Rio Tinto (RIO) — Stock Analysis 2026 [3.7]

Iron Base Metals Company Analysis
USD

Analysis as of 16 October 2026. Rio Tinto stock analysis. Price deck: base iron ore (62% Fe) US$100/t — the representative of the 3-, 6- and 12-month trailing averages (US$95.75, US$100.07 and US$102.49/t) on the fixed US$70–110/t grid — with every grid price (US$70, 80, 90, 100 and 110/t) run as a scenario, from extreme bear US$70 to bull US$110/t; copper is held at US$6.00/lb and aluminium at US$3,400/t in every column, and analyst consensus is a 0% cross-check — no spot price is weighted. Market data: NYSE close on 16 October 2026, US$90.32 per share (one ADR is one Rio Tinto plc share); company figures in US dollars. Fair value US$112.52 per share against a NAV per share of US$93.10 — implied +24.6%; the market-implied iron ore deck is US$78.14/t. Refreshed on each half-year and annual report and on material events. Rating: ★★★½ Solid / Modestly undervalued (wide band).

Rio Tinto runs the Pilbara iron ore system in Western Australia, three copper mines on three continents and an aluminium business in Canada and Australia, and is now ramping Simandou in Guinea. The thesis in one line: at US$90.32 the shares price iron ore at US$78.14/t — below its five-year low — while copper already carries half the asset value. Why now: Simandou shipped its first ore in December 2025 and copper cost guidance was cut to 30–50 US cents per pound, but free cash flow fell to US$4,025 m in 2025 at the capital peak and the lithium bought with Arcadium still loses money. To screen Rio Tinto against every iron ore producer on cost, reserves and reserve life, go to Metal Pilot’s iron ore mining stock screener.

1. Snapshot & thesis

Figure 1. Rio Tinto in numbers

$90.32
Share price — NYSE, 16 Oct 2026
$146.9 bn
Market capitalisation
$57.6 bn
Revenue — 2025
$25.4 bn
Underlying EBITDA — 2025
323–338 Mt
Pilbara sales guide — 2026 (100%)
800–870 kt
Copper guide — 2026
$14.1 bn
Net debt — 30 Jun 2026
0.5×
Net debt / LTM EBITDA
$93.10
NAV per share (Section 7)
$112.52
Fair value — blend (Section 7)
3.7/5
Quality rating — Solid
Modestly undervalued
(wide band)
Valuation read (Section 7)

Figure data: revenue and EBITDA per the Rio Tinto 2025 Annual Report; net debt per the H1 2026 half year results (29 July 2026); guidance per the Q3 2026 operations review (14 October 2026); share price per Yahoo Finance, NYSE close 16 October 2026, on 1,626.2 m basic shares (Rio Tinto plc voting rights plus Rio Tinto Limited). NAV, fair value and read per Section 7, rating per Section 9.

Rio Tinto is a dual-listed group run as one company — Rio Tinto plc (LSE: RIO; NYSE ADR: RIO), headquartered in London, and Rio Tinto Limited (ASX: RIO) — and a diversified major in the iron ore and copper sector. It holds the Pilbara iron ore system (Hamersley, Robe River at 53%, Hope Downs at 50%), 58.7% of the Iron Ore Company of Canada and 45% of Simandou production in Guinea; Oyu Tolgoi (66%) in Mongolia, 30% of Escondida in Chile and Kennecott (100%) in Utah; an aluminium chain of bauxite, alumina and smelters in Australia and Canada; and lithium at Olaroz (66.5%), Fenix and the Rincon expansion in Argentina. (kt = thousand tonnes; Mt = million tonnes; wmt = wet metric tonne; C1 = cash cost net of by-product credits; M&I = measured and indicated resources.)

Table 1. Rio Tinto in numbers

Metric Value As of
Share price / market capitalisation US$90.32 / US$146.9 bn (1,626.2 m basic shares) 16 Oct 2026
Enterprise value US$160.9 bn (net debt US$14,061 m) 30 Jun 2026
Pilbara iron ore sales, 9M / 2026 guidance (100%) 243.3 Mt / 323–338 Mt 30 Sep 2026
Copper production, 9M / 2026 guidance 646 kt / 800–870 kt 30 Sep 2026
Aluminium production, 9M / 2026 guidance 2.52 Mt / 3.25–3.45 Mt 30 Sep 2026
Revenue / underlying EBITDA US$57,638 m / US$25,363 m 2025
Underlying EBITDA margin 44% 2025
Operating cash flow / free cash flow US$16,832 m / US$4,025 m 2025
Net debt / net debt-to-LTM EBITDA US$14,061 m / 0.5× 30 Jun 2026
Ordinary dividend per share 402 US cents (H1 2026 interim: 211.0) 2025
NAV per share US$93.10 (P/NAV 0.97×) 16 Oct 2026
Fair value (blend) US$112.52 (range US$45.44–US$135.61) 16 Oct 2026
Quality rating / valuation read 3.7/5 Solid / Modestly undervalued (wide band), implied +24.6% 16 Oct 2026

Source: Rio Tinto 2025 Annual Report, H1 2026 half year results and Q3 2026 operations review; market data per Yahoo Finance, NYSE close 16 October 2026. Enterprise value = market capitalisation + net debt at 30 June 2026; LTM EBITDA US$28,642 m (2025 less H1 2025 plus H1 2026). Listed: Public (LSE, ASX, NYSE: RIO).

Thesis in brief. Bull: a Pilbara cost of US$23.5–25.0/wmt, copper C1 of 30–50 US cents per pound after gold credits and a 60 Mtpa Simandou ramp give Rio Tinto low-cost volume in both its large markets — at US$110/t iron ore the blend reaches US$135.61. Bear: the Pilbara holds about seven years of reported reserves at the guided rate, free cash flow has halved since 2023, and lithium lost US$218 m of EBITDA in H1 2026 — at US$80/t the blend is US$63.47. What tips it is the iron ore deck: the price already assumes only US$78.14/t. The full rating is in Section 9.

How to read this analysis: for the verdict, the statcards and Section 9 are enough; for the evidence, read Section 2 (the assets) through Section 7 (the valuation).

2. Assets & operations

For the markets behind these assets, see the Iron Ore — A Complete Market Guide and Copper — A Complete Market Guide; this section spends its words on the company.

2.1 Portfolio overview

Table 2. Rio Tinto asset portfolio

Asset Country Stage Interest Output Reserves (31 Dec 2025) Life (yr) Unit cost Listing / operator
Aluminium (bauxite, alumina, smelters) Canada, Australia, Guinea Producing Rio Tinto share (smelters 40–100%; QAL 100% from 2026; CBG 45% of output) 2.52 Mt Al, 44.2 Mt bauxite (9M 2026) n/d by deposit 25 (horizon) US$1,426/t all-in (Section 7 calibration) Private assets (Rio Tinto-operated)
Pilbara iron ore Australia Producing Hamersley 100%; Robe River 53%; Hope Downs 50% 209.9 Mt RT share (9M 2026) 2,616 Mt at 60.8% Fe (RT share 2,202 Mt) 7 US$23.5–25.0/wmt FOB (2026 guide) Private assets (Rio Tinto-operated)
Oyu Tolgoi Mongolia Producing (underground ramp) 66.0% 312 kt Cu (9M 2026, 100%) 1,136 Mt at 0.84% Cu 20 C1 30–50 c/lb (group, 2026 guide); −US$0.04/lb all-in net after gold credits (Section 7 calibration) Private JV with the Government of Mongolia (Rio Tinto-operated)
Escondida Chile Producing 30.0% 269 kt Cu RT share (9M 2026) 6,211 Mt at 0.54% Cu 22 in group C1; −US$0.04/lb all-in net (Section 7) Private JV operated by BHP (Public, NYSE: BHP)
Kennecott United States Producing 100% 66 kt refined Cu (9M 2026) 739 Mt at 0.38% Cu 29 in group C1; −US$0.04/lb all-in net (Section 7) Private asset (Rio Tinto-operated)
Simandou Guinea Commissioning SimFer 85%; 45.0% of production 60 Mtpa capacity (27 Mtpa RT share) 1,453 Mt at 65.3% Fe (RT share 655 Mt) 24 n/d Private JV with CIOH (Chinalco-led)
Iron Ore Company of Canada Canada Producing 58.7% in global sales 384 Mt at 65.0% Fe (RT share 225 Mt) — n/d Private JV (Rio Tinto-operated)
Lithium (Olaroz, Fenix, Rincon, Nemaska) Argentina, Canada Producing / construction Olaroz 66.5%; Fenix, Rincon 100%; Nemaska 50% 40.3 kt LCE (9M 2026) n/d not valued Rincon expansion US$2.5 bn Private assets

Source: Rio Tinto 2025 Annual Report, metals and minerals production (interests, p.279) and Ore Reserves tables (pp.289, 291; 100% tonnes and grade, JORC / S-K 1300); output and unit-cost guidance per the Q3 2026 operations review (14 October 2026); lives per Section 7. Rows sorted by enterprise NAV.

Concentration. Three businesses carry the group. In Section 7 copper is 49% of enterprise NAV, iron ore 42% and aluminium 25%, before group sustaining capital; in H1 2026 Iron Ore earned US$6,769 m of underlying EBITDA, Copper US$5,713 m (up 84% on H1 2025) and Aluminium US$3,311 m, of US$14,826 m. A China steel slowdown still moves the group most, because iron ore earns the most cash and the Pilbara has the shortest reserve life.

2.2 Revenue split

Figure 2. 2025 revenue by product

Iron ore
Aluminium, alumina & bauxite
Copper
Other & freight
Gold
Lithium
$28,376 m (51.3%)
$15,395 m (27.9%)
$6,664 m (12.1%)
$1,967 m (3.6%)
$1,922 m (3.5%)
$944 m (1.7%)
Share of 2025 product revenue of US$55,268 m

Figure data: Rio Tinto 2025 Annual Report, Note 6 revenue by destination and product (p.182), year ended 31 December 2025.

Figure 3. 9M 2026 copper production by asset

Oyu Tolgoi
Escondida (30%)
Kennecott
312 kt (48.2%)
269 kt (41.6%)
66 kt (10.2%)
Share of 647 kt across the three assets, 9M 2026

Figure data: Q3 2026 operations review, copper section (p.6); Oyu Tolgoi and Kennecott at 100% as consolidated, Escondida at Rio Tinto’s 30% (216 kt in concentrate plus 53 kt refined).

Iron ore is half of revenue, but copper’s share of earnings is far larger than its 12% of 2025 revenue suggests: Oyu Tolgoi’s underground ramp and gold credits turned it into the second earner by H1 2026. Rio Tinto does not file revenue by mine, so the by-asset split is drawn on copper output.

2.3 Pilbara iron ore

The Pilbara is an integrated system of mines, rail and port in Western Australia; Rio Tinto owns Hamersley outright, 53% of Robe River and 50% of Hope Downs, and took 85.4% of the system’s 245.7 Mt in 9M 2026. Pilbara sales are guided to 323–338 Mt (100%) in 2026 at US$23.5–25.0/wmt FOB, on A$0.67; diesel has added about US$1.1/t this year. Reserves are 2,616 Mt at 60.8% Fe (Rio Tinto share 2,202 Mt, 31 December 2025), about eight years at the guided rate at end-2025, and group iron ore reserves fell 2.4% in 2025 net of depletion. Behind them sit 8,060 Mt of M&I iron ore at 57.7% Fe. The asset risk is replacement: the next hubs must be approved and built inside that reserve life.

2.4 Oyu Tolgoi

Oyu Tolgoi (Mongolia; Rio Tinto 66%, operator, with the Government of Mongolia) is the copper growth engine: 312 kt of copper in concentrate in 9M 2026 as the underground block cave ramps. Reserves are 1,136 Mt at 0.84% Cu — 5.42 Mt of copper and 5.14 Moz of gold for Rio Tinto’s share — about 20 years in Section 7. Its gold lifts the group’s C1 guide to 30–50 US cents per pound (gold at US$4,026/oz), cut from 65–75 cents in July. The project-finance debt carries debt-equity covenants tested monthly. The asset risk is Mongolian fiscal terms.

2.5 Escondida

Escondida (Chile; Rio Tinto 30%, operated by BHP) is a non-operated holding. Rio Tinto’s share was 216 kt in concentrate and 53 kt refined in 9M 2026. Reserves are 6,211 Mt at 0.54% Cu, 7.85 Mt of copper for Rio Tinto, about 22 years. Rio Tinto has no operating control, so grade and capital decisions are BHP’s.

2.6 Aluminium

The aluminium chain runs from bauxite (44.2 Mt in 9M 2026, guided 58–61 Mt) through alumina (6.1 Mt; QAL at 100% from 2026) to 2.52 Mt of aluminium (guided 3.25–3.45 Mt) and 200 kt recycled. H1 2026 EBITDA was US$3,311 m; Section 7 calibrates an all-in cost of US$1,426/t, and carries the business over a 25-year horizon because reserves by deposit are n/d. The asset risk is power and alumina costs.

2.7 Simandou and other assets

Simandou (Guinea) shipped its first ore in December 2025. The SimFer mine is 85% SimFer and 15% the Government of Guinea; Rio Tinto takes 45% of production — 27 Mtpa of the 60 Mtpa capacity — with CIOH, a Chinalco-led consortium, funding its share (US$1,160 m in 2025). Reserves are 1,453 Mt at 65.3% Fe (Rio Tinto share 655 Mt); unit cost, grade premium and remaining capital are n/d. Section 7 carries it on a 60%, 85%, then 100% ramp at a 0.90 stage weight. Kennecott (Utah, 100%) produced 66 kt of refined copper on 739 Mt at 0.38% Cu. IOC (58.7%) holds 384 Mt at 65.0% Fe. Lithium produced 40.3 kt LCE in 9M 2026, at the low end of 61–64 kt; the Rincon expansion (60 ktpa, US$2.5 billion) starts in 2028, and Rio Tinto has a binding agreement for a Codelco joint venture in Chile’s Atacama. Dampier Salt (68%) completes the list.

2.8 Production, reserves & costs

Figure 4. Pilbara iron ore shipments by year (Mt, 100%)

Pilbara shipments (Mt)
400
320
240
160
80
0
328.6
326.2
330.5
2024
2025
2026 guide
Year ended 31 December (2026: midpoint of 323–338 Mt)

Figure data: Rio Tinto 2025 Annual Report, Iron Ore review (p.33); 2026 guidance per the Q3 2026 operations review (p.1).

The Pilbara is flat at about 330 Mt a year; growth comes from Simandou and copper. Group copper reserves are 8,086 Mt at 0.57% Cu (15.79 Mt of copper for Rio Tinto, about 19 years at the 2026 guide) and fell 2.0% in 2025; 6,297 Mt of copper M&I at 0.76% sits beyond them. Iron ore reserves total 4,453 Mt at 62.6% Fe (Rio Tinto share 3,082 Mt).

2.9 Peer positioning

The peer set for every star in Section 9 is four diversified and copper majors: BHP Group (NYSE: BHP), Vale (NYSE: VALE), Glencore (LSE: GLEN) and Freeport-McMoRan (NYSE: FCX).

Table 3. Peer positioning — quality metrics

Company Listing Commodity mix Core jurisdictions Iron ore; copper output
Rio Tinto Public (NYSE: RIO) Iron ore, aluminium, copper, lithium Australia, Mongolia, Canada, Guinea Pilbara 323–338 Mt (100%); 800–870 kt (2026 guide)
BHP Group Public (NYSE: BHP) Iron ore, copper, coal, potash Australia, Chile, Peru n/d
Vale Public (NYSE: VALE) Iron ore, nickel, copper Brazil, Canada n/d
Glencore Public (LSE: GLEN) Copper, coal, zinc, marketing DRC, Chile, Australia n/d
Freeport-McMoRan Public (NYSE: FCX) Copper, gold, molybdenum United States, Indonesia, Peru n/d

Source: Rio Tinto per the Q3 2026 operations review; peer commodity mix and jurisdictions are the author’s summary; peer output n/d — the peers’ filings are not in this analysis’s source set (Section 10.1). Compare the group on production, cost and reserve life on Metal Pilot’s copper mining stock screener.

Against this set Rio Tinto is the one major with three scale businesses: BHP has no aluminium; Vale is iron ore with its own dam legacy; Glencore and Freeport-McMoRan are copper-led with no iron ore.

3. Financials & balance sheet

Table 4. Five-year financial summary (US$m unless stated)

Metric 2021 2022 2023 2024 2025
Consolidated sales revenue 63,495 55,554 54,041 53,658 57,638
Revenue YoY % +42.3% −12.5% −2.7% −0.7% +7.4%
Underlying EBITDA (÷ revenue) 37,720 (59.4%) 26,272 (47.3%) 23,892 (44.2%) 23,314 (43.4%) 25,363 (44.0%)
Profit after tax (incl. NCI) 22,597 13,048 9,953 11,574 10,249
Diluted EPS (US cents) 1,296.3 760.4 616.5 707.2 608.4
Operating cash flow 25,345 16,134 15,160 15,599 16,832
Capital expenditure (2025: ~4,500 sustaining) 7,384 6,750 7,086 9,621 12,335
Free cash flow 17,664 9,010 7,657 5,553 4,025
Net (debt) / cash 1,576 (4,188) (4,231) (5,491) (14,362)
Net debt / underlying EBITDA net cash 0.16× 0.18× 0.24× 0.57×
Diluted shares (m) 1,628.9 1,629.6 1,631.5 1,633.4 1,638.0
Dividends declared (US cents) 1,040.0 492.0 435.0 402.0 402.0

Source: Rio Tinto 2025 Annual Report, five-year summary (pp.46, 103), APM reconciliation (p.173) and additional financial information (p.275); 2021–22 underlying EBITDA and free cash flow and 2020 revenue from the 2023 Form 20-F. Notes: (1) 2021 dividends include 247 US cents of specials. (2) Capital expenditure is purchases of property, plant, equipment and intangibles; Rio Tinto split it by sustaining and growth for 2025 only.

Figure 5. Free cash flow by year (US$ m)

Free cash flow (US$ m)
10,000
8,000
6,000
4,000
2,000
0
7,657
5,553
4,025
2023
2024
2025
Year ended 31 December

Figure data: Rio Tinto 2025 Annual Report, additional financial information — free cash flow (p.275).

Revenue rose 7.4% in 2025, and the H1 2026 results lifted revenue 15% to US$31,028 m and underlying EBITDA 28% to US$14,826 m, with operating cash flow of US$9,173 m and free cash flow of US$3,834 m. Applying the Financial Metrics for Commodity Investing guide: operating cash flow (US$16,832 m) runs well ahead of profit (US$10,249 m), and underlying earnings (US$10,868 m) sit close to profit — no large write-down pattern. Free cash flow fell because capital rose to US$12,335 m in 2025, of which about US$4.5 billion was sustaining and the rest Simandou, Oyu Tolgoi and lithium growth.

Cost deck. 2026 Pilbara guidance assumes A$0.67; at US$0.70 the cost rises about US$1.0/t, and each US$10/bbl on diesel adds about US$0.15/t. Copper C1 assumes gold at US$4,026/oz. Corporate income tax paid was US$4,215 m in 2025; tax pools are n/d. The closure provisions use a 2.5% real discount rate (2.0% before 2025).

Balance sheet. Net debt was US$14,061 m at 30 June 2026 — borrowings US$21,414 m and leases US$1,438 m less cash of US$8,913 m — or 0.5× LTM EBITDA; halving LTM EBITDA would lift it to 1.0×. The US$7.5 billion revolver is undrawn to November 2028, no more than US$2.8 billion of debt matures in any one year, and group borrowings were in covenant compliance. Closure provisions are US$18,882 m and minorities US$6,239 m. Hedging: Rio Tinto does not hedge commodity sales as a rule; volumes and strikes are n/d. Returns: the policy pays 60% of underlying earnings; the H1 2026 interim was 211.0 US cents (148.0 a year earlier); diluted shares were 1,638.0 m.

4. Management, strategy & structure

4.1 Management & governance

Simon Trott became Chief Executive on 25 August 2025 (appointed in July), from Chief Executive, Iron Ore, where he ran the Pilbara. Peter Cunningham is Chief Financial Officer and is also accountable for exploration. Dominic Barton chairs the Board. The Board works through the Audit & Risk, Nominations & Governance, Remuneration and Sustainability committees; related-party transactions are disclosed in Note 34 of the 2025 Form 20-F. Board size and independence are n/d in this source set.

4.2 Strategy

Rio Tinto’s frame is to fund copper, Simandou and lithium growth from Pilbara cash while paying 60% of underlying earnings. Its dated targets: 2026 Pilbara sales of 323–338 Mt at US$23.5–25.0/wmt, copper of 800–870 kt at 30–50 US cents C1, Simandou to 60 Mtpa, and the Rincon expansion’s first lithium in 2028 on a three-year ramp. It is also releasing capital — more than US$2 billion arranged of a US$5–10 billion program announced at its 2025 capital markets day — and spent US$692 m on exploration and evaluation in 9M 2026 (US$537 m a year earlier). The acquisition method was shown in Arcadium Lithium: a cash purchase at a low point in the lithium price.

4.3 Ownership & structure

The most material transaction is the Arcadium Lithium acquisition, completed in March 2025 for US$7.6 billion including acquired net debt. The operating joint ventures are Simandou (SimFer with CIOH), Oyu Tolgoi (66%), Escondida (30%), IOC (58.7%), Robe River (53%), Hope Downs (50%) and Nemaska Lithium (50% with Investissement Québec, which contributed US$236 m in 2025). The largest holder is Chinalco, through Shining Prospect Pte. Ltd, with 182,550,329 Rio Tinto plc shares (14.02%, notified 2018) and no special rights; BlackRock last notified 8.38% of plc and 7.01% of Limited. Shares: 1,255,153,524 plc voting rights (31 August 2026) plus 371.0 m Limited shares (2025 weighted average) — 1,626.2 m basic, 1,638.0 m diluted.

5. ESG & sustainability

Rio Tinto reports against the TCFD recommendations and all eight Climate-related Financial Disclosure requirements, and against the ICMM Performance Expectations. It recorded one fatality at managed operations in 2025 (five in 2024), an all-injury frequency rate of 0.37 and a lost-time injury rate of 0.23. Closure provisions of US$18,882 m are its largest long-term obligation. The contested point is heritage: the 2020 destruction of the Juukan Gorge rock shelters in the Pilbara remains the reference point for its licence to operate; decarbonisation targets and their baseline are not in this analysis’s source set.

6. Risks

Table 5. Risk register

Risk Type Likelihood / impact Exposure Mitigant
Iron ore price (China steel) Commodity 4 / 5 Iron ore 42% of enterprise NAV; US$10/t moves NAV per share by US$8.15 Pilbara cost of US$23.5–25.0/wmt
Copper price Commodity 3 / 4 Copper 49% of enterprise NAV; ±US$1/lb gives US$84.06–102.14 NAV per share C1 30–50 c/lb after gold credits
Pilbara reserve depletion Operational 4 / 3 About seven years of reserves at 60.8% Fe 8,060 Mt of iron ore M&I; Simandou at 65.3% Fe
Simandou ramp Execution 3 / 3 27 Mtpa Rio Tinto share; cost and remaining capital n/d CIOH funds its share
Aluminium price and power costs Commodity 3 / 3 Aluminium 25% of enterprise NAV; ±US$400/t gives US$86.68–99.52 NAV per share Canadian hydro power; integrated bauxite and alumina
A$ and diesel costs Currency 4 / 2 ~US$1.0/t per US$0.03 on the A$; diesel +US$1.1/t in 2026 US$ revenue
Closure and heritage ESG 2 / 4 Closure provisions US$18,882 m TCFD and ICMM reporting
Mongolia fiscal terms Jurisdiction 2 / 3 Oyu Tolgoi, 19% of enterprise NAV Government of Mongolia holds 34%
Lithium returns Capital allocation 3 / 2 Arcadium US$7.6 bn; H1 2026 EBITDA −US$218 m Outside the NAV; 60% payout policy

Source: Rio Tinto 2025 Annual Report and Q3 2026 operations review; exposure figures per Sections 2 and 7; likelihood and impact (1–5) are the author’s assessment.

Figure 6. Risk matrix — likelihood × impact

Impact (1–5)
5
4
3
2
1
Iron ore price 20
Copper price 12
Pilbara depletion 12
Simandou ramp 9
Aluminium / power 9
A$ / diesel 8
Closure / heritage 8
Mongolia 6
Lithium 6
1
Rare
2
3
4
5
Likely
Likelihood (1–5)

Figure data: Table 5; each point prints its likelihood × impact score; the shaded region is the high-likelihood, high-impact quadrant.

The two price risks set the value axis and Rio Tinto leaves both unhedged; Section 7 prices them through the iron ore grid and the copper and aluminium sensitivities, and carries closure and minorities as bridge lines.

7. Valuation

Valuation as of 16 October 2026, built in US dollars per share (one NYSE ADR is one Rio Tinto plc share) against the US$90.32 NYSE close of 16 October 2026. Horizon: spot fair value. Deck: iron ore US$100/t (62% Fe) on the fixed US$70–110/t grid — the grid price nearest the 3-month US$95.75, 6-month US$100.07 and 12-month US$102.49 averages of the TIO=F futures closes — with every grid price run as a scenario (extreme bear US$70 to bull US$110); copper held at US$6.00/lb and aluminium at US$3,400/t (on a US$2,600–4,200/t grid, step US$400) in every column; analyst consensus as a 0% cross-check. Discount rate 8% real after-tax.

Rio Tinto is valued as a diversified major, sum of the parts, following the How to Value Commodity Stocks guide. Three product groups carry the value — Pilbara iron ore with Simandou behind it, copper from Oyu Tolgoi, Escondida and Kennecott, and Aluminium — each modelled to its reserve life or a stated horizon, with the measured and indicated resources beyond the reserves converted at a quarter of their in-plan value. The sum of the parts carries 55% of the blend, EV/EBITDA on the next twelve months 25% and an FCF-yield support price 20%.

Enterprise NAV at the base deck is US$208.1 billion: Pilbara US$46.6 billion, Simandou US$7.7 billion and the iron ore resource row US$32.6 billion; Oyu Tolgoi US$39.5 billion at 100%, Escondida US$34.4 billion and Kennecott US$10.0 billion, with the copper resource row US$18.9 billion; Aluminium US$51.9 billion; less US$33.6 billion of group sustaining capital. Copper is 49% of it and iron ore 42%. Copper leads on NAV because its mines run 20–29 years against the Pilbara’s seven years of reported reserves; iron ore still earns more — US$13.5 billion of the US$29.3 billion forward EBITDA against copper’s US$11.1 billion — so iron ore is the primary deck and copper a second deck held beside it.

Three choices set the level. The rate is the iron-ore and base-metal 8%, with no jurisdiction premium in the rate. The iron ore deck sits 10% below its five-year average of US$111.03/t, so the deck and the target multiples flex together across the grid. And the Section 9 scorecard sets the driver line at × (1 + 0.08) — asset quality two steps up, cost and balance sheet one step each — so the targets are 1.08× NAV, 6.5× EBITDA and a 6.5% FCF yield.

Three calibrations carry the rows, each printed as a formula line in Table 9: a Pilbara realisation of 0.6955 of the index — royalties, moisture and the product discount inside — from H1 2026 Iron Ore EBITDA; a copper net cost of −US$0.04/lb, by-product gold at its H1 average of US$4,703/oz more than paying the cash cost, from H1 2026 Copper EBITDA; and an aluminium all-in cost of US$1,426/t from H1 2026 Aluminium EBITDA. The filed figures the valuation moves on are in Table 6.

Table 6. Load-bearing inputs — the filed figures the valuation moves on

Input Value Where used Source
Iron ore 62% Fe trailing averages (TIO=F) and five-year average 3-month US$95.75/t; 6-month US$100.07/t; 12-month US$102.49/t; five-year US$111.03/t Opening block — the US$100/t grid price Market | Yahoo Finance | “TIO=F” | to 16 Oct 2026; Market | Yahoo Finance | “TIO=F” daily closes | to 16 Oct 2026 (17 Oct 2021 – 16 Oct 2026, 1,256 closes)
Copper and aluminium trailing averages (HG=F; ALI=F) Copper US$6.551 / 6.395 / 5.971 per lb; aluminium US$3,372.6 / 3,524.9 / 3,272.3 per t Opening block — copper US$6.00/lb and aluminium US$3,400/t, held Market | Yahoo Finance | “HG=F” | to 16 Oct 2026; Market | Yahoo Finance | “ALI=F” | to 16 Oct 2026
2026 guidance (maintained 14 Oct 2026) Pilbara sales 323–338 Mt (100%); copper 800–870 kt (consolidated); aluminium 3.25–3.45 Mt Table 9, blocks 1–6; Table 13 Filed | Q3 2026 operations review | Production and sales table | “Pilbara iron ore sales” | p.1; Filed | Q3 2026 operations review | Production and sales table | “Copper production (consolidated basis)" | p.1; Filed | Q3 2026 operations review | Production and sales table | “Aluminium production” | p.1
2026 unit-cost guidance Pilbara US$23.5–25.0/wmt FOB; copper C1 30–50 US c/lb Table 9, blocks 1–5 Filed | Q3 2026 operations review | 2. Guidance | “Pilbara iron ore unit cash costs” | p.2; Filed | Q3 2026 operations review | 2. Guidance | “Copper C1 net unit costs” | p.2
H1 2026 underlying EBITDA (US$m): Iron Ore; Copper; Aluminium; Aluminium & Lithium; group 6,769; 5,713; 3,311; 3,093; 14,826 Table 9 — the calibrations; Table 11 — other and central costs Filed | H1 2026 half year results release | Review of operations — Iron Ore | “Underlying EBITDA (US$ millions)" | p.17; Filed | H1 2026 half year results release | 7. Review of operations — Copper | “Underlying EBITDA (US$ millions)" | p.15; Filed | H1 2026 half year results release | Review of operations — Aluminium & Lithium | “Underlying EBITDA (US$ millions)" | p.19; Filed | H1 2026 half year results release | Financial information by business unit | “Underlying EBITDA” | p.43
9M 2026 production: Pilbara (Rio Tinto share Q3; 9M; 100% basis 9M, Mt); copper by asset (kt) 71.2; 209.9; 245.7; Oyu Tolgoi 312, Escondida 216 + 53, Kennecott 66 Table 9 — Rio Tinto share, asset mix, depletion Filed | Q3 2026 operations review | 6. Iron Ore | “Total Pilbara production” | p.7; Filed | Q3 2026 operations review | 5. Copper | “Oyu Tolgoi - Metal in concentrates” | p.6
Ore Reserves, Rio Tinto share (31 Dec 2025) Pilbara 2,202 Mt; Simandou 655 Mt; Escondida 7.85 Mt Cu; Oyu Tolgoi 5.42 Mt Cu; Kennecott 2.52 Mt Cu Table 9 — lives Filed | 2025 Annual Report | Ore Reserves — iron ore | “Rio Tinto share” | p.291; Filed | 2025 Annual Report | Ore Reserves — copper | “recoverable metal” | p.289
Mineral Resources exclusive of reserves (M&I, 100%) and the reserve totals behind the Rio Tinto share Copper 6,297 Mt at 0.76%; iron ore 8,060 Mt at 57.7%; copper reserves 8,086 Mt at 0.57% (15.79 Mt Cu RT share); iron ore reserves 4,453 Mt (3,082 Mt RT share) Table 9, blocks 8–9 Filed | 2025 Annual Report | Mineral Resources — copper | “Total copper” | p.300; Filed | 2025 Annual Report | Mineral Resources — iron ore | “Total iron ore” | p.302; Filed | 2025 Annual Report | Ore Reserves — copper | “recoverable metal” | p.289; Filed | 2025 Annual Report | Ore Reserves — iron ore | “Rio Tinto share” | p.291
Rio Tinto interests; Simandou capacity Oyu Tolgoi 66.0%; Escondida 30.0%; Simandou production 45.0%; Simandou 60 Mtpa (100%), 27 Mtpa RT share Table 8; Table 11 — minorities Filed | 2025 Annual Report | Metals and minerals production | “Oyu Tolgoi (Mongolia)" | p.279; Filed | 2025 Annual Report | Metals and minerals production | “Escondida (Chile)" | p.279; Filed | 2025 Annual Report | Metals and minerals production | “Simandou iron ore production” | p.279; Filed | Q3 2026 operations review | Projects table | “SimFer mine capacity” | p.13
Bridge lines, 30 Jun 2026 (US$m): net debt; closure provisions current, non-current; receivables; inventories; payables; tax payable (current) 14,061; 1,215; 17,667; 4,663; 7,733; 9,706; 701 Table 11 Filed | H1 2026 half year results release | Net debt note | “Net debt” | p.71; Filed | H1 2026 half year results release | Balance sheet | “Close-down, restoration and environmental provisions” | p.35; Filed | H1 2026 financial results | Balance sheet | “Receivables and other assets”; Filed | H1 2026 financial results | Balance sheet | “Inventories”; Filed | H1 2026 financial results | Balance sheet | “Trade and other payables”; Filed | H1 2026 financial results | Balance sheet | “Tax payable”
Sustaining capital 2025; corporate income tax paid 2025; underlying EBITDA 2025 ~US$4.5 bn; US$4,215 m; US$25,363 m Table 9, block 10; Table 15 Filed | 2025 Annual Report | Chief Financial Officer’s statement | “We invested around $4.5 billion for sustaining” | p.18; Filed | 2025 Form 20-F | Financial review — cash flow | “Corporate income tax paid”; Filed | 2025 Annual Report | Financial statements — APM reconciliation | “Underlying EBITDA” | p.173

Source: the Rio Tinto filings named in each row — 2025 Annual Report, H1 2026 half year results, Q3 2026 operations review; iron ore, copper and aluminium averages from futures closes (Yahoo Finance TIO=F, HG=F, ALI=F, to 16 October 2026); the full register is Table 20 (Section 10.1).

Metal Pilot Premium

Valuation workings — Premium

The workings behind this valuation — the method, the models, the sensitivity grids and the scenarios, 11 tables and 3 figures in all — are for Metal Pilot Premium members.

  • 7.1 Method selection
  • 7.2 Net asset value
  • 7.3 Relative valuation
  • 7.4 Further weighted methods
  • 7.5 Cross-checks
  • 7.6 Scenarios & fair value

Want to see one first? The BHP Group (BHP) valuation is open to every reader.

Create a Metal Pilot accountLog in

See Premium plansRead a free example

You are signed in, and your plan does not include valuation workings. They come with Metal Pilot Premium.

Upgrade to Premium

The premium section could not be loaded right now.

Premium — unlocked

8. Near-term catalysts (1–3 years)

Table 18. Near-term catalysts

Catalyst Timing (company guidance) Why it benefits Rio Tinto
Simandou ramp toward 60 Mtpa From first shipment in December 2025 Adds 27 Mtpa of 65% Fe ore for Rio Tinto beside a Pilbara with about seven years of reserves
2026 copper delivery at 30–50 c/lb C1 Full-year 2026 results, early 2027 Confirms Oyu Tolgoi’s underground ramp and the cut cost guide
Capital release program US$5–10 bn, more than US$2 bn arranged Funds growth without stretching 0.5× leverage
Codelco lithium joint venture (Atacama) Binding agreement; formation in 2026 Adds a Chilean lithium source to Olaroz, Fenix and Rincon
Rincon expansion first production 2028, three-year ramp 60 ktpa of lithium for US$2.5 billion of capital

Source: Rio Tinto Q3 2026 operations review (14 October 2026), projects table and group update, and the 2025 Form 20-F projects table. All timing is company guidance, not a guarantee.

Simandou’s ramp matters most: it decides whether iron ore stays a two-province business once the Pilbara reserves run down. Rio Tinto is a diversified major, so there is no takeover-optionality read.

9. Rating & verdict

Rio Tinto is scored as a diversified major against the peers declared in Section 2.9 — BHP Group, Vale, Glencore and Freeport-McMoRan. Asset quality, cost and reserves are scored across the iron ore, copper and aluminium businesses, with the diversification credit inside asset quality; those three, balance sheet and capital allocation carry 15% each, and growth, management, jurisdiction and ESG 6.25% each. No dimension is not-applicable.

Figure 10. Scorecard by dimension, 16 October 2026

Assets & scale★★★★★15%
Cost & margins★★★★15%
Reserves & life★★★15%
Balance sheet★★★★15%
Capital allocation★★★15%
Growth★★★★6.25%
Management★★★6.25%
Jurisdiction★★★6.25%
ESG★★★6.25%
Score by dimension Weighted composite ★★★½ (3.66)
Each ring is one star; the outer ring is ★★★★★. Weights in Table 19.

Figure data: Table 19. Each spoke prints its stars and weight; the dashed ring is the weighted composite, 3.66/5.

Table 19. Scorecard rationale

Dimension Weight Score Rationale
1. Asset quality & scale 15% ★★★★★ Pilbara sales of 323–338 Mt, copper of 800–870 kt and aluminium of 3.25–3.45 Mt guided for 2026, with Simandou ramping to 60 Mtpa — three scale businesses where BHP has two and Vale one; the diversification credit sits here (Sections 2.1–2.7)
2. Cost position & margins 15% ★★★★ Pilbara US$23.5–25.0/wmt and copper C1 30–50 c/lb guided for 2026, a 44% EBITDA margin in 2025 — low on both cost curves by sector reference (peer costs sit outside this source set) (Sections 2.3–2.6, 3)
3. Reserves, life & replacement 15% ★★★ Pilbara 2,616 Mt at 60.8% Fe is about eight years at the guided rate at end-2025, copper 15.79 Mt of Rio Tinto metal about 19 years, and reserves fell 2.4% (iron ore) and 2.0% (copper) in 2025 — mid-table; Simandou’s 1,453 Mt at 65.3% Fe and 8,060 Mt of iron ore M&I keep it off the bottom (Sections 2.3–2.8)
5. Balance sheet & liquidity 15% ★★★★ Net debt US$14,061 m at 0.5× LTM EBITDA, a US$7.5 bn revolver undrawn to 2028, at most US$2.8 bn maturing in any year — above the median with BHP; net debt rose 2.6-fold in 2025 (Section 3)
6. Capital allocation & returns 15% ★★★ Dividends 1,040 US cents in 2021 to 402 in 2025 on a steady 60% payout, Arcadium bought for US$7.6 bn with lithium at −US$218 m of H1 2026 EBITDA, free cash flow 7,657 → 4,025 — mid-table by sector reference (Sections 3, 4.3)
4. Growth & optionality 6.25% ★★★★ Simandou to 60 Mtpa, the Oyu Tolgoi underground ramp, Rincon’s 60 ktpa from 2028 and the Codelco joint venture — more funded growth than Vale or BHP’s iron ore, though lithium is loss-making (Sections 2.4, 2.7, 8)
7. Management & governance 6.25% ★★★ A Chief Executive since 2025 who ran the Pilbara, a Chinalco holding of 14.02% with no special rights, related parties in Note 34 — median of the set; Board size and independence n/d (Section 4)
8. Jurisdiction & geopolitics 6.25% ★★★ Australia carries the iron ore, but Mongolia (Oyu Tolgoi, 19% of enterprise NAV) and Guinea (Simandou) sit behind the growth — weaker than BHP’s Australia and Chile, better than Glencore’s DRC (Sections 2.1, 6)
9. ESG & licence to operate 6.25% ★★★ One fatality in 2025 (five in 2024), AIFR 0.37, TCFD and ICMM reporting; held at the median by the Juukan Gorge legacy and US$18,882 m of closure provisions (Section 5)
Composite 100% ★★★½ Solid

Source: each row cites its evidence in this analysis; peer references are the set in Table 3. Rows by weight, descending.

Weighted average: 0.15 × (5 + 4 + 3 + 4 + 3) + 0.0625 × (4 + 3 + 3 + 3) = 2.85 + 0.8125 = 3.66/5 → ★★★½, Solid.

The two-axis verdict. As of 16 October 2026, quality ★★★½ Solid and a value read of Modestly undervalued (wide band) — the US$112.52 blend against US$90.32 per share, implied +24.6% — give the verdict Re-rating candidate: the catalyst is Simandou’s ramp, which turns a short-lived Pilbara into a two-province iron ore business. The market-implied iron ore deck of US$78.14/t sits below the five-year low of US$80.03/t. The target multiples carry asset quality up two steps and cost and balance sheet one step each, a net × (1 + 0.08).

The bull and bear are the iron ore deck and the copper beside it. If iron ore holds near US$110/t the blend reaches US$135.61, and every US$10/t moves NAV per share by US$8.15. If it slides to US$80/t the blend is US$63.47, and a US$1.00/lb fall in copper takes NAV per share to US$84.06. What tips it is iron ore first, copper second. To rank Rio Tinto against every iron ore producer on these nine dimensions, screen the sector on Metal Pilot’s iron ore mining stock screener.

10. Sources, methodology & disclaimer

10.1 Sources, methodology & data vintage

Company filings: the 2025 Annual Report (with the Ore Reserves and Mineral Resources statement) and the 2023–2025 Forms 20-F; the H1 2026 half year results and results presentation (29 July 2026); the Q2 and Q3 2026 operations reviews (15 July and 14 October 2026); the total voting rights notice of 1 September 2026 — at riotinto.com and in the annual report library. Market: Yahoo Finance (share price; TIO=F iron ore, HG=F copper, ALI=F aluminium and GC=F gold futures; AUD/USD, GBP/USD). Peers: as Table 3.

Methodology. Filings dated on or before 16 October 2026; balance sheet at 30 June 2026; reserves at 31 December 2025, depleted by 9M 2026 output; market data at the NYSE close on 16 October 2026 (US$90.32 per share, 1,638.0 m diluted shares). Deck: iron ore US$100/t on the US$70–110/t grid, every grid price a scenario; copper US$6.00/lb and aluminium US$3,400/t held, with ±US$1.00/lb and ±US$400/t sensitivities; 8% real after tax. Weights: SOTP NAV 55%, EV/EBITDA 25%, FCF yield 20%; cross-checks at 0%. Scorecard against Table 3’s peers. Refreshed on each half-year and annual report and on material events. The model’s full output — deck sensitivity, P/NAV map, cross-checks and the iron ore × copper grid — is claude/valuation-models/rio-tinto-rio.out.md.

Re-run log. 19 August 2026: first published; 3.9/5 Solid, Fairly valued (wide band), on the NYSE close of 15 August 2026, iron ore US$90/t and copper US$4.30/lb at 9%. 18 October 2026: reworked to an as-of of 16 October 2026 — price US$90.32; balance sheet to 30 June 2026; 9M 2026 production and maintained 2026 guidance; deck to iron ore US$100/t with copper US$6.00/lb and aluminium US$3,400/t held, at 8%; scorecard 3.9 → 3.7 (Solid); blend US$112.52, implied +24.6%, read Modestly undervalued (wide band). 18 October 2026 (fix round): the pre-launch findings applied — aluminium at Rio Tinto share, 2021–22 EBITDA and free cash flow from the 2023 Form 20-F (own EV/EBITDA 2.8–5.7×, median 4.6×; current 5.5× like for like), 2026/27 capital guidance cited and bounded, an aluminium risk row; NAV per share US$93.10, blend US$112.52, implied +24.6% and the read unchanged.

Omitted figures and data gaps. The asset location map is not built. Revenue is not filed by mine, so Figure 3 splits copper output by asset. Not in the source set: the peers’ filings (peer output in Table 3 is n/d), aluminium, bauxite and lithium reserves by deposit, Simandou’s unit cost and remaining capital, hedge volumes, tax pools, Board size and independence, decarbonisation targets and an archived analyst consensus — each n/d where it would apply.

Table 20. Source register — the filed figures behind the valuation (load-bearing inputs: Table 6)

InputValueAs ofWhere §7 uses itSource
2025 Annual Report
Escondida (Chile) — Rio Tinto interest; Oyu Tolgoi (Mongolia) — Rio Tinto interest; Iron Ore Company of Canada (Canada) — Rio Tinto interest; Hope Downs (Australia) — Rio Tinto interest; Robe River - Robe Valley (Australia) — Rio Tinto interest; Simandou iron ore production — Rio Tinto interest30.0%; 66.0%; 58.7%; 50.0%; 53.0%; 45.0%31 Dec 2025§2 asset table; §7 SOTP attributable basisFiled | 2025 Annual Report | Metals and minerals production | "Escondida (Chile)" | p.279; Filed | 2025 Annual Report | Metals and minerals production | "Oyu Tolgoi (Mongolia)" | p.279; Filed | 2025 Annual Report | Metals and minerals production | "Iron Ore Company of Canada (Canada)" | p.279; Filed | 2025 Annual Report | Metals and minerals production | "Hope Downs (Australia)" | p.279; Filed | 2025 Annual Report | Metals and minerals production | "Robe River - Robe Valley (Australia)" | p.279; Filed | 2025 Annual Report | Metals and minerals production | "Simandou iron ore production" | p.279
Total copper Ore Reserves 2025 (Mt, % Cu); Rio Tinto share of recoverable metal: Mt Cu, Moz Au, Moz Ag; 2024 total Mt8,086 Mt at 0.57% Cu; 15.79 Mt Cu, 8.30 Moz Au, 67.25 Moz Ag; 8,253 Mt31 Dec 2025§2 reserves; §7 copper life (Tier 1)Filed | 2025 Annual Report | Ore Reserves — copper | "recoverable metal" | p.289
Escondida Ore Reserves (Mt, % Cu); Rio Tinto share recoverable copper (Mt; 30%)6,211 Mt at 0.54%; 7.85 Mt31 Dec 2025§2 reserves (Tier 1)Filed | 2025 Annual Report | Ore Reserves — copper | "recoverable metal" | p.289
Oyu Tolgoi Ore Reserves (Mt, % Cu); Rio Tinto share recoverable Mt Cu / Moz Au1,136 Mt at 0.84%; 5.42 Mt / 5.14 Moz31 Dec 2025§2 reserves (Tier 1)Filed | 2025 Annual Report | Ore Reserves — copper | "recoverable metal" | p.289
Kennecott Ore Reserves (Mt, % Cu); Rio Tinto share recoverable Mt Cu739 Mt at 0.38%; 2.52 Mt31 Dec 2025§2 reserves (Tier 1)Filed | 2025 Annual Report | Ore Reserves — copper | "recoverable metal" | p.289
Total iron ore Ore Reserves 2025 (Mt, % Fe); Rio Tinto share (Mt); 2024 total4,453 Mt at 62.6% Fe; 3,082 Mt; 4,563 Mt31 Dec 2025§2 reserves; §7 iron ore life (Tier 1)Filed | 2025 Annual Report | Ore Reserves — iron ore | "Rio Tinto share" | p.291
Pilbara Operations Ore Reserves (Mt, % Fe); Rio Tinto share (Mt)2,616 Mt at 60.8%; 2,202 Mt31 Dec 2025§2 reserves (Tier 1)Filed | 2025 Annual Report | Ore Reserves — iron ore | "Rio Tinto share" | p.291
IOC Ore Reserves, marketable product (Mt, % Fe; 58.7%); Rio Tinto share (Mt)384 Mt at 65.0%; 225 Mt31 Dec 2025§2 reserves (Tier 1)Filed | 2025 Annual Report | Ore Reserves — iron ore | "Rio Tinto share" | p.291
Simandou Ore Reserves (Mt, % Fe; 45.1% interest); Rio Tinto share (Mt)1,453 Mt at 65.3%; 655 Mt31 Dec 2025§2 reserves (Tier 1)Filed | 2025 Annual Report | Ore Reserves — iron ore | "Rio Tinto share" | p.291
Total copper Mineral Resources (exclusive): Measured; Indicated; Measured + Indicated (Mt, % Cu)886 Mt at 0.62%; 5,411 Mt at 0.79%; 6,297 Mt at 0.76%31 Dec 2025§2 resources (Tier 1)Filed | 2025 Annual Report | Mineral Resources — copper | "Total copper" | p.300
Total iron ore Mineral Resources (exclusive): Measured; Indicated; Measured + Indicated (Mt, % Fe)1,960 Mt at 57.6%; 6,100 Mt at 57.8%; 8,060 Mt at 57.7%31 Dec 2025§2 resources (Tier 1)Filed | 2025 Annual Report | Mineral Resources — iron ore | "Total iron ore" | p.302
2025 consolidated sales revenue by product — Iron ore (US$ m); 2025 consolidated sales revenue by product — Aluminium, alumina and bauxite (US$ m); 2025 consolidated sales revenue by product — Copper (US$ m); 2025 consolidated sales revenue by product — Gold (US$ m); 2025 consolidated sales revenue by product — Lithium (US$ m); 2025 consolidated sales revenue by product — Other products and freight services (US$ m)28,376; 15,395; 6,664; 1,922; 944; 1,96731 Dec 2025§2 revenue split; §7 SOTP weightsFiled | 2025 Annual Report | Note 6 Revenue by destination and product | "Iron ore" | p.182; Filed | 2025 Annual Report | Note 6 Revenue by destination and product | "Aluminium, alumina and bauxite" | p.182; Filed | 2025 Annual Report | Note 6 Revenue by destination and product | "Copper" | p.182; Filed | 2025 Annual Report | Note 6 Revenue by destination and product | "Gold" | p.182; Filed | 2025 Annual Report | Note 6 Revenue by destination and product | "Lithium" | p.182; Filed | 2025 Annual Report | Note 6 Revenue by destination and product | "Other products and freight services" | p.182
Pilbara shipments (million tonnes — 100%) 2025 / 2024326.2 / 328.631 Dec 2025§2 assets; §7 product-group SOTPFiled | 2025 Annual Report | Iron Ore review | "Pilbara shipments (million tonnes — 100%)" | p.33
Consolidated sales revenue 2025 / 2024 / 2023 / 2022 / 2021; Net cash generated from operating activities 2025 / 2024 / 2023 / 2022 / 2021; Purchases of property, plant and equipment and intangible assets 2025 / 2024 / 2023 / 2022 / 2021; Net (debt)/cash 2025 / 2024 / 2023 / 2022 / 202157,638 / 53,658 / 54,041 / 55,554 / 63,495; 16,832 / 15,599 / 15,160 / 16,134 / 25,345; 12,335 / 9,621 / 7,086 / 6,750 / 7,384; (14,362) / (5,491) / (4,231) / (4,188) / 1,57631 Dec 2025§3 five-year tableFiled | 2025 Annual Report | Five-year summary | "Consolidated sales revenue" | p.46; Filed | 2025 Annual Report | Five-year summary | "Net cash generated from operating activities" | p.46; Filed | 2025 Annual Report | Five-year summary | "Purchases of property, plant and equipment and intangible assets" | p.46; Filed | 2025 Annual Report | Five-year summary | "Net (debt)/cash" | p.46
Underlying EBITDA 2025 / 2024 / 202325,363 / 23,314 / 23,89231 Dec 2025§3 five-year table; §7 EV/EBITDA (Tier 1)Filed | 2025 Annual Report | Financial statements — APM reconciliation | "Underlying EBITDA" | p.173
Free cash flow 2025 / 2024 / 20234,025 / 5,553 / 7,65731 Dec 2025§3 five-year tableFiled | 2025 Annual Report | Additional financial information | "Free cash flow" | p.275
Sustaining capital invested 2025 (CFO statement)~$4.5 bn31 Dec 2025§3 capex split sustaining / growthFiled | 2025 Annual Report | Chief Financial Officer's statement | "We invested around $4.5 billion for sustaining" | p.18
Multi-currency revolving credit facility (undrawn; matures November 2028)$7.5 bn31 Dec 2025§3 financials (§12)Filed | 2025 Annual Report | Note 24 Financial risk management | "multi-currency revolving credit facility" | p.201
Maximum non-current borrowings maturing in any one calendar year (2028)$2.8 bn31 Dec 2025§3 financials (§12)Filed | 2025 Annual Report | Chief Financial Officer's statement | "matures in 2028" | p.22
Weighted average number of shares diluted (millions) 2025 / 2024 / 2023 / 2022 / 20211,638.0 / 1,633.4 / 1,631.5 / 1,629.6 / 1,628.931 Dec 2025§3 five-year tableFiled | 2025 Annual Report | Financial information five-year summary | "Weighted average number of shares diluted (millions)" | p.103
Dividends per share declared, interim (US cents) 2025 / 2024 / 2023 / 2022 / 2021; Dividends per share declared, final (US cents) 2025 / 2024 / 2023 / 2022 / 2021; 2021 specials 185.0 interim + 62.0148.0 / 177.0 / 177.0 / 267.0 / 376.0; 254.0 / 225.0 / 258.0 / 225.0 / 417.031 Dec 2025§3 five-year table — DPSFiled | 2025 Annual Report | Financial information five-year summary | "– interim" | p.103; Filed | 2025 Annual Report | Financial information five-year summary | "– final" | p.103
Arcadium Lithium acquisition (completed March 2025), incl. acquired net debt$7.6 bn31 Dec 2025§4 governance; §5Filed | 2025 Annual Report | Financial review — cash flow | "Acquisition of Arcadium (including acquired net debt)" | p.21
Simandou: SimFer JV with CIOH (Chinalco-led consortium) — CIOH funding received 2025 for its 47% share of Simandou capex$1,160 m31 Dec 2025§4 governance; §5Filed | 2025 Annual Report | Additional financial information | "Chalco Iron Ore Holdings Ltd (CIOH)" | p.275
Rio Tinto Limited shares outstanding (weighted average 2025, millions) — latest count n/d this phase371.031 Dec 2025§7 per-share (Tier 1)Filed | 2025 Annual Report | Note 2 Earnings per share | "average number of Rio Tinto Limited shares outs" | p.174
2025 Form 20-F
Corporate income tax paid 2025 / 2024 / 20234,215 / 4,165 / 4,62731 Dec 2025§3 financials (§12)Filed | 2025 Form 20-F | Financial review — cash flow | "Corporate income tax paid"
2023 Form 20-F
Consolidated sales revenue 202044,61131 Dec 2020§3 five-year table — 2021 YoYFiled | 2023 Form 20-F | Five-year summary | "Consolidated sales revenue"
Underlying EBITDA 2022 / 202126,272 / 37,72031 Dec 2022§3 five-year table; §7 own-multiple historyFiled | 2023 Form 20-F | Financial statements — segment information | "Underlying EBITDA"
Free cash flow 2022 / 20219,010 / 17,66431 Dec 2022§3 five-year tableFiled | 2023 Form 20-F | Alternative performance measures | "Free cash flow"
H1 2026 financial results
Investments in equity accounted units, 30 Jun 20266,27330 Jun 2026§7 equity bridgeFiled | H1 2026 financial results | Balance sheet | "Investments in equity accounted units"
H1 2026 half year results release
Copper underlying EBITDA H1 2026 / H1 2025 (US$ m)5,713 / 3,10530 Jun 2026§7 SOTP run-rateFiled | H1 2026 half year results release | 7. Review of operations — Copper | "Underlying EBITDA (US$ millions)" | p.15
Iron Ore underlying EBITDA H1 2026 / H1 2025 (US$ m)6,769 / 6,86130 Jun 2026§7 SOTP run-rateFiled | H1 2026 half year results release | Review of operations — Iron Ore | "Underlying EBITDA (US$ millions)" | p.17
Aluminium & Lithium page: two underlying EBITDA rows H1 2026 / H1 2025 (US$ m) — Phase B to assign (group vs Aluminium)3,311 / 2,398; 3,093 / 2,35630 Jun 2026§7 SOTP run-rateFiled | H1 2026 half year results release | Review of operations — Aluminium & Lithium | "Underlying EBITDA (US$ millions)" | p.19
H1 2026 / H1 2025 underlying EBITDA14,826 / 11,54730 Jun 2026§7 run-rate EBITDA (Tier 1)Filed | H1 2026 half year results release | Financial information by business unit | "Underlying EBITDA" | p.43
Net debt, 30 Jun 2026 / 31 Dec 202514,061 / 14,36230 Jun 2026§7 equity bridge (Tier 1)Filed | H1 2026 half year results release | Net debt note | "Net debt" | p.71
Net debt components 30 Jun 2026: borrowings excl. overdrafts; lease liabilities; derivatives related to net debt; cash incl. overdrafts; other investments(21,414); (1,438); (263); 8,913; 14130 Jun 2026§7 equity bridge (Tier 1)Filed | H1 2026 half year results release | Net debt note | "At 30 June" | p.71
Close-down, restoration and environmental provisions current / non-current, 30 Jun 20261,215 / 17,66730 Jun 2026§7 equity bridge (Tier 1)Filed | H1 2026 half year results release | Balance sheet | "Close-down, restoration and environmental provisions" | p.35
Attributable to non-controlling interests, 30 Jun 2026 / 31 Dec 20256,239 / 4,82130 Jun 2026§7 equity bridge (Tier 1)Filed | H1 2026 half year results release | Balance sheet | "Attributable to non-controlling interests" | p.35
Q3 2026 operations review
Copper production (consolidated basis), 9M 2026; 2026 guidance646 kt; 800–870 kt30 Sep 2026§2 assets; §7 product-group SOTPFiled | Q3 2026 operations review | Production and sales table | "Copper production (consolidated basis)" | p.1
Pilbara iron ore sales (100% basis), 9M 2026; 2026 guidance243.3 Mt; 323–338 Mt30 Sep 2026§2 assets; §7 product-group SOTPFiled | Q3 2026 operations review | Production and sales table | "Pilbara iron ore sales" | p.1
Aluminium production, 9M 2026; 2026 guidance2.52 Mt; 3.25–3.45 Mt30 Sep 2026§2 assets; §7 product-group SOTPFiled | Q3 2026 operations review | Production and sales table | "Aluminium production" | p.1
Lithium carbonate equivalent (LCE) production, 9M 2026; 2026 guidance (at lower end)40.3 kt; 61–64 kt30 Sep 2026§2 assets; §7 product-group SOTPFiled | Q3 2026 operations review | Production and sales table | "Lithium carbonate equivalent (LCE) production" | p.1
Total Pilbara production Q3 / 9M 2026 (Rio Tinto share); 9M 2026 100% basis71.2 Mt; 209.9 Mt; 245.7 Mt30 Sep 2026§2 assets; §7 product-group SOTPFiled | Q3 2026 operations review | 6. Iron Ore | "Total Pilbara production" | p.7
Copper 9M 2026 by asset: Oyu Tolgoi metal in concentrates; Escondida metal in concentrates; Escondida refined; Kennecott refined312 kt; 216 kt; 53 kt; 66 kt30 Sep 2026§7 copper SOTP — Oyu Tolgoi and Kennecott 100% consolidated, Escondida equity shareFiled | Q3 2026 operations review | 5. Copper | "Oyu Tolgoi - Metal in concentrates" | p.6
Pilbara iron ore unit cash costs, FOB, 2026 guidance (US$ per wet metric tonne; A$0.67 basis)$23.5–25.0/wmt14 Oct 2026§7 iron ore margin (Tier 1)Filed | Q3 2026 operations review | 2. Guidance | "Pilbara iron ore unit cash costs" | p.2
Copper C1 net unit costs (Kennecott, Oyu Tolgoi and Escondida), 2026 guidance (US c/lb; gold at $4,026/oz)30–50 c/lb14 Oct 2026§7 copper margin (Tier 1)Filed | Q3 2026 operations review | 2. Guidance | "Copper C1 net unit costs" | p.2
Simandou: SimFer mine ownership SimFer / Government of Guinea; capacity 100% / Rio Tinto share; first shipment Dec 202585% / 15%; 60 Mtpa / 27 Mtpa14 Oct 2026§2 ramping asset; §7 iron ore SOTPFiled | Q3 2026 operations review | Projects table | "SimFer mine capacity" | p.13
Rincon expansion (Argentina, 100%): capacity; capital; first production (three-year ramp)60 ktpa; $2.5 bn; 202814 Oct 2026§2 construction asset; §7 lithiumFiled | Q3 2026 operations review | Projects table | "Rincon expansion" | p.14
Total Voting Rights notice, 1 Sep 2026
Rio Tinto plc total voting rights (ex 897,389 treasury), 31 Aug 20261,255,153,52431 Aug 2026§7 per-share (Tier 1)Filed | Total Voting Rights notice, 1 Sep 2026 | Notice | "the total number of voting rights in Rio Tinto plc" | p.1
H1 2026 results presentation
Capex guidance 2026/27 (maintained): total a year; sustaining; replacement; growthup to $11 bn; ~$4 bn; ~$4 bn; ~$3 bn29 Jul 2026§7 box field 11 item 7Filed | H1 2026 results presentation | Capex guidance (maintained) | "Sustaining" | p.17
Market and price series
RIO close, NYSE (ADR, US$)$90.3216 Oct 2026§1 statcard; §7 per-share (Tier 1)Market | Yahoo Finance | "RIO" | 16 Oct 2026
AUD/USD; GBP/USD (last bar 15 Oct 2026)0.6919; 1.327315 Oct 2026§7 FX (Tier 1)Market | Yahoo Finance | "AUDUSD=X / GBPUSD=X" | 15 Oct 2026
Iron ore 62% Fe (SGX/CME TIO=F, proxy) trailing averages 3 / 6 / 12 months; last close (US$/dmt)$95.75 / $100.07 / $102.49; $90.9016 Oct 2026§7 deck — iron ore (Tier 1)Market | Yahoo Finance | "TIO=F" | to 16 Oct 2026
Copper (COMEX HG=F, proxy for LME) trailing averages 3 / 6 / 12 months; last close (US$/lb); five-year high / low$6.551 / $6.395 / $5.971; $6.574; $6.80 / $3.2116 Oct 2026§7 deck — copper (Tier 1)Market | Yahoo Finance | "HG=F" | to 16 Oct 2026
Aluminium (COMEX ALI=F, proxy for LME) trailing averages 3 / 6 / 12 months; last close (US$/t); five-year high / low$3,372.6 / $3,524.9 / $3,272.3; $3,093.5; $4,195.0 / $2,073.316 Oct 2026§7 deck — aluminium (Tier 1)Market | Yahoo Finance | "ALI=F" | to 16 Oct 2026
Iron ore 62% Fe (TIO=F) five-year average close; five-year high; lowUS$111.03/t; US$161.84 (4 Apr 2022); US$80.03 (1 Nov 2022)16 Oct 2026§7 opening —; conclusion — the market-implied deckMarket | Yahoo Finance | "TIO=F" daily closes | to 16 Oct 2026 (17 Oct 2021 – 16 Oct 2026, 1,256 closes)
Copper (HG=F) five-year average closeUS$4.54/lb16 Oct 2026Box field 3 — copper heldMarket | Yahoo Finance | "HG=F" daily closes | to 16 Oct 2026 (17 Oct 2021 – 16 Oct 2026)
Aluminium (ALI=F) five-year average closeUS$2,636.1/t16 Oct 2026Box field 3 — aluminium heldMarket | Yahoo Finance | "ALI=F" daily closes | to 16 Oct 2026 (17 Oct 2021 – 16 Oct 2026)
H1 2026 average closes (1 Jan – 30 Jun 2026): copper HG=F (US$/lb); iron ore TIO=F (US$/t); aluminium ALI=F (US$/t); gold GC=F (US$/oz)5.978; 105.04; 3,402.7; 4,703.216 Oct 2026Table 9 — the H1 2026 calibrationsMarket | Yahoo Finance | "HG=F, TIO=F, ALI=F, GC=F" daily closes | to 16 Oct 2026

Source: the documents named in each band — the Rio Tinto filings and the Yahoo Finance market series, dated on or before 16 October 2026; the load-bearing subset is Table 6 in Section 7.

10.2 Disclaimer & disclosure

This analysis is for informational purposes only and is not investment advice; it is not a recommendation to buy, hold or sell any security. Do your own research and consult a licensed financial adviser before acting. It is a point-in-time snapshot as of 16 October 2026: the market data, valuation and rating all move with prices and events, and the figures are estimates drawn from company filings and market data that can change or be revised. This report was prepared with AI assistance; its figures were sourced and reviewed, but readers should verify any number against the primary filing before relying on it. The two-axis verdict is an analytical read, not a personal instruction. As of 18 November 2026, the author holds no position in the company this analysis covers.