Centrus Energy (LEU) — Stock Analysis 2026 [3.3]

Uranium Energy Metals Company Analysis
USD

Analysis as of 26 October 2026. Price deck: base SWU US$110/SWU — the representative recent price, set from the EIA’s 2024 and 2025 prints of what US utilities paid per separative work unit — on the fixed US$80 · 95 · 110 · 125 · 140/SWU grid, with every grid price run as a scenario (deep bear US$80 to deep bull US$140) and the SWU price at which NAV meets the share price as a 0% cross-check — no spot price; uranium is held at US$90/lb. At US$98.44 a share the market implies an SWU deck of US$200/SWU. Fundamentals from Centrus’s FY2025 10-K and Q2 2026 10-Q; market data at the 26 October 2026 NYSE close; all figures in US dollars. Refreshed on each annual report and on material events. Rating: ★★★½ Solid / Overvalued (wide band).

Centrus Energy sells enriched uranium — separative work units (SWU) — and natural uranium to utilities from a US$3.7 bn backlog that runs to 2040, and operates the Department of Energy’s high-assay low-enriched uranium (HALEU) cascade at Piketon, Ohio. The thesis in one line: the cash and the backlog are real, but at US$98.44 the shares price an SWU deck of US$200 — nearly twice anything US utilities paid in 2021–2025 — while a model on filed margins finds US$55.12. Why now: the shares have fallen from a US$390.82 close a year ago to a 52-week low, the Piketon expansion still has no filed capital estimate, and the import-ban waivers for Russian enrichment end in 2027. To screen Centrus against every listed uranium name, go to Metal Pilot’s uranium mining stock screener.

1. Snapshot & thesis

Centrus Energy Corp. (NYSE: LEU) is a nuclear-fuel supplier — archetype processor / converter, sector uranium and nuclear fuel — headquartered in Bethesda, Maryland. It reports two segments: LEU, which sells SWU and natural uranium bought under the Orano Supply Agreement (deliveries to 2030) and the 2011 TENEX contract, and Technical Solutions, which runs the HALEU cascade at Piketon, Ohio, for the DOE. A third asset, the commercial expansion of LEU and HALEU capacity at Piketon announced on 25 September 2025, is in development. Centrus mines nothing, so there are no reserves; the valuation runs on segment margins. (SWU = separative work unit, the measure of enrichment effort; HALEU = uranium enriched to between 5% and 20% U-235.)

Figure 1. Centrus Energy in numbers, as of 26 October 2026

US$98.44 /sh
Share price — NYSE, 26 Oct 2026 · 52-week low
US$1,964 m
Market capitalisation — 19.953 m basic shares
US$448.7 m
Revenue — FY2025 · +1.5% YoY
26.2%
Gross margin — FY2025 · US$117.5 m
US$60.1 m
EBITDA — FY2025 · 13.4% margin
US$3.7 bn
LEU segment backlog — 30 Jun 2026, to 2040
US$661.0 m
Net cash — 30 Jun 2026, convertibles at face
US$52.31 /sh
NAV per share — US$110/SWU, 10% · 1.88× P/NAV
US$55.12 /sh
Blended fair value — implied −44.0%
US$200 /SWU
Market-implied SWU deck — 26 Oct 2026
3.3/5
Quality rating — Solid
Overvalued
Valuation read — wide band · 26 Oct 2026

Figure data: Table 1; NAV, blend and market-implied deck per Section 7, rating per Section 9.

Table 1. Centrus Energy in numbers

Metric Value As of Source
Share price; market capitalisation US$98.44; US$1,964.2 m on 19.953 m basic shares 26 Oct 2026 close Market · Yahoo Finance · “LEU daily history, Close” · 26 Oct 2026; Derived · price × Class A and Class B shares
52-week closing range US$98.44 (26 Oct 2026)–390.82 (29 Oct 2025) 26 Oct 2026 Market · Yahoo Finance · “LEU daily history, Close” · 26 Oct 2026
Revenue US$448.7 m (+1.5% YoY) FY2025 Filed · FY2025 10-K · Consolidated Statements of Operations · “Total revenue” · p.107
Gross profit; margin US$117.5 m (LEU US$111.5 m, Technical Solutions US$6.0 m); 26.2% FY2025 Filed · FY2025 10-K · Item 7 — segment results · “Gross profit” · p.73
EBITDA; margin US$60.1 m; 13.4% of revenue FY2025 Derived · operating income US$50.2 m + D&A US$9.9 m (FY2025 10-K p.107, p.108)
Net income; diluted EPS US$77.8 m; US$3.90 FY2025 Filed · FY2025 10-K · Consolidated Statements of Operations · “Diluted” · p.107
LEU segment backlog US$3.7 bn, extending to 2040 30 Jun 2026 Filed · Q2 2026 10-Q · MD&A — backlog · “our backlog was approximately $3.7 billion and $2.9 billion” · p.42
Net cash US$661.0 m — cash US$1,868.5 m less US$1,207.5 m of convertible notes at face 30 Jun 2026 Derived · Q2 2026 10-Q balance sheet p.7 and Note 6 p.18
NAV per share; P/NAV US$52.31; 1.88× 26 Oct 2026 Derived · Table 11
Blended fair value US$55.12 (range US$39.29–73.76) 26 Oct 2026 Derived · Table 16
Valuation read; implied return Overvalued (wide band); −44.0% 26 Oct 2026 Derived · Table 16 and the Section 7 conclusion
Market-implied SWU deck US$200/SWU 26 Oct 2026 Derived · Section 7 conclusion
Quality rating 3.3/5 Solid 26 Oct 2026 Derived · Table 19

Source: Centrus SEC filings — FY2025 10-K (statements p.106–108, segment results p.73), Q2 2026 10-Q (balance sheet p.7, debt note p.18, backlog p.42); share prices per Yahoo Finance daily history at the 26 October 2026 close.

Thesis in brief. Bull: US$661.0 m of net cash, a backlog worth 10.7 years of FY2025 LEU segment revenue and the DOE’s HALEU and LEU production awards give Centrus a funded place in a US fuel cycle that is rebuilding enrichment; a filed expansion at sound returns would add value the model holds at cost. Bear: the LEU segment resells enrichment it buys — much of it Russian — on terms it does not disclose, at a 32.2% gross margin in 2025, and even at US$140/SWU the blend reaches only US$73.76, 25% below the price. What tips it: a filed capital estimate, schedule and contracted offtake for the expansion, and supply secured past the 2027 waiver deadline and the 2030 end of the Orano agreement. Full rating in Section 9.

How to read this analysis: the statcards and Section 9 carry the verdict; Sections 2–6 carry the evidence, Section 7 the valuation.

2. Assets & operations

How enrichment, conversion and term contracting sit in the uranium market is covered in Uranium — A Complete Market Guide. Centrus’s assets are one site and two supply contracts: the Piketon plant it operates, and the Orano and TENEX agreements behind the SWU it resells.

2.1 Portfolio overview

Table 2. Centrus Energy segments and assets, by value

Asset Country Stage Interest Output Reserves Life Unit cost Base value Listing / operator
LEU segment — SWU and uranium sales US (supply from France and Russia) Producing 100% US$346.2 m revenue, FY2025 n/a — no mine; backlog US$3.7 bn to 2040 (backlog) n/d — gross margin 32.2% US$650.1 m Centrus Energy Corp. (NYSE: LEU)
Piketon commercial expansion (LEU and HALEU) US — Ohio Development 100% n/d n/a n/d n/d US$113.0 m (at cost) American Centrifuge Operating (Centrus)
Technical Solutions — DOE HALEU cascade US — Ohio Producing (DOE contract) 100% 900 kg HALEU, Phase 2; US$102.5 m revenue, FY2025 n/a backlog to 2034 (US$0.8 bn) n/d — gross margin 5.9% US$80.7 m American Centrifuge Operating (Centrus)

Source: Centrus SEC filings — FY2025 10-K (revenue p.107, segment results p.73), Q2 2026 10-Q (backlog p.42, HALEU p.55); base values from Table 9 at US$110/SWU and 10%.

The LEU segment carries 77% of FY2025 revenue and 77.1% of enterprise NAV, and the two largest customers took 31% of FY2025 revenue. Piketon carries the rest: the HALEU cascade, the expansion, and property, plant and equipment of US$142.5 m at 30 June 2026, up from US$29.5 m at the year end.

2.2 Revenue split

Figure 2. Revenue by product (SWU, uranium, technical solutions)

SWU
Technical Solutions
Uranium
66.6% (US$298.7m)
22.8% (US$102.5m)
10.6% (US$47.5m)

Source: Centrus FY2025 10-K, Consolidated Statements of Operations p.107; shares of US$448.7 m sum to 100.0%.

Figure 3. Enterprise value by segment (base case)

LEU segment
Piketon expansion, at cost
Technical Solutions
77.1% (US$650.1m)
13.4% (US$113.0m)
9.6% (US$80.7m)

Source: this analysis — Table 9 at US$110/SWU and 10%; shares of the US$843.8 m enterprise NAV sum to 100.1% on rounding.

SWU is two-thirds of revenue and the LEU segment over three-quarters of value; uranium sales swing with what Centrus chooses to sell — US$103.1 m in 2024, US$47.5 m in 2025.

2.3 LEU segment

The LEU segment is held directly by Centrus Energy Corp. at 100%, with no encumbrance filed. It buys SWU under the Orano Supply Agreement, signed in 2018 with deliveries to 2030, and the 2011 TENEX Supply Contract with Russia’s state supplier — TENEX is “a major supplier of SWU to the Company”, on annual quotas the 10-K keeps confidential — and sells it with natural uranium from inventory to utilities. SWU revenue grew from US$208.2 m (2023) to US$246.8 m (2024) and US$298.7 m (2025); SWU volumes are not disclosed. Gross profit was US$111.5 m in 2025 and US$93.9 m in 2024, and US$79.5 m in the first half of 2026 against US$81.9 m a year earlier. The backlog rose from US$2.9 bn at the year end to US$3.7 bn at 30 June 2026 and extends to 2040. No cost per SWU is filed. The one asset risk is supply: the import-ban waivers that let Russian SWU into the US end in 2027.

2.4 Piketon HALEU cascade and expansion

Technical Solutions runs through American Centrifuge Operating (ACO), 100% owned, on the leased DOE site at Piketon, where the DOE retains the decommissioning. Phase 2 of the HALEU Operation Contract covers the production of 900 kg of HALEU UF₆, and the segment’s backlog, US$0.8 bn at 30 June 2026, runs to 2034. Segment revenue rose from US$51.2 m (2023) to US$102.5 m (2025), but gross profit fell from US$17.6 m (2024) to US$6.0 m (2025), and was −US$1.7 m in Q2 2026. The DOE also awarded ACO two IDIQ contracts — HALEU production on 16 October 2024 and LEU production on 10 December 2024 — which fund work only through task orders.

The commercial expansion, announced on 25 September 2025, is the development asset. Its remaining capital, first-production date, ramp by year and capacity are n/d, and the NRC licence status for the expanded plant is n/d — the approvals in hand are not itemised in the filings. What is filed is the spend: capital expenditure of US$94.8 m in H1 2026 against US$5.7 m a year earlier, property, plant and equipment up from US$29.5 m to US$142.5 m, and deposits for financial assurance up from US$2.7 m to US$33.2 m.

2.5 Deliveries, backlog & costs

Figure 4. LEU segment revenue — SWU and uranium

LEU segment revenue (US$m)
400
300
200
100
0
269.0
349.9
346.2
FY2023
FY2024
FY2025
Fiscal year (SWU and uranium revenue combined)

Source: Centrus FY2025 10-K, Consolidated Statements of Operations p.107 (SWU and uranium lines).

Figure 5. LEU segment backlog (US$ bn)

Backlog (US$ bn)
4
3
2
1
0
2.9
3.7
31 Dec 2025
30 Jun 2026
Balance-sheet date (the split by delivery period is not filed)

Source: Centrus Q2 2026 10-Q, MD&A — backlog p.42.

The LEU segment earned a 32.2% gross margin in 2025 and 26.8% in 2024; Technical Solutions 5.9% and 19.1%. In the first half of 2026 the segment sold US$141.6 m of SWU and US$56.4 m of uranium. Centrus reports cost of sales by segment only, so margin is the cost read.

2.6 Peer positioning

The peer set is the listed Western nuclear-fuel suppliers with filed financials — Cameco, Energy Fuels, BWX Technologies and ASP Isotopes; Urenco and Orano, the true enrichment peers, are unlisted. None is in a pending deal; the set is used for every star in Section 9.

Table 3. Peer positioning — quality metrics

Company Listing Revenue, FY2025 Margin, FY2025 Net cash, 30 Jun 2026 Asset base
Centrus Energy Public (NYSE: LEU) US$448.7 m 26.2% gross US$661.0 m One enrichment site; LEU resale book
Cameco Public (NYSE: CCJ / TSX: CCO) C$3,482 m 27.9% gross C$116 m (approximately) Three mines, fuel services, 49% of Westinghouse
Energy Fuels Public (NYSE American: UUUU) US$65.9 m 20.9% cash US$261.7 m (US$961.7 m cash and securities less US$700.0 m of notes) US uranium mines and the White Mesa mill
BWX Technologies Public (NYSE: BWXT) n/d n/d n/d Naval reactors and nuclear components
ASP Isotopes Public (NASDAQ: ASPI) n/d n/d n/d Isotope enrichment

Source: Centrus SEC filings; Cameco 2025 annual MD&A (consolidated financial results p.17) and Q2 2026 interim statements; Energy Fuels’ revenue, cash margin and net cash are Derived · Energy Fuels analysis Table 1, on its FY2025 10-K and Q2 2026 10-Q. Margin bases differ — gross profit for Centrus and Cameco, cash margin for Energy Fuels; currencies as reported.

Centrus’s 26.2% gross margin sits beside Cameco’s 27.9% and above Energy Fuels’ 20.9% cash margin, and its net cash is the largest in the set. BWX Technologies and ASP Isotopes are shown for their business lines; their figures are n/d here, so they inform the scores only qualitatively.

3. Financials & balance sheet

Table 4. Five-year financial summary (US$m unless stated)

Metric FY2021 FY2022 FY2023 FY2024 FY2025
Revenue 298.3 293.8 320.2 442.0 448.7
YoY % — −1.5% +9.0% +38.0% +1.5%
EBITDA margin 25.8% 23.6% 18.6% 13.3% 13.4%
Net income 175.0 52.2 84.4 73.2 77.8
Diluted EPS (US$) 9.75 3.38 5.44 4.47 3.90
Operating cash flow 50.0 20.6 9.1 37.0 51.0
Capex (sustaining / growth split n/d) 1.2 0.7 1.6 4.1 19.7
Free cash flow 48.8 19.9 7.5 32.9 31.3
Net debt (cash), carrying (92.0) (84.2) (111.6) (198.9) (782.4)
Net debt / EBITDA net cash net cash net cash net cash net cash
Diluted shares (m) 13.879 14.988 15.501 16.373 19.925
DPS (US$) none none none none none

Source: Centrus SEC filings — FY2025 10-K (statements p.106–108) for FY2023–FY2025, FY2023 10-K (statements p.96–98) for FY2021–FY2022, FY2022 10-K (balance sheet p.83) for FY2021 cash and debt. EBITDA = operating income + D&A; free cash flow = operating cash flow − capital expenditures; net debt = long-term debt at carrying value − cash.

Earnings and cash. Revenue rose from US$298.3 m (FY2021) to US$448.7 m (FY2025), most of it in 2024 (+38.0%), while EBITDA stayed near US$60 m in 2023–2025. Net income has run ahead of operating cash flow — US$77.8 m against US$51.0 m in 2025, US$84.4 m against US$9.1 m in 2023 — as inventories and deferred revenue moved. In the first half of 2026 operating cash flow was −US$16.7 m and capital expenditure US$94.8 m, mostly the expansion; investment income on the cash was US$33.3 m. Capital expenditure is filed as one line, so the sustaining and growth split is n/d.

Cost deck. Centrus gives no guidance — no volume, unit cost or capital — and reports cost of sales by segment only, so the cost read is the segment gross margin (§2.5). Corporate costs, FY2025 gross profit less operating income, were US$67.3 m; in H1 2026 SG&A of US$36.2 m and advanced technology costs of US$29.7 m ran at US$131.8 m a year. Tax was an US$8.1 m expense in 2025, and a US$355.4 m valuation allowance is still held against federal and state deferred tax assets.

Net cash and liquidity. At 30 June 2026 cash was US$1,868.5 m against US$1,207.5 m of convertible notes at face — 2.25% due November 2030 (US$402.5 m) and 0% due August 2032 (US$805.0 m) — for net cash of US$661.0 m; contractual interest was US$4.5 m in the half, and covenants are n/d. Benefit obligations add US$71.7 m (postretirement US$68.8 m, pension US$2.9 m). With net cash larger than ten years of EBITDA, a lower SWU price cannot push leverage up. There is no asset retirement obligation on the face — the DOE retains the Piketon decommissioning — and leases are n/d. Hedge book: unhedged; the 10-K states Centrus does not hedge market risk.

Capital returns. No dividend and no buyback; the at-the-market programme raised US$53.9 m in H1 2026. Diluted shares rose from 15.501 m (FY2023) to 19.925 m (FY2025) and 21.891 m in Q2 2026; 19,952,858 Class A and Class B shares were outstanding at 30 June 2026. How each line is built is in the Financial Metrics guide.

4. Management, strategy & structure

4.1 Management & governance

Amir V. Vexler (53) has been President and CEO since 1 January 2024, after joining as Special Advisor to the Board on 4 December 2023; Todd M. Tinelli (45) joined as Senior Vice President, CFO and Treasurer on 11 August 2025. Mikel H. Williams, independent, has chaired the board since September 2014; the 2026 proxy put up six nominees, five independent under the NYSE definition — all but the CEO — and the Audit and Finance and the Compensation, Nominating and Governance committees are wholly independent. Related-party detail is n/d. A Section 382 rights plan, amended for the seventh time on 18 June 2026, triggers at 4.99% ownership to protect the tax losses; it also deters a large holder.

4.2 Strategy

The strategy is to turn Piketon from a DOE cascade into commercial LEU and HALEU capacity: Phase 2 of the HALEU Operation Contract (900 kg of HALEU), the DOE’s HALEU Production Contract (an IDIQ awarded on 16 October 2024) and LEU Production Contract (10 December 2024), and the commercial expansion announced on 25 September 2025. No capacity target, capital estimate or date is filed for the expansion. Centrus is also exploring a joint venture with Oklo Inc. focused on deconversion (March 2026).

4.3 Ownership & structure

The one acquisition on file is Westerman Holdings, LLC, a centrifuge component manufacturer, announced on 19 October 2026; its price and any stock consideration are n/d. No joint venture is signed — Oklo is exploratory — and no strategic investor is on file; the 2026 proxy lists three holders above 5% of Class A at 27 March 2026: D. E. Shaw (5.1%), BlackRock (5.0%) and Global X (5.0%). Technical Solutions runs through the subsidiary American Centrifuge Operating (ACO). The capital is Class A shares (NYSE: LEU, moved from NYSE American on 4 December 2025) and Class B shares — 19,233,658 and 719,200 at 30 June 2026 — plus the two convertible notes, convertible at US$97.50 (2.25%) and US$229.62 (0%) a share with the principal settled in cash, so only value above the conversion price dilutes — about 0.04 m shares at US$98.44; Q3 2026 at-the-market sales are n/d until the Q3 10-Q.

5. ESG & sustainability

Centrus files little on ESG: no safety rate, emissions target or reporting framework appears in its 10-Ks or 10-Qs, which is why Dimension 9 scores ★★. It has no tailings exposure, since it mines nothing, and no decommissioning provision, because the DOE retains the Piketon site’s decommissioning. Deposits for financial assurance rose from US$2.7 m to US$33.2 m in the first half of 2026. The case for domestic enrichment replacing Russian supply is a policy argument, not a disclosed programme.

6. Risks

Table 5. Risk register

Risk Type Likelihood / impact Exposure Mitigant
Russian supply after 2027 Jurisdiction High / High TENEX is a major SWU supplier; the import-ban waivers end in 2027 Orano Supply Agreement to 2030; inventories of US$377.1 m at 30 Jun 2026
Supply beyond 2030 Operational Medium / High Orano deliveries end in 2030; the backlog runs to 2040 The Piketon expansion; the LEU segment to 2030 alone gives NAV/share US$44.96
Expansion capital and schedule Operational Medium / High No capital estimate, schedule or capacity filed; US$94.8 m spent in H1 2026 Cash of US$1,868.5 m; DOE HALEU and LEU IDIQs
Corporate-cost growth Balance sheet High / Medium H1 2026 SG&A and advanced technology at US$131.8 m a year, against US$67.3 m in 2025 Net cash of US$661.0 m
SWU price Commodity Medium / Medium Each US$15/SWU moves the SOTP by US$5.76 a share US$3.7 bn backlog to 2040
Dilution Balance sheet Medium / Medium US$1,207.5 m of convertibles, convertible at US$97.50 and US$229.62, principal settled in cash; US$53.9 m of at-the-market sales in H1 2026 Coupons of 0% and 2.25%; maturities 2030 and 2032
Customer concentration Counterparty Low / Medium Two largest customers 31% of FY2025 revenue Contracted backlog
DOE contract margin Counterparty Medium / Low Technical Solutions gross profit −US$1.7 m in Q2 2026 Phase 2 HALEU contract; the IDIQ awards

Source: Centrus SEC filings — FY2025 10-K (risk factors p.33), Q2 2026 10-Q (commitments p.24, balance sheet p.7, debt note p.18, segments p.29); the SWU, supply and cost sensitivities from Table 17. Likelihood and impact are this analysis’s assessment.

Figure 6. Risk matrix — likelihood × impact

Impact if it happens
High
Medium
Low
Russian supply 2027
Supply after 2030
Expansion capital
Corporate costs
SWU price
Dilution
Customers
DOE margin
Low
Medium
High
Likelihood over the next five years →

Source: Table 5. The shaded region marks the high-likelihood, high-impact quadrant.

Section 7 prices four of these: the SWU price through the grid, the supply cliff through the LEU-to-2030 case, corporate costs through the run-rate case and dilution through the basic-count case (Table 17, field 11). The expansion is held at cost — the risk and the upside the market carries.

7. Valuation

Valuation as of 26 October 2026, built in US dollars per diluted share against the US$98.44 NYSE close of 26 October 2026. Horizon: spot fair value. Deck: SWU US$110 — the EIA’s weighted-average price paid per separative work unit by US owners and operators — on a US$80–140 grid in US$15 steps, snapped from the 2024 and 2025 prints (US$97.66, US$108.70); uranium US$90/lb (grid US$60–120) held in every column, from its 3-month (US$88.56), 6-month (US$86.87) and 12-month (US$85.34) month-end averages to September 2026; 10% real after-tax.

Centrus is valued as a processor under the Commodity Stock Valuation framework: it mines nothing, so there is no reserve to build a NAV on. A sum of the parts on mid-cycle margins carries 55% of the weight and an FCF-yield support price on the next twelve months 45%. The framework’s third processor method, EV per complexity-adjusted unit, needs an anchor re-sourced from a dataset median or three dated enrichment transactions, and neither is in reach — Urenco and Orano, the true peers, are unlisted — so it is dropped and its weight split across the other two.

Three choices set the level. The first is the deck. No monthly SWU benchmark is public — the UxC and TradeTech indicators are subscriber-only — so the deck is the price US utilities actually paid, the book Centrus sells into; the base sits 7.0% above the US$102.78 five-year average, inside the band where the FCF target moves with the deck. The price reaches gross profit through the LEU segment’s 2024–2025 average SWU revenue of US$272.75 m, with half of each move kept, because Centrus buys most of what it sells from Orano and TENEX on terms it does not disclose. The second is the margin: the LEU segment earned US$111.5 m of gross profit in 2025 and US$93.9 m in 2024, and their average is the mid-cycle base, run to 2040, the end of the US$3.7 bn backlog. The third is the rate: Piketon is the only plant, so the processor convention’s single-site 10% applies, with no jurisdiction premium.

The other two segments are smaller. Technical Solutions earns on the DOE HALEU Operation Contract: its 2024–2025 average gross profit of US$11.8 m, with the US$9.9 m of 2025 depreciation added back and the US$4.1 m of 2024 sustaining capital taken off, runs on an eight-year horizon, to 2034, where the segment’s US$0.8 bn backlog ends. The Piketon expansion is carried at cost: the US$113.0 m increase in PP&E in the first half (capital expenditure US$94.8 m) — no capital estimate, schedule or capacity has been filed, so it cannot be built into a cash flow.

Uranium matters most after SWU. Uranium sales are 16.7% of enterprise NAV — a co-product, held at US$90/lb in every SWU column; a US$15/lb move takes NAV per share to US$50.49 or US$54.14. The SWU pass-through is the first of twelve gaps the assumptions box bounds (Table 17, field 11): at 0.25 or 0.75 NAV per share is US$51.00 or US$53.62. Corporate costs are the larger one: at the H1 2026 run-rate of US$131.8 m a year, against US$67.3 m in 2025, NAV per share falls to US$33.57. The load-bearing inputs are below; the build is in the member section.

From enterprise to equity, the bridge adds value rather than taking it. The LEU segment (US$650.1 m), Technical Solutions (US$80.7 m) and the Piketon expansion at its US$113.0 m cost sum to an enterprise NAV of US$843.8 m at the base deck. Against it sit US$1,207.5 m of convertible notes at face and US$391.7 m for corporate costs — US$67.3 m a year after tax over fourteen years — offset by US$1,796.8 m of cash net of benefit obligations and US$6.4 m of working capital. That leaves US$1,047.9 m of equity, or US$52.31 per diluted share — 20.030 m shares: the basic count, awards and the 2.25% notes’ in-the-money shares — and the price sits 88.2% above it. The rate moves the answer less than the deck: at the base deck NAV per share is US$54.16 at 8% and US$50.74 at 12%.

Table 6. Load-bearing inputs — the filed figures the valuation moves on (full register: Table 20)

Input Value Where §7 uses it Source
SWU price paid, 2024; 2025; five-year average (EIA) US$97.66; US$108.70; US$102.78 per SWU Opening block — the US$110/SWU grid price Market · EIA Uranium Marketing Annual Report 2025 · Table 13 · “Average price (US$ per SWU)” (eia_umar2025_uranium_marketing.txt); Derived · means of m-swu
Uranium month-end price, trailing averages to Sep 2026 3-month US$88.56/lb; 6-month US$86.87/lb; 12-month US$85.34/lb Opening block — uranium held at US$90/lb Derived · Market · Cameco · “Uranium spot price, month-end” · Oct 2025 – Sep 2026
LEU segment revenue (US$m): SWU FY2025; FY2024; uranium FY2025; FY2024 298.7; 246.8; 47.5; 103.1 Table 9, block 1 — the revenue the deck moves Filed · FY2025 10-K · Consolidated Statements of Operations · “Separative work units” · p.107; Filed · FY2025 10-K · Consolidated Statements of Operations · “Uranium” · p.107
Gross profit (US$m): LEU segment FY2025; FY2024; Technical Solutions FY2025; FY2024 111.5; 93.9; 6.0; 17.6 Table 9, blocks 1–2 — the mid-cycle margins Filed · FY2025 10-K · Segment Information · “Gross profit” · p.73
Operating income FY2025; depreciation and amortization FY2025 (US$m) 50.2; 9.9 Table 11 corporate costs; Table 13 Filed · FY2025 10-K · Consolidated Statements of Operations · “Operating income” · p.107; Filed · FY2025 10-K · Consolidated Statements of Cash Flows · “Depreciation and amortization” · p.108
LEU segment backlog, 30 Jun 2026 (extends to 2040) US$3.7 bn Table 9, block 1 — the 14-year life Filed · Q2 2026 10-Q · Backlog · “our backlog was approximately $3.7 billion and $2.9 billion” · p.42
Capital expenditures FY2024; H1 2026; PP&E net 30 Jun 2026; 31 Dec 2025 (US$m) 4.1; 94.8; 142.5; 29.5 Table 9, blocks 2–3 — sustaining capital; the expansion at cost Filed · FY2025 10-K · Consolidated Statements of Cash Flows · “Capital expenditures” · p.108; Filed · Q2 2026 10-Q · Condensed Consolidated Statements of Cash Flows · “Capital expenditures” · p.9; Filed · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · “Property, plant and equipment, net of accumulated depreciation” · p.7
Cash and cash equivalents, 30 Jun 2026 US$1,868.5 m Table 11 — net cash Filed · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · “Cash and cash equivalents” · p.7
Convertible notes principal, 30 Jun 2026: 2.25% due 2030; 0% due 2032 (US$m) 402.5; 805.0 Table 11 — convertibles at face Filed · Q2 2026 10-Q · Note 6 — Debt · “2030
Postretirement and pension benefit obligations, 30 Jun 2026 (US$m) 68.8; 2.9 Table 11 — inside net cash Filed · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · “Postretirement health and life benefit obligations” · p.7
Working capital, 30 Jun 2026 (US$m): receivables; inventories; owed to customers and suppliers; payables; inventory payables; deferred revenue; deferred costs 25.6; 377.1; 235.7; 74.0; 34.8; 85.0; 33.2 Table 11 — working capital Filed · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · “Accounts receivable” · p.7; Filed · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · “Inventories” · p.7; Filed · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · “Accounts payable and accrued liabilities” · p.7; Filed · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · “Deferred revenue and advances from customers” · p.7
Share count: Class A; Class B at 30 Jun 2026; dilutive awards, Q2 2026 (thousands); 2.25% notes conversion price (US$) 19,233,658; 719,200; 38; 97.50 every per-share figure in §7 Filed · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · “Class A Common Stock, par value” · p.7; Filed · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · “Class B Common Stock, par value” · p.7; Filed · Q2 2026 10-Q · Net income per share · “Potentially dilutive shares related to 2.25% Convertible Notes” · p.22; Filed · FY2025 10-K · Note 8 — Debt · “shares of Class A Common Stock per $1,000 principal amount of the notes” · p.129

Source: Centrus SEC filings — FY2025 10-K and Q2 2026 10-Q, pages as cited; EIA Uranium Marketing Annual Report 2025, Table 13; Cameco uranium price month-ends.

Metal Pilot Premium

Valuation workings — Premium

The workings behind this valuation — the method, the models, the sensitivity grids and the scenarios, 11 tables and 3 figures in all — are for Metal Pilot Premium members.

  • 7.1 Method selection
  • 7.2 Sum of the parts
  • 7.3 Relative valuation
  • 7.4 Further weighted methods
  • 7.5 Cross-checks
  • 7.6 Scenarios & fair value

Want to see one first? The Cameco (CCJ) valuation is open to every reader.

Create a Metal Pilot accountLog in

See Premium plansRead a free example

You are signed in, and your plan does not include valuation workings. They come with Metal Pilot Premium.

Upgrade to Premium

The premium section could not be loaded right now.

Premium — unlocked

8. Near-term catalysts (1–3 years)

Table 18. Near-term catalysts

Catalyst Timing Why it matters
Q3 2026 10-Q Early November 2026 Shares after the Westerman consideration and Q3 at-the-market sales; the corporate-cost run-rate
Piketon expansion capital, schedule and capacity Not guided Lets the expansion be valued as a cash flow rather than at cost
DOE task orders under the HALEU and LEU Production Contracts Not guided Funded volume for the expansion
Russian import-ban waivers end 2027 Tests the LEU segment’s supply before the Orano agreement ends in 2030
FY2026 10-K February 2027 Segment margins for the mid-cycle base; the backlog
Oklo deconversion joint venture Not guided A signed agreement would add a line to the SOTP

Source: Centrus SEC filings — FY2025 10-K (expansion p.11, IDIQs p.4), Q2 2026 10-Q (supply p.24), Q1 2026 10-Q (Oklo p.34); the Westerman release of 19 October 2026.

Centrus gives no guidance, so only the 2027 waiver deadline has a filed date; the expansion filing would move the value axis most.

9. Rating & verdict

Figure 10. Scorecard by dimension, 26 October 2026

Assets & scale★★★15%
Cost & margins★★★15%
Reserves & life★★★★15%
Balance sheet★★★★★15%
Capital allocation★★15%
Growth★★★★6.25%
Management★★★6.25%
Jurisdiction★★★6.25%
ESG★★6.25%
Score by dimension Weighted composite ★★★½ (3.30)
Each ring is one star; the outer ring is ★★★★★. Weights in Table 19.

Figure data: Table 19. Each spoke prints its stars and weight; the dashed ring is the weighted composite, 3.30/5.

Table 19. Scorecard rationale — Centrus Energy, 26 October 2026

Dimension Weight Score Rationale
1. Asset quality & scale 15% ★★★ One plant — the DOE HALEU cascade at Piketon — and a resale book on Orano and TENEX supply; FY2025 revenue US$448.7 m against Cameco’s C$3,482 m and Energy Fuels’ US$65.9 m — mid-set on scale, the set’s only enricher (FY2025 10-K p.107; Q2 2026 10-Q p.55; peers §2.6)
2. Cost position & margins 15% ★★★ FY2025 gross margin 26.2% against Cameco’s 27.9% and Energy Fuels’ 20.9% cash margin — the peer median; no cost per SWU disclosed and purchase terms confidential (FY2025 10-K p.73; peers §2.6)
3. Reserves, life & replacement 15% ★★★★ Processor basis: an LEU backlog of US$3.7 bn at 30 Jun 2026, up from US$2.9 bn, extending to 2040 — 10.7 years of FY2025 LEU segment revenue, a contracted life above the peer median; Piketon capacity and utilisation n/d (Q2 2026 10-Q p.42)
5. Balance sheet & liquidity 15% ★★★★★ Net cash US$661.0 m at 30 Jun 2026 — cash US$1,868.5 m against US$1,207.5 m of 0–2.25% convertibles due 2030 and 2032 — the largest in the peer set, ahead of Energy Fuels’ US$261.7 m and Cameco’s C$116 m (Q2 2026 10-Q p.7, p.18; peers §2.6)
6. Capital allocation & returns 15% ★★ Diluted shares up 41.2%, from 15.501 m (FY2023) to 21.891 m (Q2 2026), with no dividend or buyback, and US$94.8 m of H1 2026 capex into an expansion with no filed capital estimate — below Cameco’s dividend record (FY2025 10-K p.107, p.65; Q2 2026 10-Q p.8–9)
4. Growth & optionality 6.25% ★★★★ The Piketon expansion (25 Sep 2025), the DOE HALEU (16 Oct 2024) and LEU (10 Dec 2024) production IDIQs and Phase 2 of the HALEU Operation Contract, funded from cash — above the peer median, though unquantified (FY2025 10-K p.4, p.11; Q1 2026 10-Q p.4)
7. Management & governance 6.25% ★★★ CEO Amir V. Vexler since January 2024 and CFO Todd M. Tinelli since August 2025 — short records beside Cameco’s CEO since 2011; an independent Chair since 2014 and five of six nominees independent; a s.382 rights plan at a 4.99% trigger — the peer median at best (FY2025 10-K p.23; Q2 2026 10-Q p.24; 2026 proxy p.14, p.22)
8. Jurisdiction & geopolitics 6.25% ★★★ The plant is in Ohio under DOE contracts, but TENEX, a Russian state supplier, is a major source of SWU under waivers that end in 2027 — more exposed than Energy Fuels’ all-US asset base, the peer median overall (Q2 2026 10-Q p.24)
9. ESG & licence to operate 6.25% ★★ No safety rate, emissions target or reporting framework in the filings, where Cameco publishes a recordable injury rate and a Scope 1+2 target; no tailings, and the DOE retains the decommissioning (FY2025 10-K; Q2 2026 10-Q)
Composite 100% ★★★½ Solid

Source: as cited per row — Centrus SEC filings and the peer filings of §2.6. Every score is relative to the peer set declared in §2.6.

The arithmetic: Σ(weight × stars) = 0.45 + 0.45 + 0.60 + 0.75 + 0.30 + 0.25 + 0.1875 + 0.1875 + 0.125 = 3.30/5 → ★★★½, Solid. Processor weights on the producer pattern: asset quality, cost, life, balance sheet and capital allocation at 15% each, the other four at 6.25%.

The two-axis verdict, as of 26 October 2026: ★★★½ Solid, Overvalued (wide band) → “Full”. The blended fair value of US$55.12 against the US$98.44 share price is an implied −44.0%, and the market-implied deck of US$200/SWU compares with EIA prints of US$97.66–108.70 in 2021–2025. The 8.7% FCF-yield target carries Dim 5 at +0.04, Dim 3 at +0.02, Dims 1, 2 and 8 at 0.00 and Dim 6 at −0.02 (Table 12).

The bull case is policy: the United States is rebuilding domestic enrichment, Centrus holds the DOE’s HALEU and LEU production awards and the cash to build, and a filed expansion at sound returns would add value the model holds at its US$113.0 m cost. The bear case is the book: the LEU segment resells enrichment it buys, much of it Russian, on undisclosed terms, and even at US$140/SWU the blend reaches US$73.76. What tips it is the expansion’s capital, schedule and contracted offtake, and supply secured beyond 2027 — the first moves the value axis, the second the quality axis. To compare Centrus with the listed uranium names, screen the sector on Metal Pilot’s uranium mining stock screener.

10. Sources, methodology & disclaimer

10.1 Sources, methodology & data vintage

Company filings. Centrus SEC filings: the FY2025 10-K (filed 11 February 2026) and the FY2022–FY2024 10-Ks; the 2026 proxy statement (DEF 14A, 24 April 2026); the Q1–Q3 2023, Q1–Q3 2024, Q1–Q3 2025 and Q1–Q2 2026 10-Qs (balance sheet at 30 June 2026); results releases and 8-Ks from May 2025 to the Westerman release of 19 October 2026. Peers: Cameco 2025 annual MD&A and Q2 2026 interim statements; Energy Fuels FY2025 10-K and Q2 2026 10-Q. Market: the EIA Uranium Marketing Annual Report 2025, Table 13; Cameco’s uranium price page (month-ends, October 2025 – September 2026); Yahoo Finance daily closes for LEU to 26 October 2026.

Methodology. Data as of 26 October 2026, per share on 20.030 m shares (basic at 30 June 2026, awards and the 2.25% notes’ in-the-money shares), market data at the 26 October 2026 NYSE close (US$98.44). Deck: base SWU US$110/SWU on the US$80 · 95 · 110 · 125 · 140/SWU grid, every grid price a scenario, uranium held at US$90/lb, 10% real; the read is Overvalued (wide band) — NAV/share US$52.31, blend US$55.12, implied −44.0%, market-implied deck US$200/SWU. Segment margins are the FY2024–FY2025 averages; the scorecard uses processor weights on the producer pattern against the §2.6 peer set. Cadence: refreshed on each annual report and on material events — the Q3 2026 10-Q, an expansion capital estimate or a change to Russian supply would trigger a re-run.

Re-run log. 27 October 2026 — first publication, the model run with the Section 9 stars (driver line × 1.04). 27 October 2026, gate fixes — the share count rebuilt from the filed conversion terms (20.030 m, from the Q2 weighted 21.891 m) and the Technical Solutions term filed to 2034: NAV/share up 9.3% to US$52.31, blend US$55.12, implied −44.0%; the read is unchanged, Overvalued (wide band).

Omitted figures. The asset map (components only); the backlog by delivery period (not filed — Figure 5 shows the two filed totals); SWU volumes and unit cost (not disclosed). Data gaps: related-party detail; the Q3 2026 10-Q (shares after the Westerman consideration and Q3 at-the-market sales); the Westerman price; the expansion’s capital, schedule and capacity (FY2025 10-K, Q1–Q2 2026 10-Qs, 2025–2026 releases checked); subscriber SWU and uranium benchmarks (UxC, TradeTech); analyst consensus (no archived capture); BWX Technologies’ and ASP Isotopes’ consolidated figures. The model’s deck sensitivity, P/NAV map, cross-checks and uranium deck sensitivity are in its out file, claude/valuation-models/centrus-energy-leu.out.md.

Table 20. Source register — the filed figures behind the valuation (load-bearing inputs: Table 6)

InputValueAs ofWhere §7 uses itSource
Form 10-K, year ended 31 December 2025
Revenue — separative work units (SWU), FY2025 · FY2024 · FY2023US$298.7 m · $246.8 m · $208.2 m31 Dec 2025§2 revenue mix; §7 LEU segmentFiled · FY2025 10-K · Consolidated Statements of Operations · "Separative work units" · p.107
Revenue — uranium, FY2025 · FY2024 · FY2023US$47.5 m · $103.1 m · $60.8 m31 Dec 2025§2 revenue mix; §7 LEU segmentFiled · FY2025 10-K · Consolidated Statements of Operations · "Uranium" · p.107
Revenue — Technical Solutions, FY2025 · FY2024 · FY2023US$102.5 m · $92.1 m · $51.2 m31 Dec 2025§2 revenue mix; §7 TS segmentFiled · FY2025 10-K · Consolidated Statements of Operations · "Technical solutions" · p.107
Gross profit FY2025 vs FY2024 — LEU segment (first row) and Technical Solutions (second row), p.73 tableUS$111.5 m vs $93.9 m · $6.0 m vs $17.6 m31 Dec 2025§7 mid-cycle margin by segmentFiled · FY2025 10-K · Segment Information · "Gross profit" · p.73
Operating income, FY2025 · FY2024 · FY2023US$50.2 m · $48.0 m · $52.4 m31 Dec 2025§3 five-year table; §7 EBITDA buildFiled · FY2025 10-K · Consolidated Statements of Operations · "Operating income" · p.107
Piketon commercial expansion — LEU and HALEU large-scale production, announced 25 Sep 2025announced 25 Sep 202531 Dec 2025§2 growth; §7 stage-risked SOTP lineFiled · FY2025 10-K · Item 1 — Business · "we announced plans for a major expansion of our uranium capacity in Piketon, Ohio" · p.11
Diluted net income per share, FY2025 · FY2024 · FY2023US$3.90 · $4.47 · $5.4431 Dec 2025§3 five-year tableFiled · FY2025 10-K · Consolidated Statements of Operations · "Diluted" · p.107
Cash provided by operating activities, FY2025 · FY2024 · FY2023US$51.0 m · $37.0 m · $9.1 m31 Dec 2025§3 five-year table; §7 FCFFiled · FY2025 10-K · Consolidated Statements of Cash Flows · "Cash provided by operating activities" · p.108
Capital expenditures, FY2025 · FY2024 · FY2023US$(19.7) m · (4.1) m · (1.6) m31 Dec 2025§3 five-year table; §7 FCFFiled · FY2025 10-K · Consolidated Statements of Cash Flows · "Capital expenditures" · p.108
Depreciation and amortization, FY2025 · FY2024 · FY2023US$9.9 m · $10.8 m · $7.1 m31 Dec 2025§7 EBITDA (Derived: operating income + D&A)Filed · FY2025 10-K · Consolidated Statements of Cash Flows · "Depreciation and amortization" · p.108
Income tax expense (benefit), FY2025 · FY2024US$8.1 m · (0.2) m31 Dec 2025§7 tax basisFiled · FY2025 10-K · Item 7 — results of operations · "Income tax expense (benefit)" · p.75
Hedge book — none: no derivatives, no hedging of market risknone31 Dec 2025§7 hedge book (nil, filed)Filed · FY2025 10-K · Item 7A · "nor do we currently hedge our exposure to any market risk" · p.87
Valuation allowance kept against federal and state net deferred tax assets (NOL value preserved by the s.382 rights plan)US$355.4 m31 Dec 2025§7 tax basisFiled · FY2025 10-K · Critical Accounting Policies and Estimates · "The Company continues to maintain a partial valuation allowance" · p.72
2.25% Convertible Notes due 2030 — initial conversion rate (Class A shares per US$1,000) · conversion price10.2564 · US$97.5031 Dec 2025§7 share count — in the money above US$97.50Filed · FY2025 10-K · Note 8 — Debt · "shares of Class A Common Stock per $1,000 principal amount of the notes" · p.129
0% Convertible Notes due 2032 — initial conversion rate (Class A shares per US$1,000) · conversion price4.3551 · US$229.6231 Dec 2025§7 share count — out of the money at the as-ofFiled · FY2025 10-K · Note 8 — Debt · "shares of Class A Common Stock per $1,000 principal amount of the notes" · p.127
Form 10-Q, quarter ended 30 June 2026
Revenue H1 2026 — SWU · uranium · Technical Solutions (six months)US$141.6 m · $56.4 m · $54.8 m30 Jun 2026§2 run-rate; §7Filed · Q2 2026 10-Q · Condensed Consolidated Statements of Operations · "Separative work units" · p.8
LEU segment gross profit — Q2 2026 · Q2 2025 · H1 2026 · H1 2025US$51.6 m · $50.7 m · $79.5 m · $81.9 m30 Jun 2026§7 LEU marginFiled · Q2 2026 10-Q · Segment information · "LEU segment" · p.29
Technical Solutions gross profit — Q2 2026 · Q2 2025 · H1 2026 · H1 2025US$(1.7) m · $3.2 m · $1.9 m · $4.9 m30 Jun 2026§7 TS marginFiled · Q2 2026 10-Q · Segment information · "Technical Solutions" · p.29
LEU segment backlog, 30 Jun 2026 · 31 Dec 2025 (extends to 2040)US$3.7 bn · $2.9 bn30 Jun 2026§2 life basis; §7 contracted revenueFiled · Q2 2026 10-Q · Backlog · "our backlog was approximately $3.7 billion and $2.9 billion" · p.42
Technical Solutions backlog, 30 Jun 2026 · 31 Dec 2025 (extends to 2034)US$0.8 bn · $0.9 bn30 Jun 2026§2 Technical Solutions term; §7 TS horizon (8 yr)Filed · Q2 2026 10-Q · Backlog · "Our backlog in the Technical Solutions segment extends to 2034" · p.42
Supply — Orano Supply Agreement (2018) for SWU contained in LEU, deliveries to 2030to 203030 Jun 2026§2 supply; §7 LEU cost baseFiled · Q2 2026 10-Q · Commitments and contingencies · "In 2018, the Company entered into the Orano Supply Agreement" · p.24
Supply — TENEX (Russian state-owned) 2011 Supply Contract, a major SWU supplier2011 contract30 Jun 2026§2 supply riskFiled · Q2 2026 10-Q · Commitments and contingencies · "TENEX is a major supplier of SWU to the Company" · p.24
HALEU Operation Contract (DOE, Piketon cascade) — Phase 2 production of 900 kg HALEU UF6900 kg30 Jun 2026§2 asset; §7 TS segmentFiled · Q2 2026 10-Q · Part II — HALEU · "production of 900 kilograms of HALEU" · p.55
Property, plant and equipment, net — 30 Jun 2026 · 31 Dec 2025 (Piketon expansion build-out)US$142.5 m · $29.5 m30 Jun 2026§7 expansion at cost (PP&E increase)Filed · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · "Property, plant and equipment, net of accumulated depreciation" · p.7
Deposits for financial assurance, 30 Jun 2026 · 31 Dec 2025US$33.2 m · $2.7 m30 Jun 2026§7 bridge — restricted itemsFiled · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · "Deposits for financial assurance" · p.7
Cash and cash equivalents, 30 Jun 2026US$1,868.5 m30 Jun 2026§7 bridge — cashFiled · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · "Cash and cash equivalents" · p.7
Cash, cash equivalents and restricted cash, end of period (30 Jun 2026)US$1,901.9 m30 Jun 2026§7 bridge — restricted cash (Derived: less cash)Filed · Q2 2026 10-Q · Condensed Consolidated Statements of Cash Flows · "Cash, cash equivalents and restricted cash, end of period" · p.9
Accounts receivable, 30 Jun 2026US$25.6 m30 Jun 2026§7 working capitalFiled · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · "Accounts receivable" · p.7
Inventories · Inventories owed to customers and suppliers, 30 Jun 2026US$377.1 m · $235.7 m30 Jun 2026§7 bridge — net inventory (Derived)Filed · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · "Inventories" · p.7
Accounts payable and accrued liabilities · Payables under inventory purchase agreements, 30 Jun 2026US$74.0 m · $34.8 m30 Jun 2026§7 working capitalFiled · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · "Accounts payable and accrued liabilities" · p.7
Deferred revenue and advances from customers · Deferred costs associated with deferred revenue, 30 Jun 2026US$85.0 m · $33.2 m30 Jun 2026§7 working capitalFiled · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · "Deferred revenue and advances from customers" · p.7
Long-term debt (carrying), 30 Jun 2026US$1,177.5 m30 Jun 2026§7 bridge — debt carryingFiled · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · "Long-term debt" · p.7
2.25% Convertible Senior Notes due November 2030 — principal, 30 Jun 2026US$402.5 m30 Jun 2026§7 bridge — convertibles at faceFiled · Q2 2026 10-Q · Note 6 — Debt · "2030 | 2.25%" · p.18
0% Convertible Senior Notes due August 2032 — principal, 30 Jun 2026US$805.0 m30 Jun 2026§7 bridge — convertibles at faceFiled · Q2 2026 10-Q · Note 6 — Debt · "2032 | 0%" · p.18
Total debt principal, 30 Jun 2026US$1,207.5 m30 Jun 2026§7 bridge — debt at face; net debt (Derived)Filed · Q2 2026 10-Q · Note 6 — Debt · "Total" · p.18
Contractual interest expense — H1 2026US$4.5 m30 Jun 2026§7 interestFiled · Q2 2026 10-Q · Note 6 — Debt · "Contractual interest expense" · p.18
Postretirement health and life benefit obligations · Pension benefit liabilities, 30 Jun 2026US$68.8 m · $2.9 m30 Jun 2026§7 bridge — debt-like benefit obligationsFiled · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · "Postretirement health and life benefit obligations" · p.7
Deferred tax assets, 30 Jun 2026US$15.0 m30 Jun 2026§7 taxFiled · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · "Deferred tax assets" · p.7
Class A Common Stock issued and outstanding, 30 Jun 202619,233,65830 Jun 2026§7 share count (basic, with Class B)Filed · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · "Class A Common Stock, par value" · p.7
Class B Common Stock issued and outstanding, 30 Jun 2026719,20030 Jun 2026§7 share count (basic)Filed · Q2 2026 10-Q · Condensed Consolidated Balance Sheets · "Class B Common Stock, par value" · p.7
Average common shares outstanding — diluted (thousands), Q2 2026 · H1 202621,891 · 22,11430 Jun 2026§7 diluted count (weighted; fully diluted bound)Filed · Q2 2026 10-Q · Condensed Consolidated Statements of Operations · "Diluted" · p.8
Cash (used in) provided by operating activities — H1 2026 · H1 2025US$(16.7) m · $89.3 m30 Jun 2026§3 run-rate; §7 FCFFiled · Q2 2026 10-Q · Condensed Consolidated Statements of Cash Flows · "Cash (used in) provided by operating activities" · p.9
Capital expenditures — H1 2026 · H1 2025US$(94.8) m · (5.7) m30 Jun 2026§7 expansion capital spentFiled · Q2 2026 10-Q · Condensed Consolidated Statements of Cash Flows · "Capital expenditures" · p.9
Proceeds from the issuance of common stock, net — H1 2026 (ATM)US$53.9 m30 Jun 2026§3 dilution; §7 share countFiled · Q2 2026 10-Q · Condensed Consolidated Statements of Cash Flows · "Proceeds from the issuance of common stock, net" · p.9
Investment income — H1 2026US$33.3 m30 Jun 2026§7 — interest on the cash pile (excluded from operating EBITDA)Filed · Q2 2026 10-Q · Condensed Consolidated Statements of Operations · "Investment income" · p.8
Advanced technology costs · Selling, general and administrative — H1 2026US$29.7 m · $36.2 m30 Jun 2026§7 corporate cost allocationFiled · Q2 2026 10-Q · Condensed Consolidated Statements of Operations · "Advanced technology costs" · p.8
Diluted share count, Q2 2026 (thousands): basic · equity-compensation awards · 2.25% Convertible Notes (principal settled in cash)19,879 · 38 · 1,97430 Jun 2026§7 share count — awards and the notes' in-the-money sharesFiled · Q2 2026 10-Q · Net income per share · "Potentially dilutive shares related to 2.25% Convertible Notes" · p.22
Form 8-K Ex. 99.1, 19 Oct 2026
M&A — Centrus acquires Westerman Holdings, LLC (centrifuge component supplier, manufacturing), 19 Oct 202619 Oct 202619 Oct 2026§4 M&A; §7 share count noteFiled · Westerman release · Centrus Acquires Westerman Holdings · "Centrus Acquires Westerman Holdings, LLC" · p.1
Market and price series
SWU — weighted-average price paid by US owners and operators, 2021 · 2022 · 2023 · 2024 · 2025 (US$/SWU)US$99.54 · 101.03 · 106.97 · 97.66 · 108.7031 Dec 2025§7 deck — the SWU grid price; the mid-cycle referenceMarket · EIA Uranium Marketing Annual Report 2025 · Table 13 · "Average price (US$ per SWU)" (eia_umar2025_uranium_marketing.txt)
SWU price paid — 2024–2025 average (the mid-cycle years); five-year average 2021–2025 (US$/SWU)US$103.18; US$102.7831 Dec 2025§7 deck — the SWU reference and the V17 testDerived · means of m-swu
Uranium month-end price, trailing averages to 30 Sep 2026: 3 · 6 · 12 months (US$/lb)US$88.56 · 86.87 · 85.3430 Sep 2026§7 deck — uranium held at the US$90 grid priceDerived · Market · Cameco · "Uranium spot price, month-end" · Oct 2025 – Sep 2026

Source: the filings and market series named in each row; Table 6 in Section 7 lists the load-bearing subset. Centrus SEC filings; EIA Uranium Marketing Annual Report 2025.

10.2 Disclaimer & disclosure

This analysis is for informational purposes only and is not investment advice. It is a point-in-time snapshot as of 26 October 2026: the price, the multiples, the NAV and the two-axis verdict move with the market and the SWU price. Centrus reports no reserves; the valuation is a model on stated assumptions, several of them bounded inputs where the filings are silent. The rating and read are analytical judgments, not a recommendation to buy or sell. This report was prepared with AI assistance from primary filings — verify before relying on any figure.