Kinross Gold (KGC) — Stock Analysis 2026 [2.9]
Analysis as of 8 August 2026. Kinross Gold stock analysis. Price deck: base gold US$4,500/oz — the fixed-grid price nearest the representative trailing average (3-month US$4,271, 6-month US$4,567 and 12-month US$4,335, COMEX daily closes to 6 August 2026) — with every grid price run as a scenario: extreme bear US$3,000, deep bear US$3,500, bear US$4,000, base US$4,500 and bull US$5,000/oz; silver stays a by-product inside the filed costs; analyst consensus is a 0% cross-check (n/d) — no forecast and no spot price enter the value. At US$27.64 a share (NYSE close, 7 August 2026, the last close before the as-of date) the market-implied deck is US$4,046/oz gold. Fundamentals are the FY2025 filings and the Q2 2026 results of 29 July 2026. Refreshed on each quarterly report and on material events. Rating: ★★★ Average / Modestly undervalued (wide band).
Kinross Gold is a senior gold miner — scored and valued here as a mining producer in precious metals — that produced 2.07 million gold-equivalent ounces in 2025 from six mines in the United States, Brazil, Mauritania and Chile. The thesis in one line: a net-cash producer priced below a three-method fair value, whose one structural weakness is a reserve life of about ten years. Why now: Q2 2026 brought US$726.8 million of attributable free cash flow and, on 29 July 2026, refreshed economics for Lobo-Marte, the project that holds a third of its reserves. To screen Kinross against every listed gold producer on cost, reserve life and stage, see Metal Pilot’s gold mining stock screener.
1. Snapshot & thesis
Kinross Gold Corporation (NYSE: KGC; TSX: K), based in Toronto, is a mining producer in precious metals: six producing mines — Tasiast (Mauritania), Paracatu (Brazil), Fort Knox with the Manh Choh joint venture (Alaska), Round Mountain and Bald Mountain (Nevada) and La Coipa (Chile) — plus the Lobo-Marte feasibility project in Chile and the Great Bear advanced-exploration project in Ontario. (GEO = gold-equivalent ounce; AISC = all-in sustaining cost; P&P = proven and probable reserves; M&I = measured and indicated resources; koz and Moz = thousand and million ounces.)
Figure 1. Kinross Gold in numbers
undervalued
Figure data: Table 1.
Table 1. Kinross Gold in numbers
| Metric | Value | As of |
|---|---|---|
| Share price · market value (fully diluted) | US$27.64 · US$32,924.8 m | 7 Aug 2026 |
| Fully diluted shares | 1,191.2 m | 28 Jul 2026 |
| 2025 production (GEO) · H1 2026 AISC | 2,070 koz · US$1,777/oz | FY2025 · H1 2026 |
| 2026 guidance — production · AISC | 2.0 Moz (±5%) · US$1,730/oz | 29 Jul 2026 |
| Cash margin (metal sales less production cost) | US$4,704.7 m (66.7%) | FY2025 |
| P&P gold reserves · reserve life | 20.9 Moz · ≈10.1 years | 31 Dec 2025 |
| Net cash · undrawn facilities | US$1,917.6 m · US$1,708.1 m | 30 Jun 2026 |
| NAV/share at the US$4,500 base · P/NAV | US$24.38 · 1.13× | 8 Aug 2026 |
| Blended fair value (grid range) | US$32.68 (US$14.98–38.23) | 8 Aug 2026 |
| Market-implied gold deck | US$4,046/oz | 8 Aug 2026 |
| FCF before growth capital · yield | US$4,248.6 m · 12.9% | next twelve months |
| Quality rating | 2.9/5 Average | 8 Aug 2026 |
| Valuation read · implied return | Modestly undervalued (wide band) · implied +18.2% | 8 Aug 2026 |
Source: Kinross FY2025 Annual Information Form, MD&A and statements (production, reserves, cash margin) and Q2 2026 results and MD&A (AISC, guidance, net cash, shares); price per the Yahoo Finance KGC daily series; value rows from this analysis’ model (Section 7). Production and reserves are attributable.
Thesis in brief. Bull: the cash-flow methods carry the value — a 12.9% free-cash-flow yield before growth capital at the base deck, net cash, and a buyback that cancelled 9.6 million shares in four months. Bear: the asset value does not — at US$24.38 a share, net asset value sits below the price, because the mines hold about ten years of reserves and cost more each year. What tips it: whether Lobo-Marte and Great Bear turn into reserves before the existing mines run down.
How to read this analysis: the statcards and Section 9 carry the verdict; Sections 2–6 carry the evidence, and Section 7 the valuation.
2. Assets & operations
Kinross mines gold; silver is a by-product carried inside the gold-equivalent (GEO) cost lines. For how gold is priced and why producers are a geared expression of it, see Gold — A Complete Market Guide.
2.1 Portfolio overview
Table 2. Asset base — Kinross share, sorted by base-case value
| Asset | Country | Stage | Interest | 2025 output (GEO) | P&P gold, 31 Dec 2025 | Life (model) | 2025 production cost | Listing / operator |
|---|---|---|---|---|---|---|---|---|
| Tasiast | Mauritania | Producing | 100% | 503 koz | 4.40 Moz at 1.3 g/t | 8.1 yrs | US$884/oz | Kinross Gold (operator) |
| Paracatu | Brazil | Producing | 100% | 601 koz | 4.84 Moz at 0.4 g/t | 7.5 yrs | US$978/oz | Kinross Gold (operator) |
| Fort Knox incl. Manh Choh | USA (Alaska) | Producing | 100%; Manh Choh 70% | 411 koz | 1.42 Moz | 2.9 yrs | US$1,339/oz (100% basis) | Kinross Gold (operator) |
| Round Mountain | USA (Nevada) | Producing | 100% | 143 koz | 1.89 Moz at 1.3 g/t | 12.6 yrs | US$1,918/oz | Kinross Gold (operator) |
| Bald Mountain | USA (Nevada) | Producing | 100% | 179 koz | 1.23 Moz at 0.6 g/t | 6.2 yrs | US$1,198/oz | Kinross Gold (operator) |
| La Coipa | Chile | Producing | 100% | 232 koz | 0.44 Moz at 1.8 g/t | 1.3 yrs | US$1,208/oz | Kinross Gold (operator) |
| Lobo-Marte | Chile | Feasibility (2021 FS, refreshed 2026) | 100% | — | 6.73 Moz at 1.3 g/t | n/d | n/d | Kinross Gold (operator) |
| Great Bear | Canada (Ontario) | Advanced exploration | 100% | — | none (M&I 2.71 Moz) | n/d | n/d | Kinross Gold (operator) |
| Group | 2,070 koz | 20.94 Moz | ≈10.1 yrs | US$1,135/oz | Public (NYSE: KGC; TSX: K) |
Source: Kinross FY2025 Annual Information Form and MD&A (Form 40-F) — production by mine (AIF p.13), proven and probable reserves by asset (AIF p.16, NI 43-101, effective 31 December 2025), production cost of sales per GEO sold by mine (MD&A p.15–20, 100% basis), group attributable cost (MD&A p.46); Lobo-Marte reserves AIF p.16, its refreshed economics per the 29 July 2026 FS refresh release; lives are the model’s reserve-over-rate lives (Section 7). Interest in Lobo-Marte and Great Bear Derived: the Kinross-share reserve and resource rows equal the project totals. Mineral resources are not mineral reserves.
Concentration. Tasiast and Paracatu produced 1,105 koz in 2025, 53% of the group, and carry US$16.4 billion of the US$29.6 billion enterprise net asset value. By country, the United States gives 35% of output, Brazil 29%, Mauritania 24% and Chile 11%. Strip out undeveloped Lobo-Marte and the producing mines hold 14.2 Moz of reserves — under seven years at the 2025 rate.
2.2 Revenue split
Figure 2. Sales by metal, 2025 (share of gold-equivalent ounces sold)
Figure data: Kinross FY2025 MD&A, consolidated results p.3. Derived: silver converted at 70 oz to the gold ounce — the ceiling of its share at any higher gold/silver ratio.
Figure 3. Gold-equivalent production by mine, 2025
Figure data: Kinross FY2025 Annual Information Form, production during the last three years, p.13. Revenue by mine is not in the source set, so production stands in for it (Section 10.1).
2.3 Tasiast
Tasiast, in Mauritania, is wholly owned and operated by Kinross and is the most valuable mine in the model: US$8,393.1 million at the base deck, taxed at 25%. It produced 503 koz in 2025, down from 622 koz, as grade processed fell from 2.44 to 1.97 g/t and production cost rose from US$681 to US$884/oz; Q2 2026 ran at US$990/oz. Reserves are 102,765 kt at 1.3 g/t for 4.40 Moz (NI 43-101, 31 December 2025), with 2.38 Moz inferred beyond them. Royalty and state-interest terms are not in the source set. The asset risk is grade: each step down lifts the unit cost of the group’s cheapest ounces.
2.4 Paracatu
Paracatu, in Minas Gerais, Brazil, is the largest producer — 601 koz in 2025, up from 529 koz as grade rose from 0.36 to 0.43 g/t and cost eased from US$1,039 to US$978/oz. It is a bulk-tonnage pit: 399,642 kt of reserves at 0.4 g/t hold 4.84 Moz, with 3.52 Moz measured and indicated. The model values it at US$7,975.2 million under Brazil’s 34% rate. The risk is the margin a 0.4 g/t orebody leaves when costs rise; Kinross hedges part of its real exposure with zero-cost collars (Section 3).
2.5 Fort Knox and Manh Choh
Fort Knox, in Alaska, is 100% owned; its mill also treats ore trucked from Manh Choh, a 70% joint venture. Together they produced 411 koz in 2025, up from 377 koz, at 1.75 g/t and US$1,339/oz on a 100% basis. Reserves are thin — 976 koz at Fort Knox (0.4 g/t) and 444 koz at Manh Choh (6.8 g/t) — giving the model a 2.9-year life and US$2,482.1 million of value. The risk is that life: without conversion of the 2.40 Moz measured and indicated at Fort Knox, the mill runs short of feed within three years.
2.6 La Coipa
La Coipa, in Chile, is wholly owned and produced 232 koz in 2025 at US$1,208/oz, up from US$959. Its 436 koz of reserves at 1.8 g/t, with silver, last 1.3 years at that rate, so the model gives it US$628.3 million. The 2.13 Moz measured and indicated resource is its only route to a longer life.
2.7 Lobo-Marte
Lobo-Marte, also in Chile, holds 6.73 Moz of proven and probable reserves at 1.3 g/t — a third of the group’s total — and 670 koz inferred. The 29 July 2026 refresh of its 2021 feasibility study puts initial capital at about US$1.8 billion over three years, with an after-tax IRR of 26% and a 2.3-year payback at US$4,100/oz. It gives no net present value; the environmental impact assessment has been under review since Q2 2026, first gold is targeted for the early 2030s, and no construction decision is dated. The model leaves it at n/d and bounds it at up to US$1.70 a share at a developer’s US$300 per reserve ounce.
2.8 Great Bear
Great Bear, near Red Lake in Ontario, carries 2.71 Moz measured and indicated and 4.29 Moz inferred at 4.1 g/t (32,396 kt), none of it yet in reserves. Kinross’ Q1 2026 MD&A describes a path to first production in 2028; no study, remaining-capital figure or approval list is in the source set. The model carries it in the resource row — measured and indicated ounces at a quarter of the in-plan value per ounce, inferred at nil.
2.9 Nevada: Round Mountain and Bald Mountain
The two Nevada mines produced 322 koz in 2025, 16% of the group. Round Mountain fell from 215 to 143 koz as grade fell to 0.63 g/t and cost rose to US$1,918/oz, the group’s highest; its 1.89 Moz of reserves give a 12.6-year model life and US$2,448.2 million. Bald Mountain, a heap leach, made 179 koz at US$1,198/oz on 1.23 Moz of reserves — US$2,286.3 million over 6.2 years. Growth capital funds four projects the Q2 2026 MD&A names — Kettle River–Curlew, Round Mountain Phase X, Bald Mountain Redbird and Great Bear — which lifted H1 2026 capital spending to US$694.2 million. Curlew, Phase X and Redbird 2 went to construction on 15 January 2026 (AIF p.9), but the source set holds no study figures: Curlew Basin’s 409 koz of measured and indicated ounces stay out of the resource row, Manh Choh’s 46 koz are in it.
2.10 Production, reserves & costs
Figure 4. Group gold-equivalent production, 2023–2026
Figure data: Kinross FY2025 Annual Information Form, p.13 (2023–2025); 2026 guidance per the Q2 2026 results and MD&A outlook.
Output has held near 2 Moz for three years. Reserves at 31 December 2025 were 20.94 Moz of gold — 5.90 Moz proven and 15.04 Moz probable (NI 43-101) — and 11.6 Moz of silver; a replacement ratio needs the prior year’s reserve, which is not in the source set. Unit cost is rising: attributable production cost per GEO went from US$942 (2023) to US$1,021 and US$1,135 (2025), with US$1,360 guided for 2026; all-in sustaining cost was US$1,777/oz in H1 2026 against US$1,424 a year earlier, and US$1,730 is guided.
Figure 5. Reserves and resources by operating mine, 31 December 2025 (Kinross’ share)
Figure data: Kinross FY2025 Annual Information Form (Form 40-F, Ex. 99.1), “Mineral Reserve and Mineral Resource Statement” (pp.16–17) — proven and probable gold reserves (as in Table 2) and measured and indicated gold resources, Kinross’ share, which Kinross reports exclusive of reserves; NI 43-101 / CIM, effective 31 December 2025, reserves at US$2,000/oz and resources at US$2,500/oz. Fort Knox includes Manh Choh (70%). Not drawn: Lobo-Marte (6.73 Moz, feasibility) and the resource-only Great Bear (2.71 Moz M&I), Maricunga and Curlew Basin; the six sum to 14.21 Moz of reserves and 14.49 Moz of M&I against the group’s 20.94 Moz and 27.50 Moz. Inferred resources (16.6 Moz group-wide) are not drawn.
By mine (Figure 5), Paracatu and Tasiast carry two-thirds of the operating reserve. The three short-life mines are where the resource sits: Fort Knox, Bald Mountain and La Coipa each hold more M&I than reserve — La Coipa nearly five times — which is what the short lives in Table 2 depend on converting.
2.11 Peer positioning
The peer set for every star in Section 9 is three senior gold producers with FY2025 filings, none in a pending deal: Agnico Eagle, Newmont and Barrick Mining.
Table 3. Peer positioning — quality metrics, FY2025
| Company | Listing | Gold production | AISC | P&P gold | Reserve life |
|---|---|---|---|---|---|
| Agnico Eagle | Public (NYSE: AEM; TSX: AEM) | 3,447 koz (payable) | US$1,339/oz | 55.4 Moz | ≈16.1 yrs |
| Newmont | Public (NYSE: NEM; TSX: NGT) | 5,889 koz (attributable) | n/d | n/d | n/d |
| Barrick Mining | Public (NYSE: B; TSX: ABX) | 3,255 koz (attributable) | n/d | n/d | n/d |
| Kinross Gold | Public (NYSE: KGC; TSX: K) | 2,070 koz (GEO) | US$1,571/oz | 20.9 Moz | ≈10.1 yrs |
Source: Agnico Eagle FY2025 annual report and MD&A (production p.17, by-product AISC p.33, reserves p.59); Barrick FY2025 MD&A p.6; Newmont FY2025 Form 10-K, Item 1; Kinross per Table 2 and the FY2025 MD&A (attributable AISC per GEO sold, p.3). Lives Derived as reserves over production. AISC definitions differ between issuers.
Kinross is the smallest of the four by output, and on the one peer with comparable figures it has the shorter life — about ten years against Agnico Eagle’s sixteen — and an AISC US$232/oz higher on the same year.
3. Financials & balance sheet
Table 4. Financial summary, 2022–H1 2026 (US$ m unless stated; years ended 31 December)
| Metric | 2022 | 2023 | 2024 | 2025 | H1 2026 |
|---|---|---|---|---|---|
| Metal sales | 3,455.1 | 4,239.7 | 5,148.8 | 7,051.1 | 4,645.8 |
| YoY % | n/d | +22.7% | +21.4% | +36.9% | +44.0% |
| Cash margin (sales less production cost) | 1,649.4 (47.7%) | 2,185.3 (51.5%) | 2,951.7 (57.3%) | 4,704.7 (66.7%) | 3,280.6 (70.6%) |
| Net earnings attributable to common shareholders | (605.2) | 416.3 | 948.8 | 2,390.1 | 1,687.2 |
| EPS, diluted (US$) | (0.47) | 0.34 | 0.77 | 1.95 | 1.41 |
| Operating cash flow | 1,002.5 | 1,605.3 | 2,446.4 | 3,760.5 | 2,285.4 |
| Capex (of which sustaining) | 764.2 (n/d) | 1,098.3 (n/d) | 1,075.5 (n/d) | 1,194.2 (587.8) | 694.2 (n/d) |
| Free cash flow (operating cash flow less capex) | 238.3 | 507.0 | 1,370.9 | 2,566.3 | 1,591.2 |
| Net debt / (net cash) | n/d | n/d | n/d | (1,004.1) | (1,917.6) |
| Net debt / EBITDA | n/d | n/d | n/d | net cash | net cash |
| Diluted shares (m, weighted) | 1,292.8 | 1,236.7 | 1,234.5 | 1,224.6 | 1,199.1 |
| Dividend per share (US$) | n/d | n/d | n/d | n/d | 0.04 a quarter |
Source: Kinross FY2025 and FY2023 audited financial statements and MD&A (Form 40-F exhibits) — statements of operations p.6–7 (earnings and EPS attributable to common shareholders), cash flow p.8–9, earnings per share p.34 and p.47; the FY2024 MD&A p.3 for 2022–2023 capex; Q2 2026 MD&A and interim statements for H1 2026 and 30 June 2026. Cash margin, free cash flow (operating cash flow less capex) and net cash Derived. FY2021 needs the FY2022 Form 40-F, not in the source set; n/d marks a line the source set does not carry.
Figure 6. Operating cash flow, 2022–2025
Figure data: Table 4.
Metal sales doubled between 2022 and 2025 while the cash margin rose from 48% to 67% of sales, and 71% in H1 2026. Operating cash flow ran at 1.6× attributable net earnings in 2025; the 2022 loss came from discontinued operations. For how these lines are read, see Financial Metrics for Commodity Investing.
Cost deck. 2026 guidance is 2.0 Moz (±5%) at a production cost of US$1,360 and an AISC of US$1,730 per GEO, capital of US$1,500 million (US$450 million sustaining), exploration of US$185 million and taxes paid of US$1,125 million — up from US$418.4 million paid in 2025. The model runs each mine’s 2025 cost plus US$225/oz sustaining, in real terms, and capitalises US$290 million a year of corporate cost. A US$430.6 million deferred tax asset on losses remains; royalty and other price-linked cost lines are not itemised in the source set.
Balance sheet. At 30 June 2026 cash was US$2,656.4 million against US$738.8 million of long-term debt, all of it senior notes (US$500 million at 6.25% due 2033 and US$250 million at 6.875% due 2041) — net cash of US$1,917.6 million before leases (n/d). US$1,492.9 million of the revolver and US$215.2 million of the EDC facility were undrawn, and the financial covenant was met. With net cash, a lower gold price tests cash flow rather than leverage. The reclamation provision is US$986.6 million.
Hedges. No gold is hedged. The book is currency: Brazilian real collars of US$123.0, 135.6 and 42.0 million for 2026–2028 (put strikes 5.32–5.50, call strikes 6.45–7.43), Chilean peso collars of US$52.5 and 60.0 million for 2026–2027 (puts 873–924, calls 972–1,014) and Canadian dollar forwards of US$117.0 and 290.4 million at 1.36 and 1.37.
Capital returns. Kinross targets returning 40% of free cash flow. It repurchased and cancelled 7.9 million shares in Q2 2026 and 1.7 million after the quarter, and declared a US$0.04 quarterly dividend on 29 July 2026; 1,186.2 million shares were outstanding on 28 July 2026.
4. Management, strategy & corporate structure
4.1 Management & governance
J. Paul Rollinson has been Chief Executive Officer since 1 August 2012; Andrea S. Freeborough is Executive Vice-President and Chief Financial Officer. Kelly J. Osborne chairs the board as an independent director. The Audit and Risk Committee has five directors under Glenn A. Ives, and Alice Wong joined the board on 29 July 2026, the day Kinross named Bernard Wessels Chief Operating Officer in succession to Claude Schimper. Board size, the independence count, the other committees and the officers’ prior roles sit in the 2026 management information circular, which is not in the source set. The FY2025 statements’ Note 19 lists related-party dealings with subsidiaries, joint ventures and key management personnel only.
4.2 Strategy
The frame is to hold about 2 Moz a year from six mines, return 40% of free cash flow, and fund two projects from cash. Great Bear is on a path to first production in 2028 (Q1 2026 MD&A); Lobo-Marte’s feasibility economics were refreshed on 29 July 2026, without a construction decision. The dated targets are 2026’s: 2.0 Moz at US$1,730/oz AISC, US$1,500 million of capital and US$185 million of exploration.
4.3 Ownership & structure
Table 5. Capital structure
| Item | Value | As of |
|---|---|---|
| Common shares outstanding | 1,186.2 m | 28 Jul 2026 |
| RSUs · RPSUs | 2.8 m · 2.2 m | 30 Jun 2026 |
| Fully diluted shares (treasury method) | 1,191.2 m | 28 Jul 2026 |
| Joint venture | Manh Choh, 70% Kinross | 31 Dec 2025 |
| Non-controlling interests | US$121.3 m | 30 Jun 2026 |
| Long-term debt · net cash | US$738.8 m · US$1,917.6 m | 30 Jun 2026 |
| Holders of 5% or more | n/d | — |
Source: Kinross Q2 2026 MD&A and interim statements (liquidity and balance sheet); FY2025 Annual Information Form p.13 (Manh Choh). Fully diluted count Derived. Listed: Public (NYSE: KGC; TSX: K).
The mines are wholly owned except Manh Choh, and the source set names no controlling holder. The terms of past acquisitions, Great Bear’s included, are not in the filings read.
5. ESG & sustainability
Table 6. ESG snapshot
| Pillar | Program or measure | Figure | As of |
|---|---|---|---|
| Disclosure | 2025 Sustainability Report, aligned with the SASB voluntary standards | published 1 Jun 2026 | 2025 |
| Climate | Greenhouse-gas emissions against 2024 | −2.4% (estimated) | 2025 |
| Community | Economic benefits generated for host countries | US$4.9 bn | 2025 |
| Safety | Recordable injury rate | n/d | — |
| Tailings | Facilities and consequence ratings | n/d | — |
Source: Kinross 2025 Sustainability Report release (Form 6-K, 1 June 2026), highlights. The report itself is not in the source set.
Kinross reports to SASB and puts its 2025 contribution to host countries at US$4.9 billion; emissions fell an estimated 2.4% on 2024. The safety rate, the tailings facilities and a decarbonisation target with its baseline are in the report, not in the source set, so the dimension is scored on the disclosed highlights alone (Section 9).
6. Risks
Table 7. Risk register
| Risk | Type | Likelihood / impact (1–5) | Exposure | Mitigant |
|---|---|---|---|---|
| Reserve lives run short (lives −10%: NAV US$22.15 a share) | Structural | 4 / 4 | Fort Knox 2.9 yrs, La Coipa 1.3 yrs; group ≈10.1 yrs | 27.5 Moz measured and indicated; Great Bear, Lobo-Marte |
| Gold price falls (US$3,000/oz: blend US$14.98) | Commodity | 3 / 5 | The whole equity; no gold hedges | US$1,917.6 m net cash |
| Unit cost rises (guided step: NAV US$22.47) | Operational | 4 / 3 | Round Mountain US$1,918/oz; group US$1,360 guided | Tasiast and Paracatu below US$1,000/oz |
| Great Bear permitting or schedule slips | Development | 3 / 3 | First production path 2028; inside the US$7.3 bn resource credit | Net cash funds it |
| Lobo-Marte not sanctioned, or overruns | Development | 2 / 3 | US$1.8 bn initial capital; NPV n/d | 26% IRR at US$4,100/oz |
| Mauritania fiscal or security change | Jurisdiction | 2 / 4 | Tasiast: 24% of output, US$8.4 bn of value | The Dim 8 term of the driver line |
| Brazil and Chile tax or currency | Jurisdiction / FX | 3 / 2 | Paracatu at a 34% tax rate | Real and peso collars |
| Licence to operate, disclosure gaps | ESG | 2 / 2 | Every site; safety and tailings n/d | SASB-aligned reporting |
Source: exposures from Tables 2, 4 and 13 and the FY2025 Form 40-F; likelihood and impact are this analysis’ assessment, not disclosed figures.
Figure 7. Risk matrix — likelihood against impact
Rare
Likely
Figure data: Table 7; each point prints likelihood × impact, and the shaded zone is the high-likelihood, high-impact quadrant.
The first three rows are the ones the valuation prices: shorter lives, higher costs and a lower gold price move net asset value by US$1.15–2.23 a share each, and the grid runs from US$14.98 to US$38.23 (Section 7). The rest sit where value lies outside the reserves — Great Bear in the resource credit, Lobo-Marte at n/d — or in Mauritania, home of the largest single value.
7. Valuation
Valuation as of 8 August 2026, in US dollars. Horizon: spot fair value. Price deck: base gold US$4,500/oz — the 3-month, 6-month and 12-month trailing averages (US$4,271, US$4,567 and US$4,335, COMEX daily closes to 6 August 2026) all sit nearest that price on the US$3,000–5,000 grid; the scenarios run from US$3,000 to US$5,000 in US$500 steps. Silver is a by-product, carried inside the gold-equivalent cost lines. Discount rate 5% real, after tax — the precious-metal producer rate, sensitised at 4% and 7%. Share price US$27.64 (NYSE close, 7 August 2026, the last close before the as-of date) on 1,191.2 million fully diluted shares. Every asset value is attributable — Kinross’ share.
Kinross is valued on the producer (mining) archetype of How to Value Commodity Stocks, as a sum-of-the-parts: six producing mines — Tasiast in Mauritania, Paracatu in Brazil, La Coipa in Chile, and Fort Knox, Round Mountain and Bald Mountain in the United States — less the growth capital guided for 2026, plus a risked credit for the measured and indicated ounces that sit outside every mine plan, Great Bear’s among them. Net asset value carries half the weight, EV/EBITDA on the next twelve months 30% and free-cash-flow yield support 20% — the producer set, unchanged.
Each mine is valued on what it did in 2025, not on a forecast. The annual information form gives every operation’s gold-equivalent output and the MD&A its production cost per ounce sold. Kinross does not report all-in sustaining cost by mine, so the sustaining capital guided for 2026 is spread evenly across the ounces — US$225 an ounce on every mine — and the rest of the guided all-in cost, about US$290 million a year of corporate and other spending, is charged once in the bridge rather than mine by mine. Each mine then runs for as long as its reserves last at the 2025 rate, taxed at its country’s statutory rate with no depreciation shield. That is a deliberately plain build: it gives no credit for reserve growth inside a mine and none for a cost fall the company has not yet delivered.
Two pieces of the story sit outside that build. Lobo-Marte holds 6.7 Moz of reserves — a third of the group’s — but the July 2026 feasibility refresh publishes an internal rate of return and a payback, not a net present value, so the project is carried as a named gap with a bound, not as a number. Great Bear has no study on file at all; its 2.7 Moz of measured and indicated ounces enter through the resource credit at the floor of the conversion band, and its 4.3 Moz of inferred ounces at nothing.
Table 8. Load-bearing inputs — the filed figures the valuation moves on (full source register: Table 22)
| Input | Value | Where §7 uses it | Source |
|---|---|---|---|
| 2025 gold-equivalent production — Tasiast; Paracatu; Fort Knox (incl. Manh Choh at 70%); Bald Mountain; Round Mountain; La Coipa (oz) | 503,429; 601,318; 410,822; 179,169; 143,402; 231,770 | Table 11, production rows | Filed | FY2025 AIF | total gold equivalent production (in ounces) during the last three years | “Tasiast” | p.13 |
| FY2025 production cost of sales per GEO sold — same order (US$/oz, 100% basis) | $884; $978; $1,339; $1,198; $1,918; $1,208 | Table 11, margin rows | Filed | FY2025 MD&A | Tasiast – Mauritania | “Production cost of sales per equivalent ounce sold” | p.15 (Tasiast; the other mines p.16–20) |
| P&P gold reserves, 31 Dec 2025, Kinross share — Tasiast; Paracatu; Fort Knox; Manh Choh; Bald Mountain; Round Mountain; La Coipa; Lobo Marte; total (koz) | 4,401; 4,839; 976; 444; 1,225; 1,888; 436; 6,733; 20,942 | Table 11, life rows and resource block; Lobo-Marte gap | Filed | FY2025 AIF | Proven and Probable Mineral Reserves | “Tasiast” | p.16 |
| M&I gold resources, 31 Dec 2025 (exclusive of reserves) — the six mines (same order); Great Bear; Manh Choh; Maricunga; Lobo Marte; Curlew Basin; total (koz) | 2,396; 3,522; 2,400; 2,548; 1,446; 2,128; 2,713; 46; 7,140; 2,752; 409; 27,499 | Table 11, resource-conversion block (Maricunga, Lobo Marte and Curlew Basin excluded) | Filed | FY2025 AIF | Measured and Indicated Mineral Resources | “Tasiast” | p.17 |
| Inferred gold resources, 31 Dec 2025 — Great Bear; total (koz) | 4,291; 16,633 | Table 11, inferred at 0.0 | Filed | FY2025 AIF | Inferred Mineral Resources | “Great Bear” | p.18 |
| 2026 guidance — attributable gold-equivalent production; production cost of sales per GEO; AISC per GEO | 2.0 Moz; $1,360/oz; $1,730/oz | Tables 15 and 17; the sustaining and corporate lines | Filed | Q2 2026 MD&A | Outlook | “guidance of 2.0 million (+/- 5%) attributable” | p.1 |
| 2026 guidance — attributable capital expenditures; of which sustaining (US$ m) | $1,500; $450 | Table 11, development capital; Table 17 | Filed | FY2025 MD&A | Outlook | “Attributable capital expenditures for 2026 are forecasted” | p.12 |
| Lobo-Marte feasibility refresh — initial capital; after-tax IRR; payback at US$4,100/oz | $1.8 bn; 26%; 2.3 years | Table 12, Lobo-Marte row; gap register (1) | Filed | Lobo-Marte FS refresh release | Highlights | “initial capital expenditures of approximately $1.8 billion” | p.1 |
| Cash and cash equivalents; total long-term debt — 30 Jun 2026 (US$ m) | $2,656.4; $738.8 | Table 13, net cash | Filed | Q2 2026 MD&A and interim FS | Interim condensed consolidated balance sheets | “Cash and cash equivalents” | p.1; debt: Liquidity | “Total long-term debt” | p.1 |
| Reclamation and remediation obligations, 30 Jun 2026 | $986.6 m | Table 13, reclamation | Filed | Q2 2026 MD&A and interim FS | Provisions | “Reclamation and remediation obligations” | p.1 |
| Inventories (31 Mar 2026); receivables; payables; current income tax payable (30 Jun 2026) (US$ m) | $1,315.2; $130.1; $783.4; $587.5 | Table 13, working capital (first three) and current income tax payable | Filed | Q2 2026 MD&A and interim FS | Interim condensed consolidated balance sheets | “Accounts receivable and prepaid assets” | p.1; inventories: Interim condensed consolidated balance sheets | “Inventories” | p.1 |
| Long-term investments; non-controlling interests — 30 Jun 2026 (US$ m) | $97.6; $121.3 | Table 13, investments; minorities in rows | Filed | Q2 2026 MD&A and interim FS | Interim condensed consolidated balance sheets | “Long-term investments” | p.1 |
| Common shares outstanding, 28 Jul 2026; RSUs; RPSUs (m) | 1,186.2; 2.8; 2.2 | Table 13, fully diluted shares | Filed | Q2 2026 MD&A and interim FS | Liquidity | “million common shares of the” | p.1 |
| Depreciation, depletion and amortization, H1 2026 (US$ m) | $551.2 | Table 17, cash tax base (× 2) | Filed | Q2 2026 MD&A and interim FS | Consolidated financial and operating highlights | “Depreciation, depletion and amortization” | p.1 |
Source: the Kinross Gold filings named in each row; the full register closes §10.1 as Table 22.
8. Near-term catalysts (1–3 years)
Table 20. Near-term catalysts
| Catalyst | Timing (company guidance) | Why it benefits Kinross |
|---|---|---|
| 2026 guidance delivered — 2.0 Moz at US$1,730/oz AISC | FY2026, reported in 2027 | Holds the base year of the two cash-flow methods, half the blend |
| Reserve statement at 31 December 2026 | Annual, with the FY2026 results | Replacing the ounces mined is what lengthens a ten-year life |
| Lobo-Marte construction decision | First gold targeted for the early 2030s; EIA under review since Q2 2026 | Moves 6.73 Moz from n/d into the net asset value |
| Great Bear permits and study | On a path to first production in 2028 | Turns resource-row ounces into reserves; 4.29 Moz inferred now count at nil |
| Buybacks under the 40% framework | NCIB to 23 March 2027, up to 104.2 m shares | 9.6 m shares cancelled since 1 April 2026 lift value per share |
Source: Kinross Q2 2026 MD&A (guidance, NCIB, return framework), Q1 2026 MD&A (Great Bear), the Lobo-Marte FS refresh release, 29 July 2026. Timing is the company’s, not a forecast.
Two of the five catalysts are dated by the calendar, not the company: the guidance year and the reserve statement. Of the two that would change the value most, Lobo-Marte has a targeted first-gold window but no dated decision, and Great Bear’s permits carry no firm date in the source set.
9. Rating & verdict
Kinross is scored as a mining producer — a senior gold miner in precious metals — on the nine dimensions, against Agnico Eagle, Newmont and Barrick Mining (Section 2.11). Producer weights apply: asset quality, cost, reserves, balance sheet and capital allocation 15% each; growth, management, jurisdiction and ESG 6.25% each; no dimension is N/A.
Figure 11. Scorecard by dimension, 8 August 2026
Figure data: Table 21. Each spoke prints its stars and weight; the dashed ring is the weighted composite, 2.91/5.
Table 21. Scorecard rationale
| Dimension | Weight | Score | Rationale |
|---|---|---|---|
| 1. Asset quality & scale | 15% | ★★☆☆☆ | 2,070 koz GEO from six mines in 2025, none above 601 koz — the smallest of the set (Agnico Eagle 3,447 koz, Barrick 3,255 koz, Newmont 5,889 koz; FY2025 filings); two reserves above 1.7 g/t, La Coipa (1.8 g/t) and Manh Choh (6.8 g/t) (AIF p.16; Table 2) |
| 2. Cost position & margins | 15% | ★★☆☆☆ | AISC US$1,571/oz in FY2025 against Agnico Eagle’s US$1,339 (FY2025 filings); US$1,777 in H1 2026 and US$1,730 guided (Q2 2026 MD&A); group production cost up from US$942 to US$1,135/oz over 2023–2025 (Section 2.10) |
| 3. Reserves, life & replacement | 15% | ★★☆☆☆ | 20.9 Moz P&P at 31 Dec 2025 (NI 43-101), ≈10.1 years at the 2025 rate against Agnico Eagle’s ≈16.1; 6.7 Moz of it undeveloped Lobo-Marte; replacement n/d (AIF p.16; Table 3) |
| 5. Balance sheet & liquidity | 15% | ★★★★☆ | Net cash US$1,917.6 m and US$1,708.1 m undrawn at 30 Jun 2026; two senior notes, US$500 m due 2033 and US$250 m due 2041; covenant met (Q2 2026 MD&A; Section 3); peer net debt n/d in the source set, so scored on the absolute position |
| 6. Capital allocation & returns | 15% | ★★★★☆ | A 40%-of-FCF return framework; weighted diluted shares down 7.2%, from 1,292.8 m (2022) to 1,199.1 m (H1 2026); ROIC and peer buyback records n/d (FY2023 and FY2025 statements; Table 4) |
| 4. Growth & optionality | 6.25% | ★★★★☆ | Lobo-Marte 6.73 Moz P&P at a 26% IRR (US$4,100/oz); Great Bear 2.71 Moz M&I and 4.29 Moz inferred at 4.1 g/t, on a path to first production in 2028; 2026 growth capital also funds Curlew, Round Mountain Phase X and Bald Mountain Redbird — a deeper pipeline than its reserve base, peer pipelines n/d (Sections 2.7, 2.8) |
| 7. Management & governance | 6.25% | ★★★☆☆ | CEO since 1 Aug 2012, an independent Chair, a five-director Audit and Risk Committee; independence count, alignment and peer comparisons n/d (FY2025 AIF p.67–76) |
| 8. Jurisdiction & geopolitics | 6.25% | ★★★☆☆ | 2025 output 35% USA, 29% Brazil, 24% Mauritania, 11% Chile (AIF p.13); the largest single value, Tasiast, in Mauritania; peer jurisdiction splits n/d, so scored at the sector median (Table 7) |
| 9. ESG & licence to operate | 6.25% | ★★★☆☆ | SASB-aligned 2025 report; US$4.9 bn of host-country benefits; GHG −2.4%; safety and tailings n/d, and so are the peers’ (release, 1 Jun 2026; Table 6) |
| Composite | 100% | ★★★ | Average |
Source: each row cites its evidence in this analysis; the peer figures are Table 3’s, from each peer’s FY2025 filing.
Weighted average: (0.15 × 2) + (0.15 × 2) + (0.15 × 2) + (0.15 × 4) + (0.15 × 4) + (0.0625 × 4) + (0.0625 × 3) + (0.0625 × 3) + (0.0625 × 3) = 0.30 + 0.30 + 0.30 + 0.60 + 0.60 + 0.25 + 0.1875 + 0.1875 + 0.1875 = 2.91/5 → ★★★, Average.
The two-axis verdict. As of 8 August 2026, Kinross Gold rates ★★★ Average (2.9/5) and reads Modestly undervalued (wide band): blended fair value US$32.68 against US$27.64, implied +18.2% — a re-rating candidate, the catalyst being a Lobo-Marte construction decision. The market-implied deck is US$4,046/oz — the gold price the share price pays for, below the US$4,500 base and all three trailing averages. The target multiples sit 2% under their anchors — scale, cost and reserve life (Dimensions 1, 2 and 3) against the balance sheet and capital allocation (Dimensions 5 and 6) — at 0.98× NAV, 6.9× EBITDA and a 7.1% FCF yield.
The bull case is cash: US$1.9 billion net, a 12.9% free-cash-flow yield at the base deck, and a share count that falls each quarter. The bear case is time: about ten years of reserves, under seven outside Lobo-Marte, at a cost that rose 20% in two years. What tips it is reserve replacement — Lobo-Marte sanctioned and Great Bear converted would lengthen the life the net asset value is built on; another year of depletion without them would not.
To rank Kinross against every listed gold producer on the same dimensions, screen the sector on Metal Pilot’s gold mining stock screener.
10. Sources, methodology & disclaimer
10.1 Sources, methodology & data vintage
Company filings. Kinross FY2025 Form 40-F — the Annual Information Form (production, reserves and resources at 31 December 2025, directors and officers), the MD&A (mine sections, outlook) and the audited statements; the FY2024 and FY2023 Form 40-F exhibits; the Q1 and Q2 2026 MD&A and interim statements (Form 6-K); the releases on Q2 2026 results and the Lobo-Marte FS refresh (29 July 2026) and on the 2025 Sustainability Report (1 June 2026).
Peer filings. Agnico Eagle FY2025 annual report and MD&A; Barrick FY2025 MD&A; Newmont FY2025 Form 10-K.
Market data. Yahoo Finance daily closes — KGC (NYSE) to 7 August 2026 and COMEX gold (GC=F) to 6 August 2026; Bank of Canada USD/CAD.
Methodology. Data as of 8 August 2026; filed figures to 30 June 2026, reserves at 31 December 2025 (NI 43-101). Base deck US$4,500/oz gold on the fixed US$3,000–5,000/oz grid in US$500 steps, 5% real after tax (4% and 7% sensitised); weights 50% NAV, 30% EV/EBITDA, 20% FCF yield; target multiples 2% under their anchors from the scorecard’s driver line. Scorecard: producer weights against Agnico Eagle, Newmont and Barrick Mining on FY2025 figures. Kinross reports in US dollars under IFRS on a calendar year. Refreshed on each quarterly report and on material events. The model’s deck sensitivity, P/NAV price map, cross-checks and grid notes are in its out file, kinross-gold-kgc.out.md.
Re-run log. 18 October 2026: rebuilt from the filings released to 8 August 2026 on the reset model — base US$4,500/oz gold, price US$27.64 (the 7 August close, replacing the 6 August close), driver line −0.02; NAV/share US$24.37; blended fair value US$32.67, implied +18.2%, Modestly undervalued (wide band), replacing Fairly valued; market-implied deck US$4,046/oz; rating 2.9/5 Average, replacing 3.3/5 Solid. 18 October 2026 (pre-launch fixes): Manh Choh’s 46 koz of measured and indicated resources added to the resource row and current income tax payable split from working capital; NAV/share US$24.38 (from US$24.37), blended fair value US$32.68 (from US$32.67), implied +18.2%, market-implied deck US$4,046/oz, read unchanged; Curlew placed in Washington and the 15 January 2026 construction decision named in Section 2.9, no figure moved.
Figures not drawn. The asset map is not built. Revenue by mine is not in the source set, so Figure 3 shows production by mine. The safety trend is not drawn: no rates are in the source set.
Data gaps. The documents that would close them: the 2026 management information circular (board size and independence, holders of 5% or more); the NI 43-101 technical reports (lives of mine, a Great Bear study, a Lobo-Marte NPV); the 2025 Sustainability Report itself (safety, tailings); the FY2022 Form 40-F (the 2021 column); the FY2024 reserve statement (replacement); and Newmont’s and Barrick’s cost and reserve tables.
Table 22. Full source register — every input the valuation quotes (load-bearing subset: Table 8)
| Input | Value | As of | Where §7 uses it | Source |
|---|---|---|---|---|
| FY2025 Annual Information Form (Form 40-F Ex. 99.1) | ||||
| Fort Knox (incl. Manh Choh 70%) — gold equivalent production, 2025 / 2024 / 2023 | 410,822 · 377,258 · 290,651 oz | 31 Dec 2025 | Table 11, production rows; Table 2, 2025 output | Filed | FY2025 AIF | total gold equivalent production (in ounces) during the last three years | "Fort Knox" | p.13 |
| Round Mountain — gold equivalent production, 2025 / 2024 / 2023 | 143,402 · 215,387 · 235,690 oz | 31 Dec 2025 | Table 11, production rows; Table 2, 2025 output | Filed | FY2025 AIF | total gold equivalent production (in ounces) during the last three years | "Round Mountain" | p.13 |
| Bald Mountain — gold equivalent production, 2025 / 2024 / 2023 | 179,169 · 181,047 · 157,749 oz | 31 Dec 2025 | Table 11, production rows; Table 2, 2025 output | Filed | FY2025 AIF | total gold equivalent production (in ounces) during the last three years | "Bald Mountain" | p.13 |
| Paracatu — gold equivalent production, 2025 / 2024 / 2023 | 601,318 · 528,574 · 587,999 oz | 31 Dec 2025 | Table 11, production rows; Table 2, 2025 output | Filed | FY2025 AIF | total gold equivalent production (in ounces) during the last three years | "Paracatu" | p.13 |
| La Coipa — gold equivalent production, 2025 / 2024 / 2023 | 231,770 · 246,131 · 260,138 oz | 31 Dec 2025 | Table 11, production rows; Table 2, 2025 output | Filed | FY2025 AIF | total gold equivalent production (in ounces) during the last three years | "La Coipa" | p.13 |
| Tasiast — gold equivalent production, 2025 / 2024 / 2023 | 503,429 · 622,394 · 620,793 oz | 31 Dec 2025 | Table 11, production rows; Table 2, 2025 output | Filed | FY2025 AIF | total gold equivalent production (in ounces) during the last three years | "Tasiast" | p.13 |
| Fort Knox — P&P gold reserves, 31 Dec 2025 (NI 43-101) | 82,940 kt at 0.4 g/t · 976 koz | 31 Dec 2025 | Table 11, annuity (life) rows; Table 2, reserves | Filed | FY2025 AIF | Proven and Probable Mineral Reserves | "Fort Knox" | p.16 |
| Manh Choh — P&P gold reserves, 31 Dec 2025 (NI 43-101) | 2,033 kt at 6.8 g/t · 444 koz | 31 Dec 2025 | Table 11, annuity (life) rows; Table 2, reserves | Filed | FY2025 AIF | Proven and Probable Mineral Reserves | "Manh Choh" | p.16 |
| Round Mountain — P&P gold reserves, 31 Dec 2025 (NI 43-101) | 45,055 kt at 1.3 g/t · 1,888 koz | 31 Dec 2025 | Table 11, annuity (life) rows; Table 2, reserves | Filed | FY2025 AIF | Proven and Probable Mineral Reserves | "Round Mountain" | p.16 |
| Bald Mountain — P&P gold reserves, 31 Dec 2025 (NI 43-101) | 66,306 kt at 0.6 g/t · 1,225 koz | 31 Dec 2025 | Table 11, annuity (life) rows; Table 2, reserves | Filed | FY2025 AIF | Proven and Probable Mineral Reserves | "Bald Mountain" | p.16 |
| La Coipa — P&P gold reserves, 31 Dec 2025 (NI 43-101) | 7,342 kt at 1.8 g/t · 436 koz | 31 Dec 2025 | Table 11, annuity (life) rows; Table 2, reserves | Filed | FY2025 AIF | Proven and Probable Mineral Reserves | "La Coipa" | p.16 |
| Lobo Marte — P&P gold reserves, 31 Dec 2025 (NI 43-101) | 160,702 kt at 1.3 g/t · 6,733 koz | 31 Dec 2025 | Table 12, Lobo-Marte row; Table 19, gap register (1) | Filed | FY2025 AIF | Proven and Probable Mineral Reserves | "Lobo Marte" | p.16 |
| Paracatu — P&P gold reserves, 31 Dec 2025 (NI 43-101) | 399,642 kt at 0.4 g/t · 4,839 koz | 31 Dec 2025 | Table 11, annuity (life) rows; Table 2, reserves | Filed | FY2025 AIF | Proven and Probable Mineral Reserves | "Paracatu" | p.16 |
| Tasiast — P&P gold reserves, 31 Dec 2025 (NI 43-101) | 102,765 kt at 1.3 g/t · 4,401 koz | 31 Dec 2025 | Table 11, annuity (life) rows; Table 2, reserves | Filed | FY2025 AIF | Proven and Probable Mineral Reserves | "Tasiast" | p.16 |
| TOTAL GOLD — P&P gold reserves, 31 Dec 2025 (NI 43-101) | 866,785 kt at 0.8 g/t · 20,942 koz | 31 Dec 2025 | Out file, EV per reserve ounce; Table 2, group row | Filed | FY2025 AIF | Proven and Probable Mineral Reserves | "TOTAL GOLD" | p.16 |
| Bald Mountain — M&I gold resources, 31 Dec 2025 | 2,548 koz | 31 Dec 2025 | Table 11, resource-conversion block (M&I exclusive of reserves, AIF p.14) | Filed | FY2025 AIF | Measured and Indicated Mineral Resources | "Bald Mountain" | p.17 |
| Fort Knox — M&I gold resources, 31 Dec 2025 | 2,400 koz | 31 Dec 2025 | Table 11, resource-conversion block (M&I exclusive of reserves, AIF p.14) | Filed | FY2025 AIF | Measured and Indicated Mineral Resources | "Fort Knox" | p.17 |
| Great Bear — M&I gold resources, 31 Dec 2025 | 2,713 koz | 31 Dec 2025 | Table 11, resource-conversion block (M&I exclusive of reserves, AIF p.14) | Filed | FY2025 AIF | Measured and Indicated Mineral Resources | "Great Bear" | p.17 |
| Round Mountain — M&I gold resources, 31 Dec 2025 | 1,446 koz | 31 Dec 2025 | Table 11, resource-conversion block (M&I exclusive of reserves, AIF p.14) | Filed | FY2025 AIF | Measured and Indicated Mineral Resources | "Round Mountain" | p.17 |
| La Coipa — M&I gold resources, 31 Dec 2025 | 2,128 koz | 31 Dec 2025 | Table 11, resource-conversion block (M&I exclusive of reserves, AIF p.14) | Filed | FY2025 AIF | Measured and Indicated Mineral Resources | "La Coipa" | p.17 |
| Lobo Marte — M&I gold resources, 31 Dec 2025 | 2,752 koz | 31 Dec 2025 | Table 11, resource block — excluded, Lobo-Marte is n/d | Filed | FY2025 AIF | Measured and Indicated Mineral Resources | "Lobo Marte" | p.17 |
| Maricunga — M&I gold resources, 31 Dec 2025 | 7,140 koz | 31 Dec 2025 | Table 11, resource block — excluded, no plan filed | Filed | FY2025 AIF | Measured and Indicated Mineral Resources | "Maricunga" | p.17 |
| Paracatu — M&I gold resources, 31 Dec 2025 | 3,522 koz | 31 Dec 2025 | Table 11, resource-conversion block (M&I exclusive of reserves, AIF p.14) | Filed | FY2025 AIF | Measured and Indicated Mineral Resources | "Paracatu" | p.17 |
| Tasiast — M&I gold resources, 31 Dec 2025 | 2,396 koz | 31 Dec 2025 | Table 11, resource-conversion block (M&I exclusive of reserves, AIF p.14) | Filed | FY2025 AIF | Measured and Indicated Mineral Resources | "Tasiast" | p.17 |
| Manh Choh — M&I gold resources, 31 Dec 2025 | 46 koz | 31 Dec 2025 | Table 11, resource-conversion block (M&I exclusive of reserves, AIF p.14) | Filed | FY2025 AIF | Measured and Indicated Mineral Resources | "Manh Choh" | p.17 |
| Curlew Basin — M&I gold resources, 31 Dec 2025 | 409 koz | 31 Dec 2025 | Table 11, resource block — excluded, no plan in the source set | Filed | FY2025 AIF | Measured and Indicated Mineral Resources | "Curlew Basin" | p.17 |
| TOTAL GOLD — M&I gold resources, 31 Dec 2025 | 27,499 koz | 31 Dec 2025 | Table 11, resource block — the total the exclusions are taken from | Filed | FY2025 AIF | Measured and Indicated Mineral Resources | "TOTAL GOLD" | p.17 |
| Great Bear — inferred gold resource, 31 Dec 2025 | 32,396 kt at 4.1 g/t · 4,291 koz | 31 Dec 2025 | Table 11, inferred at 0.0; Table 19, gap register (2) | Filed | FY2025 AIF | Inferred Mineral Resources | "Great Bear" | p.18 |
| Total inferred gold resources, 31 Dec 2025 | 16,633 koz | 31 Dec 2025 | Table 11, inferred at 0.0; Table 19, gap register (2) | Filed | FY2025 AIF | Inferred Mineral Resources | "TOTAL GOLD" | p.18 |
| FY2025 MD&A (Form 40-F Ex. 99.2) | ||||
| Tasiast — production cost of sales per GEO sold, 2025 / 2024 | $884 · $681 | 31 Dec 2025 | Table 11, margin rows; Table 2, 2025 production cost | Filed | FY2025 MD&A | Tasiast – Mauritania | "Production cost of sales per equivalent ounce sold" | p.15 |
| Paracatu — production cost of sales per GEO sold, 2025 / 2024 | $978 · $1,039 | 31 Dec 2025 | Table 11, margin rows; Table 2, 2025 production cost | Filed | FY2025 MD&A | Paracatu – Brazil | "Production cost of sales per equivalent ounce sold" | p.16 |
| La Coipa — production cost of sales per GEO sold, 2025 / 2024 | $1,208 · $959 | 31 Dec 2025 | Table 11, margin rows; Table 2, 2025 production cost | Filed | FY2025 MD&A | La Coipa – Chile | "Production cost of sales per equivalent ounce sold" | p.17 |
| Fort Knox (100% basis) — production cost of sales per GEO sold, 2025 / 2024 | $1,339 · $1,205 | 31 Dec 2025 | Table 11, margin rows; Table 2, 2025 production cost | Filed | FY2025 MD&A | Fort Knox (100% basis) – USA | "Production cost of sales per equivalent ounce sold" | p.18 |
| Round Mountain — production cost of sales per GEO sold, 2025 / 2024 | $1,918 · $1,527 | 31 Dec 2025 | Table 11, margin rows; Table 2, 2025 production cost | Filed | FY2025 MD&A | Round Mountain – USA | "Production cost of sales per equivalent ounce sold" | p.19 |
| Bald Mountain — production cost of sales per GEO sold, 2025 / 2024 | $1,198 · $1,205 | 31 Dec 2025 | Table 11, margin rows; Table 2, 2025 production cost | Filed | FY2025 MD&A | Bald Mountain – USA | "Production cost of sales per equivalent ounce sold" | p.20 |
| 2026 guidance — attributable capital expenditures; of which sustaining | $1,500 m (+/- 5%) · $450 m | 31 Dec 2025 | Table 11, development capital; Tables 15 and 17, sustaining capital | Filed | FY2025 MD&A | Outlook | "Attributable capital expenditures for 2026 are forecasted" | p.12 |
| Q1 2026 MD&A and interim financial statements (Form 6-K Ex. 99.1) | ||||
| Inventories, 31 Mar 2026 / 31 Dec 2025 (Q2 face line not read) | $1,315.2 m · $1,370.3 m | 31 Mar 2026 | Table 13, working capital | Filed | Q1 2026 MD&A and interim FS | Interim condensed consolidated balance sheets | "Inventories" | p.1 |
| Q2 2026 MD&A and interim financial statements (Form 6-K Ex. 99.1, 29 Jul 2026) | ||||
| 2026 guidance — attributable gold equivalent production | 2.0 Moz (+/- 5%) | 30 Jun 2026 | Tables 15 and 17, volume; Table 11, sustaining per ounce | Filed | Q2 2026 MD&A | Outlook | "guidance of 2.0 million (+/- 5%) attributable" | p.1 |
| 2026 guidance — attributable production cost of sales per GEO | $1,360 (+/- 5%) | 30 Jun 2026 | Out file, grid note 3 (guided cost step) | Filed | Q2 2026 MD&A | Outlook | "of $1,360 (+/- 5%)" | p.1 |
| 2026 guidance — attributable AISC per GEO sold | $1,730 (+/- 5%) | 30 Jun 2026 | Table 15, AISC line; Table 13, corporate cost line | Filed | Q2 2026 MD&A | Outlook | "of $1,730 (+/- 5%) for 2026" | p.1 |
| Cash and cash equivalents, 30 Jun 2026 / 31 Dec 2025 | $2,656.4 m · $1,742.3 m | 30 Jun 2026 | Table 13, net cash; Table 16, bridge | Filed | Q2 2026 MD&A and interim FS | Interim condensed consolidated balance sheets | "Cash and cash equivalents" | p.1 |
| Total long-term debt, 30 Jun 2026 / 31 Dec 2025 | $738.8 m · $738.2 m | 30 Jun 2026 | Table 13, net cash; Table 16, bridge | Filed | Q2 2026 MD&A and interim FS | Liquidity | "Total long-term debt" | p.1 |
| Reclamation and remediation obligations, 30 Jun 2026 / 31 Dec 2025 | $986.6 m · $991.8 m | 30 Jun 2026 | Table 13, reclamation; Table 16, bridge | Filed | Q2 2026 MD&A and interim FS | Provisions | "Reclamation and remediation obligations" | p.1 |
| Current income tax payable, 30 Jun 2026 / 31 Dec 2025 | $587.5 m · $595.7 m | 30 Jun 2026 | Table 13, current income tax payable | Filed | Q2 2026 MD&A and interim FS | Interim condensed consolidated balance sheets | "Current income tax payable" | p.1 |
| Accounts receivable and prepaid assets, 30 Jun 2026 / 31 Dec 2025 | $130.1 m · $145.8 m | 30 Jun 2026 | Table 13, working capital | Filed | Q2 2026 MD&A and interim FS | Interim condensed consolidated balance sheets | "Accounts receivable and prepaid assets" | p.1 |
| Accounts payable and accrued liabilities, 30 Jun 2026 / 31 Dec 2025 | $783.4 m · $716.4 m | 30 Jun 2026 | Table 13, working capital | Filed | Q2 2026 MD&A and interim FS | Interim condensed consolidated balance sheets | "Accounts payable and accrued liabilities" | p.1 |
| Depreciation, depletion and amortization, Q2 2026 / Q2 2025 · H1 2026 / H1 2025 | $275.5 m · $262.9 m · $551.2 m · $551.3 m | 30 Jun 2026 | Table 17, cash tax base (H1 2026 × 2) | Filed | Q2 2026 MD&A and interim FS | Consolidated financial and operating highlights | "Depreciation, depletion and amortization" | p.1 |
| Restricted share units / restricted performance share units outstanding | 2.8 m · 2.2 m | 30 Jun 2026 | Table 13, fully diluted shares; Tables 16 and 17 | Filed | Q2 2026 MD&A and interim FS | Liquidity | "restricted share units" | p.1 |
| Non-controlling interests, 30 Jun 2026 / 31 Dec 2025 | $121.3 m · $118.1 m | 30 Jun 2026 | Table 13, minorities (inside the attributable rows) | Filed | Q2 2026 MD&A and interim FS | Interim condensed consolidated balance sheets | "Non-controlling interests" | p.1 |
| Long-term investments, 30 Jun 2026 / 31 Dec 2025 | $97.6 m · $99.3 m | 30 Jun 2026 | Table 13, long-term investments | Filed | Q2 2026 MD&A and interim FS | Interim condensed consolidated balance sheets | "Long-term investments" | p.1 |
| Common shares issued and outstanding, 28 Jul 2026 | 1,186.2 m | 28 Jul 2026 | Table 13, fully diluted shares; Tables 16 and 17 | Filed | Q2 2026 MD&A and interim FS | Liquidity | "million common shares of the" | p.1 |
| Lobo-Marte FS refresh release (Form 6-K, 29 Jul 2026) | ||||
| Lobo-Marte initial capital expenditures (over three years) | $1.8 bn | 29 Jul 2026 | Table 12, Lobo-Marte row; Table 19, gap register (1) | Filed | Lobo-Marte FS refresh release | Highlights | "initial capital expenditures of approximately $1.8 billion" | p.1 |
| Lobo-Marte FS refresh — after-tax IRR and payback at $4,100/oz | 26% · 2.3 years | 29 Jul 2026 | Table 12, Lobo-Marte row; Table 19, gap register (1) | Filed | Lobo-Marte FS refresh release | Highlights | "of 26% and payback of 2.3 years at a $4,100 per ounce gold price" | p.1 |
| Market data — Yahoo Finance daily closes | ||||
| NYSE close, Fri 7 Aug 2026 (the last close before the 8 Aug as-of) | US$27.64 | 7 Aug 2026 | Table 13, P/NAV; Table 18, implied return; Section 1 | Market | Yahoo Finance | "KGC" daily close (NYSE) | series saved as Metal Pilot Data/Market/yahoo_KGC_daily_20261018.json (5 Aug 25.70 | 6 Aug 25.62 | 7 Aug 27.64) |
| Gold (COMEX front month) close, 6 Aug 2026 | US$4,299.60/oz | 6 Aug 2026 | Section 1, cycle context | Market | Yahoo Finance | "GC=F" daily closes to 6 Aug 2026 | series saved as Metal Pilot Data/Market/yahoo_GC=F_20261018.json |
| Gold trailing averages to 6 Aug 2026 — 3 / 6 / 12 months (daily closes) | US$4,271 · $4,567 · $4,335/oz | 6 Aug 2026 | Table 19, deck field; the as-of line | Market | Yahoo Finance | "GC=F" daily closes to 6 Aug 2026 | series saved as Metal Pilot Data/Market/yahoo_GC=F_20261018.json |
| Gold (COMEX front month) — average of daily closes 18 Oct 2021 – 6 Aug 2026 (the series' start); low; high | US$2,652.11/oz; US$1,630.90 (3 Nov 2022); US$5,318.40 (29 Jan 2026) | 6 Aug 2026 | Table 19, deck field; the conclusion, market-implied deck | Market | Yahoo Finance | "GC=F" daily closes to 6 Aug 2026 | series saved as Metal Pilot Data/Market/yahoo_GC=F_20261018.json |
Source: the Kinross filings and Yahoo Finance market series named in each row; Table 8 is the load-bearing subset.
Provenance: Kinross Gold Corporation — Annual Report — 2025.
10.2 Disclaimer & disclosure
This analysis is for information only and is not investment advice, a recommendation or an offer to buy or sell any security. Do your own research or consult a licensed adviser. It is a point-in-time snapshot as of 8 August 2026: the price, the multiples and the valuation read all move. Reserve, resource, study and guidance figures are estimates on the codes stated beside each table. The Quality × Value verdict is an analytical read, never an instruction. This report was prepared with AI assistance (Claude Opus 5.5) from primary filings; verify every figure against the original documents. As of 18 November 2026, the author holds no position in the company this analysis covers.