BHP Group (BHP) — Stock Analysis 2026 [3.9]

Copper Base Metals Company Analysis
USD

Analysis as of 11 August 2026. BHP Group stock analysis. Price deck: base copper US$6.00/lb — the representative of the 3-, 6- and 12-month trailing averages (US$6.35, US$6.09 and US$5.61/lb) on the fixed US$4.00–8.00 grid — with every grid price (US$4.00, 5.00, 6.00, 7.00 and 8.00/lb) run as a scenario, from deep bear US$4.00 to deep bull US$8.00/lb; iron ore (62% Fe) is held at US$100/t and coal at its FY26 realised prices in every column, and no analyst consensus or spot price is weighted. Market data: NYSE close on 11 August 2026, US$90.02 per ADS (one ADS is two ordinary shares); company figures in US dollars. Fair value US$54.10 per ADS against a NAV per ADS of US$37.56 — implied −39.9%; the market-implied copper deck is US$9.65/lb. Refreshed on each half-year and annual report and on material events. Rating: ★★★★ Solid / Overvalued (wide band).

BHP Group is the largest diversified miner listed anywhere, and almost all of its earnings come from Western Australian iron ore and from copper in Chile, South Australia and Peru. The thesis in one line: the lowest-cost major iron ore system and 1,952.8 kt of FY26 copper make a high-quality business, but at US$90.02 per ADS the shares price copper at US$9.65/lb — 44% above the five-year high. Why now: FY27 copper is guided down to 1,650–1,800 kt as Escondida’s grade falls, while Jansen potash starts next year after a ~US$2.3 billion impairment. To screen BHP against every copper and iron ore producer on cost, reserves and reserve life, go to Metal Pilot’s copper mining stock screener.

1. Snapshot & thesis

Figure 1. BHP Group in numbers

$90.02
ADS price — NYSE, 11 Aug 2026
$228.8 bn
Market capitalisation
$51.3 bn
Revenue — FY2025
$26.0 bn
Underlying EBITDA — FY2025
1,953 kt
Copper produced — FY2026
264.7 Mt
Iron ore produced — FY2026
$14.7 bn
Net debt — 31 Dec 2025
0.5×
Net debt / LTM EBITDA
$37.56
NAV per ADS (Section 7)
$54.10
Fair value — blend (Section 7)
3.9/5
Quality rating — Solid
Overvalued
(wide band)
Valuation read (Section 7)

Figure data: revenue, EBITDA and net debt per the BHP FY2025 Form 20-F and HY2026 financial results; production per the FY2026 operational review (16 July 2026); ADS price per Yahoo Finance, NYSE close 11 August 2026, on 2,541.5 m ADS (5,083 m diluted ordinary shares ÷ 2). NAV, fair value and read per Section 7, rating per Section 9.

BHP Group Limited (ASX: BHP; NYSE: BHP; LSE: BHP; JSE: BHG), headquartered in Melbourne, is a diversified major in the copper and iron ore sector. Four copper businesses — Escondida (57.5%) and Pampa Norte (Spence) in Chile, Copper South Australia (Olympic Dam, Prominent Hill, Carrapateena) and a 33.75% share of Antamina in Peru — sit beside Western Australia Iron Ore (85% of the four main joint ventures) and 50% of Samarco in Brazil, the BMA steelmaking and NSWEC energy coal mines in Australia, the Jansen potash project in Canada and 50% of Vicuña in Argentina. (kt = thousand tonnes; Mt = million tonnes; P&P = proven and probable reserves; M&I = measured and indicated resources; ADS = American depositary share; the fiscal year ends 30 June.)

Table 1. BHP in numbers

Metric Value As of
ADS price / market capitalisation US$90.02 / US$228.8 bn (2,541.5 m ADS diluted) 11 Aug 2026
Enterprise value US$243.5 bn (net debt US$14,686 m) 31 Dec 2025
Copper production / FY27 guidance 1,952.8 kt / 1,650–1,800 kt FY2026
Iron ore production / FY27 guidance 264.7 Mt / 260–272 Mt FY2026
Revenue / Underlying EBITDA US$51,262 m / US$25,978 m FY2025
Underlying EBITDA margin (BHP basis) 53% FY2025
Net operating cash flow / free cash flow US$18,692 m / US$5,342 m FY2025
Net debt / net debt-to-LTM EBITDA US$14,686 m / 0.5× 31 Dec 2025
Dividend determined per share 110.0 US cents (HY2026 interim: 73 cents) FY2025
NAV per share (per ADS) US$37.56 (P/NAV 2.40×) 11 Aug 2026
Fair value (blend) US$54.10 (range US$31.57–US$73.76) 11 Aug 2026
Quality rating / valuation read 3.9/5 Solid / Overvalued (wide band), implied −39.9% 11 Aug 2026

Source: BHP FY2025 Form 20-F, HY2026 financial results and FY2026 operational review; market data per Yahoo Finance, NYSE close 11 August 2026. Enterprise value = market capitalisation + net debt at 31 December 2025. Listed: Public (ASX, NYSE: BHP).

Thesis in brief. Bull: WAIO’s FY25 unit cost of US$18.56/t, guided below US$17.50/t at more than 305 Mtpa from FY28, and Escondida’s US$1.19/lb make BHP the low-cost producer in both its markets — at copper US$8.00/lb the blend reaches US$73.76. Bear: copper output falls to 1,650–1,800 kt in FY27, Escondida’s medium-term guide is 900–1,000 ktpa at US$1.50–1.80/lb, and Jansen has already cost a ~US$2.3 billion impairment — at US$5.00/lb the blend is US$41.99. What tips it is the copper deck: the price already assumes US$9.65/lb. The full rating is in Section 9.

How to read this analysis: for the verdict, the statcards and Section 9 are enough; for the evidence, read Section 2 (the assets) through Section 7 (the valuation).

2. Assets & operations

For the markets behind these assets, see the Copper — A Complete Market Guide and Iron Ore — A Complete Market Guide; this section spends its words on the company.

2.1 Portfolio overview

Table 2. BHP asset portfolio

Asset Country Stage Interest FY26 output Reserves (P&P, 30 Jun 2025) Life (yr) Unit cost Listing / operator
Western Australia Iron Ore Australia Producing 85% (main JVs) 256.9 Mt 3,520 Mt, filed WAIO total (Newman, Goldsworthy, Jimblebar) 13 US$18.56/t FY25; US$18.25–19.75/t FY26 guide Private asset (BHP-operated)
Escondida Chile Producing 57.5% 1,261.2 kt (100%) 3,410 Mt at 0.56% Cu 30 (cap) US$1.19/lb FY25; US$1.00–1.20/lb FY26 guide Private asset (BHP-operated)
Copper South Australia Australia Producing 100% 320.7 kt Olympic Dam 590 Mt at 1.82% Cu; Prominent Hill & Carrapateena 171 Mt at 1.11% 30 (cap) US$1.00–1.50/lb FY26 guide Private asset (BHP-operated)
Pampa Norte (Spence) Chile Producing 100% 212.6 kt 938 Mt at 0.52% Cu 20 US$2.07/lb FY25; US$2.10–2.40/lb FY26 guide Private asset (BHP-operated)
Antamina Peru Producing 33.75% 151.5 kt 178 Mt at 0.92% Cu 11 US$1.68/lb (FY2025 revenue less EBITDA ÷ FY26 lb; derived) Private JV (non-operated)
BMA (steelmaking coal) Australia Producing 50% 18.6 Mt n/d 10 (horizon) US$127.50/t FY25; US$116–128/t FY26 guide Private JV (BHP-operated)
NSWEC (energy coal) Australia Producing 100% 16.4 Mt n/d 10 (horizon) — Private asset (BHP-operated)
Samarco Brazil Producing 50% 7.8 Mt 413 Mt at 42.7% Fe — — Private JV with Vale
Jansen (potash) Canada Construction 100% first production FY27 1,070 Mt at 24.9% K₂O (probable) not valued Stage 1 capital US$7.0–7.4 bn Private asset (BHP-operated)
Vicuña Argentina Exploration 50% — M&I 1,820 Mt at 0.35% Cu, 0.27 g/t Au (no reserves) resource row — Private JV with Lundin Mining (Public, TSX: LUN)

Source: BHP FY2025 Form 20-F, OFR 6 and the S-K 1300 reserve tables (BHP’s economic interest, 30 June 2025); FY26 output and FY26 unit-cost guidance per the FY2026 operational review; lives per Section 7. Output is BHP’s share except Escondida (100%, as BHP reports it).

Concentration. Two systems carry the group. WAIO is 48% of enterprise NAV in Section 7, and the four copper businesses together 69%; in FY2025 the Iron Ore segment earned US$14,396 m of Underlying EBITDA and Copper US$12,326 m, Coal only US$573 m. Escondida alone is 64.6% of BHP’s copper output. A China steel slowdown or an Escondida grade slip therefore moves the whole group.

2.2 Revenue split

Figure 2. FY2025 revenue by segment

Iron ore
Copper
Coal
Group & unallocated
$22,919 m (44.7%)
$22,530 m (44.0%)
$5,046 m (9.8%)
$767 m (1.5%)
Share of FY2025 revenue of US$51,262 m

Figure data: BHP FY2025 Form 20-F, OFR 13 segment information — revenue by segment, year ended 30 June 2025.

Figure 3. FY2026 copper production by asset

Escondida
Copper South Australia
Pampa Norte (Spence)
Antamina
1,261.2 kt (64.6%)
320.7 kt (16.4%)
212.6 kt (10.9%)
151.5 kt (7.8%)
Share of FY2026 group copper output of 1,952.8 kt

Figure data: BHP FY2026 operational review, production table (16 July 2026); shares of the 1,952.8 kt group total.

On revenue, copper has drawn level with iron ore — US$22,530 m against US$22,919 m — but iron ore still earns more at a higher margin (63% against 59%). BHP files revenue for only two of its mines, Escondida (US$13,177 m at 100%) and Antamina, so the by-asset split is drawn on copper output, where Escondida’s weight is plain.

2.3 Western Australia Iron Ore

WAIO is an integrated Pilbara system of mines, rail and port in which BHP holds 85% of the four main joint ventures and is operator. It produced 256.9 Mt (BHP share; 291.2 Mt at 100%) in FY26 and is guided to 253–264 Mt in FY27 and above 305 Mtpa (100%) from FY28 at below US$17.50/t. Its FY25 unit cost of US$18.56/t (FY26 guide US$18.25–19.75/t) is the lowest of any major producer. FY26 realised price was US$84.56/wmt FOB. P&P reserves are 3,520 Mt, the filed WAIO total — Mt Newman 640 Mt at 61.8% Fe, Goldsworthy 1,650 Mt at 61.3% and Jimblebar 1,230 Mt at 61.0% (S-K 1300, 30 June 2025), about 13 years of output. The asset risk is demand: the price of 62% Fe follows Chinese steel output.

2.4 Escondida

Escondida (Chile; BHP 57.5%, operator; the 42.5% minority sits in the Section 7 bridge) is the world’s largest copper mine. It produced 1,261.2 kt in FY26, guided to 1,000–1,100 kt in FY27 and 900–1,000 ktpa on average over FY28–31 at US$1.50–1.80/lb, as lower-grade ore feeds the plant. FY25 unit cost was US$1.19/lb (FY24 US$1.45/lb); FY26 guidance is US$1.00–1.20/lb at the bottom end. P&P reserves are 3,410 Mt at 0.56% Cu (BHP share, 30 June 2025). FY25 revenue was US$13,177 m and Underlying EBITDA US$8,593 m. The asset risk is grade and Chilean fiscal and water terms.

2.5 Copper South Australia

Copper South Australia (100%, operator) joins Olympic Dam with Prominent Hill and Carrapateena. It produced 320.7 kt in FY26, guided to 290–320 kt in FY27, at a FY26 unit-cost guide of US$1.00–1.50/lb after gold and uranium credits (gold US$2,900/oz, uranium US$70/lb). Olympic Dam holds 590 Mt at 1.82% Cu, 0.58 kg/t U₃O₈ and 0.68 g/t Au of P&P, with 680 Mt at 1.35% Cu of M&I beyond it; Prominent Hill and Carrapateena 171 Mt at 1.11% Cu. The asset risk is the by-product prices its cost depends on.

2.6 Other assets and the pipeline

Pampa Norte (Spence) (100%) produced 212.6 kt at US$2.07/lb (FY25) and is guided to about 235 ktpa at US$2.05–2.35/lb over FY28–31; reserves 938 Mt at 0.52% Cu. Antamina (33.75%, non-operated) gave 151.5 kt of copper (FY27 guide 120–140 kt) and 5.4 Moz of silver (CY2025); from 1 April 2026 that silver is streamed to Wheaton Precious Metals for US$4.3 billion upfront and 20% of spot thereafter, at 90% payable. BMA (50%) and NSWEC (100%) produced 18.6 Mt and 16.4 Mt of coal (FY27 guide 18.5–20.5 Mt and 14–16 Mt), realised at US$210.21/t and US$104.28/t. Samarco (50%, with Vale) produced 7.8 Mt. Jansen (100%) is under construction: Stage 1 capital rose to US$7.0–7.4 billion from US$5.7 billion, first potash is guided for FY27, Stage 2 slipped from FY2029 to FY2031, and a ~US$2.3 billion impairment was booked in H2 FY26; remaining capital and the ramp schedule are n/d. Vicuña (50% with Lundin Mining) holds 1,820 Mt of M&I at 0.35% Cu and 0.27 g/t Au, with Stage 1 FID targeted for CY26 under Argentina’s RIGI regime. Carajás was sold on 2 April 2026.

2.7 Production, reserves & costs

Figure 4. Group copper production by fiscal year

Copper production (kt)
2,500
2,000
1,500
1,000
500
0
1,865
2,017
1,952.8
FY2024
FY2025
FY2026
Fiscal year ended 30 June

Figure data: BHP FY2025 Form 20-F, OFR copper production (FY2024, FY2025); FY2026 operational review (FY2026).

Copper peaked at 2,017 kt in FY25 and is guided to 1,650–1,800 kt in FY27; iron ore holds at 263–265 Mt; steelmaking coal fell from 22 Mt in FY24 to 18 Mt in FY25. The cost position is the durable fact: WAIO at US$18.56/t, Escondida at US$1.19/lb, against a FY26 copper realised price of US$5.74/lb.

2.8 Peer positioning

The peer set for every star in Section 9 is four diversified and copper majors: Rio Tinto (NYSE: RIO), Vale (NYSE: VALE), Glencore (LSE: GLEN) and Freeport-McMoRan (NYSE: FCX). Anglo American is left out while its merger with Teck is pending.

Table 3. Peer positioning — quality metrics

Company Listing Commodity mix Core jurisdictions Copper; iron ore output
BHP Group Public (NYSE: BHP) Iron ore, copper, coal, potash Australia, Chile, Peru 1,952.8 kt; 264.7 Mt (FY2026)
Rio Tinto Public (NYSE: RIO) Iron ore, aluminium, copper Australia, Mongolia, Canada n/d
Vale Public (NYSE: VALE) Iron ore, nickel, copper Brazil, Canada n/d
Glencore Public (LSE: GLEN) Copper, coal, zinc, marketing DRC, Chile, Australia n/d
Freeport-McMoRan Public (NYSE: FCX) Copper, gold, molybdenum United States, Indonesia, Peru n/d

Source: BHP per the FY2026 operational review; peer commodity mix and jurisdictions are the author’s summary; peer output n/d — the peers’ filings are not in this analysis’s source set (Section 10.1). Compare the group on production, cost and reserve life on the Metal Pilot iron ore screener.

Against this set BHP is the only major low-cost in both iron ore and copper: Rio Tinto matches it in the Pilbara but carries aluminium; Vale is iron ore with a Brazilian dam legacy of its own; Glencore and Freeport-McMoRan are copper-led with no iron ore.

3. Financials & balance sheet

Table 4. Five-year financial summary (US$m unless stated)

Metric FY2021 FY2022 FY2023 FY2024 FY2025
Revenue 56,921 65,098 53,817 55,658 51,262
Revenue YoY % — +14.4% −17.3% +3.4% −7.9%
Underlying EBITDA (÷ revenue) 35,073 (61.6%) 40,634 (62.4%) 27,956 (51.9%) 29,016 (52.1%) 25,978 (50.7%)
Attributable profit 11,304 30,900 12,921 7,897 9,019
Diluted EPS (US cents) 223.0 609.3 254.7 155.5 177.4
Net operating cash flow 27,234 32,174 18,701 20,665 18,692
Capital & exploration (split n/d) 7,120 7,545 7,083 9,273 9,794
Free cash flow (BHP definition) 19,558 24,312 5,636 11,903 5,342
Net debt 4,121 333 11,166 9,120 12,924
Net debt / Underlying EBITDA 0.12× 0.01× 0.40× 0.31× 0.50×
Diluted shares (m) 5,068 5,071 5,073 5,077 5,083
Dividend determined (US cents) 301.0 325.0 170.0 146.0 110.0

Source: BHP FY2025 Form 20-F, OFR 2 financial information summary (p.205) and OFR 13 (free cash flow FY2023–25); FY2021–22 free cash flow (continuing operations) per the FY2023 Form 20-F. Notes: (1) the margin in brackets is EBITDA over total revenue; BHP’s own 53% for FY2025 is on its segment basis. (2) BHP does not split capital into sustaining and growth by year.

Revenue fell 7.9% in FY25 on iron ore prices, yet the HY2026 results (to 31 December 2025) put Underlying EBITDA up 25% to US$15.5 billion and net operating cash flow at US$9.4 billion, with diluted EPS of 110.8 US cents. Applying the Financial Metrics for Commodity Investing guide: operating cash flow (US$18,692 m) runs well ahead of attributable profit (US$9,019 m), and the gap to underlying profit (US$10,157 m) is a recurring pattern — Samarco charges and nickel write-downs, then the ~US$2.3 billion Jansen impairment in H2 FY26.

Cost deck. FY26 unit-cost guidance assumes AUD/USD 0.65 and USD/CLP 940 (realised 0.68 and 920); the FY26 effective tax rate is guided at 36–40%, and BHP paid US$7,721 m of income and royalty taxes in FY25. Capital runs at about US$10 billion a year in the medium term, ~40% of it growth.

Balance sheet. Net debt was US$14,686 m at 31 December 2025 (including US$3,510 m of leases) — 0.5× LTM EBITDA — and BHP expected about US$9 billion at 30 June 2026 after the US$4.3 billion stream proceeds. Halving FY25 Underlying EBITDA would lift the ratio to 1.1×. Cash was US$13,466 m and the US$5,500 m revolver undrawn; group facilities carry no financial covenants, and Fitch rates BHP A/F1. The closure and rehabilitation provision was US$10,468 m (30 June 2025) and the Samarco provision US$5.3 billion. Debt maturities are n/d. Hedging: commodity sales are unhedged; Samarco’s real-denominated payments are hedged to FY28. Returns: the HY2026 interim dividend was 73 US cents (a 60% payout); no buyback appears in the filings since FY2021; diluted shares were 5,083 m.

4. Management, strategy & structure

4.1 Management & governance

Brandon Craig is Chief Executive Officer, succeeding Mike Henry on 1 July 2026; he joined BHP in 1999 and was President Americas from 1 March 2024. Vandita Pant (joined 2016) is CFO. Ross McEwan, a former chief executive of National Australia Bank and a director since April 2024, became Chair on 31 March 2025, succeeding Ken MacKenzie; Mark Vassella joined the Board on 1 June 2026. The Board works through the Risk and Audit, Nomination and Governance, Sustainability, and People and Remuneration committees; Board size is n/d. There were no transactions or loans with Executive KMP in FY2025.

4.2 Strategy

BHP’s frame is to fund copper and potash growth from low-cost iron ore. Its dated targets: WAIO above 305 Mtpa below US$17.50/t from FY28, Escondida 900–1,000 ktpa over FY28–31, Jansen first potash in FY27 and Stage 2 in FY2031, a Vicuña Stage 1 decision in CY26, and copper growth options at US$15–21k per tonne of copper-equivalent capacity for a 13–16% IRR. It recycles capital rather than buying: San Manuel (Arizona) goes to Faraday Copper for 30% of its equity, the SolGold stake was sold for a ~US$100 m gain, and the Kabanga Nickel interest (17%) was exited on 18 July 2025.

4.3 Ownership & structure

The most material transactions: the Filo Corp. acquisition with Lundin Mining (completed 15 January 2025), which formed the 50/50 Vicuña JV; the Antamina silver stream to Wheaton Precious Metals (effective 1 April 2026, US$4.3 billion); and the Carajás sale (2 April 2026). The operating JVs are Escondida (57.5%), WAIO (85%), BMA (50%), Antamina (33.75%) and Samarco (50%, with Vale). There is no controlling holder: BlackRock last notified 6.85% (31 January 2022), and HSBC Custody Nominees’ 27.32% is a nominee line. Shares: 5,076 m ordinary at 30 June 2025 (5,083 m diluted), each ADS two ordinary shares.

5. ESG & sustainability

BHP reports climate risk against the TCFD recommendations and gives tailings storage its own section in the Form 20-F. The total recordable injury frequency fell 7% in FY25; the yearly safety series is n/d. WAIO set another record for spend with Traditional Owner businesses (+14%). The contested point is Samarco: the 2015 Fundão dam failure still carries a US$5.3 billion provision at 31 December 2025, and coal and iron ore sales leave a Scope 3 footprint no operational target reaches.

6. Risks

Table 5. Risk register

Risk Type Likelihood / impact Exposure Mitigant
Iron ore price (China steel) Commodity 4 / 5 WAIO, 48% of NAV; ±US$10/t moves NAV per ADS to US$32.99–42.13 Lowest-cost producer
Copper price Commodity 3 / 5 Four copper businesses, 69% of NAV First-quartile Escondida cost
A$ and CLP costs Currency 3 / 2 WAIO, Copper South Australia and Chilean unit costs US$ revenue
Escondida grade decline Operational 5 / 3 Output to 900–1,000 ktpa FY28–31 Long reserve; Spence and Copper South Australia
Samarco liability Legal / ESG 3 / 4 US$5.3 bn provision in the bridge Brazil settlement; BRL payments hedged to FY28
Jansen execution and potash Execution 4 / 3 Stage 1 US$7.0–7.4 bn; ~US$2.3 bn impaired First potash FY27
Chile and Peru fiscal and water Jurisdiction 3 / 3 Escondida, Spence, Antamina Long-life contracts; desalination
Coal run-off and Scope 3 Transition 2 / 2 Coal, 2.8% of NAV Shrinking coal book

Source: BHP FY2025 Form 20-F risk factors and OFR; exposure figures per Sections 2 and 7; likelihood and impact (1–5) are the author’s assessment.

Figure 5. Risk matrix — likelihood × impact

Impact (1–5)
5
4
3
2
1
Iron ore price 20
Copper price 15
Escondida grade 15
Samarco 12
Jansen 12
Chile / Peru fiscal 9
Coal / Scope 3 4
1
Rare
2
3
4
5
Likely
Likelihood (1–5)

Figure data: Table 5; each point prints its likelihood × impact score; the shaded region is the high-likelihood, high-impact quadrant.

The two price risks set the value axis and BHP leaves both unhedged; Section 7 prices them through the copper grid and the iron ore sensitivity, and carries Samarco and closure as bridge lines.

7. Valuation

Valuation as of 11 August 2026, built in US dollars per NYSE ADS (one ADS is two ordinary shares) against the US$90.02 NYSE close of 11 August 2026. Horizon: spot fair value. Deck: copper US$6.00/lb on the fixed US$4–8/lb grid, the grid price nearest the 3-month US$6.35, 6-month US$6.09 and 12-month US$5.61/lb averages (COMEX HG=F to 11 August 2026); iron ore US$100/t 62% Fe held in every column, steelmaking and energy coal held at their FY26 realised prices; 8% real after tax.

BHP is valued as a diversified major, sum of the parts, following the How to Value Commodity Stocks guide. Six producing businesses carry the value — Escondida, Pampa Norte (Spence), Copper South Australia and Antamina in copper, Western Australia Iron Ore, and the coal pair of BMA and NSWEC — each on its FY27 or medium-term guidance, run to its reserve or to a stated horizon. Unit costs are the filed guidance plus one cost uplift per commodity, measured on the FY2025 segment lines (royalties, freight, treatment charges and the rest the unit-cost definition leaves out). Group sustaining capital is one row — the medium-term US$10 billion a year less its ~40% growth share — and the growth it would buy is left out with it. The Antamina silver stream sold to Wheaton is modelled on its filed terms: BHP keeps 20% of spot on its silver at 90% payable, and the US$4.3 billion upfront sits in net debt. Copper measured and indicated beyond the reserves, Vicuña’s included, is a conversion row at 0.25. Jansen potash is not valued — its capacity and a potash series are outside the inputs — and its bound is in the assumptions box.

Enterprise NAV at the base deck is US$160.8 billion: WAIO US$77.9 billion (48%), Escondida US$68.8 billion at 100%, Copper South Australia US$23.3 billion, Spence US$12.8 billion, Antamina US$6.5 billion, coal US$4.6 billion and the resource row US$11.6 billion, less US$44.8 billion of sustaining capital. The bridge takes US$65.3 billion — net debt after the stream upfront and the March interim dividend, closure and the Samarco provision, the 42.5% Escondida minority, capitalised group costs and current tax — for an equity NAV of US$95.5 billion, US$37.56 per ADS.

Three choices set the level. The rate is the base-metal and iron-ore 8% with no jurisdiction premium. The copper deck sits 35% above its five-year average of US$4.46/lb, so every target multiple stays on its mid-cycle anchor, moved only by the scorecard’s driver line (× 1.12, Table 12), and only the deck moves across the columns. Iron ore is half of enterprise NAV, so it is a second deck in its own right: held at US$100/t in every copper column, with the copper × iron ore grid in the model’s working tables.

Two calibrations carry the rows, each printed as a formula line in Table 9. Copper’s uplift — US$0.35/lb on top of every mine’s guided unit cost — is the gap between Escondida’s FY2025 revenue less its underlying EBITDA and its US$1.19/lb unit cost, measured at the FY2025 COMEX average of US$4.43/lb; iron ore’s — US$9.22/t — is the same gap for the Iron Ore segment at the FY2025 SGX average of US$101.65/t, realised at 0.8117 of the benchmark (the FY26 realised US$84.56/wmt over the FY26 average of US$104.17/t). Antamina has no filed unit cost, so its row carries FY2025 revenue less EBITDA per pound of FY26 copper, US$1.68/lb, gross of the zinc and molybdenum it also sells — a conservative cost the assumptions box logs. Coal carries one all-in cost per tonne from the FY2025 segment and a ten-year horizon, because the BMA and NSWEC reserve rows were not in the inputs. Every row is taxed at its country’s statutory rate on the cash margin, with no depreciation shield. Lives run on contained metal in the reserve statement at 30 June 2025 less FY26 output: Escondida and Copper South Australia reach the 30-year cap with reserves to spare, Spence runs 20 years, Antamina 11 and WAIO 13 on its filed 3,520 Mt total.

Table 6. Load-bearing inputs — the filed figures the valuation moves on (full register: Table 20)

Input Value Where used Source
Copper trailing averages to 11 Aug 2026 (HG=F) 3-month US$6.346/lb; 6-month US$6.088/lb; 12-month US$5.612/lb Opening block — the US$6.00/lb grid price Market | Yahoo Finance | “HG=F” daily closes | to 11 Aug 2026
Iron ore trailing averages (TIO=F) and the FY26 realised price US$101.31 / 103.19 / 104.11 per t; realised US$84.56/wmt FOB Opening block; Table 9, block 5 Market | Yahoo Finance | “TIO=F” daily closes | to 11 Aug 2026; Filed | FY2026 operational review | Average realised prices | “Iron ore (US$/wmt, FOB)" | p.7
Copper production guidance FY27 (kt; Escondida 100%) Escondida 1,000–1,100; Spence 210–230; Copper SA 290–320; Antamina 120–140 Table 9, blocks 1–4; Table 13 Filed | FY2026 operational review | Production table | “Escondida (kt)" | p.2; Filed | FY2026 operational review | Production table | “Pampa Norte (Spence) (kt)" | p.2; Filed | FY2026 operational review | Production table | “Copper South Australia (kt)" | p.2; Filed | FY2026 operational review | Production table | “Antamina (kt)" | p.2
Iron ore and coal production guidance FY27 (Mt, BHP share) WAIO 253–264; BMA 18.5–20.5; NSWEC 14–16 Table 9, blocks 5–6; Table 13 Filed | FY2026 operational review | Production table | “WAIO (Mt)" | p.2; Filed | FY2026 operational review | Production table | “Steelmaking coal – BMA” | p.2; Filed | FY2026 operational review | Production table | “Energy coal – NSWEC (Mt)" | p.2
Medium-term guidance (FY28–31): Escondida; Spence; WAIO unit cost 900–1,000 ktpa at US$1.50–1.80/lb; ~235 ktpa at US$2.05–2.35/lb; <US$17.50/t Table 9 — steady-state volumes and unit costs Filed | FY2026 operational review | Medium term guidance | “Medium term guidance” | p.7
FY26 unit-cost guidance Escondida US$1.00–1.20/lb; Spence US$2.10–2.40/lb; Copper SA US$1.00–1.50/lb; WAIO US$18.25–19.75/t Table 9 (Copper SA); Table 13 Filed | FY2026 operational review | Unit cost guidance | “Escondida (US$/lb)" | p.7; Filed | FY2026 operational review | Unit cost guidance | “Spence (US$/lb)" | p.7; Filed | FY2026 operational review | Unit cost guidance | “Copper SA (US$/lb)" | p.7; Filed | FY2026 operational review | Unit cost guidance | “WAIO (US$/t)" | p.7
FY2025 calibration lines (US$m): Escondida revenue, EBITDA; iron ore EBITDA; coal revenue, EBITDA 13,177; 8,593; 14,396; 5,046; 573 Table 9 — the cost uplifts Filed | FY2025 Form 20-F | Financial information by asset | “Escondida” | p.206; Filed | FY2025 Form 20-F | OFR 13 Segment | “Underlying EBITDA” | p.120; Filed | FY2025 Form 20-F | OFR 13 Segment | “Revenue” | p.120
Copper and iron ore reserves, BHP share (30 Jun 2025) Escondida 3,410 Mt at 0.56%; Pampa Norte 938 Mt at 0.52%; Olympic Dam 590 Mt at 1.82%; WAIO 640 + 1,650 + 1,230 Mt Table 9 — lives Filed | FY2025 Form 20-F | OFR 6.2.11 Mineral reserves | “Escondida Total” | p.217; Filed | FY2025 Form 20-F | OFR 6.2.11 Mineral reserves | “Pampa Norte” | p.217; Filed | FY2025 Form 20-F | OFR 6.2.11 Mineral reserves | “Olympic Dam” | p.217; Filed | FY2025 Form 20-F | OFR 6.2.11 Iron ore mineral reserves | “Mt Newman” | p.223; Filed | FY2025 Form 20-F | OFR 6.2.11 Iron ore mineral reserves | “Goldsworthy” | p.223; Filed | FY2025 Form 20-F | OFR 6.2.11 Iron ore mineral reserves | “Jimblebar” | p.223
Copper M&I exclusive of reserves, BHP share Vicuña 1,820 Mt at 0.35%; Olympic Dam 680 Mt at 1.35%; Pampa Norte 1,040 Mt at 0.43% Table 9, block 8 Filed | FY2025 Form 20-F | OFR 6.2.11 Mineral resources | “Vicuna” | p.216; Filed | FY2025 Form 20-F | OFR 6.2.11 Mineral resources | “Olympic Dam” | p.216; Filed | FY2025 Form 20-F | OFR 6.2.11 Mineral resources | “Pampa Norte” | p.216
Antamina silver stream (from 1 Apr 2026) US$4.3 bn upfront; 20% of spot; 90% payable; 5.4 Moz silver (CY2025, BHP share) Table 9, block 4; Table 11 net debt Filed | Antamina silver stream release | Agreement terms | “upfront payment of US$4.3 billion” | p.2; Filed | Antamina silver stream release | Agreement terms | “Production transfer payments” | p.3; Filed | Antamina silver stream release | Agreement terms | “Streamed metal” | p.3; Filed | Antamina silver stream release | About Antamina | “Antamina produced” | p.3
BHP’s interests Escondida 57.5%; Antamina 33.75%; WAIO 85%; Vicuña 50% Table 8; Table 11 — minorities Filed | FY2025 Form 20-F | OFR 6.1 Copper | “Escondida (BHP ownership: 57.5 per cent)" | p.33; Filed | FY2025 Form 20-F | OFR 6.1 Copper | “Antamina (BHP ownership: 33.75 per cent)" | p.35; Filed | FY2025 Form 20-F | OFR 6.2 Iron ore | “BHP ownership: 85 per cent for the four main joint ventures” | p.37; Filed | FY2025 Form 20-F | OFR 6.1 Copper | “Vicuña (BHP ownership: 50 per cent)" | p.36
Bridge lines (US$m): net debt 31 Dec 2025; rehabilitation; Samarco (US$ bn); receivables; inventories; payables; current tax; interim dividend paid 26 Mar 2026 14,686; 10,468; 5.3; 5,452; 5,817; 6,288; 1,330; 3,707 Table 11 — claim lines Filed | HY2026 financial results | Financial review | “Net debt” | p.20; Filed | FY2025 Form 20-F | Note 15 Closure and rehabilitation provisions | “At the end of the financial year” | p.313; Filed | HY2026 financial results | Samarco | “provision stands at US$5.3 bn as at 31 December 2025” | p.14; Filed | HY2026 financial results | Consolidated Balance Sheet | “Trade and other receivables” | p.32; Filed | HY2026 financial results | Consolidated Balance Sheet | “Inventories” | p.32; Filed | HY2026 financial results | Consolidated Balance Sheet | “Trade and other payables” | p.32; Filed | HY2026 financial results | Consolidated Balance Sheet | “Current tax payable” | p.32; Filed | HY2026 financial results | Subsequent events | “interim ordinary dividend of 73 US cents per share” | p.40
Medium-term capex (US$ bn, ~% growth); group & unallocated EBITDA FY25; D&A FY25 (US$m) 10; 40%; (1,317); 5,540 Table 9, block 7; Table 11; Table 15 Filed | HY2026 results presentation | Capital allocation | “Medium-term group capex guidance” | p.40; Filed | FY2025 Form 20-F | OFR 13 Segment | “Underlying EBITDA” | p.120; Filed | FY2025 Form 20-F | OFR 5.3 Underlying EBITDA bridge | “Depreciation and amortisation excluding exceptional items” | p.28
Diluted shares (m) and ADS ratio 5,083 diluted; 2 ordinary per ADS every per-ADS figure in §7 Filed | FY2025 Form 20-F | OFR 2 Financial information summary | ”- Diluted” | p.205; Filed | FY2025 Form 20-F | Item 9 | ADS | “each ADS representing two ordinary shares” | p.241

Source: the BHP filings named in each row — FY2025 Form 20-F, HY2026 financial results, FY2026 operational review, Antamina silver-stream release; copper, iron ore and silver averages from futures closes (Yahoo Finance).

Free sample — the full valuation, open to every reader

7.1 Method selection

Table 7. Valuation method selection

Method Family Weight Why
SOTP NAV at target P/NAV (six producing businesses, group sustaining capital, M&I conversion incl. Vicuña) Intrinsic 55% Diversified set: no business above half of enterprise NAV; carries each mine to its reserve or a stated horizon
EV/EBITDA on the next twelve months Cash-flow 25% Diversified leg; FY27 guidance by asset at the base deck, FY26 unit costs
FCF-yield support Cash-flow 20% Third method from disclosed lines, after the Escondida minority; the cash-flow family at 45%, inside the cap
Cross-checks — market-implied deck, NAV parity deck, current EV/EBITDA, own multiple history, consensus — 0% Reported, never weighted; the market-implied deck and the own history are read in the conclusion

Source: this analysis — method set, anchors and weights per the diversified set of the valuation guide, on the filed inputs in Table 6.

7.2 Net asset value

Table 8. Vehicle map

Asset Held through Interest Encumbrance Where valued
Escondida, Chile — producing Minera Escondida (consolidated, operator) 57.50% none filed Table 9, block 1; minorities Table 11
Pampa Norte (Spence), Chile — producing BHP (100%, operator) 100.0% none filed Table 9, block 2
Copper South Australia, Australia — producing BHP (100%, operator) 100.0% none filed Table 9, block 3
Antamina, Peru — producing Compañía Minera Antamina (non-operated, equity-accounted) 33.75% Wheaton silver stream from 1 Apr 2026: BHP’s silver at 90% payable for 20% of spot — a row Table 9, block 4
Western Australia Iron Ore, Australia — producing WAIO joint ventures (85%, operator) 85.0% none filed Table 9, block 5
Coal (BMA and NSWEC), Australia — producing BMA (50%, operator); NSWEC (100%) 50.0% none filed Table 9, block 6
Vicuña, Argentina — exploration (M&I stated) Vicuña joint venture with Lundin Mining 50.0% none filed Table 9, block 8 (resource conversion)
Jansen potash, Canada — development (Stage 1 first production FY27) BHP (100%) 100.0% none filed n/d — capacity and potash deck not in the inputs; box field 11
Samarco, Brazil — producing Samarco joint venture with Vale 50.0% dam-failure settlement provision in Table 11; equity value excl.

Source: FY2025 Form 20-F ownership by asset; Antamina silver-stream release (1 April 2026); FY2026 operational review (Carajás sold 2 April 2026).

Table 9. Per-asset NPV build — base case (copper US$6.00/lb, iron ore US$100/t, 8% real)

#Line itemValueBasis / source
1. Escondida (57.5%) — producing
1Production (100%)2,094.4 Mlb/yrFiled | medium-term FY28–31 midpoint 900–1,000 kt (mt-escondida)
2×Realised: copper US$6.00/lb − all-in costUS$3.998/lbDerived | medium-term US$1.50–1.80/lb (mt-escondida) + uplift US$0.352/lb = (13,177 − 8,593) ÷ 13,177 × US$4.432 (HG=F FY2025 average) − US$1.19
3×(1 − 27%), statutory, no shield0.730×Input | statutory rate on the cash margin
4=After-tax cash flowUS$6,112.7 m/yrDerived
5×Annuity factor, 30 yr at 8%, capped (reserve beyond: 4 yr)11.2578Derived | life: 3,410 Mt at 0.56% Cu, BHP 57.5% (rv-escondida) ÷ 0.575, less FY26 output (to 30 Jun 2026)
6=Escondida NPV (100%)US$68,815.5 mDerived
2. Pampa Norte (Spence) (100%) — producing
1Production518.1 Mlb/yrFiled | medium-term ~235 kt (mt-spence)
2×Realised: copper US$6.00/lb − all-in costUS$3.448/lbDerived | medium-term US$2.05–2.35/lb (mt-spence) + uplift US$0.352/lb (block 1)
3×(1 − 27%), statutory, no shield0.730×Input | statutory rate on the cash margin
4=After-tax cash flowUS$1,304.1 m/yrDerived
5×Annuity factor, 20 yr at 8%9.8181Derived | life: 938 Mt at 0.52% Cu (rv-pampanorte), less FY26 output (to 30 Jun 2026)
6=Pampa Norte (Spence) NPVUS$12,803.6 mDerived
3. Copper South Australia (100%) — producing
1Production672.4 Mlb/yrFiled | FY27 guidance 290–320 kt (prod-cusa)
2×Realised: copper US$6.00/lb − all-in costUS$4.398/lbDerived | FY26 guidance US$1.00–1.50/lb, gold US$2,900/oz and uranium US$70/lb credits (uc-cusa-g26) + uplift US$0.352/lb (block 1)
3×(1 − 30%), statutory, no shield0.700×Input | statutory rate on the cash margin
4=After-tax cash flowUS$2,070.1 m/yrDerived
5×Annuity factor, 30 yr at 8%, capped (reserve beyond: 10 yr)11.2578Derived | life: Olympic Dam 590 Mt at 1.82% + Prominent Hill & Carrapateena 171 Mt at 1.11% (rv-od, rv-phc), less FY26 output (to 30 Jun 2026)
6=Copper South Australia NPVUS$23,305.0 mDerived
4. Antamina (33.75%) — producing
1Production286.6 Mlb/yrFiled | FY27 guidance 120–140 kt, BHP share (prod-antamina)
2×Realised: copper US$6.00/lb − all-in costUS$4.323/lbDerived | FY2025 revenue less EBITDA ÷ FY26 copper (seg-antamina): US$1.677/lb = (1,562 − 1,002) ÷ (151.5 kt × 2.20462 Mlb/kt)
3+Silver stream receipts: 5.4 Moz × 90% × 20% × US$60/ozUS$58.3 m/yrFiled | stream terms (stream-metal, stream-ptp, ag-antamina); silver held
4×(1 − 29.5%), statutory, no shield0.705×Input | statutory rate on the cash margin
5=After-tax cash flowUS$914.7 m/yrDerived
6×Annuity factor, 11 yr at 8%7.1390Derived | life: 178 Mt at 0.92% Cu, BHP share (rv-antamina), less FY26 output (to 30 Jun 2026)
7=Antamina NPVUS$6,529.8 mDerived
5. Western Australia Iron Ore (85%) — producing
1Production258.5 Mt/yrFiled | FY27 guidance 253–264 Mt, BHP share (prod-waio)
2×Realised: US$100/t × 0.8117 realisation − all-in costUS$54.455/tDerived | medium-term <US$17.50/t (mt-waio) + uplift US$9.217/t = US$101.65 (TIO=F FY2025 average) × 0.8117 − 14,396 ÷ 263 Mt − US$18.56; realisation 0.8117 = US$84.56 FY26 realised ÷ US$104.17 (TIO=F FY2026 average)
3×(1 − 30%), statutory, no shield0.700×Input | statutory rate on the cash margin
4=After-tax cash flowUS$9,853.7 m/yrDerived
5×Annuity factor, 13 yr at 8%7.9038Derived | life: Mt Newman 640 + Goldsworthy 1,650 + Jimblebar 1,230 Mt, BHP share (rv-newman, rv-goldsworthy, rv-jimblebar), less FY26 output (to 30 Jun 2026)
6=Western Australia Iron Ore NPVUS$77,881.4 mDerived
6. Coal (BMA and NSWEC) (50%) — producing
1Production34.5 Mt/yrFiled | FY27 guidance BMA 18.5–20.5 + NSWEC 14–16 Mt (prod-bma, prod-nswec)
2×Realised: BMA US$210.21/t and NSWEC US$104.28/t, FY27 mix − all-in costUS$28.608/tDerived | FY2025 coal revenue less EBITDA ÷ FY2025 coal output (seg-rev, seg-ebitda)
3×(1 − 30%), statutory, no shield0.700×Input | statutory rate on the cash margin
4=After-tax cash flowUS$690.9 m/yrDerived
5×Annuity factor, 10 yr at 8%6.7101Derived | life: reserves n/d (rv-gaps); a 10-year horizon
6=Coal (BMA and NSWEC) NPVUS$4,635.9 mDerived
7. Group sustaining capital
1Medium-term capex × (1 − ~40% growth)US$6,000.0 m/yrFiled | US$10 bn a year, ~40% growth (capex-mt)
2×(1 − 30%), deductible0.700×Input | Australian statutory rate
3×Annuity factor, 25 yr at 8%10.6748Derived
4=Sustaining capital NPV−US$44,834.1 mDerived | growth capital excluded with the growth it buys
8. Resource conversion — copper M&I beyond the reserves, Vicuña included
1Σ un-risked copper NPVs (BHP share) ÷ P&P copperUS$1.012/lbDerived | US$82,207.3 m ÷ 36,837 kt × 2.20462
2×M&I exclusive of reserves20,831 kt CuFiled | Pampa Norte 4,472 kt; Olympic Dam 9,180 kt; Antamina 809 kt; Vicuña (50%) 6,370 kt (rs-*)
3×Conversion factor0.25×Input | M&I band 0.25–0.50, low end — long-dated metal; Vicuña's stage charged here once
4=Resource conversion NPVUS$11,621.5 mDerived

Source: this analysis, on the inputs in Table 6; reserves and resources from the FY2025 Form 20-F, guidance from the FY2026 operational review.

Table 10. Per-asset model — base case (copper US$6.00/lb, iron ore US$100/t, 8% real)

Asset (interest) Stage Production Life basis Price recd. Unit cost Capital Tax Discounting CF/yr Risk wt. NPV
Escondida (57.5%) Producing 950.0 kt 31,949 kt contained ÷ rate, 30 yr US$6.00/lb US$2.002/lb group row 27% 8% real, end-year US$6,112.7 m 1.00× US$68,815.5 m
Pampa Norte (Spence) (100%) Producing 235.0 kt 4,665 kt contained ÷ rate, 20 yr US$6.00/lb US$2.552/lb group row 27% 8% real, end-year US$1,304.1 m 1.00× US$12,803.6 m
Copper South Australia (100%) Producing 305.0 kt 12,315 kt contained ÷ rate, 30 yr US$6.00/lb US$1.602/lb group row 30% 8% real, end-year US$2,070.1 m 1.00× US$23,305.0 m
Antamina (33.75%) Producing 130.0 kt 1,486 kt contained ÷ rate, 11 yr US$6.00/lb US$1.677/lb group row 29.5% 8% real, end-year US$914.7 m 1.00× US$6,529.8 m
Western Australia Iron Ore (85%) Producing 258.5 Mt 3,263 Mt ÷ rate, 13 yr US$81.17/t US$26.717/t group row 30% 8% real, end-year US$9,853.7 m 1.00× US$77,881.4 m
Coal (BMA and NSWEC) (50%) Producing 34.5 Mt 10-year horizon (reserves n/d) US$164.15/t US$135.545/t group row 30% 8% real, end-year US$690.9 m 1.00× US$4,635.9 m
Group sustaining capital — — 25 yr — — US$6,000.0 m/yr 30% shield 8% real −US$4,200.0 m 1.00× −US$44,834.1 m
Copper M&I beyond reserves (incl. Vicuña) Resource — conversion — — — — — — 0.25× US$11,621.5 m
Jansen potash Development n/d n/d n/d n/d n/d n/d n/d n/d n/d n/d

Source: this analysis — the model rows behind Table 9.

Table 11. NAV build-up and equity bridge (base case — copper US$6.00/lb, 8% real)

# Line item Value Note
1 Escondida NPV (100%) US$68,815.5 m Table 9, block 1
2 + Pampa Norte (Spence) NPV US$12,803.6 m Table 9, block 2
3 + Copper South Australia NPV US$23,305.0 m Table 9, block 3
4 + Antamina NPV US$6,529.8 m Table 9, block 4
5 + Western Australia Iron Ore NPV US$77,881.4 m Table 9, block 5
6 + Coal (BMA and NSWEC) NPV US$4,635.9 m Table 9, block 6
7 − Group sustaining capital US$44,834.1 m Table 9, block 7
8 + Resource conversion US$11,621.5 m Table 9, block 8
9 + Jansen potash (development) n/d capacity and potash deck not in the inputs; box field 11
10 = Enterprise NAV US$160,758.7 m Derived
11 − Net debt (leases inside), pro forma, and current tax payable US$15,423.0 m Filed | net debt US$14,686 m at 31 Dec 2025 (bs-netdebt) less the US$4,300 m stream upfront received 1 Apr 2026 (stream-upfront) plus the US$3,707 m interim dividend paid 26 Mar 2026 (div-int-paid) = US$14,093 m; plus current tax payable US$1,330 m, 31 Dec 2025 (bs-tax) — a tax claim, kept out of working capital
12 − Hedge book, marked to the deck US$0.0 m Filed | no commodity hedges; Samarco BRL payments hedged to FY28 inside other financial assets (samarco-hedge) — 0.0
13 − Closure and rehabilitation; Samarco provision US$15,768.0 m Filed | closure and rehabilitation US$10,468 m (30 Jun 2025, rehab) + Samarco US$5,300 m (31 Dec 2025, samarco-prov)
14 − Minority interests (42.5% of Escondida) US$29,246.6 m Derived | 42.5% × Escondida US$68,815.5 m
15 − Capitalised group and unallocated costs US$9,841.1 m Filed | Group & unallocated EBITDA −US$1,317 m FY2025 (seg-ebitda) × (1 − 30%) × 25-year annuity at 8%
16 − Convertible debt at face US$0.0 m Filed | none on the balance-sheet face (bs-conv)
17 − Stream deferred revenue excl. excl. — the US$4,300 m upfront sits in net debt; the deliveries are in the Antamina row
18 + Working capital US$4,981.0 m Filed | receivables US$5,452 m + inventories US$5,817 m − payables US$6,288 m, 31 Dec 2025
19 + Equity-accounted investments in rows in rows — US$4,292 m equity-accounted (Antamina in its row, Samarco at zero beside its provision)
20 = Equity NAV US$95,461.0 m Derived | enterprise NAV plus the claim lines
21 ÷ ADS-equivalent shares (diluted ÷ 2) 2,541.5 m Filed | 5,083 m diluted (y5-dil-sh) ÷ 2 per ADS
22 = NAV per ADS US$37.56 Derived
of which producing (+ sustaining capital and the whole bridge) US$32.988 Derived
of which development (Jansen, n/d) US$0.000 Derived | n/d carried at 0.0
of which resource (M&I conversion) US$4.573 Derived
Current ADS price US$90.02 NYSE close, 11 Aug 2026
= P/NAV (equity form) 2.40× Derived

Source: HY2026 financial results (31 December 2025); FY2025 Form 20-F note 15; this analysis.

Figure 6. NAV build-up and equity bridge

US$m, base case: copper US$6.00/lb, iron ore US$100/t held, 8% real discount rate
200,000
150,000
100,000
50,000
0
+68,815.5
+12,803.6
+23,305.0
+6,529.8
+77,881.4
+4,635.9
−44,834.1
+11,621.5
−15,423.0
−15,768.0
−29,246.6
−9,841.1
+4,981.0
95,461.0
Escondida
Pampa
Norte
Copper
South Australia
Antamina
Western
Australia Iron Ore
Coal
Sustaining
capital
Resource
Net
debt
Closure
and rehabilitation
Minority
interests
Capitalised
group and unallocated costs
Working
capital
Equity
NAV

Figure 7. NAV per ADS sensitivity — copper price × discount rate

Copper price (US$/lb)
4 5 Base6 7 8
Discount rate6% US$22.71 US$33.72 US$44.73 US$55.74 US$66.75
8% (base) US$19.28 US$28.42 US$37.56 US$46.70 US$55.84
10% US$16.40 US$24.15 US$31.90 US$39.65 US$47.40

Notes: (1) every cell is recomputed from the asset rows, never scaled; the checksum is the US$5.00/lb column at 8%, US$31.40. (2) The rate rows re-discount every row — the assets, sustaining capital, the resource row and the capitalised group costs — at 6%, 8% and 10%, the Escondida minority moving with its row; iron ore stays at US$100/t throughout.

7.3 Relative valuation

Table 12. Target-multiple driver line (one line, applied to every multiple)

Driver Scorecard dimension (Section 9) Adjustment
Copper 1,952.8 kt and iron ore 264.7 Mt in FY26 from Escondida, WAIO, Copper SA, Spence and Antamina Dim 1 ★★★★★ +0.04
WAIO US$18.56/t and Escondida US$1.19/lb in FY25; group EBITDA margin 53%, coal 11% Dim 2 ★★★★ +0.02
Escondida 3,410 Mt at 0.56% Cu and WAIO 3,520 Mt P&P (filed total) at 30 Jun 2025; Escondida guided to 900–1,000 ktpa FY28–31 Dim 3 ★★★★ +0.02
Net debt US$14,686 m at 0.5× LTM EBITDA (31 Dec 2025); US$5,500 m revolver undrawn; no financial covenants Dim 5 ★★★★ +0.02
Dividend 110.0 US cents in FY25 from 325.0 in FY22; Jansen Stage 1 to US$7.0–7.4 bn and a ~US$2,300 m impairment Dim 6 ★★★ 0.00
Australia and Chile carry the value; Peru, Argentina and Canada the rest Dim 8 ★★★★ +0.02
Σ signed adjustments +0.12

Source: this analysis — the driver terms follow from the Section 9 scorecard; each target is its anchor × (1 + 0.12).

Table 13. Forward EBITDA build — the next twelve months at the base price

# Line item Value Note
1 Escondida: 2,353.7 Mlb × (US$6.00 − US$1.452)/lb US$10,704.6 m Guidance · FY26 actual 1/12 + FY27 midpoint 11/12; FY26 unit-cost guidance
2 + Pampa Norte (Spence): 483.7 Mlb × (US$6.00 − US$2.602)/lb US$1,643.5 m Guidance · FY26 actual 1/12 + FY27 midpoint 11/12; FY26 unit-cost guidance
3 + Copper South Australia: 675.3 Mlb × (US$6.00 − US$1.602)/lb US$2,970.0 m Guidance · FY26 actual 1/12 + FY27 midpoint 11/12; FY26 unit-cost guidance
4 + Antamina: 290.6 Mlb × (US$6.00 − US$1.677)/lb + silver receipts US$1,314.5 m Guidance · FY26 actual 1/12 + FY27 midpoint 11/12; FY26 unit-cost guidance
5 + Western Australia Iron Ore: 258.4 Mt × (US$81.17 − US$28.217)/t US$13,681.9 m Guidance · FY26 actual 1/12 + FY27 midpoint 11/12; FY26 unit-cost guidance
6 + Coal (BMA and NSWEC): 34.5 Mt × (US$164.15 − US$135.545)/t US$988.2 m Guidance · FY26 actual 1/12 + FY27 midpoint 11/12; FY26 unit-cost guidance
7 − Group and unallocated costs US$1,317.0 m Filed | FY2025, held
8 = Forward EBITDA (Escondida at 100%) US$29,985.7 m Derived

Source: FY2026 operational review guidance by asset; FY2025 Form 20-F segment lines; this analysis.

Table 14. Relative valuation — implied value per ADS (base case)

Method Build Multiple Implied value/ADS
SOTP NAV at target P/NAV NAV/ADS US$37.56 (Table 11) × 1.12 1.12× US$42.07
EV/EBITDA US$29,985.7 m × 6.7 + bridge −US$55,456.6 m ÷ 2,541.5 m 6.7× US$57.23

Source: this analysis, Tables 11 and 13.

7.4 Further weighted methods

Table 15. FCF-yield support build — the next twelve months at the base price

# Line item Value Note
1 Forward EBITDA US$29,985.7 m Table 13
2 − Sustaining capital US$6,000.0 m Filed | US$10 bn × (1 − ~40% growth) (capex-mt)
3 − Cash tax, statutory 30% × (EBITDA − D&A) US$7,333.7 m D&A US$5,540 m FY2025 (da); one fiscal year
4 = FCF before growth capital (100%) US$16,652.0 m Derived | net interest not deducted (box field 11)
5 − Escondida minority (42.5% of its EBITDA after 27%) US$3,321.1 m Derived
6 = FCF attributable to BHP US$13,330.9 m Derived
7 ÷ Target FCF yield 6.3% anchor 7% ÷ (1 +0.12)
8 = FCF-yield support per ADS US$83.26 Derived | ÷ 2,541.5 m ADS

Source: HY2026 results presentation capital guidance; FY2025 Form 20-F depreciation; this analysis.

7.5 Cross-checks

The cross-checks — the market-implied deck, the NAV parity deck, the current EV/EBITDA against BHP’s own five-year history, the iron ore deck, the WAIO life and the conversion factor — print with the model’s other working tables (Section 10.1); none carries weight, and the two that bear on the read are in the conclusion.

7.6 Scenarios & fair value

Table 16. Scenarios & fair value — inputs, value per method and the blend by grid price (US$/ADS)

Deep Bear US$4.00 Bear US$5.00 Base US$6.00 Bull US$7.00 Deep Bull US$8.00
Discount rate 12% 10% 8% 8% 8%
Iron ore 62% Fe, held (US$/t) 100 100 100 100 100
NAV/share before the P/NAV 13.96 24.15 37.56 46.70 55.84
SOTP NAV × 1.12 (55%) 15.63 27.05 42.07 52.30 62.54
EV/EBITDA 6.7× (25%) 44.57 51.48 57.23 64.38 71.52
FCF yield 6.3% (20%) 59.13 71.19 83.26 95.32 107.39
Blended fair value 31.57 41.99 54.10 63.93 73.76
Memo: blend with the multiples held 34.44 44.27 54.10 63.93 73.76

Source: this analysis — every column recomputed at its own rate; iron ore held at US$100/t throughout.

Figure 8. Value per ADS by method and scenario

Scenario (copper US$/lb)
Deep BearUS$4.00 BearUS$5.00 BaseUS$6.00 BullUS$7.00 Deep BullUS$8.00
MethodSOTP NAV × 1.12 (55%) US$15.63(−63%) US$27.05(−36%) US$42.07(base) US$52.30(+24%) US$62.54(+49%)
EV/EBITDA 6.7× (25%) US$44.57(−22%) US$51.48(−10%) US$57.23(base) US$64.38(+12%) US$71.52(+25%)
FCF yield 6.3% (20%) US$59.13(−29%) US$71.19(−14%) US$83.26(base) US$95.32(+14%) US$107.39(+29%)
Blended fair value US$31.57(−42%) US$41.99(−22%) US$54.10(base) US$63.93(+18%) US$73.76(+36%)

Conclusion. The blended fair value is US$54.10 per ADS at the US$6.00/lb base, against US$90.02 — implied −39.9%, a value read of Overvalued (wide band). The range runs from US$31.57 at US$4.00/lb to US$73.76 at US$8.00/lb; even the top of the grid sits 18% under the price. The gap is wider than the method spread can explain: the FCF-yield support is the highest value at the base (US$83.26), the NAV at 1.12× the lowest (US$42.07), and all three sit below the price. Rating-flip prices: up to Modestly overvalued at copper US$6.91/lb, 15% above the base, with iron ore held at US$100/t; none down — Overvalued is the lowest band.

What the price asks for is plain from the build. Held at the base multiples, US$90.02 needs copper well above the five-year high of US$6.70/lb (5 August 2026) and three times the low of US$3.21/lb — or something the model leaves out: Jansen, Antamina’s zinc. The read moves up to Modestly overvalued only at copper of US$6.91/lb, 15% above the base; there is no lower band to fall to. The market pays 9.5× forward EBITDA against BHP’s own five-year range of 3.5–5.8× (median 5.2×, on closes unadjusted for dividends), and the forward FCF yield at the price is 5.8% against the 6.3% target. The market-implied copper deck of US$9.65/lb is the held-multiple solve; NAV parity needs US$11.74/lb at 8%.

Iron ore moves the answer almost as much as copper does. A US$10/t step either side of the held US$100/t takes NAV per ADS to US$32.99 or US$42.13, and WAIO is 48% of enterprise NAV; the full copper × iron ore grid is in the model’s working tables. The read is not a call on BHP’s quality — it says that at mid-cycle multiples and a copper deck already 35% above its five-year average, the price discounts more than the filed plans deliver.

Table 17. Assumptions box

# Field Assumption
1 Valuation date and basis Spot fair value at the US$90.02 NYSE close of 11 Aug 2026 (as of 11 August 2026), per ADS (two ordinary shares); balance sheet 31 Dec 2025 (HY2026 report), net debt pro forma the US$4.3 bn stream upfront of 1 Apr 2026 and the US$3.7 bn interim dividend paid 26 Mar 2026; reserves at 30 Jun 2025 depleted by FY26 output to 30 Jun 2026
2 Deck Copper US$6.00/lb on the US$4–8 grid, from 3-, 6- and 12-month averages of US$6.346, US$6.088 and US$5.612 (COMEX HG=F, to 11 Aug 2026); five-year average US$4.46/lb — the base sits 35% above it, so anchors are held at mid-cycle and the deck flexed alone
3 Secondary commodities Iron ore US$100/t 62% Fe, held in every column (3-, 6-, 12-month SGX TIO=F US$101.31, US$103.19, US$104.11/t), realised at 0.8117× (FY26 realised ÷ FY26 TIO=F average); WAIO 48.4% of enterprise NAV — a dual deck: ±US$10/t moves NAV/ADS to US$32.99 / US$42.13; steelmaking coal US$210.21/t and energy coal US$104.28/t held at FY26 realised; silver US$60/oz held (SI=F US$65.34, US$71.86, US$64.86/oz)
4 Discount rate 8% real after-tax: the base-metal and iron-ore convention for a large multi-asset producer, no jurisdiction premium (Australia and Chile carry the value); coal held at 8% rather than its 10% row — coal is 2.9% of enterprise NAV, one rate treatment
5 Currency US$ throughout — the reporting and the ADS currency; operating costs in A$ and CLP sit inside the guided unit costs (FY26 at A$/US$ 0.65, US$/CLP 940; as-of A$/US$ 0.7064, US$/CLP 913.52); FX sensitivity n/d (fx-sens)
6 P/NAV form Equity NAV ÷ ADS-equivalent diluted shares (2,541.5 m); target 1.12× on the 1.00× anchor
7 Tax basis Statutory on the cash margin, no shield — Australia 30%, Chile 27%, Peru 29.5%; sustaining capital deductible at 30%; the guided 36–40% effective rate not used
8 Bridge Net debt with leases (pro forma the stream upfront and the interim dividend paid), no commodity hedges (0.0), closure and rehabilitation plus the Samarco provision, the Escondida minority at 42.5% of its row, group and unallocated costs capitalised once after tax, convertibles 0.0, current tax payable carried with net debt, not in working capital; stream deferred revenue excl.; equity-accounted investments in rows
9 Weights SOTP NAV 55% · EV/EBITDA 25% · FCF yield 20% — the diversified set, no deviation; driver line × (1 + 0.12) from the Section 9 scorecard (Table 12)
10 Stage risk Every valued business producing at 1.00; Vicuña’s exploration stage charged once in the 0.25 conversion factor; Jansen n/d (field 11), so no development tier
11 Gap register 1. Jansen potash n/d — Stage 1 capacity and a potash series not in the inputs; direction up; bound: the US$7.0–7.4 bn Stage 1 capital at par = +US$2.83 NAV/ADS · 2. Steelmaking coal held at FY26 realised (no benchmark series to the as-of); BMA and NSWEC reserves n/d — a 10-year horizon; coal 2.9% of enterprise NAV · 3. Antamina’s zinc and molybdenum credits not credited (cost from FY2025 revenue less EBITDA); direction up · 4. Chile’s specific mining tax and royalties inside the FY2025 uplift only; net interest not in the FCF build; FY27 unit-cost guidance n/d (FY26 used) · 5. Archived analyst consensus n/d; 0% weight · 6. FX sensitivity n/d (fx-sens) — documents checked: FY2025 Form 20-F key-sensitivities table, p.116; direction: A$ strength lowers NAV

Source: this analysis.

8. Near-term catalysts (1–3 years)

Table 18. Near-term catalysts

Catalyst Timing (company guidance) Why it benefits BHP
FY2026 results and FY27 unit-cost guidance August 2026 Sets the cost line under the FY27 copper decline; net debt guided to ~US$9 bn
Vicuña Stage 1 FID CY2026 Turns 1,820 Mt of M&I into a funded project under RIGI
Jansen Stage 1 first potash FY2027 Turns the largest capital drain into a fourth revenue line
San Manuel to Faraday Copper On closing (agreements July 2026) Recycles a non-core asset into 30% of a listed developer
WAIO above 305 Mtpa below US$17.50/t FY28–FY31 More volume at a lower cost from the cash engine
Jansen Stage 2 first production FY2031 Doubles potash capacity, beyond the window

Source: BHP FY2026 operational review (16 July 2026) and FY2025 Form 20-F. All timing is company guidance, not a guarantee.

Jansen’s first potash is the event that matters most: it shows whether the revised budget holds. BHP is a diversified major, so there is no takeover-optionality read.

9. Rating & verdict

BHP is scored as a diversified major against the peers declared in Section 2.8 — Rio Tinto, Vale, Glencore and Freeport-McMoRan. Asset quality, cost and reserves are scored across the iron ore and copper segments, with the diversification credit inside asset quality; those three, balance sheet and capital allocation carry 15% each, and growth, management, jurisdiction and ESG 6.25% each. No dimension is not-applicable.

Figure 9. Scorecard by dimension, 11 August 2026

Assets & scale★★★★★15%
Cost & margins★★★★15%
Reserves & life★★★★15%
Balance sheet★★★★15%
Capital allocation★★★15%
Growth★★★★6.25%
Management★★★★6.25%
Jurisdiction★★★★6.25%
ESG★★★6.25%
Score by dimension Weighted composite ★★★★ (3.94)
Each ring is one star; the outer ring is ★★★★★. Weights in Table 19.

Figure data: Table 19. Each spoke prints its stars and weight; the dashed ring is the weighted composite, 3.94/5.

Table 19. Scorecard rationale

Dimension Weight Score Rationale
1. Asset quality & scale 15% ★★★★★ 1,952.8 kt of copper and 264.7 Mt of iron ore in FY26 from two tier-1 systems, plus coal and potash — broader than Rio Tinto, Vale or Freeport-McMoRan; the diversification credit sits here (Sections 2.1–2.5)
2. Cost position & margins 15% ★★★★ WAIO US$18.56/t and Escondida US$1.19/lb in FY25, a 53% group margin — low on both cost curves by sector reference (peer costs sit outside this source set); docked for coal’s 11% margin and Escondida’s US$1.50–1.80/lb medium-term guide (Sections 2.3–2.4, 3)
3. Reserves, life & replacement 15% ★★★★ Escondida 3,410 Mt at 0.56% Cu and Olympic Dam 590 Mt at 1.82% Cu reach the 30-year cap and WAIO’s filed 3,520 Mt total gives 13 years — long by sector reference (peer reserves sit outside this source set) (Sections 2.3–2.5)
5. Balance sheet & liquidity 15% ★★★★ Net debt US$14,686 m at 0.5× LTM EBITDA, US$5,500 m undrawn, no covenants, Fitch A/F1 — above the median with Rio Tinto; the US$5.3 bn Samarco provision keeps it off the top (Section 3)
6. Capital allocation & returns 15% ★★★ Dividend down from 325.0 to 110.0 US cents over FY22–FY25, no buyback, Jansen Stage 1 up to US$7.0–7.4 bn and a ~US$2.3 bn impairment — mid-table by sector reference (peer payout records sit outside this source set) (Sections 3, 4.2)
4. Growth & optionality 6.25% ★★★★ Jansen first potash FY27, Vicuña FID CY26 and WAIO above 305 Mtpa, against FY27 copper down to 1,650–1,800 kt — more funded growth than Vale or Rio Tinto (Sections 2.6, 8)
7. Management & governance 6.25% ★★★★ A CEO at BHP since 1999, a Chair appointed in March 2025, no KMP related-party transactions — above the median of the set; Board size n/d (Section 4.1)
8. Jurisdiction & geopolitics 6.25% ★★★★ Australia and Chile carry the value; Peru, Argentina and Canada the rest — a better mix than Vale’s Brazil or Glencore’s DRC (Sections 2.1, 6)
9. ESG & licence to operate 6.25% ★★★ TRIF down 7% in FY25, TCFD reporting, record Traditional Owner spend; held at the median by Samarco’s US$5.3 bn provision, as Vale is by its own dam legacy (Section 5)
Composite 100% ★★★★ Solid

Source: each row cites its evidence in this analysis; peer references are the set in Table 3. Rows by weight, descending.

Weighted average: 0.15 × (5 + 4 + 4 + 4 + 3) + 0.0625 × (4 + 4 + 4 + 3) = 3.00 + 0.9375 = 3.94/5 → ★★★★, Solid.

The two-axis verdict. As of 11 August 2026, quality ★★★★ Solid and a value read of Overvalued (wide band) — the US$54.10 blend against US$90.02 per ADS, implied −39.9% — give the verdict Full: a low-cost, long-life major priced for a copper deck no market has printed. The market-implied copper deck of US$9.65/lb sits 44% above the five-year high of US$6.70/lb. The target multiples carry asset quality up two steps and cost, reserves, balance sheet and jurisdiction one step each, a net × (1 + 0.12).

The bull and bear are the two decks. If copper holds near US$8.00/lb the blend reaches US$73.76, and every US$10/t on iron ore moves NAV per ADS by about US$4.57. If copper slides to US$5.00/lb the blend is US$41.99, while Escondida’s grade decline and Jansen’s ramp run on regardless. What tips it is copper first, iron ore second. To rank BHP against every copper and iron ore producer on these nine dimensions, screen the sector on Metal Pilot’s copper mining stock screener.

10. Sources, methodology & disclaimer

10.1 Sources, methodology & data vintage

Company filings: the FY2023–FY2025 Form 20-F (the FY2025 report with its S-K 1300 reserve statement and the Escondida technical report summary); the HY2026 financial results and presentation (17 February 2026); the Antamina silver-stream release; the Q2, Q3 and full-year FY2026 operational reviews (16 July 2026) — at SEC EDGAR and bhp.com. Market: Yahoo Finance (ADS price; COMEX copper and silver, SGX iron ore, AUD/USD, USD/CLP) and FRED (Newcastle coal). Peers: as Table 3.

Methodology. Filings dated on or before 11 August 2026 (the FY2026 Form 20-F, filed 18 August 2026, is not used); balance sheet at 31 December 2025; reserves at 30 June 2025, depleted by FY26 output; market data at the NYSE close on 11 August 2026 (US$90.02 per ADS, 2,541.5 m ADS on 5,083 m diluted shares). Deck: copper US$6.00/lb on the US$4.00–8.00 grid, every grid price a scenario; iron ore US$100/t held, with a ±US$10/t sensitivity; 8% real after tax. Weights: SOTP NAV 55%, EV/EBITDA 25%, FCF yield 20%; cross-checks at 0%. Scorecard against Table 3’s peers. Refreshed on each half-year and annual report and on material events. The model’s full output — deck sensitivity, P/NAV map, cross-checks and the copper × iron ore grid — is claude/valuation-models/bhp-group-bhp.out.md.

Re-run log. 11 August 2026: first published; 4.3/5 High quality, Modestly overvalued (wide band) at US$83.79. 13 October 2026: reworked on the same as-of date — price corrected to the US$90.02 NYSE close of 11 August 2026; balance sheet to 31 December 2025; FY26 production, the Antamina silver stream, the Jansen impairment and the Carajás sale added; deck to copper US$6.00/lb with iron ore at US$100/t; scorecard 4.3 → 3.9 (Solid); blend US$56.33, implied −37.4%, read Overvalued (wide band). 13 October 2026 (pre-launch fixes): net debt rolled for the US$3.7 billion interim dividend paid 26 March 2026, current tax split from working capital, reserves depleted by FY26 output to 30 June 2026, the calibrations printed — NAV per ADS US$40.60 → US$37.56, blend US$56.33 → US$54.10, implied −37.4% → −39.9%; read unchanged, Overvalued (wide band); lives, the iron-ore sensitivity and NAV shares then re-mirrored, no figure moved.

Omitted figures and data gaps. The asset location map is not built. Revenue is filed for Escondida and Antamina only, so Figure 3 splits copper output by asset. Not in the source set: the peers’ filings (peer output in Table 3 is n/d), the BMA and NSWEC reserves, FY27 unit-cost guidance (published after the as-of), the debt maturity profile, the yearly safety series, Board size and an archived analyst consensus — each n/d where it would apply.

Table 20. Source register — the filed figures behind the valuation (load-bearing inputs: Table 6)

InputValueAs ofWhere §7 uses itSource
FY2025 Form 20-F
Escondida interest (operator BHP, Chile)57.5%30 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR 6.1 Copper | "Escondida (BHP ownership: 57.5 per cent)" | p.33
Antamina interest (non-operated, Peru)33.75%30 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR 6.1 Copper | "Antamina (BHP ownership: 33.75 per cent)" | p.35
WAIO interest in the four main JVs (operator BHP, Australia)85%30 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR 6.2 Iron ore | "BHP ownership: 85 per cent for the four main joint ventures" | p.37
Vicuña interest (JV with Lundin Mining, Argentina; exploration stage)50%30 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR 6.1 Copper | "Vicuña (BHP ownership: 50 per cent)" | p.36
Escondida unit cost FY25 / FY24US$1.19/lb; US$1.45/lb30 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR Copper unit costs | "Escondida (US$/lb)" | p.111
WAIO unit cost FY25 / FY24US$18.56/t; US$18.19/t30 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR Iron ore unit costs | "WAIO (US$/t)" | p.113
Escondida reserves, total P+P3,410 Mt at 0.56% Cu30 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR 6.2.11 Mineral reserves | "Escondida Total" | p.217
Pampa Norte reserves, total P+P938 Mt at 0.52% Cu30 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR 6.2.11 Mineral reserves | "Pampa Norte" | p.217
Olympic Dam reserves, total P+P590 Mt at 1.82% Cu, 0.58 kg/t U3O8, 0.68 g/t Au30 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR 6.2.11 Mineral reserves | "Olympic Dam" | p.217
Prominent Hill & Carrapateena reserves, total P+P171 Mt at 1.11% Cu30 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR 6.2.11 Mineral reserves | "Prominent Hill & Carrapateena" | p.217
Antamina reserves, total P+P (BHP share)178 Mt at 0.92% Cu30 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR 6.2.11 Mineral reserves | "Antamina" | p.217
Mt Newman JV reserves, total P+P640 Mt at 61.8% Fe30 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR 6.2.11 Iron ore mineral reserves | "Mt Newman" | p.223
Mt Goldsworthy JV reserves, total P+P1,650 Mt at 61.3% Fe30 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR 6.2.11 Iron ore mineral reserves | "Goldsworthy" | p.223
Jimblebar reserves, total P+P1,230 Mt at 61.0% Fe30 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR 6.2.11 Iron ore mineral reserves | "Jimblebar" | p.223
Vicuña resources: M+I; inferred (exploration stage, no reserves)1,820 Mt at 0.35% Cu, 0.27 g/t Au; inferred 3,950 Mt at 0.32% Cu30 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR 6.2.11 Mineral resources | "Vicuna" | p.216
Olympic Dam resources excl. reserves: M+I; inferred680 Mt at 1.35% Cu; inferred 280 Mt at 1.53% Cu30 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR 6.2.11 Mineral resources | "Olympic Dam" | p.216
Pampa Norte resources excl. reserves: M+I; inferred1,040 Mt at 0.43% Cu; inferred 835 Mt at 0.41% Cu30 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR 6.2.11 Mineral resources | "Pampa Norte" | p.216
Revenue by segment FY25: Copper; Iron Ore; Coal; Group & unallocated; Total (US$M)22,530; 22,919; 5,046; 767; 51,26230 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR 13 Segment | "Revenue" | p.120
Underlying EBITDA by segment FY25 (US$M)12,326; 14,396; 573; (1,317); 25,97830 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR 13 Segment | "Underlying EBITDA" | p.120
Escondida revenue; Underlying EBITDA FY25 (US$M, 100% consolidated)13,177; 8,59330 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | Financial information by asset | "Escondida" | p.206
Antamina revenue; Underlying EBITDA FY25 (US$M, BHP share)1,562; 1,00230 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | Financial information by asset | "Antamina" | p.206
Total steelmaking coal production FY25 / FY24; Total energy coal production FY25 / FY2418 Mt; 22 Mt; 15 Mt; 15 Mt30 Jun 2025§2 assets; §7 segment buildFiled | FY2025 Form 20-F | OFR Coal | "Total steelmaking coal production (Mt)" | p.114; Filed | FY2025 Form 20-F | OFR Coal | "Total energy coal production (Mt)" | p.114
Jansen Stage 1 capital estimate (from US$5.7 bn)US$7.0–7.4 bn30 Jun 2025§2 Jansen; §7 Jansen segmentFiled | FY2025 Form 20-F | OFR 6.4 Potash | "capital expenditure for JS1" | p.20
Closure and rehabilitation provision at 30 Jun 2025: total; current; non-current10,468; 662; 9,80630 Jun 2025§3; §7 bridgeFiled | FY2025 Form 20-F | Note 15 Closure and rehabilitation provisions | "At the end of the financial year" | p.313
Depreciation and amortisation excluding exceptional items FY255,54030 Jun 2025§3 financials; §7 bridgeFiled | FY2025 Form 20-F | OFR 5.3 Underlying EBITDA bridge | "Depreciation and amortisation excluding exceptional items" | p.28
Underlying EBITDA FY2025; FY2024; FY2023; FY2022; FY202125,978; 29,016; 27,956; 40,634; 35,07330 Jun 2025§3 five-year table; multiple historyFiled | FY2025 Form 20-F | OFR 2 Financial information summary | "Underlying EBITDA" | p.205
Diluted shares (million) FY2025; FY2024; FY2023; FY2022; FY20215,083; 5,077; 5,073; 5,071; 5,06830 Jun 2025§3 five-year table;Filed | FY2025 Form 20-F | OFR 2 Financial information summary | "- Diluted" | p.205
ADR ratio (1 ADS = 2 ordinary shares)2 ordinary per ADS30 Jun 2025§7 share basisFiled | FY2025 Form 20-F | Item 9 | ADS | "each ADS representing two ordinary shares" | p.241
HY2026 financial results
Net debt at 31 Dec 202514,68631 Dec 2025§3 financials; §7 bridgeFiled | HY2026 financial results | Financial review | "Net debt" | p.20
Samarco dam failure provision at 31 Dec 2025 (30 Jun 2025: US$5.8 bn)US$5.3 bn31 Dec 2025§3; §6 risk; §7 bridgeFiled | HY2026 financial results | Samarco | "provision stands at US$5.3 bn as at 31 December 2025" | p.14
Trade and other receivables, current; non-current; Inventories, current; non-current; Trade and other payables, current; non-current5,452; 104; 5,817; 1,833; 6,288; 3731 Dec 2025§3 financials; §7 bridgeFiled | HY2026 financial results | Consolidated Balance Sheet | "Trade and other receivables" | p.32; Filed | HY2026 financial results | Consolidated Balance Sheet | "Inventories" | p.32; Filed | HY2026 financial results | Consolidated Balance Sheet | "Trade and other payables" | p.32
Current tax payable1,33031 Dec 2025§3 financials; §7 bridgeFiled | HY2026 financial results | Consolidated Balance Sheet | "Current tax payable" | p.32
HY2026 interim dividend determined, paid 26 March 2026 (US$m)3,70726 Mar 2026§7 bridge — net debt pro formaFiled | HY2026 financial results | Subsequent events | "interim ordinary dividend of 73 US cents per share" | p.40
HY2026 results presentation
Medium-term group capex guidance; growth shareUS$10 bn per annum; ~40% growth17 Feb 2026§3 capex; §7 FCF buildFiled | HY2026 results presentation | Capital allocation | "Medium-term group capex guidance" | p.40
Antamina silver stream release
Antamina silver stream (Wheaton) upfront consideration (received H2 FY26); Antamina silver stream production transfer paymentUS$4.3 bn; 20% of spot silver1 Apr 2026§2 streams; §7 Antamina rowFiled | Antamina silver stream release | Agreement terms | "upfront payment of US$4.3 billion" | p.2; Filed | Antamina silver stream release | Agreement terms | "Production transfer payments" | p.3
Antamina silver stream: streamed metal (of BHP's 33.75% share, fixed payable rate); step-down after 100 Moz (rate n/d)33.75% of Antamina silver at 90% payable1 Apr 2026§7 Antamina rowFiled | Antamina silver stream release | Agreement terms | "Streamed metal" | p.3
Antamina silver CY2025 (BHP share)5.4 Moz31 Dec 2025§7 Antamina rowFiled | Antamina silver stream release | About Antamina | "Antamina produced" | p.3
FY2026 operational review
Escondida copper FY26; FY26e / FY27e (100% basis)1,261.2 kt; 1,200–1,275 kt; 1,000–1,100 kt30 Jun 2026§2 assets; §7 segment buildFiled | FY2026 operational review | Production table | "Escondida (kt)" | p.2
Pampa Norte (Spence) copper FY26; FY26e / FY27e212.6 kt; 210–220 kt; 210–230 kt30 Jun 2026§2 assets; §7 segment buildFiled | FY2026 operational review | Production table | "Pampa Norte (Spence) (kt)" | p.2
Copper South Australia copper FY26; FY26e / FY27e320.7 kt; 310–340 kt; 290–320 kt30 Jun 2026§2 assets; §7 segment buildFiled | FY2026 operational review | Production table | "Copper South Australia (kt)" | p.2
Antamina copper FY26; FY26e / FY27e (BHP share)151.5 kt; 150–160 kt; 120–140 kt30 Jun 2026§2 assets; §7 segment buildFiled | FY2026 operational review | Production table | "Antamina (kt)" | p.2
WAIO iron ore FY26; FY26e / FY27e (BHP share)256.9 Mt; 251–262 Mt; 253–264 Mt30 Jun 2026§2 assets; §7 segment buildFiled | FY2026 operational review | Production table | "WAIO (Mt)" | p.2
BMA steelmaking coal FY26; FY26e / FY27e (BHP share)18.6 Mt; 18–20 Mt; 18.5–20.5 Mt30 Jun 2026§2 assets; §7 segment buildFiled | FY2026 operational review | Production table | "Steelmaking coal – BMA" | p.2
NSWEC energy coal FY26; FY26e / FY27e16.4 Mt; 14–16 Mt; 14–16 Mt30 Jun 2026§2 assets; §7 segment buildFiled | FY2026 operational review | Production table | "Energy coal – NSWEC (Mt)" | p.2
Escondida FY26 unit cost guidance (bottom end expected)US$1.00–1.20/lb16 Jul 2026§2 assets; §7 segment buildFiled | FY2026 operational review | Unit cost guidance | "Escondida (US$/lb)" | p.7
Spence FY26 unit cost guidance (bottom end expected)US$2.10–2.40/lb16 Jul 2026§2 assets; §7 segment buildFiled | FY2026 operational review | Unit cost guidance | "Spence (US$/lb)" | p.7
Copper SA FY26 unit cost guidance (bottom end; by-products gold US$2,900/oz, uranium US$70/lb)US$1.00–1.50/lb16 Jul 2026§2 assets; §7 segment buildFiled | FY2026 operational review | Unit cost guidance | "Copper SA (US$/lb)" | p.7
WAIO FY26 unit cost guidanceUS$18.25–19.75/t16 Jul 2026§2 assets; §7 segment buildFiled | FY2026 operational review | Unit cost guidance | "WAIO (US$/t)" | p.7
Escondida medium-term (FY28–FY31 avg) production; unit cost900–1,000 ktpa; US$1.50–1.80/lb16 Jul 2026§2 assets; §7 segment buildFiled | FY2026 operational review | Medium term guidance | "Medium term guidance" | p.7
Spence medium-term production; unit cost~235 ktpa; US$2.05–2.35/lb16 Jul 2026§2 assets; §7 segment buildFiled | FY2026 operational review | Medium term guidance | "Medium term guidance" | p.7
WAIO medium-term production (100%); unit cost>305 Mtpa; 16 Jul 2026§2 assets; §7 segment buildFiled | FY2026 operational review | Medium term guidance | "Medium term guidance" | p.7
Average realised copper price FY26US$5.74/lb30 Jun 2026§2 assets; §7 segment buildFiled | FY2026 operational review | Average realised prices | "Copper (US$/lb)" | p.7
Average realised iron ore price FY26 (US$/wmt, FOB)US$84.56/wmt30 Jun 2026§2 assets; §7 segment buildFiled | FY2026 operational review | Average realised prices | "Iron ore (US$/wmt, FOB)" | p.7
Average realised steelmaking coal price FY26; Average realised energy coal price FY26US$210.21/t; US$104.28/t30 Jun 2026§2 assets; §7 segment buildFiled | FY2026 operational review | Average realised prices | "Steelmaking coal (US$/t)" | p.7; Filed | FY2026 operational review | Average realised prices | "Energy coal (US$/t)" | p.7
Capital and exploration spend H2 FY26 (expected)~5,00030 Jun 2026§7 FCF build (forward NTM)Filed | FY2026 operational review | Summary of disclosures | "Capital and exploration spend" | p.3
Market and price series
Copper 3-, 6-, 12-month trailing averages; five-year average (COMEX HG=F)US$6.346 / 6.088 / 5.612 per lb; five-year US$4.4611 Aug 2026§7 opening — the US$6.00/lb grid priceMarket | Yahoo Finance | "HG=F" daily closes | to 11 Aug 2026
Iron ore 62% Fe CFR 3-, 6-, 12-month trailing averages; five-year average (SGX TIO=F)US$101.31 / 103.19 / 104.11 per t; five-year US$112.5511 Aug 2026§7 opening — iron ore US$100/t, heldMarket | Yahoo Finance | "TIO=F" daily closes | to 11 Aug 2026
Fiscal-year averages: HG=F FY26; FY25 (US$/lb); TIO=F FY26; FY25 (US$/t)5.475; 4.432; 104.17; 101.6511 Aug 2026Table 9 — realisation and FY2025 calibrationMarket | Yahoo Finance | "HG=F, TIO=F" daily closes | to 11 Aug 2026
AUD/USD; USD/CLP on the as-of date0.7064; 913.5211 Aug 2026Box field 5Market | Yahoo Finance | "AUDUSD=X, CLP=X" daily closes | to 11 Aug 2026

Source: each row’s source cell — the BHP filings at SEC EDGAR and bhp.com, and the market series named in it.

10.2 Disclaimer & disclosure

This analysis is for informational purposes only and is not investment advice, a recommendation, or an offer to buy or sell any security. Do your own research or consult a licensed adviser. It is a point-in-time snapshot as of 11 August 2026: the ADS price, market capitalisation, multiples and valuation read all move. Reserve, resource and forecast figures are estimates on the codes and bases stated beside each table; the sum-of-the-parts valuation is an author-built model, not a company figure. The Quality × Value verdict is an analytical read, never an instruction. This report was prepared with AI assistance; verify every number against the original documents before acting on it. As of 18 November 2026, the author holds no position in the company this analysis covers.