Freeport-McMoRan (FCX) — Stock Analysis 2026 [3.5]

Copper Base Metals Company Analysis
USD

Analysis as of 19 August 2026. Freeport-McMoRan stock analysis. Market data at the NYSE close of 17 August 2026 (US$68.38); fundamentals from Freeport-McMoRan’s FY2025 10-K, its Q2 2026 10-Q and results, and the reserve statement at 31 December 2025. Price deck: base copper US$6.00/lb — the representative trailing average on the fixed US$4–8/lb grid — with every grid price run as a scenario (deep bear US$4.00, bear US$5.00, base US$6.00, bull US$7.00 and deep bull US$8.00/lb), gold held at US$4,500/oz, and analyst consensus as a 0% cross-check — no spot deck. Refreshed on each quarterly report and on material events. Rating: ★★★½ Solid / Modestly overvalued (wide band) — blended fair value US$51.17 against US$68.38, implied -25.2%; NAV US$48.59 per share; the price asks for copper at US$7.05/lb.

Freeport-McMoRan owns three of the world’s great copper districts — Grasberg in Indonesia, Morenci in Arizona and Cerro Verde in Peru — with 112.3 billion pounds of copper reserves behind them. The thesis in one line: the assets are first-rate, but at US$68.38 the shares price copper above anything it has traded at in five years, and a clean Grasberg restart on top. Why now: the Grasberg Block Cave is coming back from the September 2025 mud rush on a ramp Freeport has already cut once, while copper trades near a record. To compare Freeport with every listed copper producer on output, cost and reserve life, use Metal Pilot’s copper mining stock screener.

1. Snapshot & thesis

Archetype: producer (mining), sector base metals. Freeport-McMoRan Inc. (NYSE: FCX), headquartered in Phoenix, Arizona, mines copper with gold and molybdenum by-products from twelve operations in four groups: seven U.S. copper mines (Morenci, Safford, Sierrita, Chino, Bagdad, Tyrone, Miami), Cerro Verde in Peru and El Abra in Chile, the Grasberg minerals district in Indonesia through PT Freeport Indonesia (PTFI), and the Climax and Henderson molybdenum mines. Units: Mlb and Blb are million and billion pounds, koz and Moz thousand and million troy ounces; unit net cash cost is the cash cost per pound of copper after by-product credits.

Figure 1. Freeport-McMoRan in numbers

$68.38
Share price (NYSE, 17 Aug 2026)
$98.2 bn
Market capitalisation (Derived)
$25.9 bn
FY2025 revenue
3,383 Mlb
FY2025 copper output
112.3 Blb
Copper reserves (P&P)
$1.90/lb
2026 unit net cash cost guide
$5.3 bn
Net debt (30 Jun 2026)
$48.59
NAV per share (base deck)
$51.17
Blended fair value
-25.2%
Implied return
3.5/5
Quality rating — Solid
Modestly
overvalued
Valuation read (wide band)

Figure data: Freeport-McMoRan FY2025 10-K and Q2 2026 10-Q; price per stockanalysis.com, NYSE close of 17 August 2026; market capitalisation = US$68.38 × 1,436.0 m shares; NAV, fair value and read per Section 7, rating per Section 9.

Table 1. Freeport-McMoRan in numbers

Metric Value As of
Share price / market capitalisation US$68.38 / US$98.2 bn 17 Aug 2026
Shares outstanding (fully diluted) 1,436.0 m (1,439.8 m) 31 Jul 2026
Revenue US$25,915 m FY2025
Cash margin (EBITDA ÷ revenue) 33.8% (EBITDA US$8,762 m) FY2025
Net income attributable / diluted EPS US$2,204 m / US$1.52 FY2025
Copper output / Indonesian gold output 3,383 Mlb / 937 koz FY2025
2026 sales guidance 3,057 Mlb copper; 654 koz gold; 93 Mlb molybdenum 30 Jun 2026
2026 unit net cash cost guidance US$1.90/lb 30 Jun 2026
P&P reserves 112.3 Blb copper; 20.6 Moz gold 31 Dec 2025
Net debt (total / excl. PTFI downstream debt) US$5,306 m / US$2.1 bn 30 Jun 2026
NAV/share (US$6.00/lb, 9.5% real) US$48.59 (P/NAV 1.41×) 19 Aug 2026
Blended fair value / implied return US$51.17 / implied -25.2% 19 Aug 2026
Quality rating 3.5/5 Solid 19 Aug 2026
Valuation read Modestly overvalued (wide band); implied -25.2% 19 Aug 2026

Source: FY2025 10-K pp.36, 39, 129; Q2 2026 10-Q pp.1, 3, 24; Q2 2026 results release p.1; EBITDA = operating income US$6,518 m + DD&A US$2,244 m (Derived); valuation rows per Section 7.

Thesis in brief. The bull case: Grasberg at capacity is among the cheapest copper anywhere once its gold is credited — the 2026 guide is a credit of US$1.22/lb — the U.S. and South American mines hold 88.1 Blb of reserves between them, and net debt at 0.61× FY2025 EBITDA leaves room for Bagdad and Kucing Liar. The bear case: Indonesia is 39% of enterprise NAV on a licence that runs to 2041, the ramp was cut once already in April 2026, and FY2025’s 33.8% cash margin was the lowest in the peer set. What tips it is copper: the blend reaches the share price only at about US$7.05/lb.

How to read this analysis: Figure 1 and Section 9 carry the verdict; Sections 2–6 the evidence; Section 7 the valuation.

2. Assets & operations

Freeport’s mines sit at the centre of the copper market; the Metal Pilot Copper — A Complete Market Guide covers the market, and this section covers the mines.

2.1 Portfolio overview

Table 2. Freeport-McMoRan asset portfolio, sorted by base-case value

Asset Country Stage FCX interest Output (FY2025) Reserves (P&P, 31 Dec 2025) Life Unit cost Listing / operator
Grasberg district (PTFI) Indonesia Producing; block cave ramping 48.76% (about 37% from 2042) 1,015 Mlb Cu; 937 koz Au 24.2 Blb Cu; 20.0 Moz Au to 2041 (IUPK) 2026 guide US$(1.22)/lb credit Unlisted subsidiary of NYSE: FCX; FCX-operated
Morenci U.S. (Arizona) Producing 72% 497 Mlb Cu 11.8 Blb Cu (100%) in U.S. ≈ 33 yr U.S. guide US$2.96/lb Unincorporated JV; FCX-operated
Cerro Verde Peru Producing 55.08% 863 Mlb Cu 24.9 Blb Cu (100%) ≈ 29 yr S. America guide US$2.56/lb Unlisted subsidiary; FCX-operated
Other U.S. mines U.S. (Arizona, New Mexico) Producing 100% 811 Mlb Cu rest of U.S. 42.5 Blb Cu Bagdad > 80 yr U.S. guide US$2.96/lb Subsidiaries of NYSE: FCX
El Abra Chile Producing (leach); mill option 51% 201 Mlb Cu 17.5 Blb Cu tied to a potential mill mill-dependent S. America guide US$2.56/lb Unlisted subsidiary; FCX-operated
Climax, Henderson U.S. (Colorado) Producing 100% 37 Mlb Mo ≈ 0.56 Blb Mo (16% of consolidated, Derived) ≈ 15 yr US$17.91/lb Mo guide Subsidiaries of NYSE: FCX

Source: FY2025 10-K pp.15, 21, 23, 36, 39, 43; Q2 2026 10-Q pp.40, 42, 46, 47. Other U.S. mines: Safford (with Lone Star) 287, Sierrita 184, Chino 150, Bagdad 149, Tyrone 32 and Miami 9 Mlb; lives are reserves ÷ 2025 output (Derived).

By output the portfolio looks balanced: in 2025 the U.S. mines produced 1,304 Mlb, South America 1,064 Mlb and Grasberg 1,015 Mlb in a year the mud rush nearly halved it. By value it is not: PTFI is 39% of enterprise NAV at the base deck and carries almost all of the group’s gold, so one block cave in Papua sets more of the value than the seven U.S. mines together. Grasberg, Cerro Verde and Morenci produced 2,375 Mlb, 70% of 2025 copper.

2.2 Revenue split

Copper was 75% of FY2025 revenue, gold 15% and molybdenum 8% (Figure 2). Freeport files no revenue by mine, so Figure 3 splits the base-case enterprise NAV instead — the measure Section 7 uses.

Figure 2. FY2025 revenue by metal (%)

Copper
Gold
Molybdenum
Other
75%
15%
8%
2%
Share of FY2025 revenue of US$25,915 m, %

Source: FY2025 10-K, revenue by product; “other” is the remainder to 100% (Derived).

Figure 3. Enterprise NAV by asset block, base case (%)

PTFI (Grasberg)
Resources beyond reserves
U.S. copper mines
South America
Molybdenum mines
38.9%
22.8%
20.6%
16.1%
1.6%
Share of enterprise NAV of US$130.3 bn, base case, %

Source: Section 7, Table 10 (copper US$6.00/lb, gold US$4,500/oz, 9.5% real); enterprise NAV US$130.3 bn.

Gold is the second business: a 15% revenue line becomes 29% of enterprise NAV at US$4,500/oz, nearly all of it at Grasberg, which is why a Grasberg outage hits two metals at once.

2.3 Grasberg (PTFI, Indonesia)

Grasberg, in the highlands of Papua, is mined underground; Kucing Liar is the next block cave under development. Freeport holds a 48.76% economic interest in PTFI and operates it; the Indonesian state’s MIND ID holds the rest. PTFI mines under an IUPK licence that runs through 2041. A February 2026 memorandum extends operations for the life of the resource, with Freeport keeping 48.76% to 2041 and about 37% from 2042 — a memorandum, not yet an amended licence. Encumbrances at filed terms: Indonesian royalties (US$113 m in H1 2026) and US$3.2 bn of downstream-processing debt at PTFI.

The 8 September 2025 mud rush killed seven workers and stopped the Grasberg Block Cave. Output fell to 1,015 Mlb copper and 937 koz gold in 2025, from 1,800 Mlb and 1,861 koz in 2024. Production Blocks 2 and 3 began ramping up at the end of March 2026; Block 1S has no restart date. Freeport expects about 65% of capacity in H2 2026, 80% by mid-2027 and close to full by the end of 2027, cut in April 2026 from 85% and 100%. The cave milled 53,000 t/d in Q2 2026 against 114,500 a year earlier. 2026 sales guidance is 0.7 bn lb copper and 650 koz gold; the November 2025 plan put the district at 1.7 bn lb copper and 1.3–1.4 Moz gold a year in 2028–29.

Reserves are 24.2 Blb copper and 20.0 Moz gold, proven and probable (S-K 1300, 31 December 2025), down from 27.0 Blb and 22.4 Moz after downward adjustments of 1.8 Blb and 1.5 Moz; measured resources beyond them grade 0.77% copper and 0.64 g/t gold. Unit net cash cost was a credit of US$0.55/lb in 2025, and the 2026 guide is a credit of US$1.22/lb at US$4,000/oz gold; outside unit costs, Freeport expects US$1.2 bn of idle-facility and restoration costs in 2026. Remaining capital: Kucing Liar, US$1.4 bn spent by June 2026 and about US$4 bn more through 2033. The asset risk is a second interruption of the cave.

2.4 U.S. copper mines

Seven open-pit mines in Arizona and New Mexico. Morenci is a 72% undivided interest in an unincorporated joint venture; the other six are wholly owned. They produced 1,304 Mlb in 2025 and hold 42.5 Blb copper, 0.6 Moz gold and about 2.0 Blb molybdenum (58% of the consolidated 3.5 Blb, Derived) of P&P reserves (S-K 1300, 31 December 2025) — about 33 years of 2025 output. Morenci holds 11.8 Blb at 100%, up from 11.1 after 1.4 Blb of additions; Bagdad’s reserve life exceeds 80 years. Grade is low (0.19% copper in Q2 2026) and so is the margin: unit net cash cost was US$3.05/lb in 2025 and is guided at US$2.96/lb for 2026 at US$30/lb molybdenum, on 1,360 Mlb of sales. Capital was US$1,102 m in 2025. The growth option is the Bagdad expansion: about US$4.5 bn, 30% above the 2023 estimate, for +200–250 Mlb/yr copper and +10–12 Mlb/yr molybdenum over three to four years, with a decision targeted for H2 2026 and no capital in the 2026 guidance. The asset risk is cost: at 0.19% grade, a lower copper price reaches these mines first. Committed capital: Bagdad tailings, about US$1.1 bn in 2026 — the discretionary growth guide less Kucing Liar’s ~US$0.5 bn (Derived; Q2 2026 10-Q p.25).

2.5 Cerro Verde and El Abra (South America)

Cerro Verde in Peru is a large open-pit concentrator; Freeport owns 55.08%, Sumitomo Metal Mining 21.0% and Buenaventura 19.58%. It produced 863 Mlb copper in 2025 and holds 24.9 Blb of P&P reserves at 100% (31 December 2025). El Abra in Chile, 51% Freeport and 49% Codelco, is a leach operation that produced 201 Mlb; 17.5 Blb of the region’s 45.6 Blb of reserves are tied to a potential El Abra mill, costed at about US$7.5 bn at US$4.00/lb copper and not sanctioned. Unit net cash cost was US$2.43/lb in 2025; the 2026 guide is US$2.56/lb on 1,022 Mlb of sales, and capital was US$419 m. The asset risk is fiscal: Peru’s guided 2026 effective tax rate is 40%, above the 29.5% statutory row the valuation uses.

2.6 Molybdenum mines

Climax and Henderson in Colorado, both wholly owned, produced 24 Mlb and 13 Mlb of molybdenum in 2025 at a unit net cash cost of US$15.78/lb (2026 guide US$17.91/lb), against a realised price of US$22.63/lb. They are 1.6% of enterprise NAV; a further 55 Mlb came as a by-product at the U.S. mines (34 Mlb) and Cerro Verde (21 Mlb).

2.7 Production, reserves & costs

Group copper production was 3,383 Mlb in 2025, down from 4,214 Mlb, with sales of 3,574 Mlb at a realised US$4.75/lb; 1,007 Mlb of the output was attributable to partners. Consolidated reserves are 112.3 Blb copper, 20.6 Moz gold and 3.5 Blb molybdenum (78.6 Blb, 10.4 Moz and 3.1 Blb net of partners), struck at US$3.25/lb copper and US$1,600/oz gold — about 33 years of 2025 output. Resources beyond reserves add 7,520 Mt measured and 9,978 Mt indicated. Consolidated unit net cash cost was US$1.65/lb (US$1.56 in 2024); the 2026 guide is US$1.90/lb.

Figure 4. FY2025 copper production by mine (Mlb)

Copper production (Mlb)
1,200
900
600
300
0
1,015
863
497
287
201
184
150
149
Grasberg
Cerro Verde
Morenci
Safford
El Abra
Sierrita
Chino
Bagdad
Mine, FY2025

Source: FY2025 10-K p.36, operating data at 100% (Morenci at its 72% share).

2.8 Peer positioning

The peer set, used for every star in Section 9: Southern Copper (NYSE: SCCO), Antofagasta (LSE: ANTO), Ivanhoe Mines (TSX: IVN) and BHP (NYSE: BHP) — large listed copper producers, compared on quality only.

Table 3. Peer positioning — quality metrics

Company Listing Operations Revenue (latest FY) Cash margin Reserve life Country risk premium
Freeport-McMoRan NYSE: FCX U.S., Peru, Chile, Indonesia US$25.9 bn 33.8% ≈ 33 yr (P&P) Indonesia 2.46%; Peru 2.07%
Southern Copper NYSE: SCCO Peru, Mexico US$13.4 bn 58.6% ≈ 52 yr (P&P) Peru 2.07%; Mexico 2.46%
Antofagasta LSE: ANTO Chile US$8.6 bn 60.3% n/d Chile 1.10%
Ivanhoe Mines TSX: IVN DR Congo, South Africa US$3.7 bn (Kamoa-Kakula and Kipushi, 100% basis) n/d ≈ 33 yr (probable) n/d
BHP NYSE: BHP Australia, Chile (copper, iron ore) US$58.8 bn (FY to 30 Jun 2026) 56.1% n/d Chile 1.10%

Source: FY2025 10-K pp.39, 129 (Freeport cash margin and life Derived); Southern Copper FY2025 10-K (margin: operating income US$7,001.7 m plus DD&A US$868.4 m; life: 108,955 Mlb P&P ÷ 2,108.2 Mlb mined in 2025; Derived); Antofagasta 2025 Annual Report (EBITDA US$5,201.9 m, including its share of associates and joint ventures; reserves by mine, no group total); Ivanhoe Mines 2025 AIF (Kamoa-Kakula is a joint venture — no group margin filed; life: 13.0 Mt Cu probable ÷ 388,841 t produced in 2025, Derived); BHP FY2026 Form 20-F p.37 (Underlying EBITDA US$32,947 m; reserves by asset, no group total); country risk premiums per Damodaran, 5 January 2026. Screen the full set on Metal Pilot’s copper mining stock screener.

Freeport leads this set on scale and trails it on margin: its 33.8% cash margin is the lowest in Table 3 (Ivanhoe files none), held down by the Grasberg outage and the U.S. mines’ US$2.96/lb guide. Its country-risk mix sits mid-set — better than Ivanhoe’s Congo, worse than Antofagasta’s Chile.

3. Financials & balance sheet

Revenue was US$25,915 m in FY2025, up 1.8%, on higher prices against lower volume. Operating income was US$6,518 m and EBITDA (operating income plus DD&A, Derived) US$8,762 m, a 33.8% cash margin against 35.8% in 2024. Net income attributable to common stock was US$2,204 m (US$1.52 diluted) after US$1,948 m went to partners, US$1,325 m of it at PTFI. Operating cash flow of US$5,610 m was 2.5× net income, but capital of US$4,494 m left free cash flow at US$1,116 m. H1 2026 operating income of US$4,140 m includes a one-off US$699 m mud-rush insurance gain. Read with the Financial Metrics for Commodity Investing guide, the gap between EBITDA and attributable earnings is partners and Indonesian tax, not accounting.

Cost deck. The 2026 unit net cash cost guide is US$1.90/lb at US$4,000/oz gold and US$30/lb molybdenum (US$2.00 in Q3), moving US$0.02/lb per US$100/oz gold and US$0.03/lb per US$2/lb molybdenum; US$1.2 bn of idle-facility and restoration costs sit outside it. Tax is the largest price-linked line: the 2026 effective rate is guided at 30% (Peru 40%, Indonesia 36%, U.S. 7% under the minimum tax) after 35% in FY2025, when cash taxes paid were US$2,898 m. A 10% move in the rupiah shifts annual costs by US$100–122 m.

Balance sheet. Total debt was US$9,386 m and cash US$4,080 m at 30 June 2026: net debt US$5,306 m, or US$2.1 bn excluding PTFI’s US$3.2 bn of downstream debt, against a US$3.0–4.0 bn target; long-term leases add US$973 m. That is 0.61× FY2025 EBITDA, and 0.81× with EBITDA a quarter lower. Liquidity is a US$3.0 bn FCX revolver to May 2031, US$1.5 bn at PTFI and US$350 m at Cerro Verde; 93% of the debt is fixed-rate at a 5.2% average, with US$1,321 m due in 2027, and covenants were met. Environmental and retirement obligations are US$5,943 m. Freeport does not hedge copper; Atlantic Copper’s forwards carry a US$(46) m fair value.

Capital returns. Up to 50% of available cash goes back to shareholders. The dividend was US$0.60 a share in each of 2023–25, base plus variable; buybacks reached 55.4 m shares under the US$5.0 bn programme by 31 July 2026, 3.4 m of them in H1 2026 for US$203 m. Diluted shares fell from 1,482 m in 2021 to 1,443 m.

Table 4. Five-year financial summary (US$ m unless stated)

Metric FY2021 FY2022 FY2023 FY2024 FY2025
Revenue 22,845 22,780 22,855 25,455 25,915
Revenue YoY % — -0.3% +0.3% +11.4% +1.8%
Cash margin (EBITDA ÷ revenue) 45.4% 39.8% 36.3% 35.8% 33.8%
Net income attributable 4,306 3,468 1,848 1,889 2,204
EPS, diluted (US$) 2.90 2.39 1.28 1.30 1.52
Operating cash flow 7,715 5,139 5,279 7,160 5,610
Capital expenditure (total; sustaining / growth n/d) 2,115 3,469 4,824 4,808 4,494
Free cash flow 5,600 1,670 455 2,352 1,116
Net debt n/d 2,474 4,664 5,025 5,555
Net debt / EBITDA n/d 0.27× 0.56× 0.55× 0.63×
Diluted shares (m) 1,482 1,451 1,443 1,445 1,443
Dividends declared per share (US$) 0.375 0.60 0.60 0.60 0.60

Source: FY2025 10-K pp.84, 129, 131 and FY2023 10-K pp.122, 124. Derived: YoY, EBITDA (operating income + DD&A; FY2021–22 from the FY2023 10-K p.122), free cash flow (operating cash flow − capital), net debt (total debt − cash: FY2023 10-K p.88, FY2024 10-K p.90, Q2 2026 10-Q pp.3, 15). FY2021 YoY and net debt need the FY2020–21 balance sheet and revenue (FY2022 10-K, not in the source set).

Figure 5. Free cash flow by year (US$ m)

Free cash flow (US$ m)
6,000
4,500
3,000
1,500
0
5,600
1,670
455
2,352
1,116
2021
2022
2023
2024
2025
Fiscal year

Source: Table 4 (operating cash flow less capital expenditure, Derived).

4. Management, strategy & structure

4.1 Management & governance

Kathleen L. Quirk (62) has been chief executive since June 2024 and president since February 2021. Richard C. Adkerson (79), her predecessor as chief executive, has chaired the board since February 2021 and been a director since October 2006. Maree E. Robertson (50) is chief financial officer. Board size, independence, the committee list and related-party transactions sit in the 2026 proxy statement, which is not in this analysis’s source set; they are n/d here, and the Section 9 stars rest on tenure and record.

4.2 Strategy

Freeport’s frame is copper first: run the existing districts, grow them from within, and pay out by formula. The named programmes are the Grasberg restart and the Kucing Liar development in Indonesia (about US$4 bn more through 2033), the Bagdad expansion in Arizona (about US$4.5 bn, decision targeted for H2 2026), the El Abra mill option in Chile (about US$7.5 bn at US$4.00/lb copper), and more copper from existing leach stockpiles. 2026 capital is guided at US$4.3 bn — US$1.3 bn sustaining, US$1.4 bn planned projects and US$1.6 bn discretionary (Kucing Liar, Bagdad tailings) — against operating cash flow of US$8.3 bn. The filings in the source set describe no acquisition programme.

4.3 Ownership & structure

Freeport has one class of common stock, listed on the NYSE: 1,436,017,523 shares outstanding at 31 July 2026 (8,601 holders of record in January 2026) and 4.76 m vested options at a US$14.53 average strike; there are no convertibles. The structure sits in the partner stakes: PTFI 48.76% (MIND ID the rest since the 2018 divestment to the Indonesian state, Freeport’s share falling to about 37% from 2042), Cerro Verde 55.08%, El Abra 51% and Morenci 72%. Partners’ equity was US$12,113 m at 30 June 2026, and they received US$1.3 bn of distributions in 2025, US$1.0 bn of it from PTFI.

5. ESG & sustainability

The defining fact is the 8 September 2025 mud rush at the Grasberg Block Cave, which killed seven workers; the total recordable incident rate rose to 0.55 per 200,000 hours in 2025 from 0.53. On tailings, Freeport completed implementation and verification of conformance with the Global Industry Standard on Tailings Management in 2025, while Grasberg’s legacy river-based tailings system in Papua remains contested. Scope 1 and 2 emissions are n/d: the 2025 sustainability report is not in the source set.

6. Risks

The register puts the risks Section 7 prices first — the ramp, the deck, the licence, taxes and gold — then the rest.

Table 5. Risk register

Risk Type Likelihood / impact Exposure Mitigant
PTFI ramp slips again Operational Medium / High PTFI 39% of enterprise NAV; a ramp one year later takes NAV to US$48.04/share Blocks 2 and 3 ramping; schedule already reset once
Copper below the base deck Commodity Medium / High Each US$1/lb on the grid moves the held blend about US$16.32/share Long reserve lives; no hedge book to unwind
Licence after 2041 Jurisdiction Medium / High Grasberg metal past 2041, valued only in the resource row at Freeport’s 37% February 2026 extension memorandum
Peru and Indonesia tax Jurisdiction Medium / Medium At the 2026 guided rates (40% / 36%) NAV falls to US$46.62/share IUPK terms continue under the memorandum
Gold price Commodity Medium / Medium 29% of enterprise NAV; ±US$500/oz moves NAV to US$47.06–50.11/share By-product credit inside the unit cost
Molybdenum price Commodity Medium / Low Held at the guidance’s US$30.00/lb; at FY2025’s realised US$22.63/lb NAV falls to US$47.41/share By-product credit inside the unit costs
Currencies Financial Low / Low ±10% in the rupiah, sol, peso and Australian dollar moves NAV about ±US$0.79/share US$ reporter, US$ revenue
U.S. cost and grade Operational Medium / Medium 0.19% grade; US$2.96/lb 2026 guide Morenci reserve additions; leach recovery
Bagdad capital creep Balance sheet Low / Medium US$4.5 bn estimate, 30% above 2023 Not sanctioned; outside the 2026 guidance
Block-cave safety ESG Low / High Seven fatalities in 2025; the licence to operate Phased restart

Source: FY2025 10-K and Q2 2026 10-Q risk factors and MD&A; NAV figures per Section 7 and the model’s out file; likelihood and impact are the author’s read against the Section 2.8 peers.

Figure 6. Risk matrix — likelihood × impact

Impact →
PTFI ramp M/H
Copper price M/H
Licence after 2041 M/H
Peru / Indonesia tax M/M
Gold price M/M
Molybdenum price M/L
Currencies L/L
U.S. cost and grade M/M
Bagdad capital L/M
Block-cave safety L/H
Low
Medium
High
Likelihood →

Source: Table 5; positions are a qualitative read, not measured probabilities. The shaded corner holds the high-impact risks.

The ramp, the deck and the licence are correlated: each is a claim on Grasberg’s cash, and Section 7’s bear columns price the first two together.

7. Valuation

Valuation as of 19 August 2026, in US dollars (Freeport-McMoRan’s reporting and trading currency) against the US$68.38 NYSE close of 17 August 2026. Horizon: spot fair value. Price deck: base copper US$6.00/lb — the representative of the trailing averages (3-month US$6.355, 6-month US$6.110 and 12-month US$5.645/lb, COMEX, to 17 August 2026) on the fixed US$4–8/lb grid — with every grid price run as a scenario (deep bear US$4.00 to deep bull US$8.00/lb); gold held at US$4,500/oz in every column (trailing averages US$4,250.28, US$4,537.52 and US$4,363.18/oz); molybdenum held at the guidance’s US$30.00/lb; analyst consensus as a 0% cross-check — no spot deck. Discount rate 9.5% real after-tax (the base-metal 8% plus a 1.5% jurisdiction premium).

Freeport-McMoRan is valued as a copper producer, sum of the parts, following the How to Value Commodity Stocks guide. Four producing regions carry the value on their 2026 guidance — the U.S. copper mines, South America (Cerro Verde and El Abra), PTFI’s Grasberg district on its filed restart path back to capacity by the end of 2027, and the molybdenum mines — each to its reserve, PTFI to the end of its licence plan in 2041. Metal beyond the reserves enters through one conversion row, with Grasberg’s share after 2041 at the roughly 37% Freeport keeps under the February 2026 extension memorandum. Net asset value carries half the weight; EV/EBITDA and an FCF-yield build on the next twelve months carry the rest.

Enterprise NAV at the base deck is US$130.3 billion: PTFI US$50.7 billion (39%), the U.S. mines US$26.8 billion, South America US$21.0 billion, molybdenum US$2.1 billion and the resource row US$29.7 billion (23%). The bridge takes US$60.3 billion — most of it the partners’ shares of PTFI (after its downstream debt) and Cerro Verde (US$45.3 billion) — for NAV of US$48.59 per share, a P/NAV of 1.41×. Gold is 29% of enterprise NAV, a co-product carried on Grasberg’s own ounces.

Three choices set the level. The rate is the base-metal 8% plus a 1.5% jurisdiction premium for the scorecard’s ★★★ jurisdiction read — the producing blocks’ NAV-weighted country risk premium, led by Indonesia’s 2.46%. The copper deck sits 38% above its five-year average of US$4.36/lb, so every target multiple is held at its anchor and only the deck moves. And PTFI is valued on its reserve plan to 2041, not on the extension: the life-of-resource memorandum is valued only in the resource row, at Freeport’s reduced share.

Table 6. Load-bearing inputs — the filed figures the valuation moves on (full source register: Table 20)

Input Value Where §7 uses it Source
Copper trailing averages to 17 Aug 2026 3-month US$6.355/lb; 6-month US$6.110/lb; 12-month US$5.645/lb Opening block — the US$6.00/lb grid price Market | Yahoo Finance | “HG=F” daily closes | to 17 Aug 2026
Gold trailing averages to 17 Aug 2026 3-month US$4,250.28/oz; 6-month US$4,537.52/oz; 12-month US$4,363.18/oz Opening block — gold US$4,500/oz, held; Table 9 block 3 Market | Yahoo Finance | “GC=F” daily closes | to 17 Aug 2026
2026 sales guidance U.S. 1,360 Mlb Cu; South America 1,022 Mlb Cu; PTFI 0.7 bn lb Cu and 650 koz Au Table 9, blocks 1–3; Table 13 Filed | Q2 2026 10-Q | Outlook | “U.S. copper mines” | p.24; Filed | Q2 2026 10-Q | Operations, Indonesia | “Consolidated sales volumes from PTFI are expected to approximate 0.7 billion pounds of copper” | p.44
2026 unit net cash cost guidance U.S. US$2.96/lb; South America US$2.56/lb; PTFI US$(1.22)/lb credit at US$4,000/oz gold; molybdenum mines US$17.91/lb Mo Table 9, every block; Table 13 Filed | Q2 2026 10-Q | Operations, United States | “for our U.S. copper mines are expected to approximate $2.96 per pound of copper” | p.40; Filed | Q2 2026 10-Q | Operations, South America | “for our South America operations are expected to approximate $2.56 per pound of copper” | p.42; Filed | Q2 2026 10-Q | Operations, Indonesia | “for PTFI are expected to approximate $1.22 per pound of copper” | p.46; Filed | Q2 2026 10-Q | Operations, Molybdenum mines | “Average unit net cash costs for our Molybdenum mines are expected to approximate $17.91 per pound” | p.47
PTFI ramp and the Grasberg plan at capacity 65% of capacity in H2 2026, 80% by mid-2027, approaching full by the end of 2027; Nov 2025 plan 2028e–29e Cu 1.7 / 1.7 bn lb, Au 1.4 / 1.3 Moz Table 9 block 3 — volumes; Table 13 Filed | Q2 2026 10-Q | Operations, Indonesia | “overall production rates are expected to approximate 65% of capacity in the second half of 2026” | p.43; Filed | November 2025 update | Slide 10 | “Grasberg Minerals District Mine Plan Metal Production” | p.10
Recoverable reserves, 31 Dec 2025 (consolidated basis) U.S. 42.5 Blb Cu; South America 45.6 Blb Cu (incl. 17.5 Blb El Abra mill); Indonesia 24.2 Blb Cu and 20.0 Moz Au Table 9 — lives and the resource row Filed | FY2025 10-K | Mineral reserves | “U.S." | p.39
PTFI licence term and the extension MOU IUPK through 2041; FCX 48.76% to 2041, about 37% from 2042 Table 9 block 3 — plan to 2041; block 5 — Grasberg at 37% Filed | FY2025 10-K | Mineral reserves note c | “which extends through 2041” | p.39; Filed | Q2 2026 10-Q | Operations, Indonesia | “hold approximately 37% beginning in 2042” | p.42
FCX interests in the operations PTFI 48.76%; Cerro Verde 55.08%; El Abra 51%; Morenci 72% Table 8; Table 11 — minorities Filed | FY2025 10-K | Operating data | “Grasberg minerals district (48.76%)" | p.36; Filed | FY2025 10-K | Operations | “We have a 55.08% ownership interest in Cerro Verde” | p.21; Filed | FY2025 10-K | Operations | “We have a 51% ownership interest in El Abra” | p.23
2026 capital guidance and Kucing Liar sustaining US$1.3 bn; planned projects US$1.4 bn; discretionary US$1.6 bn; Kucing Liar about US$4 bn more to 2033 (about US$0.5 bn a year) Table 9 — sustaining and growth capital; Table 15 Filed | Q2 2026 10-Q | Outlook | “Sustaining capital and other” | p.25; Filed | Q2 2026 10-Q | Operations, Indonesia | “PTFI had incurred approximately $1.4 billion for Kucing Liar development” | p.42
Corporate costs outside the unit costs SG&A H1 2026 US$297 m; exploration and research H1 2026 US$91 m; idle facility costs Q3 2026 US$0.3 bn Tables 11, 13, 15 Filed | Q2 2026 10-Q | Income statement | “Selling, general and administrative expenses” | p.4; Filed | Q2 2026 10-Q | Outlook | “Idle facility and restoration costs are expected to approximate $1.2 billion” | p.25
Cash, debt and leases, 30 Jun 2026 cash US$4,080 m; total debt US$9,386 m; leases US$973 m long-term + US$103 m current (31 Dec 2025) Table 11 — net debt Filed | Q2 2026 10-Q | Balance sheet | “Cash and cash equivalents” | p.3; Filed | Q2 2026 10-Q | Debt note | “Total debt” | p.10; Filed | FY2025 10-K | Leases note | “Present value of net minimum lease payments” | p.165
Closure obligations, 30 Jun 2026 current US$327 m; non-current US$5,616 m Table 11 — claim lines Filed | Q2 2026 10-Q | Balance sheet | “Current portion of environmental and asset retirement obligations” | p.3
Shares outstanding and options 1,436,017,523 shares (31 Jul 2026); 4,764,968 options at US$14.53 every per-share figure in §7 (treasury method in Table 11) Filed | Q2 2026 10-Q | Cover | “there were issued and outstanding” | p.1; Filed | FY2025 10-K | Stock-based compensation | “Balance at December 31, 2025” | p.149

Source: the Freeport-McMoRan filings named in each row (full source register: Table 20); copper and gold averages from COMEX futures closes (Yahoo Finance).

Metal Pilot Premium

Valuation workings — Premium

The workings behind this valuation — the method, the models, the sensitivity grids and the scenarios, 11 tables and 3 figures in all — are for Metal Pilot Premium members.

  • 7.1 Method selection
  • 7.2 Net asset value
  • 7.3 Relative valuation
  • 7.4 Further weighted methods
  • 7.5 Cross-checks
  • 7.6 Scenarios & fair value

Want to see one first? The BHP Group (BHP) valuation is open to every reader.

Create a Metal Pilot accountLog in

See Premium plansRead a free example

You are signed in, and your plan does not include valuation workings. They come with Metal Pilot Premium.

Upgrade to Premium

The premium section could not be loaded right now.

Premium — unlocked

8. Near-term catalysts (1–3 years)

Mostly Grasberg, all on Freeport’s own guidance:

Table 18. Near-term catalysts (1–3 years)

Catalyst Expected timing Why it benefits Freeport
PTFI at 80% of capacity Mid-2027 Lifts the twelve-month EBITDA the Section 7 EV/EBITDA leg reads
PTFI close to full capacity End-2027 Restores a district planned at 1.7 bn lb copper and 1.3–1.4 Moz gold a year
Bagdad expansion decision H2 2026 +200–250 Mlb/yr copper from a mine with more than 80 years of reserves
Block 1S restart date Not given Closes the last open item of the restart
IUPK amendment formalising the extension Not dated Would bring Grasberg after 2041 into the reserve plan
Kucing Liar development Through 2033 The district’s next block cave, inside the reserve plan

Source: Q2 2026 10-Q pp.37, 42, 43; November 2025 investor update p.10; timing is company guidance, not a commitment.

The swing catalyst is the ramp: each quarter on the filed path narrows the gap between twelve-month EBITDA and NAV. As a producer, Freeport carries no takeover read.

9. Rating & verdict

Scored on the producer rubric against the Section 2.8 peers (Southern Copper, Antofagasta, Ivanhoe Mines, BHP): the five producer dimensions carry 15% each, the other four 6.25%.

Figure 10. Scorecard by dimension, 19 August 2026

Assets & scale★★★★★15%
Cost & margins★★☆☆☆15%
Reserves & life★★★★☆15%
Balance sheet★★★★☆15%
Capital allocation★★★☆☆15%
Growth★★★★☆6.25%
Management★★★★☆6.25%
Jurisdiction★★★☆☆6.25%
ESG★★☆☆☆6.25%
Score by dimension Weighted composite ★★★½ (3.51)
Each ring is one star; the outer ring is ★★★★★. Weights in Table 19.

Figure data: Table 19. Each spoke prints its stars and weight; the dashed ring is the weighted composite, 3.51/5.

Table 19. Scorecard rationale

Dimension Weight Score Rationale (sourced)
Asset quality & scale 15% ★★★★★ Grasberg, Morenci and Cerro Verde — three tier-one districts; 3,383 Mlb copper in an outage year, 4,214 Mlb in 2024; second in the peer set by revenue after BHP (Table 3; FY2025 10-K p.36)
Cost position & margins 15% ★★☆☆☆ 33.8% cash margin in FY2025 (35.8% in 2024), the lowest in Table 3 (Southern Copper 58.6%, BHP 56.1%, Antofagasta 60.3%); 2026 guide US$1.90/lb, U.S. mines US$2.96/lb (FY2025 10-K p.129; Q2 2026 10-Q pp.24, 40)
Reserves, life & replacement 15% ★★★★☆ 112.3 Blb copper and 20.6 Moz gold P&P (S-K 1300, 31 Dec 2025), about 33 years of 2025 output; Grasberg down 2.8 Blb in 2025 and licensed to 2041; Southern Copper’s life is longer (FY2025 10-K pp.39, 43)
Balance sheet & liquidity 15% ★★★★☆ Net debt US$5,306 m, 0.61× FY2025 EBITDA (0.81× with EBITDA a quarter lower); US$3.0 bn FCX revolver to 2031; 93% fixed-rate; peer leverage not in the source set, scored on the level (Q2 2026 10-Q pp.3, 49)
Capital allocation & returns 15% ★★★☆☆ Free cash flow US$1,116 m on US$4,494 m of capital in 2025; US$0.60 dividend held three years; diluted shares 1,482 m to 1,443 m since 2021; read as the peer median, peer payout records not in the source set (FY2025 10-K pp.129, 131)
Growth & optionality 6.25% ★★★★☆ Grasberg back near capacity by end-2027; Bagdad +200–250 Mlb/yr (decision H2 2026); El Abra mill; Kucing Liar to 2033 — a deeper organic list than Antofagasta or Southern Copper carry in Table 3 (Q2 2026 10-Q pp.37, 42, 43)
Management & governance 6.25% ★★★★☆ Quirk chief executive since 2024 after three years as president; Adkerson chair since 2021; board composition n/d, peer governance not in the source set (FY2025 10-K p.82)
Jurisdiction & geopolitics 6.25% ★★★☆☆ PTFI 39% of enterprise NAV in Indonesia (country risk premium 2.46%), Cerro Verde in Peru (2.07%), U.S. mines 0.23% — mid-set between Ivanhoe’s Congo and Antofagasta’s Chile (Damodaran, 5 Jan 2026)
ESG & licence to operate 6.25% ★★☆☆☆ Seven fatalities in the September 2025 mud rush; TRIR 0.55 (0.53); tailings-standard conformance verified in 2025 (FY2025 10-K pp.32, 158; Q3 2025 10-Q p.24)
Composite 100% ★★★½ Solid

Source: FY2025 10-K and the Q2 2026 and Q3 2025 10-Qs at the pages cited in each row; peers per Table 3; country risk premiums per Damodaran, 5 January 2026.

Σ(weight × stars) = 0.75 + 0.30 + 0.60 + 0.60 + 0.45 + 0.25 + 0.25 + 0.1875 + 0.125 = 3.51/5 → ★★★½, Solid. Peer set per Section 2.8; value read per Section 7.

The two-axis verdict. As of 19 August 2026, Freeport-McMoRan is Solid (★★★½) and Modestly overvalued (wide band) → full: first-rate copper districts priced above what the base deck supports — a blended fair value of US$51.17 and NAV of US$48.59 per share at US$6.00/lb copper, against US$68.38, implied -25.2%. The market-implied copper deck is US$7.05/lb, above copper’s five-year high of US$6.703/lb; the read turns Fairly valued at about US$6.64/lb and Overvalued below about US$5.80/lb. Dimensions 1, 2, 3 and 5 carried the target multiples (net +6%: P/NAV 1.06×, EV/EBITDA 7.4×, FCF yield 6.6%); the ★★★ jurisdiction read is charged in the 9.5% rate instead. The bull case is Grasberg at capacity on a US$7 copper price; the bear case is the ramp and the licence, both in Indonesia. What tips it is copper. This is an analytical read, not advice. Rank Freeport against its peers on Metal Pilot’s copper mining stock screener.

10. Sources, methodology & disclaimer

10.1 Sources, methodology & data vintage

Company filings: Freeport-McMoRan’s FY2025, FY2024 and FY2023 10-Ks; its Q2 2026, Q1 2026 and Q3 2025 10-Qs; the Q2 2026, Q1 2026 and Q4 2025 results releases and the November 2025 investor update; the 2025 technical report summary. Market data: the NYSE close of 17 August 2026 (stockanalysis.com); COMEX copper and gold futures closes (Yahoo Finance); the copper five-year average (FRED PCOPPUSDM); country risk premiums (Damodaran, 5 January 2026).

Methodology. Fundamentals to 30 June 2026, reserves at 31 December 2025, market data at 17 August 2026; data as of 19 August 2026, refreshed on each quarterly report. Base deck copper US$6.00/lb on the fixed US$4–8/lb grid, every price run as a scenario; gold held at US$4,500/oz and molybdenum at US$30/lb; 9.5% real after-tax (8% plus a 1.5% jurisdiction premium). Weights NAV 50%, EV/EBITDA 30%, FCF yield 20%; scorecard against Southern Copper, Antofagasta, Ivanhoe Mines and BHP on each company’s latest annual report. Result: blended fair value US$51.17 and NAV US$48.59 per share against US$68.38, implied -25.2%, read Modestly overvalued (wide band), market-implied copper deck US$7.05/lb.

Re-run log. 18 October 2026: reworked to the current template and re-modelled — base deck US$6.00/lb (was US$5.00), rate 9.5% (was 9%), Cerro Verde at 55.08% (was 53.56%); rating 3.5/5 Solid (was 4.1/5); blended fair value US$51.17, implied -25.2%; read Modestly overvalued (wide band), unchanged. Gate fixes the same day: price re-dated to the 17 Aug 2026 close (printed as 15 Aug, a Saturday) and the deck averages re-cut to it (snaps unchanged); PTFI’s minorities taken after its US$3.2 bn downstream debt, investment securities and restricted funds added, accrued income taxes printed inside the working-capital line, the molybdenum mines on their reserve — NAV/share +US$1.35 to US$48.59, blend +US$1.26 to US$51.17, implied -25.2%; read unchanged. Second fix round the same day: Table 3 re-sourced to the peers’ own filings and the U.S. copper mines’ molybdenum reserve corrected to about 2.0 Blb; no star, figure or read moves.

Omitted figures and gaps. No asset map is built; Figure 3 splits NAV, not revenue, because Freeport files no revenue by mine. Not in the source set: the 2026 proxy statement (board, committees, related parties), the 2025 sustainability report (Scope 1 and 2), peers’ filings and the post-revision 2027 PTFI volume; Table 17’s gap register bounds each valuation gap. The P/NAV map, deck sensitivity and cross-checks are in the model’s out file, claude/valuation-models/freeport-mcmoran-fcx.out.md. Table 6 opens Section 7; the register below closes this section.

Table 20. Full source register — every input the valuation uses (load-bearing inputs: Table 6)

InputValueAs ofWhere §7 uses itSource
FY2025 10-K
Recoverable P&P reserves, consolidated basis112.3 Blb Cu; 20.6 Moz Au; 3.5 Blb Mo31 Dec 2025§7 model inputsFiled | FY2025 10-K | Mineral reserves | "Consolidated basis" | p.39
Reserves, U.S.42.5 Blb Cu; 0.6 Moz Au; 2.6 Blb Mo31 Dec 2025§7 model inputsFiled | FY2025 10-K | Mineral reserves | "U.S." | p.39
Reserves, South America (incl. 17.5 Blb El Abra potential mill)45.6 Blb Cu; 0.1 Moz Au; 0.9 Blb Mo31 Dec 2025§7 model inputsFiled | FY2025 10-K | Mineral reserves | "South America" | p.39
Reserves, Indonesia (through the IUPK to 2041)24.2 Blb Cu; 20.0 Moz Au31 Dec 2025§7 model inputsFiled | FY2025 10-K | Mineral reserves | "Indonesia" | p.39
Reserves tied to the potential El Abra mill17.5 Blb Cu31 Dec 2025§7 model inputsFiled | FY2025 10-K | Mineral reserves note b | "associated with a potential mill project at El Abra" | p.39
PTFI IUPK operating termextends through 204131 Dec 2025§7 model inputsFiled | FY2025 10-K | Mineral reserves note c | "which extends through 2041" | p.39
Cerro Verde ownershipFCX 55.08%; SMM 21.0%; Buenaventura 19.58%31 Dec 2025§7 model inputsFiled | FY2025 10-K | Operations | "We have a 55.08% ownership interest in Cerro Verde" | p.21
El Abra ownershipFCX 51%; Codelco 49%31 Dec 2025§7 model inputsFiled | FY2025 10-K | Operations | "We have a 51% ownership interest in El Abra" | p.23
PTFI (Grasberg) economic interest48.76%31 Dec 2025§7 model inputsFiled | FY2025 10-K | Operating data | "Grasberg minerals district (48.76%)" | p.36
Morenci undivided interest (unincorporated JV)72%31 Dec 2025§7 model inputsFiled | FY2025 10-K | Operating data | "Morenci (72%)" | p.36
U.S. copper, FY2025production 1,304 Mlb (FY2024 1,246); sales 1,296 Mlb31 Dec 2025§7 model inputsFiled | FY2025 10-K | Operating data | "Total U.S." | p.36
South America copper, FY2025production 1,064 Mlb (FY2024 1,168); sales 1,073 Mlb31 Dec 2025§7 model inputsFiled | FY2025 10-K | Operating data | "Total South America" | p.36
Grasberg copper, FY2025 (mud rush year)production 1,015 Mlb (FY2024 1,800); sales 1,205 Mlb31 Dec 2025§7 model inputsFiled | FY2025 10-K | Operating data | "Grasberg minerals district (48.76%)" | p.36
Molybdenum, primary mines, FY2025Climax 24 Mlb; Henderson 13 Mlb31 Dec 2025§7 model inputsFiled | FY2025 10-K | Operating data | "Climax (100%)" | p.36
Average realized gold price, FY2025$3,423/oz31 Dec 2025§7 model inputsFiled | FY2025 10-K | Operating data | "Average realized price per ounce" | p.36
Q2 2026 10-Q
2026 copper sales guidance, U.S. copper mines1,360 Mlb30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Outlook | "U.S. copper mines" | p.24
2026 copper sales guidance, South America1,022 Mlb30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Outlook | "South America operations" | p.24
2026 copper sales guidance, Indonesia675 Mlb30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Outlook | "Indonesia operations" | p.24
2026 gold sales guidance654 koz30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Outlook | "Gold (thousands of recoverable ounces)" | p.24
2026 molybdenum sales guidance93 Mlb30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Outlook | "Molybdenum (millions of recoverable pounds)" | p.24
2026 consolidated unit net cash cost guidance$1.90/lb Cu, at $4,000/oz gold and $30.00/lb molybdenum for H2 202630 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Outlook | "Based on achievement of current sales volume and cost estimates and assuming average prices of $4,000 per ounce of gold" | p.24
2026 capex guidance, major projects$3.0 bn30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Outlook | "Major projects" | p.25
2026 capex guidance, sustaining capital and other$1.3 bn30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Outlook | "Sustaining capital and other" | p.25
FY2025 10-K
Grasberg resources exclusive of reserves (100% basis, milling)M 388 Mt at 0.77% Cu, 0.64 g/t Au; I 2,457 Mt at 0.66%, 0.55 g/t; Inf 318 Mt at 0.43%, 0.33 g/t31 Dec 2025§7 model inputsFiled | FY2025 10-K | Estimated Mineral Resources | "Grasberg minerals district" | p.48
Cerro Verde resources (100% basis, milling)M 107 Mt at 0.28%; I 1,626 Mt at 0.33%; Inf 408 Mt at 0.33%31 Dec 2025§7 model inputsFiled | FY2025 10-K | Estimated Mineral Resources | "Cerro Verde" | p.48
El Abra resources (100% basis, milling)M 126 Mt at 0.55%; I 561 Mt at 0.39%; Inf 1,065 Mt at 0.29%31 Dec 2025§7 model inputsFiled | FY2025 10-K | Estimated Mineral Resources | "El Abra" | p.48
Morenci resources (100% basis, milling)M 819 Mt at 0.27%; I 727 Mt at 0.30%; Inf 391 Mt at 0.31%31 Dec 2025§7 model inputsFiled | FY2025 10-K | Estimated Mineral Resources | "Morenci" | p.48
Safford incl. Lone Star resources (milling)M 1,829 Mt at 0.36%; I 2,141 Mt at 0.30%; Inf 648 Mt at 0.23%31 Dec 2025§7 model inputsFiled | FY2025 10-K | Estimated Mineral Resources | "Safford, including Lone Star" | p.48
U.S. copper mines unit net cash cost, FY2025by-product $3.05/lb Cu; co-product $3.22/lb Cu, $16.41/lb Mo31 Dec 2025§7 model inputsFiled | FY2025 10-K | Product revenues and production costs | "Unit net cash costs" | p.116
South America unit net cash cost, FY2025by-product $2.43/lb Cu; co-product $2.64/lb Cu31 Dec 2025§7 model inputsFiled | FY2025 10-K | Product revenues and production costs | "Unit net cash costs" | p.118
Indonesia unit net cash cost, FY2025by-product $(0.55)/lb Cu (a credit); co-product $1.54/lb Cu, $1,167/oz Au31 Dec 2025§7 model inputsFiled | FY2025 10-K | Product revenues and production costs | "Unit net cash (credits) costs" | p.120
Q2 2026 10-Q
PTFI phased ramp-up schedule (Grasberg Block Cave)about 65% of capacity in H2 2026, 80% by mid-2027, approaching full capacity by the end of 202730 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Operations, Indonesia | "overall production rates are expected to approximate 65% of capacity in the second half of 2026" | p.43
PTFI 2026 sales guidance0.7 bn lb Cu and 650 koz Au; production exceeds sales by about 100 Mlb Cu and 50 koz Au held at the smelters30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Operations, Indonesia | "Consolidated sales volumes from PTFI are expected to approximate 0.7 billion pounds of copper" | p.44
November 2025 update
Grasberg minerals district mine plan, November 2025 estimate (100% basis; before the April 2026 ramp revision)Cu 1.0, 1.0, 1.5, 1.7, 1.7 bn lb and Au 0.9, 0.9, 1.2, 1.4, 1.3 Moz in 2025e-2029e18 Nov 2025§7 model inputsFiled | November 2025 update | Slide 10 | "Grasberg Minerals District Mine Plan Metal Production" | p.10
Q2 2026 10-Q
IUPK life-of-resource extension MOU (February 2026)FCX keeps 48.76% of PTFI through 2041 and holds about 37% from 2042; existing governance and IUPK terms continue over the life of the resource30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Operations, Indonesia | "hold approximately 37% beginning in 2042" | p.42
2026 U.S. copper mines unit net cash cost guidance$2.96/lb Cu at $30.00/lb molybdenum for H2 2026; $0.03/lb per $2/lb molybdenum30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Operations, United States | "for our U.S. copper mines are expected to approximate $2.96 per pound of copper" | p.40
2026 South America unit net cash cost guidance$2.56/lb Cu at $30.00/lb molybdenum for H2 2026; $0.04/lb per $2/lb molybdenum30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Operations, South America | "for our South America operations are expected to approximate $2.56 per pound of copper" | p.42
2026 PTFI unit net cash credit guidance (excl. idle facility and restoration costs)$(1.22)/lb Cu (a credit) at $4,000/oz gold for H2 2026; $0.06/lb per $100/oz gold30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Operations, Indonesia | "for PTFI are expected to approximate $1.22 per pound of copper" | p.46
2026 Molybdenum mines unit net cash cost guidance$17.91/lb Mo30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Operations, Molybdenum mines | "Average unit net cash costs for our Molybdenum mines are expected to approximate $17.91 per pound" | p.47
Kucing Liar development, incurred to 30 Jun 2026 and remainingabout $1.4 bn incurred; about $4 bn more through 2033 (about $0.5 bn a year)30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Operations, Indonesia | "PTFI had incurred approximately $1.4 billion for Kucing Liar development" | p.42
2026 major projects capex, planned vs discretionaryplanned projects $1.4 bn (Grasberg underground development, mill and power; El Abra leaching); discretionary growth $1.6 bn (Kucing Liar; Bagdad tailings)30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Outlook | "Includes $1.4 billion for planned projects" | p.25
Investment securities and legally restricted funds, 30 Jun 2026$59 m and $234 m at carrying amount30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Financial instruments | "Legally restricted funds" | p.14
Cash and cash equivalents; restricted$4,080 m; restricted $278 m30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Balance sheet | "Cash and cash equivalents" | p.3
Total debt, 30 Jun 2026 (31 Dec 2025)$9,386 m ($9,379 m)30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Debt note | "Total debt" | p.10
Long-term leases, less current portion$973 m30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Balance sheet | "Long-term leases, less current portion" | p.3
Environmental and asset retirement obligations, current$327 m30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Balance sheet | "Current portion of environmental and asset retirement obligations" | p.3
Environmental and asset retirement obligations, non-current$5,616 m30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Balance sheet | "Environmental and asset retirement obligations, less current portion" | p.3
Noncontrolling interests (equity)$12,113 m30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Balance sheet | "Noncontrolling interests" | p.3
FY2025 10-K
Stock options outstanding, 31 Dec 2025 (all vested)4,764,968 at $14.53 weighted-average exercise price; intrinsic $173 m31 Dec 2025§7 model inputsFiled | FY2025 10-K | Stock-based compensation | "Balance at December 31, 2025" | p.149
Q2 2026 10-Q
Common shares issued and outstanding, 31 Jul 20261,436,017,52331 Jul 2026§7 model inputsFiled | Q2 2026 10-Q | Cover | "there were issued and outstanding" | p.1
Selling, general and administrative expenses, Q2 2026 and H1 2026 (Q2 2025, H1 2025)$135 m; $297 m ($127 m; $281 m)30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Income statement | "Selling, general and administrative expenses" | p.4
Exploration and research expenses, Q2 2026 and H1 2026 (Q2 2025, H1 2025)$53 m; $91 m ($46 m; $85 m)30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Income statement | "Exploration and research expenses" | p.4
2026 idle facility and restoration costs estimate (excluded from unit net cash costs)$1.2 bn for 2026 (Q3 2026 $0.3 bn)30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Outlook | "Idle facility and restoration costs are expected to approximate $1.2 billion" | p.25
2026 effective tax rate estimate by jurisdictionconsolidated 30%; Peru 40%; Indonesia 36%; U.S. 7% (CAMT)30 Jun 2026§7 model inputsFiled | Q2 2026 10-Q | Income taxes | "we estimate our consolidated effective tax rate for the year 2026 would approximate 30%" | p.33
FY2025 10-K
Lease liabilities, 31 Dec 2025present value $1,113 m; current portion $103 m; long-term $1,010 m31 Dec 2025§7 model inputsFiled | FY2025 10-K | Leases note | "Present value of net minimum lease payments" | p.165
Market layer
Copper 3-, 6-, 12-month trailing averages (COMEX HG=F daily closes to 17 Aug 2026)US$6.355 / 6.110 / 5.645 per lb17 Aug 2026§7 opening — the US$6.00/lb grid priceMarket | Yahoo Finance | "HG=F" daily closes | to 17 Aug 2026
Copper five-year average and range (FRED PCOPPUSDM monthly means, Aug 2021 – Jul 2026)US$4.36/lb; high US$6.15 (Jun 2026), low US$3.42 (Jul 2022)31 Jul 2026Table 17 field 2 — anchors heldMarket | FRED | PCOPPUSDM | Aug 2021 – Jul 2026
Gold 3-, 6-, 12-month trailing averages (COMEX GC=F daily closes to 17 Aug 2026)US$4,250.28 / 4,537.52 / 4,363.18 per oz17 Aug 2026§7 opening — gold US$4,500/oz, heldMarket | Yahoo Finance | "GC=F" daily closes | to 17 Aug 2026

Source: the Freeport-McMoRan filings and market series named in each row; copper and gold from COMEX futures closes (Yahoo Finance).

10.2 Disclaimer & disclosure

This analysis is for information only and is not investment advice; it is not a recommendation to buy, hold or sell any security. Do your own research and consult a licensed financial adviser before acting. It is a point-in-time snapshot as of 19 August 2026: the market data, valuation and rating move with prices and events, and the figures come from company filings and market data that can be revised. This report was prepared with AI assistance; its figures were sourced and checked, but verify any number against the primary filing before relying on it. The verdict is an analytical read, not a personal instruction. As of 18 November 2026, the author holds no position in the company this analysis covers.