flow p.11, balance sheet p.9); FY2023 and FY2025 MD&A (adjusted EBITDA p.19 and p.17, capital spending p.53, dividend p.30); 2025 AIF (shares p.143). 2021 adjusted EBITDA is not printed in the FY2022 MD&A; diluted share counts are not rowed before 2025; the 2024 dividend is dividends paid over shares outstanding. Year-end shares 2023–2024 and dividends 2021–2022 from the 2023 and 2024 Annual Information Forms (p.137, p.145; p.142).

Figure 6. Revenue by fiscal year, FY2021–FY2025 (C$ m)

Revenue (C$ m)
4,000
3,000
2,000
1,000
0
1,475.0
1,868.0
2,587.8
3,135.8
3,481.9
FY2021
FY2022
FY2023
FY2024
FY2025
Fiscal year

Figure data: Table 5.

Revenue has more than doubled since 2021 and the cash margin has climbed from 23.1% to 55.4%, but growth is slowing — +38.5%, +21.2%, +11.0% — and earnings are noisier than cash: 2025 operating cash flow was 2.4 times net earnings, and 2024 earnings dipped on Westinghouse. The first half of 2026 was weaker: net earnings C$156.0 m (C$0.36 a diluted share against C$0.90) and operating cash flow C$108.8 m after C$236.9 m of income taxes paid. 2025 capex came in under its C$360–400 m outlook: C$144 m sustaining, C$121 m capacity replacement, C$68 m growth.

Cost deck. The 2026 outlook guides uranium unit cost of sales including depreciation at C$63.00–67.50/lb and fuel services at C$33.50–35.80/kgU, against a realized uranium price of C$91.00–96.00/lb. Saskatchewan royalties rise with price and cost C$101.3 m in the first half; the statutory tax rate is 26.9%, and the unused tax pools are not tabulated — the CRA reassessments have drawn them down. Life-of-mine costs are in constant 2025 dollars.

Net debt and liquidity. At 30 June 2026, C$1,112.7 m of cash against C$996.75 m of debentures left net cash of C$116.0 m; leases sit inside other liabilities. The debentures mature C$400 m in October 2027 (2.95%), C$500 m in May 2031 (4.94%) and C$100 m in 2042 (5.09%), and the C$1.0 bn revolver to October 2029 is undrawn. Stress-tested, halving forward EBITDA (Table 14) leaves gross debt at 1.2 times it. Provisions, mostly reclamation, were C$1,048.4 m, backed by C$1,125.2 m of letters of credit; separately the CRA holds C$559 m (C$209 m cash, C$350 m letters of credit) against transfer-pricing reassessments.

Hedge book. Uranium is unhedged — the contract book’s fixed and market-related prices do that job. The currency is hedged: policy covers 35–100% of expected net US-dollar exposure over 60 months, at an average 1.37 USDCAD, and each cent moves revenue by C$12 m.

Capital returns. The dividend doubled from C$0.12 (2023) to C$0.24 (2025), C$104.5 m paid; 435,532,978 shares and 39,063 options were outstanding at 30 June 2026. How each line is built is in the Financial Metrics guide.

4. Management, strategy & corporate structure

4.1 Management & governance

Tim Gitzel has led Cameco since July 2011 — president and CEO to August 2025, chief executive since — and has sat on the board since 2011. Heidi Shockey became senior vice-president and chief financial officer on 1 September 2025, and Catherine Gignac chairs the board. Seven of the nine 2026 nominees (78%) are independent; Gitzel is not. The board’s committee list is not in this run’s source set (2025 AIF p.149–151). Note 19 of the interim statements reports related-party transactions of C$27.3 m in Q2 2026 and C$51.5 m in the first half. The record has one entry on each side: supply discipline — idle tier-one capacity held back until contracts paid for it — and a Westinghouse stake whose return is still unproven.

4.2 Strategy

Cameco sizes tier-one production to contracts, not capacity: 19.5–21.5 Mlb planned in 2026 against commitments averaging about 28 Mlb a year to 2030, the gap filled by up to 3 Mlb of market purchases and the Inkai entitlement. Capital is planned at C$490–540 m in 2026, C$400–450 m in 2027 and C$350–400 m in 2028, with 2026 growth capital of C$120–135 m. Forward targets for 2026: consolidated revenue of C$3,320–3,570 m and a Westinghouse adjusted EBITDA share of US$370–430 m. The acquisition method is the minority stake beside a partner — Westinghouse with Brookfield, Inkai with Kazatomprom, Global Laser Enrichment with Silex Systems.

4.3 Ownership & structure

The most material transaction is Westinghouse: 49% bought alongside Brookfield (51%) in 2023, carried at C$2,671.8 m at 31 December 2025 (C$2,931.7 m a year earlier); the purchase price is not restated in the 2025 filings read here. JV Inkai is 40% Cameco, 60% Kazatomprom; Global Laser Enrichment is 49% Cameco, 51% Silex Systems. No shareholder holds 5% or more; the Province of Saskatchewan holds the single Class B share. There are no warrants and no convertibles: 435,532,978 common shares and 39,063 options at C$15.27 at 30 June 2026, 435,572,041 fully diluted.

5. ESG & sustainability

Safety met its mark: the 2025 incentive scorecard recorded a combined total recordable injury rate of 1.78 against a 1.80 target and a 2.30 threshold. The climate target is a 30% cut in Scope 1 and 2 emissions by 2030 from a 2015 baseline. Reclamation is the liability side — C$989.9 m provisioned at 31 December 2025 on C$1,370.0 m of undiscounted cost, secured by C$1,125.2 m of letters of credit — long-dated and staged across decades of sites.

6. Risks

Table 6. Risk register

Risk Type Likelihood / impact Exposure Mitigant
Contract-book repricing Commodity Medium / High About 28 Mlb a year committed 2026–2030; realized price at a US$90 market near US$69/lb over the next twelve months Market-related share of the book; long-term indicator US$95.50 at July 2026
Cigar Lake plan ends 2036 Operational High / High 94.1 Mlb attributable; 9.5–10.0 Mlb of 2026 production 14.3 Mlb exclusive M&I; no sanctioned successor
Kazakh fiscal change Jurisdiction High / Medium Inkai’s 96.5 Mlb, 22% of reserves; MET tiers to 18% plus a price add-on 40% minority beside the state operator; licence of 10.4 Mlb a year
Westinghouse value and leverage Counterparty Medium / High 49%; C$2,187.0 m share of net debt; C$2,671.8 m carrying amount Brookfield operates; a listing would mark the stake; the US Government Participation Interest takes 20% only of distributions above US$17.5 bn and lapses unvested in January 2029
Purchase-cost squeeze Commodity High / Medium Up to 3 Mlb of 2026 market purchases; unit cost of sales C$63.00–67.50/lb Inkai entitlement; inventory
Saskatchewan operating disruption Operational Medium / Medium McArthur River and Cigar Lake: 20.9 of 2025’s 21.0 Mlb Two mines; 2026 guidance unchanged after Q2 disruptions
USD/CAD Currency High / Low Each cent moves revenue by C$12 m 35–100% of net US-dollar exposure hedged, average 1.37
CRA transfer-pricing dispute Balance sheet Low / Medium C$559 m remitted or secured Net cash; undrawn C$1.0 bn revolver
Reclamation liabilities ESG Low / Medium C$989.9 m provisioned; C$1,370.0 m undiscounted C$1,125.2 m of letters of credit

Source: Cameco 2025 annual report and MD&A and Q2 2026 MD&A (price sensitivity p.22–23, CRA p.17); 2025 AIF and the Inkai technical report (fiscal terms p.109). Likelihood and impact are this analysis’s assessment.

Figure 7. Risk matrix — likelihood against impact

Impact if it happens
High
Medium
Low
Cigar Lake 2036
Contract repricing
Westinghouse
Kazakh fiscal
Purchase cost
Sask. disruption
CRA dispute
Reclamation
USD/CAD
Low
Medium
High
Likelihood over the next five years →

Source: Table 6. The shaded region marks the high-likelihood, high-impact quadrant.

Section 7 prices four of these: the contract book sets the realized price to 2030 and the deck after it, Inkai carries the Kazakh fiscal terms in its rows, Westinghouse enters after its debt, and the out file runs USD/CAD ±10%. Cigar Lake’s 2036 is a schedule, not a probability: a reader on a twenty-year horizon assumes a successor that does not yet exist.

7. Valuation

Valuation as of 12 August 2026, in Canadian dollars at US$1.00 = C$1.392 (11 August 2026). Horizon: spot fair value. Uranium deck: US$60, 75, 90, 105 and 120/lb, base US$90/lb — the trailing averages of the month-end uranium price (3-month US$85.19, 6-month US$85.52, 12-month US$83.54, to July 2026) snapped to the nearest grid price; the long-term indicator averages (US$95.00, US$93.00, US$89.04) point to the same grid price. Cameco’s own contract book sets the realized price for 2027–2030 and the deck applies from 2031. Discount rate 8% real after-tax on every asset. Share basis 435.6 m fully diluted; market data at the 11 August 2026 close (C$137.51 on the TSX).

Cameco is valued as a uranium producer with the method set of the commodity stock valuation guide: a sum-of-the-parts NAV on the three producing mines’ life-of-mine plans, fuel services and the 49% Westinghouse stake (50%), a forward EV/EBITDA (30%) and FCF-yield support from disclosed lines (20%). Fuel services and Westinghouse are rows inside the NAV, not a second archetype — together they carry about a fifth of enterprise NAV. The base deck sits 32.7% above the US$67.82 five-year average, so the target multiples hold at mid-cycle and only the deck moves across the scenarios.

Three choices shape the numbers. First, the price Cameco actually receives is not the market price: about 28 Mlb a year is already committed for 2027–2030, and the company’s own sensitivity table says a US$90 market price turns into roughly US$71–82/lb realized over those years. The model reads that table at every grid price and only lets the deck through from 2031, so the near-term years carry the contract book and the long tail carries the deck. Second, each mine is valued on its filed life-of-mine plan — McArthur River/Key Lake to 2044, Cigar Lake to 2036, Inkai to 2045 — with Saskatchewan’s basic and profit royalties and resource surcharge, Kazakhstan’s mineral extraction tax, and each jurisdiction’s statutory income tax charged row by row; the study NPVs, struck at mixed rates and decks, are not carried. Third, Inkai enters at Cameco’s 40% equity in JV Inkai, priced at the deck less the 5% transfer discount the joint venture sells at; the extra pounds Cameco buys under its ramp-up entitlement pass through the contract book and carry no separate value. Westinghouse is valued on Cameco’s share of its guided 2026 adjusted EBITDA at the services multiple, less 49% of its net debt — a mark well below the C$2,671.8 m carrying value, because that debt is large against one year’s earnings. The Westinghouse row is deliberately plain: Cameco’s C$556.8 m share of guided adjusted EBITDA at the 7.0× services multiple, less C$2,187.0 m for its 49% of the net debt, leaves C$1,710.6 m of equity. It takes no view on reactor orders or a listing, which would need a filed plan to value. The rate is one treatment for every asset: Inkai, in Kazakhstan, is discounted at the same 8% as the Saskatchewan mines, because the jurisdiction dimension scored four stars in Section 9 and a premium applies only at three or fewer; the risk that remains there sits in the mineral extraction tax charged in its row, not in the rate.

Table 7. Load-bearing inputs — the filed figures the valuation moves on

Input Value Where §7 uses it Source
McArthur River/Key Lake life-of-mine (100%) 346.6 Mlb milled 2026–2044; operating C$21.72/lb; capital C$1,790.0 m Tables 10–11, block 1 Filed | AIF 2025 | McArthur River — operating and capital costs | “mill production of” | p.40; Filed | AIF 2025 | McArthur River — operating and capital costs | “Total operating cost per pound U 3 O 8” | p.40; Filed | AIF 2025 | McArthur River — capital costs | “Total capital costs” | p.41 — full register Table 21
Cigar Lake life-of-mine (100%) 170.5 Mlb milled to 2036; operating C$23.94/lb; capital C$1,310.6 m Tables 10–11, block 2 Filed | AIF 2025 | Cigar Lake — operating and capital costs | “mill production of” | p.55; Filed | AIF 2025 | Cigar Lake — operating costs | “Total operating cost per pound U 3 O 8” | p.56; Filed | AIF 2025 | Cigar Lake — capital costs | “Total capital costs” | p.56 — full register Table 21
Inkai life-of-mine (100% JV Inkai) operating C$2,538.4 m (C$12.94/lb); capital C$1,331.0 m; transfer discount 5% of the price (US$4.85/lb at the TR’s US$97) Tables 10–11, block 3 Filed | AIF 2025 | Inkai — operating and capital costs | “Total operating costs” | p.77; Filed | Inkai TR 2024 | Table 19-1 | “Transfer Price Discount $US/lb” | p.97 — full register Table 21
Cameco interests McArthur River 69.805%; Cigar Lake 54.5%; JV Inkai 40%; Westinghouse 49% Table 9; Tables 10–12 Filed | FY2025 MD&A | McArthur River/Key Lake summary | “Ownership” | p.78; Filed | FY2025 MD&A | Cigar Lake summary | “Cigar Lake is the world’s highest-grade uranium mine” | p.82; Filed | Q2 2026 interim FS | Note — equity-accounted investees | “JV Inkai is the operator” | p.11; Filed | AIF 2025 | Risks — Westinghouse | “We beneficially own 49% of Westinghouse” | p.133 — full register Table 21
Realized price at a uranium price of US$40 / 60 / 80 / 100 / 120 / 140 / 160, 2027 (US$/lb) 46 / 58 / 69 / 74 / 76 / 78 / 80 Tables 10–11 price row (2026–2030 rows in the register) Filed | Q2 2026 MD&A | Price sensitivity analysis: uranium segment | “2027 |" | p.23 — full register Table 21
Saskatchewan royalties basic 5% less 0.75% credit; profit 10% to C$13.03/lb, 15% above; surcharge 3% Tables 10–11, blocks 1–2 Filed | AIF 2025 | Government regulation — royalties | “Basic royalty : This royalty is calculated as 5% of gross sales” | p.112; Filed | AIF 2025 | Government regulation — royalties | “Profit royalty : A 10% royalty is charged on profit” | p.112; Filed | AIF 2025 | Government regulation — royalties | “we also pay a corporate resource surcharge of” | p.112 — full register Table 21
Kazakhstan fiscal terms (JV Inkai) MET 15% (2026 tier to 4,000 tU) plus price add-on; corporate tax 20% Tables 10–11, block 3 Filed | Inkai TR 2024 | Taxes and royalties | “a new MET rate will be introduced” | p.109; Filed | Inkai TR 2024 | Taxes and royalties | “The rate of corporate income tax on aggregate income is” | p.109 — full register Table 21
Canadian statutory tax rate (federal + Saskatchewan) 26.9% Tables 10–12, 16 Filed | FY2025 audited FS | Note 20 — income taxes, rate reconciliation | “Combined federal and provincial tax rate” | p.44 — full register Table 21
Fuel services 2026 outlook revenue C$610–650 m; 13–14 million kgU; unit cost C$33.50–35.80/kgU Tables 10, 14 Filed | Q2 2026 MD&A | 2026 Financial Outlook | “Revenue” | p.19; Filed | Q2 2026 MD&A | 2026 Financial Outlook | “Production (owned and operated properties)" | p.19; Filed | Q2 2026 MD&A | 2026 Financial Outlook | “Average unit cost of sales (including D&A)" | p.19 — full register Table 21
Westinghouse (49%) Cameco-share adj. EBITDA US$370–430 m (2026); 49% of net debt C$2,187,023 k Tables 10, 14, 15 Filed | Q2 2026 MD&A | 2026 Financial Outlook | “Adjusted EBITDA (non-IFRS, see page 40)" | p.19; Derived | current LTD 48,695 + LTD 4,682,928 − cash 268,310 (FY2025 audited FS p.34) × 49% — full register Table 21
2026 capital: sustaining; capacity replacement C$205–230 m; C$165–175 m Table 16 Filed | FY2025 MD&A | Capital spending table | “Total sustaining capital” | p.53; Filed | FY2025 MD&A | Capital spending table | “Total capacity replacement capital” | p.53 — full register Table 21
Net cash; provisions (current; non-current), 30 Jun 2026 C$115,968 k; C$60,872 k; C$987,512 k Table 12 Derived | Cash and cash equivalents 1,112,718 − Long-term debt 996,750 (Q2 2026 interim FS p.4); Filed | Q2 2026 interim FS | Balance sheet | “Provisions” | p.4 — full register Table 21
Shares outstanding; options, 30 Jun 2026 435,532,978; 39,063 Table 12 Filed | Q2 2026 interim FS | Note 10 — share capital | “common shares outstanding” | p.14 — full register Table 21
Uranium price, trailing 3 / 6 / 12-month and five-year averages (US$/lb) 85.19 / 85.52 / 83.54; five-year 67.82 opening block; Table 18 Derived | means of the two month-end price rows above (Cameco uranium price page); Derived | mean of 60 month-end values, Cameco uranium price page (UxC/TradeTech), saved 10 Oct 2026 — full register Table 21

Source: the filings named in each row; the full source register is Table 21 in Section 10.1. Cameco financial information.

Free sample — the full valuation, open to every reader

7.1 Method selection

Table 8. Valuation method selection and weights

Method (each emits a value per share) Why it applies Weight
SOTP NAV at target P/NAV Three producing uranium mines on their life-of-mine plans, fuel services and the Westinghouse stake, bridged to equity (7.2) 50%
EV/EBITDA Next-twelve-month adjusted EBITDA (Cameco’s share of Westinghouse included) at the producer anchor (7.3) 30%
FCF-yield support Free cash flow before growth capital from disclosed lines, plus the Westinghouse stake (7.4) 20%
Cross-checks Market-implied deck, own-multiple history, equity-accounted carrying value, consensus — in the conclusion and the model’s out file 0%

Source: this analysis; producer method set and default weights per the commodity stock valuation guide (Producer, mining).

7.2 Net asset value

Table 9. Vehicle map — how each asset reaches Cameco’s equity

Asset Vehicle Cameco interest How it is valued Home
McArthur River/Key Lake Unincorporated joint venture, proportionately consolidated; Cameco operator 69.805% Life-of-mine DCF (block 1) in rows
Cigar Lake Unincorporated joint venture, proportionately consolidated; Cameco operator 54.5% Life-of-mine DCF (block 2) in rows
JV Inkai Equity-accounted joint venture; Kazatomprom operator (60%) 40% Life-of-mine DCF at the transfer price (block 3) in rows
Fuel services Wholly owned refining, conversion and fabrication 100% Guided margin DCF (block 4) in rows
Westinghouse Equity-accounted; Brookfield 51% 49% EV/EBITDA at the services anchor less 49% of net debt (block 5) in rows
Global Laser Enrichment; US ISR; Yeelirrie, Kintyre Equity-accounted (GLE 49%); care and maintenance; exploration — No filed economics excl.

Source: Q2 2026 interim financial statements (equity-accounted investees); FY2025 MD&A property summaries; 2025 AIF. Cameco financial information.

Table 10. Per-asset NPV build — base case (US$90/lb, 8% real)

#Line itemValueBasis / source
1. McArthur River/Key Lake — producing
1Production, Cameco share, 18.39 years12.73 Mlb/yrFiled | AIF 2025 | McArthur River — operating and capital costs | p.40–41
2×Price, discount-weighted (C$/lb)C$118.96/lbDerived | contract-book realized price 2027–2030, deck thereafter; × FX 1.392
3−Operating costC$21.72/lbFiled | life-of-mine operating cost per lb
4−Royalties (Saskatchewan)C$21.78/lbDerived | Table 7 fiscal terms
5−CapitalC$5.16/lbDerived | life-of-mine capital ÷ life-of-mine pounds
6=Pre-tax marginC$70.29/lbDerived | rows 2 − 3 − 4 − 5
7×(1 − tax)0.731×Input | statutory rate, capital deducted as spent
8=After-tax cash flow, discount-weightedC$654.3 m/yrDerived | rows 1 × 6 × 7
9×Σ discount factors, 18.39 yr at 8%9.4623Derived
10=McArthur River/Key Lake NPVC$6,191.3 mDerived | rows 8 × 9
2. Cigar Lake — producing
1Production, Cameco share, 10.39 years8.45 Mlb/yrFiled | AIF 2025 | Cigar Lake — operating and capital costs | p.55–56
2×Price, discount-weighted (C$/lb)C$116.59/lbDerived | contract-book realized price 2027–2030, deck thereafter; × FX 1.392
3−Operating costC$23.94/lbFiled | life-of-mine operating cost per lb
4−Royalties (Saskatchewan)C$20.54/lbDerived | Table 7 fiscal terms
5−CapitalC$7.69/lbDerived | life-of-mine capital ÷ life-of-mine pounds
6=Pre-tax marginC$64.41/lbDerived | rows 2 − 3 − 4 − 5
7×(1 − tax)0.731×Input | statutory rate, capital deducted as spent
8=After-tax cash flow, discount-weightedC$397.8 m/yrDerived | rows 1 × 6 × 7
9×Σ discount factors, 10.39 yr at 8%6.8773Derived
10=Cigar Lake NPVC$2,735.6 mDerived | rows 8 × 9
3. Inkai (JV, 40%) — producing
1Production, Cameco share, 19.39 years3.92 Mlb/yrFiled | AIF 2025 | Inkai — operating and capital costs | p.77
2×Price, discount-weighted (C$/lb)C$119.02/lbDerived | deck × (1 − 5.0% transfer discount) × FX 1.392
3−Operating costC$12.94/lbFiled | life-of-mine operating cost per lb
4−Mineral extraction taxC$19.04/lbDerived | Table 7 fiscal terms
5−CapitalC$6.79/lbDerived | life-of-mine capital ÷ life-of-mine pounds
6=Pre-tax marginC$80.25/lbDerived | rows 2 − 3 − 4 − 5
7×(1 − tax)0.800×Input | statutory rate, capital deducted as spent
8=After-tax cash flow, discount-weightedC$251.9 m/yrDerived | rows 1 × 6 × 7
9×Σ discount factors, 19.39 yr at 8%9.6873Derived
10=Inkai (JV, 40%) NPVC$2,440.0 mDerived | rows 8 × 9
4. Fuel services — producing
1Gross margin incl. D&A (2026 outlook midpoints)C$162.2 mFiled | Q2 2026 MD&A | 2026 Financial Outlook | p.19
2×(1 − tax)0.731×Input | statutory rate
3=After-tax cash flowC$118.6 m/yrDerived
4×Annuity factor, 25 yr at 8%10.6748Input | 25-year horizon
5=Fuel services NPVC$1,265.9 mDerived
5. Westinghouse (49%) — producing
1Adjusted EBITDA, Cameco share (US$400 m × 1.392)C$556.8 mFiled | Q2 2026 MD&A | 2026 Financial Outlook | p.19
2×EV/EBITDA, services anchor7.0×Input | services anchor
3−49% of Westinghouse net debtC$2,187.0 mDerived | FY2025 audited FS | Note 11 | p.34
4=Westinghouse equity valueC$1,710.6 mDerived | US Government Participation Interest: no effect below US$17.5 bn of distributions (FY2025 MD&A p.60)
6. Resource conversion — exclusive M&I beyond every plan
1Σ in-plan mine NPVsC$11,366.8 mDerived | blocks 1–3
2÷Mineral reserves, Cameco share433.0 MlbFiled | FY2025 MD&A | Mineral reserves table | p.110
3×M&I exclusive of reserves, Cameco share56.1 MlbFiled | FY2025 MD&A | property summaries | p.78, 82, 86
4×Conversion factor0.30×Input | M&I conversion band
5=Resource conversion NPVC$441.8 mDerived

Source: 2025 AIF life-of-mine tables (McArthur River p.40–41, Cigar Lake p.55–56, Inkai p.77); Q2 2026 MD&A price sensitivity (p.23) and 2026 outlook (p.19); Inkai technical report 2024 Table 19-1; model claude/valuation-models/cameco-ccj.py. Cameco financial information.

Table 11. Per-asset model — base case (US$90/lb, 8% real)

# Asset Interest Volume (Mlb/yr) Life (yr) Price (C$/lb) Operating (C$/lb) Royalty/MET (C$/lb) Capital (C$/lb) Tax Rate NPV (C$ m)
1 McArthur River/Key Lake 69.805% 12.73 18.39 118.96 21.72 21.78 5.16 26.9% 8% 6,191.3
2 Cigar Lake 54.5% 8.45 10.39 116.59 23.94 20.54 7.69 26.9% 8% 2,735.6
3 Inkai (JV, 40%) 40.0% 3.92 19.39 119.02 12.94 19.04 6.79 20.0% 8% 2,440.0

Source: Table 10; discount-weighted averages over each plan’s remaining life. Cameco financial information.

Table 12. NAV build-up and equity bridge (base case — US$90/lb, 8% real)

# Line item Value Note
1 McArthur River/Key Lake NPV C$6,191.3 m Table 10, block 1
2 + Cigar Lake NPV C$2,735.6 m Table 10, block 2
3 + Inkai (JV, 40%) NPV C$2,440.0 m Table 10, block 3
4 + Fuel services NPV C$1,265.9 m Table 10, block 4
5 + Westinghouse (49%) equity value C$1,710.6 m Table 10, block 5
6 + Resource conversion C$441.8 m Table 10, block 6
7 = Enterprise NAV C$14,785.1 m Derived
8 + Net cash C$116.0 m Derived | Q2 2026 interim FS | balance sheet | p.4 (cash 1,112.7 − debt 996.8)
9 − FX and interest-rate derivatives, fair value C$95.2 m Filed | Q2 2026 interim FS | fair value note | p.20 (no uranium hedges)
10 − Reclamation and other provisions C$1,048.4 m Filed | Q2 2026 interim FS | balance sheet | p.4 (carrying value)
11 − Non-controlling interest C$0.0 m Filed | Q2 2026 interim FS | balance sheet | p.4
12 − Capitalised corporate administration C$1,788.4 m Derived | C$252.5 m × (1 − 0.269) × annuity 19.39 yr at 8% (to Inkai’s 2045 plan end)
13 + Convertible debt at face C$0.0 m None — common shares not convertible (FY2025 FS p.39)
14 − Stream / prepaid deferred revenue n/a Not applicable — no stream or prepayment
15 + Working capital, current tax and non-current other liabilities C$100.0 m Derived | Q2 2026 interim FS | p.4 and note 8 p.13 | receivables 337.1 + inventories 767.1 − payables 504.2 − current other liabilities less current derivatives 157.4 (derivatives in line 9) + current tax 17.1 − 20.2 − non-current other liabilities less derivatives 339.5 (product loans 262.3, pension 73.6, lease 12.2, deferred sales, other)
16 + Long-term receivables, investments & other C$868.2 m Filed | Q2 2026 interim FS | p.4 | incl. the C$209 m CRA cash deposit (Q2 2026 MD&A p.17), a contingent recovery at face; equity-accounted investees in rows
17 = Equity NAV C$12,937.2 m Derived | enterprise NAV plus the claim lines
18 ÷ Fully diluted shares 435.6 m shares Filed | Q2 2026 interim FS | share capital note; options by treasury method
19 = NAV per share C$29.70 Derived
of which producing (+ the whole bridge) C$28.687 Derived
of which development (risked) C$0.000 Derived | no development asset
of which resource (M&I conversion) C$1.014 Derived
Current share price C$137.51 Market | TSX close, 11 Aug 2026
= P/NAV (equity form) 4.63× Derived

Source: Table 10; Q2 2026 interim financial statements, balance sheet (p.4) and fair-value note (p.20). Cameco financial information.

Figure 8. NAV build-up and equity bridge

C$ m, base case: US$90/lb, 8% real discount rate
20,000
15,000
10,000
5,000
0
+6,191.3
+2,735.6
+2,440.0
+1,265.9
+1,710.6
+441.8
+116.0
−95.2
−1,048.4
−0.0
−1,788.4
+100.0
+868.2
12,937.2
McArthur
River/Key Lake
Cigar
Lake
Inkai
Fuel
services
Westing-
house
Resource
Net
cash
FX
and interest-rate derivatives
Reclamation
and other provisions
Non-controlling
interest
Capitalised
corporate administration
Working
capital
Long-term
receivables
Equity
NAV

Figure 9. NAV/share sensitivity — uranium price × discount rate

Uranium price (US$/lb)
60 75 Base90 105 120
Discount rate6% C$21.31 C$27.64 C$33.71 C$39.42 C$44.88
8% (base) C$19.03 C$24.49 C$29.70 C$34.59 C$39.23
10% C$17.19 C$21.96 C$26.48 C$30.70 C$34.68

Notes to Figure 9. 1. Checksum: the cell one step below the base, US$75/lb at 8%, recomputes to C$24.49: McArthur River C$5,018.0 m + Cigar Lake C$2,216.4 m + Inkai C$1,948.4 m + fuel services C$1,265.9 m + Westinghouse C$1,710.6 m + resource at 0.30× C$356.9 m, bridge −C$1,847.9 m, equity C$10,668.3 m ÷ 435.6 m shares; the grid holds the conversion factor at 0.30×, Table 17 moves it by column. 2. Every rate row re-discounts each asset’s year-by-year schedule, the contract-book years included; nothing is scaled.

7.3 Relative valuation

Table 13. Target-multiple driver line (one line, applied to every multiple)

Driver Scorecard dimension (Section 9) Adjustment
Cigar Lake 16.33% and McArthur River 6.48% U3O8; 433.0 Mlb attributable reserves Dim 1 Asset quality & scale ★★★★★ +0.04
Life-of-mine operating cost C$21.72/lb (McArthur) and C$23.94/lb (Cigar); purchases lift unit cost of sales to C$63.00–67.50/lb Dim 2 Cost position & margins ★★★★ +0.02
433.0 Mlb reserves, about 21 years at the 2026 production midpoint; Cigar Lake ends in 2036 Dim 3 Reserves, life & replacement ★★★★ +0.02
Net cash C$116.0 m at 30 Jun 2026; C$1.0 bn revolver undrawn to 2029 Dim 5 Balance sheet & liquidity ★★★★★ +0.04
Dividend doubled to C$0.24 since 2023 against a 0.8% forward FCF yield and an unproven Westinghouse return Dim 6 Capital allocation & returns ★★★ 0.00
78% of attributable reserves in Saskatchewan; Inkai (22%) under a rising Kazakh MET Dim 8 Jurisdiction & geopolitics ★★★★ +0.02
Σ signed adjustments +0.14

Source: Section 9 scorecard; producer anchors per the valuation guide’s anchor table; the stars’ filed inputs from Cameco financial information.

Table 14. Forward EBITDA build — the next twelve months at the base price

# Line item Value Note
1 Uranium sales volume 30.5 Mlb Filed | 2026 outlook midpoint (2027 not guided — held)
2 × Realized price, month-weighted 5/12 2026 + 7/12 2027 C$96.63/lb Derived | contract-book sensitivity at a US$90 market price × 1.392
3 = Uranium revenue C$2,947.2 m Derived
4 − Uranium cost of sales incl. D&A (C$65.25/lb) C$1,990.1 m Filed | 2026 outlook midpoint
5 + Fuel services gross margin incl. D&A C$162.2 m Filed | 2026 outlook midpoints
6 + Depreciation and amortization added back C$293.1 m Filed | FY2025 run-rate
7 − Administration, exploration and R&D C$337.5 m Filed | 2026 outlook midpoints
8 + Westinghouse adjusted EBITDA, Cameco share C$556.8 m Filed | 2026 outlook midpoint × 1.392
9 = Forward adjusted EBITDA C$1,631.6 m Derived

Source: Q2 2026 MD&A, 2026 Financial Outlook (p.19) and price sensitivity (p.23); FY2025 audited financial statements (D&A). Cameco financial information.

Table 15. Relative valuation — implied value per share (base case)

Method Build Multiple Implied value/share
SOTP NAV at target P/NAV NAV/share C$29.70 (Table 12) × 1.14 1.14× C$33.86
EV/EBITDA C$1,631.6 m × 8.0 + bridge incl. 49% Westinghouse net debt C$2,246.5 m ÷ 435.6 m 8.0× C$24.81

Source: Tables 12 and 14. Cameco financial information.

7.4 FCF-yield support

Table 16. FCF-yield support build — the next twelve months at the base price

# Line item Value Note
1 Forward EBITDA excluding Westinghouse C$1,074.8 m Table 14 less row 8
2 − Sustaining capital C$217.5 m Filed | 2026 plan midpoint
3 − Capacity replacement capital C$170.0 m Filed | 2026 plan midpoint
4 − Cash tax, statutory basis C$210.3 m 26.9% × (EBITDA − D&A)
5 = FCF before growth capital C$477.1 m Derived
6 ÷ Target FCF yield 6.1% anchor 7% ÷ (1 +0.14)
7 + Westinghouse (49%) equity value C$1,710.6 m Table 10, block 5
8 = FCF-yield support per share C$21.88 Derived | ÷ 435.6 m shares

Source: Table 14; FY2025 MD&A capital spending table (p.53); FY2025 audited financial statements note 20 (tax rate). Cameco financial information.

7.5 Scenarios & fair value

Table 17. Scenarios & fair value — inputs, value per method and the blend by grid price

Deep Bear US$60 Bear US$75 Base US$90 Bull US$105 Deep Bull US$120
Discount rate 12% 10% 8% 8% 8%
Resource conversion factor 0.25× 0.25× 0.30× 0.35× 0.40×
NAV/share before the P/NAV 15.62 21.84 29.70 34.79 39.68
SOTP NAV × 1.14 (50%) 17.81 24.90 33.86 39.66 45.24
EV/EBITDA 8.0× (30%) 17.21 21.93 24.81 26.42 27.34
FCF-yield 6.1% (20%) 10.49 17.57 21.88 24.29 25.68
Blended fair value 16.16 22.54 28.75 32.61 35.96
Memo: blend at 8%, conversion 0.30×, multiples held 18.11 24.06 28.75 32.50 35.70

Source: model claude/valuation-models/cameco-ccj.py; Tables 10–16. Cameco financial information.

Figure 10. Value per share by method and scenario

Scenario (price)
Deep BearUS$60 BearUS$75 BaseUS$90 BullUS$105 Deep BullUS$120
MethodSOTP NAV × 1.14 (50%) C$17.81(−47%) C$24.90(−26%) C$33.86(base) C$39.66(+17%) C$45.24(+34%)
EV/EBITDA 8.0× (30%) C$17.21(−31%) C$21.93(−12%) C$24.81(base) C$26.42(+6%) C$27.34(+10%)
FCF-yield 6.1% (20%) C$10.49(−52%) C$17.57(−20%) C$21.88(base) C$24.29(+11%) C$25.68(+17%)
Blended fair value C$16.16(−44%) C$22.54(−22%) C$28.75(base) C$32.61(+13%) C$35.96(+25%)

Conclusion. The blended base-case fair value is C$28.75, inside a C$16.16 (Deep Bear, US$60) – C$35.96 (Deep Bull, US$120) range, against a C$137.51 price — an implied −79.1%, Overvalued (wide band), the qualifier earned because the Deep Bear blend sits 88% below the price. Rating-flip prices: up into Modestly overvalued only above ~$404/lb (+349% from the base price); there is no lower read to flip into. The market-implied deck of ~$597/lb — the uranium price at which the blend with the multiples held equals the share price, read off the grid prices’ held blends — compares with a twelve-month range of the month-end price of US$75.13 to US$94.28; at year-end 2025 the shares traded on 28.3× that year’s adjusted EBITDA, four times the 7.0× producer anchor. Forward free cash flow before growth capital is C$477.1 m, a 0.8% yield on the C$59,895.5 m market capitalisation.

The NAV leg (C$29.70, a 4.63× P/NAV) sits above the two cash-flow legs (C$24.81 and C$21.88) because it values McArthur River and Cigar Lake at the deck from 2031, while the next twelve months still carry contract-book prices near US$69/lb. McArthur River/Key Lake is the asset that matters: C$6,191.3 m of the C$14,785.1 m enterprise NAV on 12.73 Mlb a year, ahead of Cigar Lake (C$2,735.6 m) and Inkai (C$2,440.0 m). Fuel services adds C$1,265.9 m on its guided margin and Westinghouse C$1,710.6 m after its debt; exclusive measured and indicated resources add C$441.8 m at a 0.30× conversion factor. The bridge takes C$1,847.9 m off, most of it reclamation and capitalised head-office cost, against C$116.0 m of net cash.

The read does not hinge on the rate or the multiples. At 6% the base NAV/share is C$33.71 and at 10% C$26.48; no scenario column, including US$120/lb uranium, puts the blend above 27% of the price or any method above a third of it. The gap is the uranium price: the market pays for a deck several times any month on record, or for a Westinghouse worth far more than one year’s guided EBITDA at a services multiple — value this model, on filed figures, does not find. The two assumptions that would close it are a much higher long-term contract price written into Cameco’s book after 2030, and a market listing of Westinghouse at a reactor-builder multiple; neither is in a filing dated on or before 12 August 2026. Each US$15/lb step between grid prices moves NAV/share by about C$4.89 at 8%, and the blend by C$3.86 between US$90 and US$105. Three inputs are not filed and are held or bounded instead: 2027 guidance (the 2026 outlook carries the next twelve months), the depreciation inside the fuel-services unit cost, and Cameco’s unused tax pools; none of them could close a gap of this size.

What the market-implied price means is narrower than a forecast. It is the single uranium price at which the blend, with every multiple held, equals the C$137.51 share price, read along the five grid prices and extended beyond the top one; it is not a price anyone has quoted. Paying C$137.51 is therefore a bet that uranium settles far above the contract book’s 2027–2030 prices for the life of McArthur River, or that something outside the model — Westinghouse’s reactor pipeline, Global Laser Enrichment, the idle US and Australian assets — is worth many times what the filings support today.

Table 18. Assumptions box

# Field Setting
1 Valuation date and price 12 Aug 2026; C$137.51 TSX close on 11 Aug 2026; spot fair value
2 Deck uranium price US$60 · 75 · 90 · 105 · 120/lb, base US$90 (trailing 3/6/12-month averages 85.19 / 85.52 / 83.54); realized price from Cameco’s contract-book sensitivity 2027–2030, the deck thereafter
3 Secondary deck none — fuel services held at 2026 guidance; Westinghouse on its own EBITDA
4 Discount rate 8% real after-tax (contracted long-life uranium); grid rows 6 / 8 / 10%; 12 / 10 / 8 / 8 / 8% by column
5 FX US$1.00 = C$1.392 (11 Aug 2026), every column
6 NAV basis attributable life-of-mine pounds, P/NAV in equity form on fully diluted shares
7 Mid-cycle base US$90 sits 32.7% above the US$67.82 five-year average — target multiples held at the anchors, the deck flexed
8 Tax basis Canada 26.9% statutory and Saskatchewan royalties per row; Kazakhstan 20% corporate tax and MET; capital deducted as spent
9 Reclamation provisions at carrying value, 30 Jun 2026
10 Stage risk none — every mine producing; resource tier at the conversion factor 0.25 · 0.25 · 0.30 · 0.35 · 0.40× by scenario column; 0.30× on the rate × price grid and every held-blend series
11 Gap register 2027 guidance n/d (Q2 2026 MD&A p.19 searched) — 2026 held; either direction, −10% on NTM volume = −C$1.05 on the blend · tax pools n/d (FY2025 FS note 20 p.42–44; Q2 2026 MD&A p.17) — up: pools lower cash tax; bound ≤ +C$1.58 on the blend at zero cash tax · fuel-services D&A split n/d (FY2025 MD&A segment results) — up: the guided margin is after D&A; bound ≤ segment D&A, inside the C$293.1 m add-back; horizon −5 yr = −C$0.13 · own EV/EBITDA 2023–2025 31.3× / 21.5× / 28.3× (out file); 2021–2022 n/d (no year-end share count on disk) — cross-check only, no weight · consensus n/d (no capture ≤ 12 Aug 2026) — cross-check, no weight · GLE, US ISR and Australia excl. — up, unbounded (no study)

Source: this analysis; the model’s out file (claude/valuation-models/cameco-ccj.out.md) carries the deck sensitivity, the P/NAV map and the cross-checks.

8. Near-term catalysts (1–3 years)

Table 19. Near-term catalysts

Catalyst Timing (from guidance) Why it benefits Cameco
Westinghouse listing The US Government may require an IPO at ≥ US$30 bn before January 2029, once its interest vests A first public mark on the 49% stake Section 7 carries at C$1,710.6 m after its debt
Inkai ramp to its licence 2026 plan 10.4 Mlb (100%) Lifts Cameco’s entitlement toward 4.2 Mlb a year from the lowest-cost asset
Contract book rolling toward market 2028–2030 At a US$100 market the realized price rises from US$80/lb in 2028 to US$88/lb in 2030
Capital plan steps down 2027–2028 Total capital falls from C$490–540 m (2026) to C$400–450 m and C$350–400 m
2027 guidance With the FY2026 results, early 2027 Replaces the 2026 outlook Section 7 holds for the next twelve months
CRA dispute resolved No date filed — Cameco has asked the CRA to reverse its 2007–2013 adjustments (Q2 2026 MD&A p.17) Returns up to C$559 m remitted or secured

Source: Cameco Q2 2026 MD&A (price sensitivity p.23, CRA p.17); FY2025 MD&A capital outlook (p.53); 2025 AIF (Inkai p.67); FY2025 MD&A (Westinghouse Participation Interest and IPO right, p.60). Timing is company guidance, not a guarantee.

Most of these are scheduled or contracted; the swing item is the Westinghouse listing, and it moves the value axis only.

9. Rating & verdict

Figure 11. Scorecard by dimension, 12 August 2026

Assets & scale★★★★★15%
Cost & margins★★★★15%
Reserves & life★★★★15%
Balance sheet★★★★★15%
Capital allocation★★★15%
Growth★★★6.25%
Management★★★★6.25%
Jurisdiction★★★★6.25%
ESG★★★★6.25%
Score by dimension Weighted composite ★★★★ (4.09)
Each ring is one star; the outer ring is ★★★★★. Weights in Table 20.

Figure data: Table 20. Each spoke prints its stars and weight; the dashed ring is the weighted composite, 4.09/5.

Table 20. Scorecard rationale (sorted by weight)

Dimension Weight Score Rationale
1. Asset quality & scale 15% ★★★★★ Cigar Lake 16.33% and McArthur River 6.48% U₃O₈ against 0.03% at the Kazakh ISR operations; 433.0 Mlb attributable — top of the peer set on grade, second to Kazatomprom on scale (FY2025 MD&A p.110, 31 Dec 2025; peers §2.9)
2. Cost position & margins 15% ★★★★ Life-of-mine operating C$21.72–23.94/lb (US$15.60–17.20) below Kazatomprom’s US$29.00–30.50 AISC and Paladin’s US$43.3, above NexGen’s C$13.86 study cost; purchases lift 2026 unit cost of sales to C$63.00–67.50/lb (2025 AIF p.40, p.56; Q2 2026 MD&A p.19)
3. Reserves, life & replacement 15% ★★★★ 433.0 Mlb P&P, about 21 years at the 2026 midpoint — 1.8 times NexGen’s 240 Mlb and 4.4 times Denison’s 97.8 Mlb; no replacement ratio published, and Cigar Lake’s plan ends in 2036 (FY2025 MD&A p.110; peer AIFs 2025)
5. Balance sheet & liquidity 15% ★★★★★ Net cash C$116.0 m at 30 Jun 2026, C$1.0 bn revolver undrawn to 2029, first maturity C$400 m in October 2027 — the strongest in the peer set, where NexGen and Denison still carry development funding needs (Q2 2026 interim FS p.4; FY2025 FS note 13)
6. Capital allocation & returns 15% ★★★ Dividend doubled to C$0.24 and 2025 capex of C$333 m under its C$360–400 m outlook, against a 0.8% forward FCF yield and a Westinghouse carrying amount down from C$2,931.7 m to C$2,671.8 m — the peer median, not above it (FY2025 MD&A p.30; FY2024 MD&A p.46; FY2025 FS p.34)
4. Growth & optionality 6.25% ★★★ Inkai’s licence to 10.4 Mlb (4.2 Mlb Cameco’s share) and C$120–135 m of 2026 growth capital, but no new mine sanctioned while NexGen and Denison each carry a development-scale project (2025 AIF p.67; FY2025 MD&A p.53)
7. Management & governance 6.25% ★★★★ CEO Tim Gitzel since 2011 with the sector’s supply-discipline record; seven of nine nominees (78%) independent; no 5% holder; the Westinghouse return unproven (Circular 2026 p.12, p.18; peers’ boards per their AIFs)
8. Jurisdiction & geopolitics 6.25% ★★★★ 336.6 Mlb, 77.7% of reserves, in Saskatchewan — matched in the peer set by NexGen and Denison only at smaller scale; Inkai’s 22% under a MET rising from 6% (2023) to 2026 tiers of 4–18% (FY2025 MD&A p.110; Inkai TR 2024 p.109)
9. ESG & licence to operate 6.25% ★★★★ 2025 recordable injury rate 1.78 against a 1.80 target; a 30% Scope 1+2 cut targeted by 2030; C$989.9 m reclamation provision secured by C$1,125.2 m of letters of credit — above the developers, which carry no operating record (Circular 2026 p.92; FY2025 FS p.38)
Composite 100% ★★★★ Solid

Source: as cited per row — Cameco financial information and the peer filings of §2.9. Every score is relative to the peer set declared in §2.9.

The arithmetic: Σ(weight × stars) = 0.75 + 0.60 + 0.60 + 0.75 + 0.45 + 0.19 + 0.25 + 0.25 + 0.25 = 4.09/5 → ★★★★, Solid. Producer weights: asset quality, cost, reserves, balance sheet and capital allocation at 15% each, the other four at 6.25%.

The two-axis verdict, as of 12 August 2026: ★★★★ Solid, Overvalued (wide band) → “Full”. The blended fair value of C$28.75 against C$137.51 is an implied −79.1%, and the market-implied deck of ~$597/lb compares with a twelve-month month-end range of US$75.13–94.28. The target multiples — P/NAV 1.14×, EV/EBITDA 8.0×, FCF yield 6.1% — carry Dims 1 and 5 at +0.04, Dims 2, 3 and 8 at +0.02 and Dim 6 at 0.00 (Table 13).

The bull case is scarcity: no one can build another Cigar Lake, and a decade of Western fuel-cycle rebuilding could price pounds in the ground above any filed plan. The bear case is arithmetic: even at US$120/lb the blend values the shares at 26% of the price, and no method at more than a third of it, and the stake the bull case leans on has never been priced by anyone but its owners. What tips it is the Westinghouse listing and the long-term price written into contracts after 2030 — both move the value axis, neither the quality axis. To rank Cameco against its peers on these nine dimensions, screen the sector on Metal Pilot’s uranium mining stock screener.

10. Sources, methodology & disclaimer

10.1 Sources, methodology & data vintage

Company filings. Cameco 2025 annual report and MD&A (13 February 2026), audited financial statements and the 2025 Annual Information Form; Q1 and Q2 2026 interim statements and MD&A (balance sheet at 30 June 2026); FY2022–FY2024 audited statements and MD&A; the 2026 management proxy circular. Technical reports: McArthur River (effective 31 December 2018), Cigar Lake (filed 22 March 2024) and Inkai (effective 30 September 2024), all NI 43-101. Peers: Kazatomprom 2025 integrated annual report; NexGen and Denison 2025 AIFs; Paladin quarterly report to 30 June 2026. Market: Yahoo Finance daily closes for CCJ, CCO.TO and CADUSD=X to 11 August 2026; Cameco’s uranium price page (UxC/TradeTech month-ends, August 2021 – July 2026).

Methodology. Data as of 12 August 2026, market data at the 11 August 2026 close (C$137.51). Deck: base uranium US$90/lb on the US$60 · 75 · 90 · 105 · 120/lb grid, every grid price a scenario, 8% real; the read is Overvalued (wide band) — NAV/share C$29.70, blend C$28.75, implied −79.1%, market-implied deck ~$597/lb. Scorecard on producer weights against the §2.9 peer set. Cadence: refreshed on each annual report and on material events — the Westinghouse listing or 2027 guidance would trigger a re-run. Re-run log: 10 October 2026 — reworked to instruction version 61 with a standalone model; rating 4.3 → 4.1 (High quality → Solid), read unchanged. Omitted figures: the asset map (components only); FY2025 revenue by segment, replaced by the 2026 guided split. Data gaps: 2027 guidance (not filed by the as-of; FY2025, Q1 and Q2 2026 MD&A checked); the fuel-services depreciation split (FY2025 MD&A p.47); tax pools (FY2025 FS note 20); a reserve-replacement ratio (FY2025 MD&A, 2025 AIF); FY2021 adjusted EBITDA (FY2022 MD&A); analyst consensus (no archived capture); the board committee list (2025 AIF p.149–151). The model’s deck sensitivity, P/NAV map, cross-checks and FX sensitivity are in its out file, claude/valuation-models/cameco-ccj.out.md. Re-run 10 October 2026 (gate fixes): the bridge split by claim — current derivatives out of working capital, non-current other liabilities of C$339.5 m and current tax carried in the working-capital line, the CRA deposit named in line 16; NAV/share C$30.35 → C$29.70, blend C$29.32 → C$28.75, implied −78.7% → −79.1%, read unchanged.

Table 21. Full source register for the valuation

InputValueAs ofWhere §7 uses itSource
Management's discussion and analysis, year ended 31 December 2025 (13 Feb 2026)
Cigar Lake — mineral reserves, 31 Dec 2025proven 263.7 kt at 17.06% = 99.2 Mlb; probable 215.3 kt at 15.43% = 73.2 Mlb; total 479.0 kt at 16.33% = 172.4 Mlb (100%); Cameco share 94.1 Mlb; metallurgical recovery 98.9%31 Dec 2025NAV build — Cigar Lake block (reserves)Filed | FY2025 MD&A | Mineral reserves table | "Cigar Lake" | p.110
McArthur River — mineral reserves, 31 Dec 2025proven 1,942.0 kt at 6.65% = 284.6 Mlb; probable 484.2 kt at 5.79% = 61.8 Mlb; total 2,426.2 kt at 6.48% = 346.5 Mlb (100%); Cameco share 241.9 Mlb; metallurgical recovery 99.2%31 Dec 2025NAV build — McArthur River/Key Lake block (reserves)Filed | FY2025 MD&A | Mineral reserves table | "McArthur River" | p.110
Key Lake — mineral reserves (stockpiles), 31 Dec 2025total 61.1 kt at 0.52% = 0.7 Mlb (100%); Cameco share 0.6 Mlb31 Dec 2025NAV build — McArthur River/Key Lake block (reserves)Filed | FY2025 MD&A | Mineral reserves table | "Key Lake" | p.110
Inkai — mineral reserves, 31 Dec 2025proven 269,017.7 kt at 0.03% = 194.1 Mlb; probable 90,674.4 kt at 0.02% = 47.2 Mlb; total 359,692.2 kt at 0.03% = 241.2 Mlb (100%); Cameco share 96.5 Mlb; metallurgical recovery 85.0%31 Dec 2025NAV build — Inkai block (reserves)Filed | FY2025 MD&A | Mineral reserves table | "Inkai" | p.110
Total mineral reserves, 31 Dec 2025760.8 Mlb (100%); Cameco share 433.0 Mlb31 Dec 2025NAV build — reserve tier totalFiled | FY2025 MD&A | Mineral reserves table | "Total" | p.110
McArthur River/Key Lake — resources (Cameco share)measured and indicated 4.7 Mlb at 2.25% U3O8; inferred 1.7 Mlb at 2.81%31 Dec 2025NAV — resource-conversion rowFiled | FY2025 MD&A | McArthur River/Key Lake summary | "Estimated resources" | p.78
Cigar Lake — resources (Cameco share)measured and indicated 14.3 Mlb at 5.05% U3O8; inferred 10.9 Mlb at 5.55%31 Dec 2025NAV — resource-conversion rowFiled | FY2025 MD&A | Cigar Lake summary | "Estimated resources" | p.82
Inkai — resources (Cameco share)measured and indicated 37.1 Mlb at 0.03% U3O8; inferred 8.9 Mlb31 Dec 2025NAV — resource-conversion rowFiled | FY2025 MD&A | Inkai summary | "Estimated resources" | p.86
McArthur River ownership69.805%31 Dec 2025NAV — attributable basisFiled | FY2025 MD&A | McArthur River/Key Lake summary | "Ownership" | p.78
Cigar Lake ownership54.5%31 Dec 2025NAV — attributable basisFiled | FY2025 MD&A | Cigar Lake summary | "Cigar Lake is the world's highest-grade uranium mine" | p.82
Total uranium production, Cameco shareFY2025 21.0; FY2024 23.4; 2026 plan 19.5–21.5 Mlb31 Dec 2025§2 production; §7 group volumeFiled | FY2025 MD&A | Uranium production table | "Total" | p.77
Stock options outstanding39,063 at C$15.2731 Dec 2025§7 diluted countFiled | FY2025 MD&A | Outstanding share data | "stock options outstanding, with an exercise price of" | p.31
Sustaining capital, Cameco share — 2025 actual / 2026 plan (C$ m): uranium; fuel services; other; total84 / 110–120; 52 / 95–105; 8 / 0–5; 144 / 205–23031 Dec 2025§7 FCF-yield support buildFiled | FY2025 MD&A | Capital spending table | "Total sustaining capital" | p.53
Capacity replacement capital (uranium) — 2025 actual / 2026 plan (C$ m)121 / 165–17531 Dec 2025§7 FCF-yield support buildFiled | FY2025 MD&A | Capital spending table | "Total capacity replacement capital" | p.53
Management's discussion and analysis, quarter ended 30 June 2026
2026 outlook — productionuranium 19.5–21.5 Mlb; fuel services 13–14 million kgU30 Jun 2026Table 14 — 2026 guidance rowFiled | Q2 2026 MD&A | 2026 Financial Outlook | "Production (owned and operated properties)" | p.19
2026 outlook — sales/delivery volumeuranium 29–32 Mlb; fuel services 13–14 million kgU30 Jun 2026Table 14 — 2026 guidance rowFiled | Q2 2026 MD&A | 2026 Financial Outlook | "Sales/delivery volume" | p.19
2026 outlook — uranium average realized priceC$91.00–96.00/lb30 Jun 2026Table 14 — 2026 guidance rowFiled | Q2 2026 MD&A | 2026 Financial Outlook | "Average realized price" | p.19
2026 outlook — average unit cost of sales (incl. D&A)uranium C$63.00–67.50/lb; fuel services C$33.50–35.80/kgU30 Jun 2026Table 14 — 2026 guidance rowFiled | Q2 2026 MD&A | 2026 Financial Outlook | "Average unit cost of sales (including D&A)" | p.19
2026 outlook — revenueconsolidated C$3,320–3,570 m; uranium C$2,700–2,910 m; fuel services C$610–650 m30 Jun 2026Table 14 — 2026 guidance rowFiled | Q2 2026 MD&A | 2026 Financial Outlook | "Revenue" | p.19
2026 outlook — Westinghouse adjusted EBITDA (Cameco share)US$370–430 m30 Jun 2026§7 Westinghouse equity-stake rowFiled | Q2 2026 MD&A | 2026 Financial Outlook | "Adjusted EBITDA (non-IFRS, see page 40)" | p.19
Committed deliveries, 2026–2030average about 28 Mlb per year30 Jun 2026§7 volume / realized-price buildFiled | Q2 2026 MD&A | Price sensitivity analysis | "commitments requiring delivery of an average of about" | p.23
Expected realized uranium price at spot US$40/60/80/100/120/140/160, 2026 (US$/lb)58 / 62 / 66 / 67 / 68 / 69 / 6930 Jun 2026§7 realized-price deckFiled | Q2 2026 MD&A | Price sensitivity analysis: uranium segment | "2026 |" | p.23
Expected realized uranium price at spot US$40/60/80/100/120/140/160, 2027 (US$/lb)46 / 58 / 69 / 74 / 76 / 78 / 8030 Jun 2026§7 realized-price deckFiled | Q2 2026 MD&A | Price sensitivity analysis: uranium segment | "2027 |" | p.23
Expected realized uranium price at spot US$40/60/80/100/120/140/160, 2028 (US$/lb)49 / 60 / 72 / 80 / 84 / 89 / 9230 Jun 2026§7 realized-price deckFiled | Q2 2026 MD&A | Price sensitivity analysis: uranium segment | "2028 |" | p.23
Expected realized uranium price at spot US$40/60/80/100/120/140/160, 2029 (US$/lb)53 / 62 / 75 / 85 / 91 / 96 / 10130 Jun 2026§7 realized-price deckFiled | Q2 2026 MD&A | Price sensitivity analysis: uranium segment | "2029 |" | p.23
Expected realized uranium price at spot US$40/60/80/100/120/140/160, 2030 (US$/lb)53 / 63 / 76 / 88 / 94 / 100 / 10630 Jun 2026§7 realized-price deckFiled | Q2 2026 MD&A | Price sensitivity analysis: uranium segment | "2030 |" | p.23
2026 outlook — direct administration; exploration; R&DC$245–260 m; C$30–35 m; C$50–55 m30 Jun 2026§7 corporate cost lineFiled | Q2 2026 MD&A | 2026 Financial Outlook | "Direct administration costs" | p.19
Condensed consolidated interim financial statements, 30 June 2026
JV Inkai ownershipCameco 40%; Kazatomprom 60% (operator)30 Jun 2026NAV — Inkai blockFiled | Q2 2026 interim FS | Note — equity-accounted investees | "JV Inkai is the operator" | p.11
Cash and cash equivalentsC$1,112,718 k (31 Dec 2025: C$1,114,860 k)30 Jun 2026§7 bridge — cashFiled | Q2 2026 interim FS | Balance sheet | "Cash and cash equivalents" | p.4
Long-term receivables, investments and otherC$868,173 k (current portion C$30,089 k)30 Jun 2026§7 bridge — investmentsFiled | Q2 2026 interim FS | Balance sheet | "Long-term receivables, investments and other" | p.4
Other liabilities (current; non-current)C$213,216 k; C$379,038 k30 Jun 2026§7 bridge — other liabilitiesFiled | Q2 2026 interim FS | Balance sheet | "Other liabilities" | p.4
Long-term debt (no current portion)C$996,750 k30 Jun 2026§7 bridge — debtFiled | Q2 2026 interim FS | Balance sheet | "Long-term debt" | p.4
Provisions (current; non-current) — reclamation-led, note 9C$60,872 k; C$987,512 k30 Jun 2026§7 rehabilitation provisionFiled | Q2 2026 interim FS | Balance sheet | "Provisions" | p.4
Common shares outstanding, 30 Jun 2026435,532,978 shares; options on 39,063 shares30 Jun 2026§7 share count (basic)Filed | Q2 2026 interim FS | Note 10 — share capital | "common shares outstanding" | p.14
Net cash, 30 Jun 2026 (cash − long-term debt)C$115,968 k30 Jun 2026§7 bridge — net debtDerived | Cash and cash equivalents 1,112,718 − Long-term debt 996,750 (Q2 2026 interim FS p.4)
Derivatives at 30 Jun 2026 — foreign currency contracts (asset; liability); interest rate contracts (liability)C$91 k; C$93,968 k; C$1,330 k30 Jun 2026§7 bridge — derivativesFiled | Q2 2026 interim FS | Note — fair value | "Foreign currency contracts" | p.20
Annual Information Form, year ended 31 December 2025
Westinghouse ownershipCameco 49%; Brookfield 51%31 Dec 2025NAV — Westinghouse equity stakeFiled | AIF 2025 | Risks — Westinghouse | "We beneficially own 49% of Westinghouse" | p.133
McArthur River/Key Lake — LOM operating cost (2026–2044, constant 2025 C$, 100% MRJV)total C$7,529.2 m; C$21.72/lb U3O831 Dec 2025§7 asset model row — McArthur costFiled | AIF 2025 | McArthur River — operating and capital costs | "Total operating cost per pound U 3 O 8" | p.40
McArthur River/Key Lake — LOM mill production (2026–2044, 100%)346.6 Mlb31 Dec 2025§7 asset model row — McArthur volumeFiled | AIF 2025 | McArthur River — operating and capital costs | "mill production of" | p.40
McArthur River/Key Lake — LOM capital (2026–2044, 100% MRJV)total C$1,790.0 m (mine C$692.4 m; mill C$671.8 m)31 Dec 2025§7 asset model row — McArthur capitalFiled | AIF 2025 | McArthur River — capital costs | "Total capital costs" | p.41
Cigar Lake — LOM operating cost (constant 2025 C$, 100%)total C$4,082.5 m; C$23.94/lb U3O831 Dec 2025§7 asset model row — Cigar costFiled | AIF 2025 | Cigar Lake — operating costs | "Total operating cost per pound U 3 O 8" | p.56
Cigar Lake — LOM capital (100%)total C$1,310.6 m31 Dec 2025§7 asset model row — Cigar capitalFiled | AIF 2025 | Cigar Lake — capital costs | "Total capital costs" | p.56
Cigar Lake — remaining LOM mill production (100%)170.5 Mlb31 Dec 2025§7 asset model row — Cigar volumeFiled | AIF 2025 | Cigar Lake — operating and capital costs | "mill production of" | p.55
Inkai — LOM operating and capital cost (2026–2045, 100% JV Inkai)operating C$2,538.4 m (C$12.94/lb); capital C$1,331.0 m31 Dec 2025§7 asset model row — InkaiFiled | AIF 2025 | Inkai — operating and capital costs | "Total operating costs" | p.77
Saskatchewan basic royalty5% of gross sales of uranium, less the Saskatchewan resource credit of 0.75%31 Dec 2025§7 McArthur/Cigar margin rows — royaltyFiled | AIF 2025 | Government regulation — royalties | "Basic royalty : This royalty is calculated as 5% of gross sales" | p.112
Saskatchewan profit royalty tiers10% on profit up to C$28.732/kg U3O8 (C$13.03/lb); 15% on profit above31 Dec 2025§7 McArthur/Cigar margin rows — profit royaltyFiled | AIF 2025 | Government regulation — royalties | "Profit royalty : A 10% royalty is charged on profit" | p.112
Saskatchewan corporate resource surcharge3% of the value of resource sales31 Dec 2025§7 McArthur/Cigar margin rows — surchargeFiled | AIF 2025 | Government regulation — royalties | "we also pay a corporate resource surcharge of" | p.112
JV Inkai licensed production and Cameco's share10.4 Mlb/yr (100%), 4.2 Mlb our share; prior licence 5.2 Mlb (3.0 Mlb our share)31 Dec 2025§7 Inkai block — Cameco volumeFiled | AIF 2025 | Inkai — Implementation Agreement | "JV Inkai has the right to produce 10.4 million pounds of" | p.67
Cameco purchase entitlement during ramp-up57.5% of the first 5.2 Mlb; 22.5% of incremental production to a 4.2 Mlb maximum; 40% once ramp-up is complete31 Dec 2025§7 Inkai block — Cameco volumeFiled | AIF 2025 | Inkai — Implementation Agreement | "during the ramp-up, we are entitled to purchase" | p.68
Inkai Operation NI 43-101 technical report (effective 30 Sep 2024)
Inkai NPV basis — transfer price discount 2026 / JV Inkai average price 2026 (US$/lb)4.85 / 92.1530 Sep 2024§7 Inkai NPV re-strikeFiled | Inkai TR 2024 | Table 19-1 | "Transfer Price Discount $US/lb" | p.97
Kazakh MET — 2023 / 2025 rate; 2026 volume tiers (to 500 / 1,000 / 2,000 / 3,000 / 4,000 / over 4,000 tU)6% / 9%; tiers 4% / 6% / 9% / 12% / 15% / 18%30 Sep 2024§7 Inkai block — METFiled | Inkai TR 2024 | Taxes and royalties | "a new MET rate will be introduced" | p.109
Kazakh MET 2026 price add-on (over US$70 / 80 / 90 / 100 / 110 per lb)+0.5% / 1.0% / 1.5% / 2.0% / 2.5%30 Sep 2024§7 Inkai block — METFiled | Inkai TR 2024 | Taxes and royalties | "Weighted average price of natural uranium concentrate" | p.109
Kazakh corporate income tax rate (JV Inkai)20%30 Sep 2024§7 Inkai block — taxFiled | Inkai TR 2024 | Taxes and royalties | "The rate of corporate income tax on aggregate income is" | p.109
Consolidated financial statements, year ended 31 December 2025
Depreciation and amortization FY2025; FY2024 (C$ k)C$293,094 k; C$280,702 k31 Dec 2025§3 five-year tableFiled | FY2025 audited FS | Income statement | "Depreciation and amortization" | p.7
Combined federal and provincial (Saskatchewan) statutory tax rate, 2025; 202426.9%; 26.9%31 Dec 2025§7 tax basis — Canadian rowsFiled | FY2025 audited FS | Note 20 — income taxes, rate reconciliation | "Combined federal and provincial tax rate" | p.44
Westinghouse net debt at 31 Dec 2025, 100% and Cameco 49% (C$ k)C$4,463,313 k; C$2,187,023 k31 Dec 2025§7 Westinghouse EV-to-equity bridgeDerived | current LTD 48,695 + LTD 4,682,928 − cash 268,310 (FY2025 audited FS p.34) × 49%
Market and price series
CADUSD0.7184 US$ per C$ (USDCAD 1.392)11 Aug 2026§7 FX lineMarket | Yahoo Finance | "CADUSD=X" daily history, "Close" | 11 Aug 2026
Uranium trailing averages to Jul 2026 (US$/lb): spot 3 / 6 / 12-month; long-term 3 / 6 / 12-monthspot 85.19 / 85.52 / 83.54; long-term 95.00 / 93.00 / 89.0431 Jul 2026§7 deck — 3/6/12-month basesDerived | means of the two month-end price rows above (Cameco uranium price page)
Uranium five-year average, Aug 2021 – Jul 2026 (US$/lb): spot; long-term67.82; 67.9631 Jul 2026§7 deck — five-year referenceDerived | mean of 60 month-end values, Cameco uranium price page (UxC/TradeTech), saved 10 Oct 2026

Source: the filings and market series named in each row; Table 7 in Section 7 lists the load-bearing subset. Cameco financial information.

10.2 Disclaimer & disclosure

This analysis is for informational purposes only and is not investment advice. It is a point-in-time snapshot as of 12 August 2026: the price, the multiples, the NAV and the two-axis verdict move with the market and the uranium price. Reserves and resources are NI 43-101 estimates and may be revised; the valuation is a model on stated assumptions. The rating and read are analytical judgments, not a recommendation to buy or sell. This report was prepared with AI assistance from primary filings — verify before relying on any figure.