Vale (VALE) — Stock Analysis 2026 [3.2]
Analysis as of 23 August 2026. Price deck: base iron ore (62% Fe) US$100/t — the representative of the 3-, 6- and 12-month trailing averages (US$99.34, US$102.84 and US$103.90/t) on the fixed US$70–110/t grid — with every grid price (US$70, 80, 90, 100 and 110/t) run as a scenario, from extreme bear US$70 to bull US$110/t; copper is held at US$6.00/lb and nickel at US$17,500/t in every column, and no spot price is weighted. Market data: NYSE close on 21 August 2026, US$14.59 a share (one ADR is one Vale common share); company figures in US dollars. Fair value US$13.21 per share against a NAV per share of US$6.53 — implied −9.5%; the market-implied deck is US$102.88/t of iron ore. Refreshed on each quarterly and annual report and on material events. Rating: ★★★ Average / Fairly valued (wide band).
Vale mines high-grade iron ore — reserves at 64.6–65.3% Fe — at Carajás in northern Brazil and runs a copper and nickel business, Vale Base Metals, beside it. The thesis in one line: at US$14.59 the shares already price iron ore at US$102.88/t — close to the trailing averages — so the stock is a fair bet on the deck rather than a discount waiting to close. Why now: Vale raised its 2026 iron ore all-in cost guidance to US$58–62/t in July while copper output climbs toward a 700,000 t/yr ambition, and the Brumadinho and Mariana reparations still sit inside its expanded net debt. To compare Vale with every iron ore producer on production, cost and reserves, use Metal Pilot’s iron ore mining stock screener.
1. Snapshot & thesis
Figure 1. Vale in numbers
(wide band)
Figure data: EBITDA per the 2025 Form 20-F; guidance per the 2Q26 production and sales report and the 31 July 2026 cost-guidance 6-K; net debt per the 2Q26 performance release, at vale.com; price per Yahoo Finance, NYSE close 21 August 2026, on 4,255.8 m shares outstanding. NAV, fair value and read per Section 7, rating per Section 9.
Vale S.A. (B3: VALE3; NYSE ADR: VALE), headquartered in Rio de Janeiro, is a producer (mining) in the iron ore sector — Iron Ore Solutions earned 75% of 6M26 revenue — scored on the producer weights and valued as a producer. It runs two segments: Iron Ore Solutions, the Northern system at Carajás (Serra Norte, Serra Sul, Serra Leste) and the Southeastern and Southern systems in Minas Gerais, with the rail and ports that serve them; and Vale Base Metals, copper at Salobo and Sossego in Brazil and nickel and copper at Sudbury and Voisey’s Bay in Canada and Onça Puma in Brazil. It also holds 50% of Samarco and an 18.9% stake in the Thompson company. (Mt = million tonnes; kt = thousand tonnes; C1 = direct cash cost; “all-in” = Vale’s guided all-in cost; EBITDA is Vale’s adjusted EBITDA; “expanded net debt” adds the reparation obligations to net debt.)
Table 1. Vale in numbers
| Metric | Value | As of |
|---|---|---|
| Share price / market capitalisation | US$14.59 / US$62.1 bn (4,255.8 m shares) | 21 Aug 2026 |
| Enterprise value | US$75.3 bn (net debt US$13,173 m) | 30 Jun 2026 |
| Iron ore production 6M26 / 2026 guidance | 153.9 Mt / 335–345 Mt | 30 Jun 2026 |
| Copper / nickel production 6M26 / 2026 guidance | 200.7 kt / 350–380 kt; 91.3 kt / 175–200 kt | 30 Jun 2026 |
| Adjusted EBITDA / EBITDA margin | US$15,458 m / 40.3% | FY2025 |
| Net debt / LTM EBITDA (expanded net debt) | 0.8× (US$16,677 m) | 30 Jun 2026 |
| NAV per share | US$6.53 (P/NAV 2.24×) | 23 Aug 2026 |
| Fair value (blend) | US$13.21 (range US$0.34–US$20.99) | 23 Aug 2026 |
| Quality rating / valuation read | 3.2/5 Average / Fairly valued (wide band), implied −9.5% | 23 Aug 2026 |
Source: Vale 2025 Form 20-F, Q2 2026 interim financial statements, 2Q26 performance release and 2Q26 production and sales report; market data per Yahoo Finance, NYSE close 21 August 2026. Enterprise value = market capitalisation + net debt at 30 June 2026; margin = adjusted EBITDA ÷ net operating revenue of US$38,403 m. Listed: Public (B3: VALE3; NYSE: VALE).
Thesis in brief. Bull: Carajás reserves of 5,117 Mt at 64.6–65.3% Fe are fifteen years of group output from two complexes, copper has a path from 350–380 kt toward 700 kt, and at US$110/t iron ore the blend reaches US$20.99. Bear: Vale’s 40.3% EBITDA margin is the lowest in its peer set, the all-in cost guide rose US$6/t this year, and US$16.7 billion of expanded net debt plus US$6.2 billion of dam provisions stay fixed when the price falls — at US$90/t the blend is US$7.07. What tips it is the iron ore deck around US$100/t. The full rating is in Section 9.
How to read this analysis: for the verdict, the statcards and Section 9 are enough; for the evidence, read Section 2 (the assets) through Section 7 (the valuation).
2. Assets & operations
For the markets behind these assets, see the Iron Ore — A Complete Market Guide and Copper — A Complete Market Guide; this section spends its words on the company.
2.1 Portfolio overview
Table 2. Vale asset portfolio
| Asset | Country | Stage | Interest | 2026 guidance | Reserves (P&P, 31 Dec 2025) | Life | Unit cost (2026 guide) | Listing / operator |
|---|---|---|---|---|---|---|---|---|
| Iron ore — Northern system (Serra Norte, Serra Sul, Serra Leste) | Brazil (Pará) | Producing | 100% | 335–345 Mt across all three systems | Serra Norte 1,512.3 Mt @ 64.6% Fe; Serra Sul 3,605.1 Mt @ 65.3% Fe | ~15 yr (Carajás P&P ÷ group output) | C1 US$22.5–23.5/t; all-in US$58–62/t | Vale S.A. (B3: VALE3; NYSE: VALE) |
| Iron ore — Southeastern and Southern systems | Brazil (Minas Gerais) | Producing | 100% | inside the group 335–345 Mt | n/d by property | n/d | group guidance | Vale S.A. (B3: VALE3; NYSE: VALE) |
| Copper — Salobo and Sossego | Brazil (Pará) | Producing | 100% | 350–380 kt (group copper) | Salobo 921.3 Mt @ 0.59–0.60% Cu, 0.34 g/t Au; Sossego n/d | n/d | all-in US$0–500/t | Vale Base Metals (Vale-operated) |
| Nickel and copper — Sudbury | Canada (Ontario) | Producing | 100% | 175–200 kt (group nickel) | 63.4 Mt @ 1.40% Ni, 1.54% Cu | ~4 yr on Sudbury P&P | nickel all-in US$10,000–11,500/t | Vale Base Metals (Vale Canada) |
| Nickel — Voisey’s Bay, Onça Puma | Canada; Brazil | Producing | 100% | inside the group 175–200 kt | n/d by property | n/d | group guidance | Vale Base Metals |
| Samarco; Thompson company; PT Vale Indonesia | Brazil; Canada; Indonesia | Equity-accounted or partly held | 50%; 18.9%; offtake 80% | — | — | — | — | Associates (book value) |
Source: 2025 Form 20-F Item 4D reserves summaries (S-K 1300, 31 December 2025) and the streaming note; 2Q26 production and sales report (guidance); 2Q26 performance release and the 31 July 2026 cost-guidance 6-K (unit costs); Q2 2026 interim financial statements (Samarco, Thompson). Life = reserves ÷ guided output, capped at 30 years (Section 7).
Concentration is high on two axes. Iron ore is 66% of gross asset value in the Section 7 model, copper 30% and nickel 3%; Iron Ore Solutions earned 75% of 6M26 revenue. And Brazil carries all of the iron ore and most of the copper, so the country premium in the discount rate (Section 7) applies to almost the whole book.
2.2 Revenue split
Figure 2. 6M26 revenue by product
Figure data: 2Q26 performance release, net operating revenue by business area, six months to 30 June 2026; “other products” is Iron Ore Solutions’ US$338 m and Vale Base Metals’ US$288 m beyond the named products (Derived).
Figure 3. 6M26 revenue by business
Figure data: 2Q26 performance release, net operating revenue by business area. Revenue is not filed by mine, so the business split stands in for the split by asset.
2.3 Iron ore: Carajás and the southern systems
Vale owns its iron ore outright, and Carajás is the value: Serra Norte holds 1,512.3 Mt of proven and probable reserves at 64.6% Fe (down from 1,567.9 Mt a year earlier) and Serra Sul 3,605.1 Mt at 65.3% Fe (up from 3,401.6 Mt), reported under S-K 1300 at 31 December 2025. Group output was 336.1 Mt in 2025 and 153.9 Mt in 6M26, against 335–345 Mt guided for 2026; Vale began commissioning the Serra Sul +20 expansion in July 2026, and in the Southeastern system the Capanema project and the VGR1 plant at Vargem Grande are ramping up — the 2Q26 production report credits both with added volume — inside the same guide. Costs moved the wrong way: C1 was US$24.1/t in 2Q26 and the 2026 guide rose to US$22.5–23.5/t from US$20.0–21.5/t, the all-in to US$58–62/t from US$52–56/t. The Southeastern and Southern systems in Minas Gerais — where the Brumadinho dam failed in 2019 — report no reserves by property, so the model’s iron ore life rests on Carajás alone. The asset risk is tailings safety in that southern system (Section 5).
2.4 Copper: Salobo, Sossego and Sudbury
Copper is Vale’s growth leg and 30% of asset value. Salobo in Pará holds 314.7 Mt proven and 606.6 Mt probable at 0.59–0.60% Cu and 0.34 g/t Au; 75% of its by-product gold is streamed to Wheaton Precious Metals at the lesser of US$400/oz (rising 1% a year) and spot, and Sudbury’s by-product gold is streamed at 70% on the same basis — a US$1,944 m liability at 30 June 2026. Group copper was 98.4 kt in 2Q26 and 200.7 kt in 6M26, against 350–380 kt guided; the all-in guide was revised down to US$0–500/t. Vale’s stated aim is 700,000 t/yr by 2035. Sossego’s reserves are not reported separately. The asset risk is delivering that ramp on budget inside a US$5.4–5.7 bn capital programme.
2.5 Nickel and other holdings
Nickel is 3% of asset value. Sudbury holds 63.4 Mt at 1.40% Ni and 1.54% Cu; Voisey’s Bay and Onça Puma report no reserves by property. Output was 91.3 kt in 6M26 against 175–200 kt guided, at an all-in cost of US$10,000–11,500/t against a US$17,500/t deck. Outside the consolidated businesses Vale holds 50% of Samarco, an 18.9% interest in the company that received the Thompson assets, and an 80% share of PT Vale Indonesia’s offtake (Sumitomo takes 20%); all are carried at book in Section 7.
2.6 Production, reserves & costs
Figure 4. Iron ore production by year (Mt)
Figure data: 2025 Form 20-F, Item 4 production table (p.47); 2026 guidance per the 2Q26 production and sales report (p.1).
Output has grown 4.6% in two years to 336.1 Mt and the 2026 guide holds it near 340 Mt. The reserve base outruns that: Carajás proven and probable rose 3.0% in 2025 to 5,117 Mt, while the cost curve moved up — the 2026 C1 guide is about US$2/t above the old range.
2.7 Peer positioning
Table 3. Peer positioning — quality metrics
| Company | Listing | Fiscal year | Revenue (US$m) | Underlying / adjusted EBITDA (US$m) | EBITDA margin |
|---|---|---|---|---|---|
| Vale | B3: VALE3; NYSE: VALE | Dec 2025 | 38,403 | 15,458 | 40.3% |
| BHP | ASX/NYSE: BHP | Jun 2025 | 51,262 | 25,978 | 50.7% |
| Rio Tinto | ASX/LSE/NYSE: RIO | Dec 2025 | 57,638 | 25,400 | 44.1% |
| Fortescue | ASX: FMG | Jun 2025 | 15,541 | 7,941 | 51.1% |
Source: Vale 2025 Form 20-F; BHP Annual Report 2025 (20-F); Rio Tinto 2025 Annual Report (20-F); Fortescue Annual Report 2025. Margin = EBITDA ÷ revenue (Derived). Peer reserve lives and growth are not in the filings read, so they are not compared.
The peer set is the three other large seaborne iron ore producers, none in a pending deal; it is used for every star in Section 9 and for nothing in Section 7. Vale sits in the middle on revenue and last on margin.
3. Financials & balance sheet
Table 4. Five-year financial summary (US$m unless stated)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | 6M26 |
|---|---|---|---|---|---|---|
| Net operating revenue | 54,502 | 43,839 | 41,784 | 38,056 | 38,403 | 19,756 |
| YoY % | n/d | −19.6% | −4.7% | −8.9% | +0.9% | +16.7% |
| Adjusted EBITDA (cash margin) | n/d | 19,760 (45.1%) | 18,601 (44.5%) | 14,840 (39.0%) | 15,458 (40.3%) | 7,506 (38.0%) |
| Net income attributable to Vale | 22,445 | 18,788 | 7,983 | 6,166 | 2,352 | 3,268 |
| Diluted EPS (US$) | 4.47 | 4.05 | 1.83 | 1.44 | 0.55 | 0.77 |
| Operating cash flow | 25,679 | 11,485 | 13,165 | 9,366 | 8,801 | n/d |
| Capex: sustaining / growth | n/d | n/d | 4,269 / n/d | 4,538 / n/d | 4,371 / n/d | 2,429 total |
| Free cash flow | n/d | n/d | n/d | n/d | n/d | 2,318 |
| Net debt | n/d | n/d | n/d | n/d | n/d | 13,173 |
| Net debt / EBITDA | n/d | n/d | n/d | n/d | n/d | 0.8× |
| Diluted shares (m) | 5,016.8 | 4,642.4 | 4,370.0 | 4,279.9 | 4,274.8 | 4,270.4 |
| DPS (US$) | n/d | n/d | n/d | n/d | n/d | n/d |
| Dividends and interest on capital paid | 13,483 | 6,603 | 5,513 | 3,914 | 3,561 | 1,701 approved |
Source: 2025, 2024 and 2023 Forms 20-F (operating results, income statements, cash flow statements, Note 6); Q2 2026 interim financial statements and 2Q26 performance release. FY2022 and FY2021 from the 2023 Form 20-F (FY2022 EBITDA from continuing operations); FY2023 EBITDA on the restated basis of the 2024 Form 20-F; net income is the line attributable to Vale’s shareholders, the EPS basis; FY2021 EBITDA, year-end net debt and DPS per share are not in the filings read (n/d); 6M26 EBITDA = 1Q26 US$3,830 m + 2Q26 US$3,676 m (Derived).
Revenue fell 8.9% in 2024 and held flat in 2025, and adjusted EBITDA has slid from US$19,760 m in 2022 to US$15,458 m; 6M26 revenue is up 16.7% on 6M25. Net income attributable to Vale fell to US$2,352 m in 2025 while operating cash flow was US$8,801 m — the gap sits below EBITDA, with income tax expense of US$2,670 m against US$721 m in 2024. Sustaining capital runs at about US$4.4 bn a year, and total capital investment is guided at US$5.4–5.7 bn for 2026. For how these measures fit together, see Financial Metrics for Commodity Investing.
Figure 5. Adjusted EBITDA by year (US$m)
Figure data: 2023, 2024 and 2025 Forms 20-F, operating results (adjusted EBITDA, non-GAAP).
3.1 Cost deck, debt and capital returns
Cost deck. The 2026 guide is iron ore C1 US$22.5–23.5/t and all-in US$58–62/t, copper all-in US$0–500/t and nickel all-in US$10,000–11,500/t. Royalties were US$693 m in 6M26, 3.5% of revenue, and move with price. Costs are largely in reais: the real averaged R$5.0494 per US$ in 2Q26 and closed June at R$5.1766. The tax-pool horizon is not disclosed.
Debt and liquidity. At 30 June 2026 gross debt was US$18,304 m and net debt, leases included, US$13,173 m — 0.8× LTM EBITDA; expanded net debt with the reparations is US$16,677 m, inside Vale’s US$10–20 bn target. At US$80/t iron ore, forward EBITDA of about US$7.9 bn would lift net debt to 1.7× (Derived from Section 7). Liquidity is US$5,765 m of cash and short-term investments plus a US$3 bn revolver to 2029; US$323 m matures in 2026, the average maturity is 8.1 years, and 14.5% of debt carries covenants. Dam de-characterization and asset retirement provisions total US$6,151 m. Hedge book: none on commodities — the filings show net-investment and debt swaps only.
Capital returns. Dividends and interest on capital paid fell from US$13,483 m in 2021 to US$3,561 m in 2025; US$1,701 m was approved in July 2026 for September. Buybacks were US$214 m in 6M26, and the diluted count has eased from 4,370.0 m (2023) to 4,270.4 m.
4. Management, strategy & structure
4.1 Management & governance
Gustavo Duarte Pimenta has been chief executive since 2024; Marcelo Feriozzi Bacci is executive vice-president of finance and investor relations, and Wilfred Theodoor Bruijn chairs the Board. Vale reports a majority-independent Board under NYSE rule 303A.01; Board size and the committee roster are not in the filings read. At the 22 July 2026 extraordinary general meeting, holders of 82.4% of the voting capital took part. Related-party detail is not in the filings read.
4.2 Strategy
The frame is iron ore for cash and copper for growth. In iron ore Vale is adding volume at Serra Sul (+20 Mtpa commissioning from July 2026) while holding output at 335–345 Mt. In base metals the target is 700,000 t/yr of copper by 2035, from 350–380 kt guided for 2026. Capital investment is guided at US$5.4–5.7 bn for 2026, and expanded net debt is managed to a US$10–20 bn range. Climate targets: Scope 1 and 2 emissions down 33% by 2030 from 2017, net zero by 2050.
4.3 Ownership & structure
Vale has no controlling shareholder. At 18 March 2026 the largest holders were Previ (8.0%), BlackRock (7.0%), Mitsui & Co. (6.7%) and Capital World Investors (5.3%) of 4,269,514,353 shares outstanding; the Brazilian government holds 12 golden shares. At 30 June 2026 4,255,762,783 shares were outstanding excluding treasury. Vale Base Metals is consolidated, with US$935 m of minority equity. Vale holds 50% of Samarco (equity-accounted), 18.9% of the company that took the Thompson assets, and US$5,264 m of investments in associates and joint ventures. Two Wheaton Precious Metals streams take 75% of Salobo’s and 70% of Sudbury’s by-product gold.
5. ESG & sustainability
Vale’s record is defined by two tailings failures. The Brumadinho dam failure in 2019 killed 270 people, and the Mariana Definitive Settlement is estimated at R$170 billion. Vale reports Global Industry Standard on Tailings Management conformance at 48 of its 50 facilities (2024 Form 20-F) and carries US$6,151 m of dam de-characterization and closure provisions. Its targets are a 33% cut in Scope 1 and 2 emissions by 2030 against 2017 and net zero by 2050. A safety rate by year is not in the filings read.
6. Risks
Table 5. Risk register
| Risk | Type | Likelihood / impact | Exposure | Mitigant |
|---|---|---|---|---|
| Iron ore price (China steel) | Commodity | 4 / 5 | 66% of gross asset value; the blend falls from US$13.21 to US$7.07 at US$90/t | C1 guide US$22.5–23.5/t |
| Reparations and settlements | Legal / balance sheet | 3 / 4 | Brumadinho and Samarco provisions US$3,871 m in expanded net debt; Mariana settlement R$170 bn | Definitive Settlement fixes the schedule |
| Unit-cost creep | Operational | 4 / 3 | All-in guide raised to US$58–62/t; 2Q26 C1 US$24.1/t | Serra Sul +20 volume |
| Brazil jurisdiction | Jurisdiction | 3 / 3 | Ba1; sovereign CDS 2.21% | US$-priced sales; NYSE listing |
| Tailings failure | ESG / operational | 2 / 5 | 270 deaths at Brumadinho; US$6,151 m dam provisions | GISTM at 48 of 50 facilities |
| Copper ramp and price | Commodity | 2 / 4 | 30% of gross asset value; ±US$1/lb moves NAV per share to US$5.55–7.50 | All-in guide US$0–500/t |
| Brazilian real | FX | 4 / 2 | ±10% on the C1 cost moves NAV per share to US$5.61–7.45 | Reais costs, US$ sales |
Source: Section 7 (sensitivities); 2025 Form 20-F Item 3; 2Q26 performance release; Damodaran, Country Default Spreads and Risk Premiums (5 January 2026). Likelihood and impact on a 1–5 scale (Estimate).
Figure 6. Risk matrix — likelihood × impact
Rare
Likely
Figure data: Table 5 (Estimate).
The iron ore price, the reparations and the Brazil premium are the three risks Section 7 prices — in the deck grid, the bridge and the rate. The highest-scoring risk is the deck: iron ore is two-thirds of asset value and the claims ahead of equity do not move with it, so a US$10/t fall costs far more than its share of revenue. Tailings safety is the lowest-likelihood risk with the largest impact, and the one the record says cannot be ruled out.
7. Valuation
Valuation as of 23 August 2026, built in US dollars per share (one NYSE ADR is one Vale common share) against the US$14.59 NYSE close of 21 August 2026. Horizon: spot fair value. Deck: iron ore US$100/t (62% Fe) on the fixed US$70–110/t grid — the grid price nearest the 3-month US$99.34, 6-month US$102.84 and 12-month US$103.90 averages; copper US$6.00/lb and nickel US$17,500/t (on a US$13,500–21,500 grid, step US$2,000) held in every column; 10% real after-tax discount rate (the 8% iron ore and base-metal convention plus a 2% Brazil premium). Balance sheet 30 June 2026; 4,270.4 million diluted shares.
Vale is valued as an iron ore producer with a base-metals arm, following the How to Value Commodity Stocks guide: iron ore is three-quarters of revenue, so the producer method set applies — net asset value at a target P/NAV (50%), EV/EBITDA on the next twelve months (30%) and FCF-yield support (20%). Three businesses carry the value, each modelled from its 2026 guidance and its filed reserves: iron ore from the Carajás, Southeastern and Southern systems, copper from Salobo, Sossego and Sudbury, and nickel from Sudbury, Voisey’s Bay and Onça Puma.
Enterprise NAV at the base deck is US$58.7 billion — iron ore US$53.4 billion, copper US$24.5 billion and nickel US$2.7 billion, less US$21.9 billion of group sustaining capital — and the bridge takes away US$30.9 billion: expanded net debt with the Brumadinho and Mariana reparations inside, dam de-characterization provisions, the capitalised central costs and the book minority, with the associates added back at book.
Three choices set the level. The rate carries a 2% Brazil premium, the top of the band for a ★★★ jurisdiction, placed by Damodaran’s country risk table of 5 January 2026 (Brazil Ba1: default spread 2.13%, CDS 2.21%). The iron ore deck sits 12% below its five-year average of US$113.4/t, so the deck and the target multiples flex together across the grid. And the iron ore life rests on the Carajás reserves alone — 5,117 Mt of Serra Norte and Serra Sul proven and probable, 15 years of group output — because the Southeastern and Southern systems’ reserves are not disclosed by property; a 30-year life would add US$1.12 per share. The premium is charged once, in the rate, and the same 10% discounts every business — the Canadian nickel included — so no second jurisdiction charge sits in the target multiples.
Table 6. Load-bearing inputs — the inputs the valuation moves on
| Input | Value | Where used | Source |
|---|---|---|---|
| Iron ore 62% Fe trailing averages (TIO=F) | 3-month US$99.34/t; 6-month US$102.84/t; 12-month US$103.90/t | Opening block — the US$100/t grid price | Market · Yahoo Finance · “TIO=F” daily closes · to 21 Aug 2026 |
| Iron ore five-year average; high; low (monthly, Aug 2021 – Jul 2026) | US$113.4/t; US$162.1/t; US$90.1/t | Opening block — deck and multiples flex together | Market · FRED · “PIORECRUSDM” monthly · to Jul 2026 |
| Copper (HG=F) trailing averages; five-year average | US$6.371 / 6.134 / 5.678 per lb; US$4.47/lb | Opening block — copper US$6.00/lb, held | Market · Yahoo Finance · “HG=F” daily closes · to 21 Aug 2026 |
| Nickel trailing averages; five-year average (monthly) | US$17,671 / 17,521 / 16,461 per t; US$19,552/t | Opening block — nickel US$17,500/t, held | Market · FRED · “PNICKUSDM” monthly · to Jul 2026 |
| Brazil (Ba1): adjusted default spread; sovereign CDS; equity country risk premium | 2.13%; 2.21%; 3.24% | Opening block — the 2% Brazil premium in the 10% rate | Market · Damodaran · “Country Default Spreads and Risk Premiums” · 5 Jan 2026 |
| 2026 production guidance | Iron ore 335–345 Mt; copper 350–380 kt; nickel 175–200 kt | Table 9, blocks 1–3; Table 13 | Filed · 2Q26 production and sales report · Summary · “2026 guidance” · p.1 |
| 2026 unit-cost guidance | Iron ore C1 US$22.5–23.5/t, all-in US$58–62/t; copper all-in US$0–500/t; nickel all-in US$10,000–11,500/t | Table 9, blocks 1–3 | Filed · 6-K 31 Jul 2026 (cost guidance) · “C1 cash cost of iron ore”; Filed · 2Q26 performance release · Iron ore · “all-in cost guidance” · p.11 |
| 6M26 calibration: Iron Ore Solutions revenue; iron ore output; copper revenue, output; nickel revenue, output; adjusted EBITDA 1Q26, 2Q26 | US$14,763 m; 153,930 kt; US$2,590 m, 200.7 kt; US$1,564 m, 91.3 kt; US$3,830 m, US$3,676 m | Table 9 — the realisations; Table 11 — other costs | Filed · 2Q26 performance release · Net operating revenue by business area · “Iron Ore Solutions”; Filed · 2Q26 production and sales report · Summary · p.1 |
| Mineral Reserves (S-K 1300, 31 Dec 2025) | Serra Norte 1,512.3 Mt; Serra Sul 3,605.1 Mt; Salobo 314.7 + 606.6 Mt; Sudbury 63.4 Mt | Table 9 — lives | Filed · 20-F 2025 · “Summary of … Mineral Reserves” tables (Serra Norte l.8386, Serra Sul l.8534, Salobo l.9774, Sudbury l.9336) · “Total” |
| Bridge lines, 30 Jun 2026 (US$m): expanded net debt; net debt; taxes payable; dam and ARO provisions current, non-current; minorities; associates | 16,677; 13,173; 890; 1,119; 5,032; 935; 5,264 | Table 11 | Filed · 2Q26 performance release · Net debt · “Expanded net debt” · p.1; Filed · Q2 2026 interim FS · Balance sheet |
| Sustaining capital 2025; D&A 6M26; diluted shares 6M26 | US$4,371 m; US$1,756 m; 4,270,395 thousand | Table 9, block 4; Table 11; Table 15 | Filed · 20-F 2025 · l.18420 · “sustaining capital investments”; Filed · Q2 2026 interim FS · Note 6 |
Source: the Vale filings named in each row — 2025 Form 20-F, Q2 2026 interim financial statements, 2Q26 performance release, 2Q26 production and sales report, the 31 July 2026 cost-guidance 6-K; iron ore and copper averages from futures closes (Yahoo Finance TIO=F, HG=F, to 21 August 2026), nickel and the five-year iron ore average from FRED (PNICKUSDM, PIORECRUSDM), the Brazil premium from Damodaran’s country risk table (5 January 2026); the full register is Table 20 (Section 10.1).
8. Near-term catalysts (1–3 years)
Table 18. Near-term catalysts
| Catalyst | Timing | Why it matters |
|---|---|---|
| Serra Sul +20 ramp-up | Commissioning from July 2026; 2026–27 | Adds Carajás volume at 65.3% Fe grade inside the 335–345 Mt guide |
| Delivery of the revised 2026 cost guide (C1 US$22.5–23.5/t, all-in US$58–62/t) | 2H26 results, early 2027 | Each US$1/t on 340 Mt is about US$340 m of EBITDA |
| Copper output toward 350–380 kt | FY2026 results | The first step on the 700,000 t/yr ambition for 2035 |
| US$1,701 m shareholder remuneration | Paid September 2026 | About 2.7% of the market capitalisation |
Source: 6-K of 30 July 2026 (Serra Sul +20); 31 July 2026 cost-guidance 6-K and 2Q26 performance release; 2Q26 production and sales report; Q2 2026 interim financial statements, subsequent events (remuneration). EBITDA per US$1/t and the yield are Derived.
9. Rating & verdict
Table 19. Scorecard rationale
| Dimension | Weight | Stars | Rationale (metric, figure, peer reference) | Source |
|---|---|---|---|---|
| 1. Asset quality & scale | 15% | ★★★★ | Iron ore 336.1 Mt in 2025 and 335–345 Mt guided; Carajás reserves at 64.6–65.3% Fe; copper 350–380 kt and nickel 175–200 kt beside it. Revenue of US$38.4 bn sits between Fortescue (US$15.5 bn) and BHP and Rio Tinto (US$51.3 bn, US$57.6 bn); above the median on grade, behind the two majors on breadth | Filed · 2Q26 production and sales report · Summary · “2026 guidance” · p.1 |
| 2. Cost position & margins | 15% | ★★ | FY2025 adjusted EBITDA margin 40.3% — below Rio Tinto 44.1%, BHP 50.7% and Fortescue 51.1%; the 2026 iron ore all-in guide raised to US$58–62/t from US$52–56/t | Filed · 2Q26 performance release · Iron ore · “The iron ore all-in cost guidance has been revised to US$58-62/t” · p.11 |
| 3. Reserves, life & replacement | 15% | ★★★★ | Carajás proven and probable 5,117 Mt — about 15 years of guided group output from two complexes — up 3.0% in 2025; Salobo 921.3 Mt; peer lives not in the filings read, so scored on life and replacement | Filed · 20-F 2025 · Item 4D · “for purposes of Item 1300 of Regulation S-K (S-K 1300)" · p.48 |
| 5. Balance sheet & liquidity | 15% | ★★★ | Net debt US$13,173 m, 0.8× LTM EBITDA (expanded US$16,677 m); US$5,765 m cash and a US$3 bn undrawn revolver; about 1.7× at US$80/t iron ore — the peer median of the set | Filed · 2Q26 performance release · Debt indicators · “Net debt / adjusted LTM EBITDA (x)" · p.7 |
| 6. Capital allocation & returns | 15% | ★★★ | Dividends and interest on capital paid fell from US$13,483 m (2021) to US$3,561 m (2025) with EBITDA; diluted shares down 2.3% since 2023; US$1,701 m approved in July 2026 — at the peer median on returns, with no filed per-share series to rank against BHP, Rio Tinto or Fortescue | Filed · 20-F 2025 · Cash flow statement · “Dividends and interest on capital paid to Vale S.A." · p.F-5 |
| 4. Growth & optionality | 6.25% | ★★★★ | Copper toward 700,000 t/yr by 2035 from 350–380 kt; Serra Sul +20 commissioning; US$5.4–5.7 bn of capital investment guided for 2026 — above the peer median on funded copper growth for an iron ore producer | Filed · 20-F 2025 · Strategy · “copper production is expected to rise to 700,000 tons per” · p.10 |
| 7. Management & governance | 6.25% | ★★★ | CEO Gustavo Duarte Pimenta since 2024; majority-independent Board; no holder above 8.0%; 12 golden shares with the Brazilian government | Filed · 20-F 2025 · Item 6 · “Gustavo Duarte Pimenta” · p.156 |
| 8. Jurisdiction & geopolitics | 6.25% | ★★★ | Brazil (Ba1, sovereign CDS 2.21%) carries the iron ore and most of the copper, Canada the nickel; a higher country premium than Australia-based BHP and Fortescue; the 2% premium sits in the 10% rate | Market · Damodaran · “Country Default Spreads and Risk Premiums” · 5 Jan 2026 |
| 9. ESG & licence to operate | 6.25% | ★★ | Brumadinho (2019) killed 270; Mariana settlement R$170 bn; GISTM at 48 of 50 facilities; US$6,151 m dam provisions — below the peer median on the tailings record | Filed · 20-F 2025 · Item 3 · “dam failure resulted in 270 fatalities” · p.13 |
| Composite | 100% | ★★★ | Average | — |
Source: the filings named in each row (vale.com, SEC); peers per Table 3. Producer weights: Dims 1, 2, 3, 5 and 6 at 15%, the rest at 6.25%.
Weighted average: 0.15 × (4 + 2 + 4 + 3 + 3) + 0.0625 × (4 + 3 + 3 + 2) = 2.40 + 0.75 = 3.15/5 → ★★★, Average.
The two-axis verdict. As of 23 August 2026, quality ★★★ Average and a value read of Fairly valued (wide band) — the US$13.21 blend against US$14.59, implied −9.5% — make Vale priced about right. The market-implied deck is US$102.88/t of iron ore, between the US$100/t base and the 12-month average of US$103.90/t. The target multiples carry Dims 1 and 3 (+0.02 each) and Dim 2 (−0.02), a net × 1.02; Dim 8 sits in the rate.
The bull and bear are the deck and the claims beneath it. At US$110/t the blend reaches US$20.99 and Carajás grade and copper growth carry the case; at US$90/t it is US$7.07, because US$16.7 billion of expanded net debt and US$6.2 billion of dam provisions do not shrink with the price and the lowest margin in the peer set leaves less room. What tips it is whether iron ore holds above US$100/t while the cost guide stops rising. To rank Vale against every iron ore producer on production, cost and reserves, use Metal Pilot’s iron ore mining stock screener.
10. Sources, methodology & disclaimer
10.1 Sources, methodology & data vintage
Company filings: the 2025, 2024 and 2023 Forms 20-F with the S-K 1300 reserve summaries; the Q2 2026 interim financial statements, the 2Q26 performance release and the 2Q26 production and sales report; the 6-Ks of 30 and 31 July 2026; the 22 July 2026 EGM minutes and voting map — at vale.com and SEC EDGAR. Peers: the BHP and Rio Tinto 2025 Forms 20-F and Fortescue’s 2025 annual report. Market: Yahoo Finance (VALE, VALE3.SA, TIO=F, HG=F), FRED (PIORECRUSDM, PNICKUSDM) and Damodaran’s country risk table (5 January 2026).
Methodology. Filings dated on or before 23 August 2026; balance sheet at 30 June 2026; reserves at 31 December 2025; market data at the NYSE close of 21 August 2026 (US$14.59 a share, 4,270.4 m diluted shares). Deck: iron ore US$100/t on the US$70–110/t grid, every grid price a scenario; copper US$6.00/lb and nickel US$17,500/t held, with ±US$1.00/lb and ±US$2,000/t sensitivities; 10% real after tax (8% plus a 2% Brazil premium). Weights: NAV 50%, EV/EBITDA 30%, FCF yield 20%; cross-checks at 0%. Scorecard against Table 3’s peers. Refreshed on each quarterly and annual report and on material events. The model’s working tables are in claude/valuation-models/vale.out.md.
Re-run log. 23 August 2026: first published; 3.8/5 Solid, Modestly undervalued (wide band), on iron ore US$90/t, copper US$4.00/lb and nickel US$7.50/lb at 9%. 19 October 2026: reworked on the same as-of — balance sheet to 30 June 2026, 2Q26 production and the revised 2026 cost guide; deck to iron ore US$100/t with copper US$6.00/lb and nickel US$17,500/t held, at 10%; producer weights; scorecard 3.8 → 3.2 (Average); blend US$13.21, implied −9.5%, read Fairly valued (wide band); slug to vale-vale, the old address kept as an alias. 19 October 2026, gate fixes: net income on the attributable line, FY2021–22 added to Table 4, the own-multiple history repaired and the gap register completed; NAV per share US$6.53, blend US$13.21, implied −9.5% and the read unchanged.
Omitted figures and data gaps. The asset location map is not built. Revenue is not filed by mine, so Figure 3 splits revenue by business. Not in the filings read: reserves of the Southeastern and Southern iron ore systems, Sossego, Voisey’s Bay and Onça Puma; unit cost and life by asset; payables; year-end net debt and DPS per share by year; FY2021 adjusted EBITDA; growth capital by project; the tax-pool horizon; Board size and committees; a safety rate by year; peer reserve lives; and an archived analyst consensus — each n/d, with the bounds in the Section 7 assumptions box.
Table 20. Source register — the filed figures behind the valuation (load-bearing inputs: Table 6)
| Input | Value | As of | Where §7 uses it | Source |
|---|---|---|---|---|
| 20-F 2025 | ||||
| Net operating revenue FY2025; FY2024; FY2023 | US$38,403 m; 38,056; 41,784 | FY2025–23 | Section 3, Table 4 | Filed · 20-F 2025 · Operating results · "Net operating revenue" |
| Adjusted EBITDA FY2025 | US$15,458 m | FY2025 | Table 13 calibration; Table 4 | Filed · 20-F 2025 · Operating results · "Our Adjusted EBITDA increased to US$15,458 million in 2025" |
| Net income attributable to Vale's shareholders FY2025; FY2024; FY2023 | US$2,352 m; 6,166; 7,983 | FY2025–23 | Table 4 | Filed · 20-F 2025 · Income statement · "Net income attributable to Vale S.A.'s shareholders" |
| Diluted EPS FY2025; FY2024; FY2023 | US$0.55; 1.44; 1.83 | FY2025–23 | Table 4 | Filed · 20-F 2025 · Income statement · "diluted earnings per share (US$)" |
| Operating cash flow FY2025; FY2024; FY2023 | US$8,801 m; 9,366; 13,165 | FY2025–23 | Table 4 | Filed · 20-F 2025 · Cash flow statement · "Net cash generated by operating activities" |
| Sustaining capital FY2025; FY2024; FY2023 | US$4,371 m; 4,538; 4,269 | FY2025–23 | Table 9, block 4; Table 15 | Filed · 20-F 2025 · l.18420 · "less sustaining capital investments, which represented US$4,371"; Filed · 20-F 2025 · l.18420 · "(2024: US$4,538 and 2023: US$4,269)" |
| Capital investment guidance 2026 | US$5.4–5.7 bn | 2026 | Section 3; Table 18 | Filed · 20-F 2025 · Liquidity · "guidance for 2026 range from US$5.4 billion to US$5.7 billion" |
| Income tax expense FY2025 | US$2,670 m | FY2025 | Table 15 — cash tax | Filed · 20-F 2025 · Operating results · "we recorded an income tax expense of US$2,670 million" |
| Dividends and interest on capital paid FY2025; FY2024; FY2023 | US$3,561 m; 3,914; 5,513 | FY2025–23 | Table 4; Dim 6 | Filed · 20-F 2025 · Cash flow statement · "Dividends and interest on capital paid to Vale S.A." |
| Weighted diluted shares FY2025; FY2024; FY2023 | 4,274,804; 4,279,867; 4,369,961 thousand | FY2025–23 | Table 4; own history | Filed · 20-F 2025 · Note 6 · "Weighted average number of common shares outstanding and potential ordinary shares" |
| Undrawn revolver (2029); debt maturing 2026; share of debt under covenants | US$3 bn; US$323 m; 14.5% | 31 Dec 2025 | Section 3 — liquidity | Filed · 20-F 2025 · Liquidity · "US$3 billion available under a revolving credit line maturing in 2029"; Filed · 20-F 2025 · Liquidity · "A principal amount of US$323 million of our debt matures in 2026"; Filed · 20-F 2025 · Liquidity · "14.5% of the aggregate principal amount of our total debt" |
| Mineral Reserves P&P: Serra Norte; Serra Sul | 1512.3 Mt; 3605.1 Mt | 31 Dec 2025 | Table 9, block 1 — life | Filed · 20-F 2025 · Serra Norte – Summary of Iron Mineral Reserves · "Total | 1,512.3 | 64.6"; Filed · 20-F 2025 · Serra Sul - Summary of Iron Ore Mineral Reserves · "Total | 3,605.1 | 65.3" |
| Mineral Reserves: Salobo proven; probable | 314.7 Mt; 606.6 Mt | 31 Dec 2025 | Table 9, block 2 — life | Filed · 20-F 2025 · Salobo - Summary of Copper Mineral Reserves · "Proven | 314.7 | 0.59 | 0.34"; Filed · 20-F 2025 · Salobo - Summary of Copper Mineral Reserves · "Probable | 606.6 | 0.60 | 0.34" |
| Mineral Reserves P&P: Sudbury | 63.4 Mt | 31 Dec 2025 | Table 9, block 3 — life | Filed · 20-F 2025 · Sudbury - Summary of Nickel, Cobalt, Copper, PGMs and Gold Mineral Reserves · "Total | 63.4 | 1.40" |
| Wheaton gold streams: Salobo; Sudbury by-product gold | 75%; 70% | 31 Dec 2025 | Table 8; Table 9 | Filed · 20-F 2025 · l.16285 · "75% of the gold produced as a by-product at the Salobo copper mine"; Filed · 20-F 2025 · l.16285 · "70% of the gold produced as a by-product at the Sudbury nickel mines" |
| Copper production ambition | 700,000 t/yr | 2035 | Section 2.4; Dim 4 | Filed · 20-F 2025 · Strategy · "copper production is expected to rise to 700,000 tons per" |
| Iron ore production FY2025 | 336.1 Mt | FY2025 | Figure 4 | Filed · 20-F 2025 · Item 4 · "Total | 336.1 | 327.7 | 321.2" |
| CEO Gustavo Duarte Pimenta | since 2024 | 2025 | Section 4.1 | Filed · 20-F 2025 · Item 6 · "Gustavo Duarte Pimenta" |
| Brumadinho fatalities (2019); Mariana Definitive Settlement | 270 fatalities; R$170 bn | 31 Dec 2025 | Section 5; Dim 9 | Filed · 20-F 2025 · Item 3 · "dam failure resulted in 270 fatalities"; Filed · 20-F 2025 · "The Definitive Settlement, estimated in R$170 billion" |
| Scope 1 and 2 reduction target vs 2017 | 33% by 2030 | 2030 | Section 5 | Filed · 20-F 2025 · l.16958 · "absolute Scope 1 and 2 emissions by 33% by 2030" |
| Holders: Previ; BlackRock; Mitsui & Co.; Capital World Investors | 8.0%; 7.0%; 6.7%; 5.3% | 18 Mar 2026 | Section 4.3 | Filed · 20-F 2025 · Major Shareholders · "(Previ) | 339,606,102 | 8.0%"; Filed · 20-F 2025 · Major Shareholders · "BlackRock, Inc. (1) | 297,783,803 | 7.0%"; Filed · 20-F 2025 · Major Shareholders · "& Co., Ltd. | 286,347,055 | 6.7%"; Filed · 20-F 2025 · Major Shareholders · "World Investors (2) | 227,690,911 | 5.3%" |
| 20-F 2024 | ||||
| Adjusted EBITDA FY2024 | US$14,840 m | FY2024 | Table 4; Figure 5 | Filed · 20-F 2024 · Operating results · "Our Adjusted EBITDA decreased to US$14,840 million in 2024" |
| Adjusted EBITDA FY2023 (restated) | US$18,601 m | FY2023 | Table 4; Figure 5 | Filed · 20-F 2024 · Operating results · "from US$18,601 million in" |
| Tailings facilities conforming to GISTM | 48 of 50 | 31 Dec 2024 | Section 5 | Filed · 20-F 2024 · Tailings · "We implemented the GISTM in 48 of the 50" |
| 20-F 2023 | ||||
| Adjusted EBITDA FY2022; dividends paid FY2022; FY2021 | US$19,760 m; 6,603; 13,483 | FY2022–21 | Table 4; Dim 6 | Filed · 20-F 2023 · Operating results · "million in 2023 from US$19,760 million in 2022"; Filed · 20-F 2023 · Cash flow statement · "Dividends and interest on capital paid to Vale" |
| Net operating revenue; operating cash flow; net income attributable to Vale's shareholders; weighted diluted shares — FY2022; FY2021 | US$43,839 m, 11,485, 18,788, 4,642,432 thousand; US$54,502 m, 25,679, 22,445, 5,016,848 thousand | FY2022–21 | Table 4; own history | Filed · 20-F 2023 · Operating results · "net operating revenues from continuing operations"; Filed · 20-F 2023 · Cash flow statement · "Net cash generated by operating activities"; Filed · 20-F 2023 · Income statement · "Net income attributable to Vale's shareholders"; Filed · 20-F 2023 · Note 9 · "Weighted average number of common shares outstanding and potential ordinary shares" |
| Q2 2026 interim FS | ||||
| 6M26 revenue; cost of goods sold; net income to Vale; EPS | US$19,756 m; 13,467; 3,268; US$0.77 | 6M26 | Table 4 | Filed · Q2 2026 interim FS · Income statement · "Net operating revenue"; Filed · Q2 2026 interim FS · Income statement · "Cost of goods sold and services rendered"; Filed · Q2 2026 interim FS · Income statement · "Net income attributable to Vale S.A.'s shareholders"; Filed · Q2 2026 interim FS · Income statement · "Basic and diluted earnings per share (US$)" |
| 6M26 D&A; royalties | US$1,756 m; 693 | 6M26 | Table 15; Section 3 | Filed · Q2 2026 interim FS · Information by business segment and geographic area · "Depreciation, depletion and amortization"; Filed · Q2 2026 interim FS · Costs and expenses by nature · "Royalties" |
| Weighted shares 6M26: diluted; basic | 4,270,395; 4,263,826 thousand | 6M26 | NAV per share; Table 14 | Filed · Q2 2026 interim FS · Note 6 · "Weighted average number of common shares outstanding and potential ordinary shares"; Filed · Q2 2026 interim FS · Note 6 · "Weighted average number of common shares outstanding" |
| Shares outstanding excl. treasury | 4,255,762,783 | 30 Jun 2026 | Market capitalisation | Filed · Q2 2026 interim FS · Note 25 · "Total outstanding (without shares in treasury)" |
| Dam de-characterization and ARO: current; non-current | US$1,119 m; 5,032 | 30 Jun 2026 | Table 11 | Filed · Q2 2026 interim FS · Balance sheet (current) · "De-characterization of dams and asset retirement obligations"; Filed · Q2 2026 interim FS · Balance sheet (non-current) · "De-characterization of dams and asset retirement obligations" |
| Streaming liability; minorities (book); investments in associates | US$1,944 m; 935; 5,264 | 30 Jun 2026 | Table 11 | Filed · Q2 2026 interim FS · Balance sheet · "Streaming transactions"; Filed · Q2 2026 interim FS · Balance sheet · "Equity attributable to noncontrolling interests"; Filed · Q2 2026 interim FS · Balance sheet · "Investments" |
| Taxes payable; receivables; inventories | US$890 m; 2,614; 6,264 | 30 Jun 2026 | Table 11; gap register | Filed · Q2 2026 interim FS · Balance sheet · "Taxes payable"; Filed · Q2 2026 interim FS · Balance sheet · "Accounts receivable"; Filed · Q2 2026 interim FS · Balance sheet · "Inventories" |
| Buybacks paid 6M26; remuneration approved Jul 2026 | US$214 m; 1,701 | 6M26 | Section 3; Dim 6 | Filed · Q2 2026 interim FS · Cash flow statement · "Shares buyback program"; Filed · Q2 2026 interim FS · Subsequent events · "approved shareholder remuneration in the total amount of US$1,701" |
| Samarco interest; Thompson equity interest | 50%; 18.9% | 30 Jun 2026 | Table 8 | Filed · Q2 2026 interim FS · Samarco note · "its 50% interest in Samarco"; Filed · Q2 2026 interim FS · Note · "hold an 18.9% equity interest in the new company" |
| 2Q26 performance release | ||||
| Adjusted EBITDA 2Q26; free cash flow 6M26 | US$3,676 m; 2,318 | 2Q26; 6M26 | Table 13 calibration; Table 4 | Filed · 2Q26 performance release · Selected financial indicators · "Adjusted EBITDA"; Filed · 2Q26 performance release · Selected financial indicators · "Free cash flow" |
| Gross debt; net debt incl. leases; cash and short-term investments | US$18,304 m; 13,173; 5,765 | 30 Jun 2026 | Table 11; Section 3 | Filed · 2Q26 performance release · Net debt · "Gross debt"; Filed · 2Q26 performance release · Net debt · "Net debt"; Filed · 2Q26 performance release · Net debt · "Cash, cash equivalents and short-term investments" |
| Expanded net debt; net debt / LTM EBITDA; average maturity | US$16,677 m; 0.8×; 8.1 years | 30 Jun 2026 | Table 11; Dim 5 | Filed · 2Q26 performance release · Net debt · "Expanded net debt"; Filed · 2Q26 performance release · Debt indicators · "Net debt / adjusted LTM EBITDA (x)"; Filed · 2Q26 performance release · Net debt · "Average debt maturity (years)" |
| Iron ore C1 2Q26; all-in cost guidance 2026 | US$24.1/t; US$58–62/t | 2Q26; 2026 | Table 9, block 1 | Filed · 2Q26 performance release · Highlights · "C1 cash cost was US$ 24.1/t"; Filed · 2Q26 performance release · Iron ore · "The iron ore all-in cost guidance has been revised to US$58-62/t" |
| All-in cost guidance 2026: copper; nickel | US$0–500/t; US$10,000–11,500/t | 2026 | Table 9, blocks 2–3 | Filed · 2Q26 performance release · Copper · "The copper all-in cost guidance for 2026 was revised down to US$ 0-500/t"; Filed · 2Q26 performance release · Highlights · "US$ 10,000-11,500/t" |
| 6M26 revenue: Iron Ore Solutions; Vale Base Metals | US$14,763 m; 4,993 | 6M26 | Archetype; Figures 2–3 | Filed · 2Q26 performance release · Net operating revenue by business area · "Iron Ore Solutions"; Filed · 2Q26 performance release · Net operating revenue by business area · "Vale Base Metals" |
| BRL per US$: 30 Jun 2026; 2Q26 average | R$5.1766; R$5.0494 per US$ | 30 Jun 2026; 2Q26 | FX sensitivity | Filed · 2Q26 performance release · Annex · "BRL-USD exchange rate of 5.1766"; Filed · 2Q26 performance release · Annex · "Average 5.0494" |
| 2Q26 production and sales report | ||||
| Iron ore production 6M26; 2026 guidance | 153,930 kt; 335–345 Mt | 6M26; 2026 | Table 9, block 1; Table 13 | Filed · 2Q26 production and sales report · Summary · "Iron ore" · p.1; Filed · 2Q26 production and sales report · Summary · "2026 guidance" · p.1 |
| Copper production 2Q26; 2026 guidance | 98.4 kt; 350–380 kt | 2Q26; 2026 | Table 9, block 2; Table 13 | Filed · 2Q26 production and sales report · Summary · "Copper 98.4 92.6" · p.1; Filed · 2Q26 production and sales report · Summary · "350-380 kt" · p.1 |
| Nickel production 2Q26; 2026 guidance | 42.0 kt; 175–200 kt | 2Q26; 2026 | Table 9, block 3; Table 13 | Filed · 2Q26 production and sales report · Summary · "42.0 40.3" · p.1; Filed · 2Q26 production and sales report · Summary · "175-200 kt" · p.1 |
| 6-K 31 Jul 2026 (cost guidance) | ||||
| Iron ore C1 cash cost guidance 2026 (revised) | US$22.5–23.5/t | 2026 | Table 9, block 1; FX sensitivity | Filed · 6-K 31 Jul 2026 (cost guidance) · "C1 cash cost of iron ore" |
| Market and price series | ||||
| Iron ore 62% Fe trailing averages: 3-, 6-, 12-month | US$99.34; 102.84; 103.90/t | 21 Aug 2026 | Opening block — the grid price | Market · Yahoo Finance · "TIO=F" 62% Fe front-month daily close · 21 Aug 2026 |
Source: the Vale filings named in each band — the 2025, 2024 and 2023 Forms 20-F on SEC EDGAR, the Q2 2026 interim financial statements, the 2Q26 performance release, the 2Q26 production and sales report and the 31 July 2026 cost-guidance 6-K; iron ore averages from Yahoo Finance (TIO=F) to 21 August 2026. The load-bearing inputs open Section 7 (Table 6).
10.2 Disclaimer & disclosure
This analysis is for informational purposes only and is not investment advice, a recommendation, or an offer to buy or sell any security. It is a point-in-time snapshot as of 23 August 2026: the ADR price, market capitalisation, enterprise value, multiples and valuation read all move. Production, reserve, resource and forecast figures are estimates, prepared on the codes and bases stated beside each table, and forward figures are not achieved results; the NAV, EV/EBITDA and FCF-yield valuation is an author-built model, not company figures. The Quality × Value verdict is an analytical read, never an instruction to the reader. This report was prepared with AI assistance; figures were sourced from primary filings and reviewed, but readers should verify every number against the original documents before acting on it. The author holds no position in Vale S.A. or in any company named here. Please do your own research and consult a licensed financial adviser.