B2Gold (BTO) — Stock Analysis 2026 [2.6]
Analysis as of 5 November 2026. Price deck: base gold US$4,500/oz — the fixed-grid price nearest the representative trailing average (3-month US$4,303.64, 6-month US$4,290.96 and 12-month US$4,468.92, COMEX daily closes to 5 November 2026) — with every grid price run as a scenario: extreme bear US$3,000, deep bear US$3,500, bear US$4,000, base US$4,500 and bull US$5,000/oz; no analyst consensus is on file at this date, and no forecast and no spot price enter the value. At US$5.30 a share (C$7.40 TSX close, 5 November 2026, at USD/CAD 1.3972) the blended fair value is US$7.31, implied +38.1%, on NAV/share of US$5.50; at the held multiples the share price implies gold at US$3,865/oz. Re-run after each quarterly report. Rating: ★★½ Average / Undervalued (wide band).
B2Gold runs four gold mines — Fekola in Mali, Masbate in the Philippines, Otjikoto in Namibia and the new Goose mine in Nunavut — and guides 820,000–970,000 ounces for 2026 at an all-in sustaining cost of US$2,230–2,410/oz. The thesis in one line: a share price that pays for gold well below its trailing averages, set against the highest costs and the shortest reserve lives in its peer set. Why now: the Q3 2026 report cut the cost guidance, the Goose mill has run at 3,200 tonnes a day since mid-October, and Mali granted the Menankoto exploitation permit in August. To screen B2Gold against every listed gold producer on cost, reserve life and stage, see Metal Pilot’s gold mining stock screener.
1. Snapshot & thesis
B2Gold Corp. (TSX: BTO; NYSE American: BTG; NSX: B2G) is a Canadian mining producer in the precious-metals sector — gold only, reporting in US dollars. It operates every asset it owns: four producing mines (the Fekola Complex in Mali, 80% of the mine and 65% of Fekola Regional; Masbate in the Philippines, 100%; Goose in Nunavut, 100%; Otjikoto in Namibia, 90%), one development project (Gramalote in Colombia, 100%) and the Back River district around Goose.
Figure 1. B2Gold in numbers, as of 5 November 2026
Figure data: Table 1; rating per Section 9, valuation per Section 7.
Thesis in brief. Bull: the market values B2Gold at 3.4 times the forward EBITDA Section 7 builds at US$4,500/oz and a 14.4% free-cash-flow yield, Goose is ramping toward 4,000 tonnes a day, and the balance sheet holds net cash before the convertible notes. Bear: the guided AISC is the highest in the peer set, Fekola and Masbate exhaust their reserves inside seven years and Otjikoto within months, and 27.2% of the asset value sits in Mali. What tips it: whether Goose reaches its rate at the guided cost and Fekola Regional and the indicated ounces convert to reserve before the pits run out — and whether gold holds above the US$4,366/oz flip price.
Table 1. B2Gold in numbers
| Metric | Value | As of |
|---|---|---|
| Share price · market capitalisation | $5.30 (C$7.40) · $6,976 m | 5 Nov 2026 |
| Enterprise value (fully diluted market value less net cash before the notes) | $7,769.4 m | 5 Nov 2026 |
| Shares outstanding · fully diluted | 1,317.2 m · 1,492.2 m | 4 Nov 2026 |
| 2026 guidance — gold · AISC | 820,000–970,000 oz · $2,230–2,410/oz | 30 Sep 2026 |
| 9M 2026 production · gold revenue · realised price | 634,732 oz · $2.78 bn · $4,089/oz | 30 Sep 2026 |
| FY2025 production · AISC | 979,604 oz · $1,584/oz | FY2025 |
| FY2025 gold revenue · cash margin | $3,061.2 m · $2,315.8 m (75.6%) | FY2025 |
| Net income · free cash flow, 9M 2026 | $1,039 m · $152 m | 30 Sep 2026 |
| Probable reserves · attributable | 8.99 Moz · 8.53 Moz | 31 Dec 2025 |
| Cash · debt (carrying) · undrawn revolver | $293.6 m · $546.2 m · $705 m | 30 Sep 2026 |
| NAV/share · P/NAV | $5.50 · 0.96× | 5 Nov 2026 |
| Blended fair value (range) | $7.31 ($2.42–9.06) | 5 Nov 2026 |
| Valuation read · implied return | Undervalued (wide band) · +38.1% | 5 Nov 2026 |
| Market-implied gold deck | $3,865/oz | 5 Nov 2026 |
| Quality rating | 2.6/5 Average | 5 Nov 2026 |
Source: B2Gold’s filings on SEDAR+ and b2gold.com — the Q3 2026 MD&A (4 November 2026) for guidance, nine-month results and the share count at 4 November 2026; the Q3 2026 interim statements for the balance sheet at 30 September 2026; the FY2025 MD&A, Selected annual information p.5, for FY2025 production, revenue, costs and AISC; the FY2025 AIF p.24 for reserves (NI 43-101, effective 31 December 2025); price per Yahoo Finance, TSX close of 5 November 2026 at USD/CAD 1.3972; valuation per Section 7, rating per Section 9. Note: cash margin is gold revenue less production costs.
How to read this analysis: the statcards and Section 9 carry the verdict; Sections 2–6 carry the evidence, Section 7 the valuation.
2. Assets & operations
B2Gold sells gold only, with a small collar book (Section 3); for how the metal is priced and why miners gear to it, see Gold — A Complete Market Guide. This section covers the four mines, Gramalote and the ground around them.
2.1 Portfolio overview
Table 2. B2Gold asset portfolio, by value
| Asset | Country | Stage | Interest | 2026 guidance | Probable reserves | Life (Section 7) | 2026 AISC guidance | Listing / operator |
|---|---|---|---|---|---|---|---|---|
| Fekola Complex | Mali | Producing; Fekola Regional (Menankoto) permitted 7 Aug 2026 | 80% mine · 65% Regional | 390–420 koz | 2.70 Moz at 1.76 g/t (47.7 Mt) | 5.3 yr | $2,350–2,500/oz | B2Gold, operator (Public, TSX: BTO) |
| Masbate | Philippines | Producing | 100% | 180–200 koz | 1.46 Moz at 0.72 g/t (62.9 Mt) | 6.8 yr | $1,250–1,400/oz | B2Gold, operator (Public, TSX: BTO) |
| Goose | Canada (Nunavut) | Ramp-up; first gold 30 Jun 2025 | 100% | 170–200 koz | 2.38 Moz at 6.79 g/t (10.9 Mt) | 7.0 yr | $2,670–2,970/oz | B2Gold, operator (Public, TSX: BTO) |
| Gramalote | Colombia | Feasibility study (2024); no construction decision | 100% | — | 2.36 Moz at 0.96 g/t (76.7 Mt) | — | — | B2Gold (Public, TSX: BTO) |
| Otjikoto | Namibia | Producing; stockpiles and Wolfshag underground | 90% | 80–100 koz | 0.09 Moz at 2.33 g/t (1.2 Mt) | 0.2 yr | $1,630–1,780/oz | B2Gold, operator (Public, TSX: BTO) |
Source: B2Gold FY2025 AIF, Probable Mineral Reserves Statement p.24 (NI 43-101, effective 31 December 2025, US$2,000/oz; Fekola Regional US$1,750/oz) and interests p.24; Q3 2026 MD&A, mine sections pp.6–11 (guidance, Otjikoto interest), Highlights p.3 (Menankoto permit); FY2024 AIF p.102 (Gramalote study). Notes: (1) life is Section 7’s reserve life at the guidance midpoint; (2) rows sorted by Section 7 asset value.
Value is spread across three mines. Of the US$9,803.0 million enterprise NAV, Fekola carries US$2,666.1 million (27.2%), Masbate US$2,566.8 million (26.2%) and Goose US$2,249.8 million (23.0%); the credit for indicated ounces beyond the reserves adds US$1,920.5 million (19.6%), Gramalote US$376.4 million at a 0.40 risk weight and Otjikoto US$23.4 million. No mine exceeds 30%, but Mali and the Philippines together hold over half. The asset map is not drawn (Section 10.1).
2.2 Revenue split
Figure 2. Revenue by commodity, FY2025
Source: B2Gold FY2025 MD&A, Selected annual information p.5 (“Gold revenue”). By-product silver and copper are not reported as revenue lines.
Figure 3. Production by mine — 2026 guidance midpoints (proxy for revenue by asset)
Source: B2Gold Q3 2026 MD&A, mine guidance pp.6–11. Revenue by mine for FY2025 is not in the facts on hand, so guided production stands in.
Gold is the whole revenue line. Fekola is close to half of guided 2026 output; Masbate and Goose are about a fifth each.
2.3 Fekola Complex
Fekola Complex (Mali; 80% of the Fekola Mine and 65% of Fekola Regional, the State of Mali holding 20% and 35%). Open-pit and underground mining at Fekola, with Fekola Regional (Menankoto) alongside. Probable reserves at 31 December 2025 are 47.7 Mt at 1.76 g/t for 2.70 Moz (2.03 Moz attributable at the 65% Regional interest): 1.83 Moz at the mine (33.8 Mt at 1.68 g/t) and 0.88 Moz on Fekola Regional (13.8 Mt at 1.97 g/t). 2026 guidance is 390,000–420,000 oz, unchanged at Q3, at a cash operating cost of US$1,060–1,160/oz produced and an AISC of US$2,350–2,500/oz sold. Q3 2026 ore grades were 1.35 g/t in the open pit and 2.85 g/t underground, with 91.7% recovery over nine months. The Menankoto exploitation permit was granted on 7 August 2026 and pre-stripping began in October; Q3 brought a US$253 million reversal of an earlier Fekola impairment. Encumbrances beyond the State’s interests (royalties) are not in the facts on hand (n/d). Section 7 runs 5.27 years of reserve. The asset risk is Mali itself: its fiscal regime and permits, and the US$329.6 million non-current VAT receivable that Section 7 places there.
2.4 Masbate
Masbate (Philippines, 100%). A low-grade open-pit operation: probable reserves of 62.9 Mt at 0.72 g/t for 1.46 Moz. 2026 guidance is 180,000–200,000 oz at a cash operating cost of US$800–900/oz produced and an AISC of US$1,250–1,400/oz sold, cut at Q3 — the group’s lowest-cost mine. Section 7 runs the reserve for 6.84 years; indicated resources of 3.18 Moz (inclusive) leave 1.72 Moz beyond it. Recovery is not on file (n/d). The asset risk is the grade: at 0.72 g/t there is little room if costs rise.
2.5 Goose
Goose (Back River Gold District, Nunavut, Canada, 100%). The newest mine, with first gold poured on 30 June 2025, and the highest-grade reserve in the group: 10.9 Mt at 6.79 g/t for 2.38 Moz. It produced 39,973 oz in Q3 2026 and 95,739 oz in the first nine months, against 2026 guidance of 170,000–200,000 oz at a cash operating cost of US$1,610–1,810/oz produced and an AISC of US$2,670–2,970/oz sold. The mill has averaged 3,200 tonnes a day since mid-October 2026 and targets 4,000 tonnes a day by the end of the first half of 2027; on those rates Section 7 mines about 303,000 contained ounces in 2027 and 319,000 a year after, for 7.02 years. The remaining capital to 4,000 tonnes a day, the unit cost at that rate and the approvals for it are not on file (n/d). Encumbrance: a gold stream carried at US$254.4 million at 30 September 2026, terms n/d. The asset risk is the ramp: Q3’s 39,973 oz runs well below the rate the reserve life assumes.
2.6 Otjikoto
Otjikoto (Namibia, 90%; EVI holds 10%). The reserve is now 1.2 Mt at 2.33 g/t for 0.09 Moz, in stockpiles and the Wolfshag underground. 2026 guidance is 80,000–100,000 oz at an AISC of US$1,630–1,780/oz sold, cut at Q3. On reserve alone Section 7 runs about two months; the 0.91 Moz of indicated resources (inclusive) and 0.95 Moz inferred are the mine’s future, credited only through the resource tier. The asset risk: without a reserve update Otjikoto stops contributing after 2026.
2.7 Gramalote and the exploration portfolio
Gramalote (Colombia, 100%) holds probable reserves of 76.7 Mt at 0.96 g/t for 2.36 Moz. Its feasibility study of 14 July 2025 gives an after-tax NPV(5%) of US$941 million and a 22.4% IRR at US$2,500/oz, superseding the June 2024 PEA’s US$778 million; no construction decision is taken and the study’s capital is not on file (n/d). Section 7 carries it at 0.40× the study NPV, US$376.4 million. The 2026 exploration budget is about US$80 million. In April 2026 B2Gold sold its 70% of Fingold Ventures to Agnico Eagle for a US$292 million gain.
2.8 Production, reserves & costs
Group output went from 1,061,060 oz in 2023 to 804,778 oz in 2024 and 979,604 oz in 2025, Goose’s first half-year. The first nine months of 2026 brought 634,732 oz (193,321 in Q3), 71% of the 895,000 oz guidance midpoint; the low end needs 185,268 oz in Q4. Consolidated AISC rose from US$1,022/oz in 2022 to US$1,584/oz in 2025 and is guided at US$2,230–2,410/oz for 2026, cut at Q3 from US$2,370–2,550.
Figure 4. Group gold production — FY2023 to 2026 guidance (koz)
Source: B2Gold FY2025 MD&A, Selected annual information p.5 (“Gold produced”, including Goose pre-commercial); Q3 2026 MD&A, Summary and outlook p.30; Q1 2026 MD&A p.2 (2026 guidance).
Figure 5. Reserves and resources by asset
Figure data: B2Gold FY2025 AIF, Probable Mineral Reserves Statement p.24 and Indicated Mineral Resource Statement pp.26–27 (NI 43-101, effective 31 December 2025, 100% basis; reserves at US$2,000/oz, Fekola Regional US$1,750/oz). The filed resources are inclusive of reserves; the exclusive figure is indicated less probable (Derived). No proven reserves or measured resources are reported. Inferred, not drawn: Fekola Complex 3.07, Goose 3.49, Gramalote 2.00, Otjikoto 0.95, Masbate 0.93 Moz (p.27).
Fekola and Goose hold the most reserve. Fekola, Masbate and Otjikoto each carry more indicated ounces outside their reserves than inside — the conversion Section 7 prices at 0.25×.
2.9 Peer positioning
The peers behind the stars in Section 9 are five gold producers with 2025 filings on hand: Kinross Gold (TSX: K), Endeavour Mining (LSE: EDV), Alamos Gold (TSX: AGI), Lundin Gold (TSX: LUG) and OceanaGold (TSX: OGC). None is in a pending takeover; none appears in Section 7.
Table 3. Peer positioning — quality metrics
| Company | Listing | FY2025 gold production | AISC | Gold reserves · life | Net cash (debt) | Main jurisdictions |
|---|---|---|---|---|---|---|
| Kinross Gold | Public (TSX: K; NYSE: KGC) | 2,070 koz GEO | $1,777/oz (H1 2026) | 20.9 Moz P&P · ≈10.1 yr | +$1,917.6 m (30 Jun 2026) | Americas, Mauritania |
| Endeavour Mining | Public (LSE: EDV; TSX: EDV) | 1,209 koz | $1,433/oz (FY2025) | 16.6 Moz P&P · ≈13.7 yr | −$157.5 m (31 Dec 2025) | West Africa |
| B2Gold | Public (TSX: BTO) | 979.6 koz | $1,584/oz (FY2025); $2,230–2,410/oz (2026 guide) | 8.99 Moz probable · ≈10.0 yr (≈7.6 yr producing mines) | +$133.9 m before the notes (30 Sep 2026) | Mali, Philippines, Canada, Namibia |
| Alamos Gold | Public (TSX: AGI) | 545.4 koz | $1,524/oz (FY2025); $1,775–1,875/oz (2026 guide) | 15.9 Moz P&P · ≈30 yr | +$436.9 m (30 Jun 2026) | Canada, Mexico |
| Lundin Gold | Public (TSX: LUG) | 498.3 koz | $1,015/oz (FY2025); $1,110–1,170/oz (2026 guide) | 5.85 Moz P&P · 11.7 yr | +$573.6 m (30 Sep 2026) | Ecuador |
| OceanaGold | Public (TSX: OGC) | 497.6 koz + 13.3 kt Cu | $1,750–1,900/oz (2026 guide) | 5.83 Moz P&P · 10.5 yr | +$728.7 m (30 Sep 2026) | USA, New Zealand, Philippines |
Source: B2Gold per Tables 1 and 2; each peer from its own filings on SEDAR+ — Kinross FY2025 AIF and Q2 2026 MD&A; Endeavour FY2025 annual report pp.29, 33, 183; Alamos MD&A 2025 and Q2 2026 MD&A; Lundin Gold AIF 2025 and September 2026 Quarterly; OceanaGold AIF 2025 and Q3 2026 MD&A. Notes: (1) AISC definitions and periods differ by issuer; (2) life is reserves over annual output — FY2025 production for Kinross, Endeavour, Alamos and Lundin Gold, the 2026 guidance midpoint for B2Gold and OceanaGold; B2Gold’s shorter figure excludes Gramalote; (3) net cash is cash less drawn debt on each company’s basis; (4) rows sorted by FY2025 production.
B2Gold is third of six on scale, but its 2026 guided AISC is the highest: about US$500/oz above Alamos’s and OceanaGold’s midpoints and US$1,180/oz above Lundin Gold’s. Its 8.99 Moz sits below Kinross, Endeavour and Alamos; counting only the producing mines, its life of about 7.6 years is the shortest in the set.
3. Financials & balance sheet
Gold revenue rose 60.9% in 2025 to US$3,061.2 million on a realised price of US$3,299/oz (US$2,373 in 2024), and the cash margin widened to 75.6%. Net income of US$426.7 million followed a US$626.7 million loss in 2024, while adjusted net income was US$611.9 million and US$206.5 million: impairments swing reported earnings both ways, and Q3 2026 reversed US$253 million at Fekola. Operating cash flow of US$895.8 million ran 2.1× net income. The first nine months of 2026 brought gold revenue of US$2.78 billion on 680,901 oz sold at US$4,089/oz, net income of US$1,039 million (US$0.70 diluted) and operating cash flow of US$699.3 million, which carried the delivery of the US$285.5 million of prepaid gold outstanding at the end of 2025; free cash flow was US$152 million after US$370 million of sustaining capital, and current income and other taxes took US$492 million. EBITDA is not disclosed; Section 7 builds forward EBITDA of US$2,310.1 million. How these measures fit together is set out in Financial Metrics for Commodity Investing.
The cost deck. 2026 consolidated AISC guidance is US$2,230–2,410/oz sold; by mine, cash operating costs run from US$800–900/oz produced at Masbate to US$1,610–1,810/oz at Goose. The price-linked lines (royalties and production taxes) and the inflation basis are not quantified in the facts on hand (n/d). B2Gold expects Q4 2026 current income tax, withholding and other tax payments of US$154 million at US$4,000/oz. Tax pools are not disclosed: the deferred tax liability was US$251.1 million at 30 September 2026 and operating loss carry-forwards US$84.2 million at the end of 2025.
Balance sheet. At 30 September 2026 cash was US$293.6 million against US$546.2 million of debt at carrying value: the 2.75% convertible notes due 1 February 2030 (US$386.5 million carrying, US$460 million face), US$90.4 million drawn on the US$800 million revolver (maturing 17 December 2028, US$705 million undrawn, covenants met), US$19.8 million of equipment loans and US$49.6 million of leases. Net debt is US$252.6 million with the notes and leases, or net cash of US$133.9 million without the notes, which convert at about US$3.17 a share. That is 0.11× forward EBITDA; at US$3,500/oz, with about US$870 million less EBITDA, about 0.18× (Derived). Other claims: US$306.6 million of income and other taxes payable, US$146.1 million of mine restoration provisions and the US$254.4 million Goose stream. Working capital was US$497 million.
Hedge book. Gold zero-cost collars on 66,548 oz (49,911 oz for the rest of 2026, 16,637 oz in 2027) with a US$2,450/oz floor and a US$3,294/oz ceiling, US$63 million out of the money at 30 September; fuel forwards on 21.1 million litres of fuel oil at US$0.37/L and 29.0 million litres of gas oil at US$0.52/L.
Capital returns. A US$0.02 quarterly dividend (US$0.08 a year, 1.5% at US$5.30); Q3 2026 returned US$26 million in dividends and US$33 million in buybacks, under an NCIB for up to 10% of the shares to 2 April 2027. Diluted weighted shares rose from 1,237.4 million in 2023 to 1,480.9 million in 2025.
Table 4. Five-year financial summary (US$m unless stated)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
| Gold revenue | n/d | 1,732.6 | 1,934.3 | 1,902.0 | 3,061.2 |
| YoY % | n/d | n/d | +11.6% | −1.7% | +60.9% |
| Cash margin (gold revenue less production costs) | n/d | n/d | 1,318.1 (68.1%) | 1,220.2 (64.2%) | 2,315.8 (75.6%) |
| Net income | n/d | 286.7 | 41.6 | (626.7) | 426.7 |
| Diluted EPS ($) | n/d | 0.24 | 0.01 | (0.48) | 0.28 |
| Operating cash flow | n/d | 595.8 | 714.5 | 877.6 | 895.8 |
| Capex — sustaining / growth | n/d | n/d | 344.3 / 45.9 | 248.3 / 68.1 | 258.3 / 501.1 |
| Free cash flow | n/d | n/d | n/d | n/d | n/d |
| Net debt | n/d | n/d | (114.8) | 100.9 | 217.9 |
| Net debt / EBITDA | n/d | n/d | n/d | n/d | n/d |
| Diluted weighted shares (m) | n/d | n/d | 1,237.4 | 1,308.9 | 1,480.9 |
| DPS ($) | n/d | n/d | n/d | 0.16 | 0.08 |
Source: B2Gold FY2025 MD&A, Selected annual information p.5 (FY2023–FY2025), and FY2024 MD&A, Selected annual information (FY2022); FY2025 and FY2024 audited statements, earnings-per-share notes (diluted shares) and balance sheets pp.8, 9 (net debt). Notes: (1) the FY2021 column, FY2022 capex and net debt, and DPS before FY2024 need the FY2022–FY2023 annual filings, not in the source set; (2) capex from the MD&A reconciliations of sustaining to operating-mine capital (FY2025 MD&A pp.30–31; FY2024 MD&A p.36); growth is operating-mine capital less sustaining, so development outside the operating mines (Goose before 2025, Gramalote) is not in it; net debt is all debt, notes and leases included, less cash, bracketed where cash exceeds it; free cash flow n/d; EBITDA is not disclosed; (3) the FY2024 loss carries impairments.
4. Management, strategy & structure
4.1 Management & governance
Mike Cinnamond became President and CEO on 4 June 2026, succeeding Clive Johnson; he had been Senior Vice President Finance and CFO since 1 July 2013. Kelvin Dushnisky has been Executive Chair since 23 February 2026 and Johnson is Chair Emeritus; Michael McDonald succeeded Cinnamond as CFO on 4 June 2026. The board’s size and independence and the full committee list sit in the 2026 management information circular, not in the source set (n/d); the AIF names the Audit Committee. Women held 40% of board seats at the end of 2025, against a 30% target. Related-party transactions were US$16 million in 9M 2026 (US$11 million a year earlier). Directors and executive officers held 10,407,693 shares on 6 March 2026, about 0.8% of the shares.
4.2 Strategy
The filed strategy is organic: ramp Goose to 4,000 tonnes a day by the end of the first half of 2027 and grow the Back River district around it; bring Fekola Regional into production now that the Menankoto permit is in hand; hold Gramalote at feasibility; and spend about US$80 million on exploration in 2026. Non-core ground is sold, as the Fingold stake was in April 2026. No targets beyond 2026 are filed, and 2027 guidance is not yet issued.
4.3 Ownership & structure
The most material transaction on file is the sale of the 70% Fingold Ventures interest (the Finland Properties) to Agnico Eagle, completed on 23 April 2026 for a US$292 million gain. Minorities: the State of Mali (20% of the Fekola Mine, 35% of Fekola Regional) and EVI (10% of Otjikoto). B2Gold holds a strategic investment in Versamet under an investor rights agreement. Holders of 5% or more are n/d (circular). Shares outstanding were 1,317,220,545 at 4 November 2026; fully diluted, 1,492.2 million with about 145 million convertible-note shares, 20 million options, 4 million RSUs and 6 million PSUs. B2Gold lists on the TSX (BTO), NYSE American (BTG) and the Namibian Stock Exchange (B2G).
5. ESG & sustainability
B2Gold reported a lost-time injury frequency rate of 0.09 for 2025 (release, 26 May 2026) and targets a 30% cut in Scope 1 and 2 emissions by 2030 from a 2021 baseline. Tailings conformance with GISTM, the reporting framework and community spend sit in the 2025 sustainability report, which is not in the source set (n/d), so the ESG star is held at the median on what is filed.
6. Risks
Table 5. Risk register
| Risk | Type | Likelihood / impact | Exposure | Mitigant |
|---|---|---|---|---|
| Reserve lives run out | Operational | 4 / 4 | Fekola 5.27 and Masbate 6.84 years on reserve, Otjikoto months; producing mines about 7.6 years | 7.48 Moz attributable indicated beyond the reserves; Fekola Regional permitted; $80 m exploration |
| Mali fiscal and permitting regime | Jurisdiction | 3 / 5 | Fekola 27.2% of enterprise NAV; State of Mali holds 20%; $329.6 m non-current VAT receivable | Menankoto permit granted Aug 2026; carried in the jurisdiction star, not the rate |
| Gold falls below $4,366/oz | Commodity | 3 / 4 | The read turns Modestly undervalued; each $500/oz moves NAV by $1.29/share | Net cash before the notes; $705 m undrawn revolver |
| Cost inflation | Operational | 4 / 3 | Guided AISC $2,230–2,410/oz, highest in the peer set; +10% on costs takes NAV to $4.90 | Q3 guidance cut; Masbate at $1,250–1,400/oz |
| Goose ramp slips | Operational | 3 / 3 | 95,739 oz in 9M 2026 against 170,000–200,000 guided; held at the guided rate NAV is $5.31 | 3,200 tpd since mid-Oct 2026; 4,000 tpd targeted by end H1 2027 |
| Cash tax above statutory rates | Jurisdiction | 4 / 2 | $492 m current tax in 9M 2026 against the model’s $515.7 m full-year | Q4 payments guided at $154 m at $4,000/oz |
| Tailings and licence to operate | ESG | 2 / 3 | GISTM conformance n/d | LTIFR 0.09 in 2025; Scope 1 and 2 target |
| Local-currency costs and FX | Macro | 3 / 2 | Local share of costs n/d; a 10% weaker US$ on every local cost takes NAV to $4.90 at most (the cost +10% bound) | Costs guided in US$; bounded by the cost case in Section 7 |
| Convertible dilution | Balance sheet / dilution | 2 / 2 | ≈145 m shares at ≈$3.17 | Already in the 1,492.2 m fully diluted count |
| Gramalote never built | Development | 4 / 1 | At nothing NAV is $5.25, against $376.4 m risked at 0.40× | July 2025 feasibility study; held at a 0.40 weight |
| Collar ceiling and counterparties | Counterparty | 1 / 2 | 66,548 oz capped at $3,294/oz, $63 m out of the money | Rolls off by the end of 2027 |
Source: B2Gold FY2025 AIF, Q3 2026 MD&A and Q3 2026 interim statements; the cases in Section 7. Likelihood and impact are the author’s 1–5 assessment, not disclosed figures.
Figure 6. Risk matrix — likelihood × impact
Rare
Likely
Source: Table 5. Each point prints its likelihood × impact score; the shaded region is the high-likelihood, high-impact quadrant. Ratings are the author’s assessment, not disclosed figures.
Section 7 prices the first five: reserve life sets each mine’s years, the deck sets the read, the cost and Goose cases are its grid notes, and Mali’s risk sits in the jurisdiction star of the driver line, not in the discount rate.
7. Valuation
Valuation as of 5 November 2026, in US dollars. Horizon: spot fair value. Price deck: base gold US$4,500/oz — the 3-month, 6-month and 12-month trailing averages (US$4,303.64, US$4,290.96 and US$4,468.92, COMEX daily closes to 5 November 2026) all sit nearest that price on the US$3,000–5,000 grid; the scenarios run from US$3,000 to US$5,000 in US$500 steps. There is no secondary commodity: gold is the only revenue line B2Gold reports. Discount rate 5% real, after tax — the precious-metal producer rate, sensitised at 4% and 7%. Share price US$5.30 (C$7.40 TSX close on 5 November 2026, the day after the third-quarter MD&A, at USD/CAD 1.3972) on 1,492.2 million fully diluted shares.
B2Gold is valued on the producer (mining) archetype of How to Value Commodity Stocks, mine by mine. The four producing mines are Fekola in Mali (80% of the mine, 65% of the Fekola Regional ground), Goose in Nunavut (100%, ramping up since first gold on 30 June 2025), Masbate in the Philippines (100%) and Otjikoto in Namibia (90%). Gramalote in Colombia is added as a risked development project, along with a credit for the indicated ounces outside the reserves. Net asset value carries half the weight, EV/EBITDA on the next twelve months 30% and free-cash-flow yield support 20%. That is the producer set, unchanged.
Every mine’s life is set by its reserve. Each mine runs at its 2026 guidance midpoints for production and all-in sustaining cost until its 31 December 2025 probable reserve is used up. That reserve is first reduced by the ounces mined since January at the guided rate. On that basis Fekola lasts 5.27 years at its 91.7% recovery and Masbate 6.84 years. Otjikoto, whose reserve is now mostly stockpiles, lasts about two months. Goose is run on tonnes instead. Its 10.9 Mt reserve at 6.79 g/t goes through a mill running at 3,200 tonnes a day since October, rising to 4,000 tonnes a day by the end of the first half of 2027. That gives about 303,000 contained ounces in 2027 and 319,000 a year after, for 7.02 years in all, at the 2026 cost held. Each country’s statutory tax rate is charged on the cash margin, with no depreciation shield: Mali 30%, Canada 27%, the Philippines 25% and Namibia 37.5%.
Three claims sit outside the mine rows. The State of Mali’s interest in Fekola and EVI’s 10% of Otjikoto come off as minorities, at their share of each mine’s value. The Goose gold stream is deducted at its US$254.4 million carrying value, because its terms are not on file. The 2.75% convertible notes are counted as shares, because they convert at about US$3.17 a share, below the price. The target multiples sit 8% below their anchors, set by the Section 9 scorecard. The rest of the section follows the build in order: the vehicle map and the mine rows, the bridge to equity, the multiples on the next twelve months, the free-cash-flow build, and then the five grid prices side by side.
Table 6. Load-bearing inputs — the filed figures the valuation moves on (full register: Table 20)
| Input | Value | Where §7 uses it | Source |
|---|---|---|---|
| 2026 gold production guidance by mine (oz) — Fekola Complex; Goose; Masbate; Otjikoto | 390,000–420,000; 170,000–200,000; 180,000–200,000; 80,000–100,000 | Table 9, production and life; Table 13, volume | Filed · Q3 2026 MD&A · Fekola Complex · “Fekola Complex gold production guidance remains unchanged” · p.6; Filed · Q3 2026 MD&A · Goose Mine · “Goose gold production guidance remains unchanged” · p.8; Filed · Q3 2026 MD&A · Masbate Mine · “Masbate gold production guidance remains unchanged” · p.9; Filed · Q3 2026 MD&A · Otjikoto Mine · “Otjikoto gold production guidance remains unchanged” · p.11 |
| 2026 AISC guidance by mine (US$/oz sold) — Fekola Complex; Goose; Masbate; Otjikoto; consolidated | $2,350–2,500; $2,670–2,970; $1,250–1,400; $1,630–1,780; $2,230–2,410 | Table 9, margin rows; Table 13, margin; Table 11, corporate cost | Filed · Q3 2026 MD&A · Fekola Complex · “Fekola Complex gold production guidance remains unchanged” · p.6; Filed · Q3 2026 MD&A · Goose Mine · “Goose gold production guidance remains unchanged” · p.8; Filed · Q3 2026 MD&A · Masbate Mine · “Masbate gold production guidance remains unchanged” · p.9; Filed · Q3 2026 MD&A · Otjikoto Mine · “Otjikoto gold production guidance remains unchanged” · p.11; Filed · Q3 2026 MD&A · Highlights · “Reduced consolidated all-in sustaining cost guidance range” · p.3 |
| Probable reserves, 31 Dec 2025 (koz, 100%) — Fekola Complex; Goose; Masbate; Otjikoto; Gramalote; total | 2,700; 2,380; 1,460; 90; 2,360; 8,990 | Table 9, reserve left and life; block 6, value per reserve ounce | Filed · FY2025 AIF · Probable Mineral Reserves Statement · “Fekola Complex” · p.24; Filed · FY2025 AIF · Probable Mineral Reserves Statement · “Mine” · p.24; Filed · FY2025 AIF · Probable Mineral Reserves Statement · “Gold Project” · p.24; Filed · FY2025 AIF · Probable Mineral Reserves Statement · “stockpiles and Wolfshag Underground” · p.24; Filed · FY2025 AIF · Probable Mineral Reserves Statement · “Project” · p.24; Filed · FY2025 AIF · Probable Mineral Reserves Statement · “Probable Mineral Reserves (includes stockpiles)" · p.24 |
| Attributable reserves; attributable indicated resources, inclusive (AIF basis, Fekola Regional at 90%); inferred; Fekola Complex and Fekola Mine indicated (koz, 31 Dec 2025) | 8,530; 16,390; 10,450; 5,530 and 3,120 | Table 9, block 6 — restated to 65% Regional (less 25% of 880 koz reserve and 2,410 koz indicated), indicated exclusive Derived; inferred at 0.0 | Filed · FY2025 AIF · Probable Mineral Reserves Statement · “Probable Mineral Reserves (includes stockpiles)" · p.24; Filed · FY2025 AIF · Indicated Mineral Resource Statement · “Indicated Mineral Resources (includes stockpiles)" · p.27; Filed · FY2025 AIF · Inferred Mineral Resource Statement · “Inferred Mineral Resources” · p.27; Filed · FY2025 AIF · Indicated Mineral Resource Statement · “Fekola Complex” · p.26; Filed · FY2025 AIF · Indicated Mineral Resource Statement · “Fekola Mine” · p.27 |
| Goose reserve tonnes (kt) and grade (g/t); mill throughput now and target (tpd) | 10,900; 6.79; 3,200; 4,000 | Table 9, block 2 — the tonnes ramp | Filed · FY2025 AIF · Probable Mineral Reserves Statement · “Mine” · p.24; Filed · Q3 2026 MD&A · Summary and outlook · “Mill throughput is now averaging 3,200 tpd” · p.30 |
| Interests — Fekola Mine; Fekola Regional; Otjikoto (%); Fekola Regional reserve (koz, 100%) | 80; 65; 90; 880 | Table 8; Table 11, minorities; Table 15, minorities’ share — Fekola attributable 2,030 koz Derived (2,250 less 25% of 880) | Filed · Q3 2026 MD&A · Fekola Complex - Mali · “which will be owned 65% by B2Gold and 35% by the State of Mali” · p.5; Filed · Q3 2026 MD&A · Otjikoto Mine · “Otjikoto in Namibia is owned 90% by B2Gold” · p.10; Filed · FY2025 AIF · Probable Mineral Reserves Statement · “Regional” · p.24 |
| Fekola recovery, 9M 2026 (%) | 91.7 | Table 9, block 1 — recoverable ounces | Filed · Q3 2026 MD&A · Fekola Complex · “Recovery” · p.5 |
| Gramalote feasibility study (14 Jul 2025) — after-tax NPV(5%) (US$ m); IRR (%); gold price (US$/oz) | $941; 22.4; $2,500 | Table 9, block 5 | Filed · Release 14 Jul 2025 (Gramalote feasibility study) · Gramalote feasibility study · “After-Tax NPV (5%) of $941 Million” · p.1 |
| Cash (US$000); RCF; equipment loans; leases (US$000) — 30 Sep 2026 | $293,589; $90,355; $19,772; $49,607 | Table 11, net cash | Filed · Q3 2026 interim FS · Condensed interim consolidated balance sheets · “Cash and cash equivalents” · p.5; Filed · Q3 2026 interim FS · Note 11 Long-term debt · “Balance at September 30, 2026” · p.15 |
| Convertible notes — face (US$ m); coupon (%); shares if converted (m) | $460; 2.75; ≈ 145 | Table 11, convertible 0.0 and the diluted count | Filed · Q3 2026 MD&A · Liquidity and capital resources · “convertible senior unsecured notes” · p.16; Filed · Q3 2026 MD&A · Outstanding share data · “The Notes, if converted” · p.31 |
| Gold collars outstanding (oz); floor; ceiling (US$/oz) | 66,548; $2,450; $3,294 | Table 11, hedge book by column | Filed · Q3 2026 MD&A · Derivative financial instruments · “Ounces” · p.16 |
| Mine restoration provisions, current + non-current; income taxes payable; gold stream obligation, current + non-current (US$000) | $16,535 + $129,588; $306,625; $30,400 + $224,000 | Table 11, reclamation and tax line; stream line | Filed · Q3 2026 interim FS · Condensed interim consolidated balance sheets · “Mine restoration provisions” · p.5; Filed · Q3 2026 interim FS · Condensed interim consolidated balance sheets · “Current income and other taxes payable” · p.5; Filed · Q3 2026 interim FS · Condensed interim consolidated balance sheets · “Gold stream obligation (Note 15)" · p.5 |
| Receivables; current VAT; payables; long-term investments; associates (US$000) — 30 Sep 2026 | $89,374; $45,067; $177,961; $249,058; $135,582 | Table 11, working capital and investments | Filed · Q3 2026 interim FS · Condensed interim consolidated balance sheets · “Receivables, prepaids and other” · p.5; Filed · Q3 2026 interim FS · Condensed interim consolidated balance sheets · “Value-added and other tax receivables” · p.5; Filed · Q3 2026 interim FS · Condensed interim consolidated balance sheets · “Accounts payable and accrued liabilities” · p.5; Filed · Q3 2026 interim FS · Condensed interim consolidated balance sheets · “Long-term investments (Note 7)" · p.5 |
| Shares outstanding (4 Nov 2026); options; RSUs; PSUs (m); group sustaining capital (US$000) and D&A (US$ m), 9M 2026 | 1,317,220,545; 20; 4; 6; $370,124; $401 | Table 11, fully diluted shares; Tables 13 and 15, sustaining capital and the cash-tax base | Filed · Q3 2026 MD&A · Outstanding share data · “common shares were outstanding” · p.31; Filed · Q3 2026 MD&A · Outstanding share data · “The Notes, if converted” · p.31; Filed · Q3 2026 MD&A · For the nine months ended September 30, 2026 · “Sustaining capital expenditures (2)" · p.26; Filed · Q3 2026 MD&A · Review of financial results · “Depreciation and depletion expense” · p.13 |
Source: the B2Gold filings named in each row, on SEDAR+; the full register closes §10.1 as Table 20.
8. Near-term catalysts (1–3 years)
Table 18. Near-term catalysts
| Catalyst | Timing (company guidance) | Why it benefits B2Gold |
|---|---|---|
| Goose mill at 4,000 tonnes a day | By the end of H1 2027 | About 303,000 contained ounces in 2027 (Section 7), against 170,000–200,000 oz guided for 2026 |
| Fekola Regional (Menankoto) into the mill feed | Pre-stripping since October 2026 | Brings the 0.88 Moz Fekola Regional reserve to a complex with 5.27 years of reserve |
| 2026 delivery against guidance | Q4 2026 results | The low end needs 185,268 oz in Q4, after 193,321 oz in Q3 |
| Gold collars roll off | 49,911 oz in 2026, 16,637 oz in 2027 | Removes the $3,294/oz ceiling on the hedged ounces |
| Normal course issuer bid | To 2 April 2027 | Up to 10% of the shares, bought below NAV/share at today’s price |
Source: B2Gold Q3 2026 MD&A (4 November 2026) — Summary and outlook p.30, Highlights p.3, Derivative financial instruments p.16, Liquidity and capital resources; FY2025 AIF p.24. Timing is company guidance, not a guarantee.
Each catalyst adds ounces, years or cash per share — the levers the bear case turns on. As a producer, B2Gold carries no takeover-optionality subsection.
9. Rating & verdict
B2Gold is a mining producer in precious metals, scored on the producer weights against the five Section 2.9 peers: asset quality, cost, reserves, balance sheet and capital allocation at 15% each, the other four dimensions at 6.25%.
Figure 10. Scorecard by dimension, 5 November 2026
Figure data: Table 19. Each spoke prints its stars and weight; the dashed ring is the weighted composite, 2.55/5.
Table 19. Scorecard rationale — B2Gold, 5 November 2026
| Dimension | Weight | Score | Rationale |
|---|---|---|---|
| 1. Asset quality & scale | 15% | ★★★ | Four producing mines and 979.6 koz in 2025, third of six behind Kinross’s 2,070 koz GEO and Endeavour’s 1,209 koz; no mine above 27.2% of NAV; low grades outside Goose’s 6.79 g/t — Masbate 0.72 g/t, Fekola 1.76 g/t (Tables 2, 3) |
| 2. Cost position & margins | 15% | ★★ | 2026 AISC guidance $2,230–2,410/oz, the highest in the set — about $500/oz above Alamos’s and OceanaGold’s midpoints; FY2025 AISC $1,584/oz against Endeavour’s $1,433 and Lundin Gold’s $1,015; FY2025 cash margin 75.6% (Tables 3, 4) |
| 3. Reserves, life & replacement | 15% | ★★ | 8.99 Moz probable, no proven, at 31 Dec 2025; about 10.0 years with Gramalote and 7.6 for the producing mines, the shortest in a set running 10.1–30 years; Fekola 5.27 and Masbate 6.84 years (Table 3; Sections 2.3–2.6) |
| 5. Balance sheet & liquidity | 15% | ★★★ | Net cash $133.9 m before the notes; $705 m undrawn on the revolver to December 2028; 0.11× forward EBITDA with the notes; less net cash than Kinross, OceanaGold, Lundin Gold and Alamos, more than Endeavour (Section 3; Table 3) |
| 6. Capital allocation & returns | 15% | ★★ | $0.08 a year dividend (1.5%); diluted weighted shares from 1,237.4 m to 1,480.9 m over 2023–2025; $33 m of Q3 2026 buybacks; the Fingold sale for a $292 m gain; below Lundin Gold’s and OceanaGold’s payout records (Sections 3, 4.3) |
| 4. Growth & optionality | 6.25% | ★★★★ | Goose from 3,200 to 4,000 tpd by the end of H1 2027, about 303 koz contained in 2027; Menankoto permitted with pre-stripping under way; Gramalote at feasibility with 2.36 Moz; $80 m exploration; more funded growth than Lundin Gold, whose 2026 midpoint repeats 2025 (Table 3; Sections 2.3–2.7, 4.2) |
| 7. Management & governance | 6.25% | ★★★ | CEO Cinnamond and CFO McDonald since 4 Jun 2026, Executive Chair Dushnisky since 23 Feb 2026, Johnson Chair Emeritus; 40% women on the board; $16 m of related-party transactions in 9M 2026; independence n/d, scored at the median (Section 4.1) |
| 8. Jurisdiction & geopolitics | 6.25% | ★★ | Mali 27.2% of NAV with a 20% state interest and a $329.6 m VAT receivable; the Philippines, Namibia and Colombia beside Nunavut; of the peers only Endeavour Mining, all in West Africa, carries comparable country risk (Tables 2, 3; Section 6) |
| 9. ESG & licence to operate | 6.25% | ★★★ | LTIFR 0.09 in 2025; a 30% Scope 1 and 2 cut targeted by 2030; tailings and framework n/d, scored at the median (Section 5) |
| Composite | 100% | ★★½ | Average |
Source: each row cites its evidence in this analysis, from B2Gold’s filings on SEDAR+; peers per Table 3, from their own filings.
Weighted average: 0.45 + 0.30 + 0.30 + 0.45 + 0.30 + 0.25 + 0.1875 + 0.125 + 0.1875 = 2.55/5 → ★★½, Average.
The two-axis verdict. As of 5 November 2026, B2Gold rates ★★½ Average and reads Undervalued (wide band): blended fair value US$7.31 against US$5.30, implied +38.1%, on NAV/share of US$5.50 at the US$4,500/oz base — a re-rating candidate, and the catalyst to watch is Goose reaching 4,000 tonnes a day by the end of the first half of 2027. At the held multiples the share price implies gold at US$3,865/oz. The target multiples sit 8% below their anchors, carried down by the two-star cost, reserve, capital-allocation and jurisdiction dimensions; asset quality and the balance sheet hold at three stars and add nothing.
The bull case is cash: at the base deck the mines earn far more than the price pays for, a 14.4% free-cash-flow yield. The bear case is time and place: the highest costs in the set, producing reserves that run out within seven years, and over a quarter of the value in Mali. Reserve conversion tips it. To rank B2Gold against every listed gold producer on cost, reserve life and stage, see Metal Pilot’s gold mining stock screener.
10. Sources, methodology & disclaimer
10.1 Sources, methodology & data vintage
Company filings. B2Gold’s filings on SEDAR+, EDGAR and b2gold.com: the FY2025 AIF (11 March 2026; reserves and resources at 31 December 2025, NI 43-101), the FY2024 AIF (the Gramalote study), the FY2025 and FY2024 MD&A and audited statements, the Q1, Q2 and Q3 2026 MD&A, the Q3 2026 interim statements (4 November 2026), the 2026 AGM report of voting results and the 26 May 2026 sustainability release.
Market data. Yahoo Finance for the TSX close of C$7.40 on 5 November 2026 and USD/CAD 1.3972, and COMEX gold (GC=F) daily closes to 5 November 2026. No analyst-consensus capture is on file at the as-of, so that cross-check is n/d.
Methodology. Data as of 5 November 2026; balance sheet at 30 September 2026; share count at 4 November 2026; reserves at 31 December 2025 (NI 43-101), depleted to 5 November 2026 in Section 7. Base deck US$4,500/oz gold on the fixed US$3,000–5,000/oz grid in US$500 steps, no secondary commodity, 5% real after tax (4% and 7% sensitised); weights 50% NAV, 30% EV/EBITDA, 20% FCF yield; target multiples 8% below their anchors from the scorecard’s driver line. NAV/share US$5.50; blended fair value US$7.31 (US$2.42–9.06); implied +38.1%, Undervalued (wide band); market-implied deck US$3,865/oz. Peer basis: the five Section 2.9 producers, each on its own latest filings. Cadence: re-run after each quarterly report.
Re-run log. 6 November 2026: first edition, on the reset model, from the filings to the Q3 2026 MD&A and the TSX close of 5 November 2026: NAV/share US$5.64, blended fair value US$7.25, implied +36.9%, Undervalued (wide band); 2.6/5 Average. Same day, after the pre-launch review: Fekola Regional restated to its 65% interest (Q3 2026 MD&A) and Gramalote to its July 2025 feasibility study — NAV/share US$5.64 → US$5.50, blended fair value US$7.25 → US$7.05, implied +36.9% → +33.1%; read unchanged, Undervalued (wide band). Same day, second fix round: group sustaining capital restated to the four mines’ US$370 million for 9M 2026 (the Fekola Mine’s US$135 million was used) — forward EBITDA US$1,996.6 m → US$2,310.1 m; NAV/share unchanged at US$5.50, blended fair value US$7.05 → US$7.31, implied +33.1% → +38.1%; read unchanged. Same day, third: Table 4 net debt filled for FY2023–FY2025 from the year-end balance sheets; NAV/share, blend and read unchanged.
Figures not drawn. The asset map is not built. Figure 3 uses guided 2026 production by mine as a proxy, because revenue by mine is not in the facts on hand. The Section 3 financial line and the safety trend are not drawn.
Data gaps. The documents that would close them: the 2026 management information circular (board, holders of 5% or more); the 2025 sustainability report (tailings, framework); the FY2025 MD&A mine sections and non-IFRS reconciliations (production, AISC and revenue by mine; free cash flow by year); the FY2022 and FY2023 annual FS and MD&A (the FY2021 column, FY2022 capex and DPS before FY2024); NI 43-101 technical reports for Goose and Gramalote (expansion capital, unit cost, recovery) and the timing of a Gramalote construction decision, not guided; the Goose stream agreement; the option strikes; a dated analyst-consensus capture; and a provider series of five year-end multiples. The deck sensitivity, P/NAV map, cross-checks and grid notes are in the model’s out file, claude/valuation-models/b2gold-bto.out.md; the load-bearing inputs open Section 7 (Table 6) and the full register closes this section (Table 20).
Table 20. Source register — the filed figures behind the valuation (load-bearing inputs: Table 6)
| Input | Value | As of | Where §7 uses it | Source |
|---|---|---|---|---|
| MD&A for the quarter ended 30 September 2026 (4 Nov 2026) | ||||
| Fekola Complex (Mali) — interests | Fekola Mine 80% (State of Mali 20%); Fekola Regional 65% (State 35%) | 30 Sep 2026 | asset table; attributable NAV (the FY2025 AIF's attributable reserve and resource figures use 90% for Fekola Regional) | Filed · Q3 2026 MD&A · Fekola Complex - Mali · "which will be owned 65% by B2Gold and 35% by the State of Mali" · p.5 |
| Otjikoto (Namibia) — interest | 90% B2Gold, 10% EVI | 30 Sep 2026 | asset table | Filed · Q3 2026 MD&A · Otjikoto Mine · "Otjikoto in Namibia is owned 90% by B2Gold" · p.10 |
| Goose — mill throughput now · target | 3,200 tpd since mid-Oct 2026 · 4,000 tpd by end H1 2027 | 30 Sep 2026 | ramp by year | Filed · Q3 2026 MD&A · Summary and outlook · "Mill throughput is now averaging 3,200 tpd" · p.30 |
| News release, 14 July 2025 | ||||
| Gramalote (Colombia, 100%) — after-tax NPV(5%), IRR and gold price, feasibility study 14 Jul 2025 | $941 m · 22.4% · $2,500/oz | 14 Jul 2025 | development NAV | Filed · Release 14 Jul 2025 (Gramalote feasibility study) · Gramalote feasibility study · "After-Tax NPV (5%) of $941 Million" · p.1 |
| MD&A for the quarter ended 30 September 2026 (4 Nov 2026) | ||||
| Fekola Complex 2026 guidance: production · cash operating cost · AISC | 390,000–420,000 oz · $1,060–1,160/oz produced · $2,350–2,500/oz sold | 30 Sep 2026 | asset volume and unit cost | Filed · Q3 2026 MD&A · Fekola Complex · "Fekola Complex gold production guidance remains unchanged" · p.6 |
| Goose 2026 guidance: production · cash operating cost · AISC | 170,000–200,000 oz · $1,610–1,810/oz produced · $2,670–2,970/oz sold | 30 Sep 2026 | asset volume and unit cost | Filed · Q3 2026 MD&A · Goose Mine · "Goose gold production guidance remains unchanged" · p.8 |
| Masbate 2026 guidance: production · cash operating cost · AISC (reduced) | 180,000–200,000 oz · $800–900/oz produced · $1,250–1,400/oz sold | 30 Sep 2026 | asset volume and unit cost | Filed · Q3 2026 MD&A · Masbate Mine · "Masbate gold production guidance remains unchanged" · p.9 |
| Otjikoto 2026 guidance: production · cash operating cost · AISC (reduced) | 80,000–100,000 oz · $1,200–1,300/oz produced · $1,630–1,780/oz sold | 30 Sep 2026 | asset volume and unit cost | Filed · Q3 2026 MD&A · Otjikoto Mine · "Otjikoto gold production guidance remains unchanged" · p.11 |
| Annual Information Form for the year ended 31 December 2025 (filed 11 Mar 2026) | ||||
| Fekola Regional probable reserves | 13,800 kt at 1.97 g/t, 880 koz · 790 koz attributable | 31 Dec 2025 | reserves by mine | Filed · FY2025 AIF · Probable Mineral Reserves Statement · "Regional" · p.24 |
| Fekola Complex probable reserves (total) | 47,700 kt at 1.76 g/t, 2,700 koz · 2,250 koz attributable | 31 Dec 2025 | reserves by mine | Filed · FY2025 AIF · Probable Mineral Reserves Statement · "Fekola Complex" · p.24 |
| Goose Mine probable reserves | 10,900 kt at 6.79 g/t, 2,380 koz (100%) | 31 Dec 2025 | reserves by mine | Filed · FY2025 AIF · Probable Mineral Reserves Statement · "Mine" · p.24 |
| Masbate Gold Project probable reserves | 62,900 kt at 0.72 g/t, 1,460 koz (100%) | 31 Dec 2025 | reserves by mine | Filed · FY2025 AIF · Probable Mineral Reserves Statement · "Gold Project" · p.24 |
| Otjikoto (stockpiles and Wolfshag Underground) probable reserves | 1,200 kt at 2.33 g/t, 90 koz · 80 koz attributable | 31 Dec 2025 | reserves by mine; Otjikoto life | Filed · FY2025 AIF · Probable Mineral Reserves Statement · "stockpiles and Wolfshag Underground" · p.24 |
| Gramalote Project probable reserves | 76,700 kt at 0.96 g/t, 2,360 koz (100%) | 31 Dec 2025 | reserves by mine | Filed · FY2025 AIF · Probable Mineral Reserves Statement · "Project" · p.24 |
| Total Probable Mineral Reserves (includes stockpiles), 31 Dec 2025 | 8,990 koz (100%) · 8,530 koz attributable | 31 Dec 2025 | group reserves; reserve life | Filed · FY2025 AIF · Probable Mineral Reserves Statement · "Probable Mineral Reserves (includes stockpiles)" · p.24 |
| Fekola Complex indicated resources (inclusive) | 139,830 kt at 1.23 g/t, 5,530 koz · 4,660 koz attributable | 31 Dec 2025 | resources by mine | Filed · FY2025 AIF · Indicated Mineral Resource Statement · "Fekola Complex" · p.26 |
| Fekola Mine indicated resources (inclusive) | 75,720 kt at 1.28 g/t, 3,120 koz · 2,490 koz attributable | 31 Dec 2025 | resources by mine; the Regional's 65% restatement | Filed · FY2025 AIF · Indicated Mineral Resource Statement · "Fekola Mine" · p.27 |
| Total Indicated Mineral Resources (includes stockpiles) | 496,700 kt at 1.09 g/t, 17,350 koz · 16,390 koz attributable | 31 Dec 2025 | group resources | Filed · FY2025 AIF · Indicated Mineral Resource Statement · "Indicated Mineral Resources (includes stockpiles)" · p.27 |
| Total Inferred Mineral Resources | 263,620 kt at 1.23 g/t, 10,450 koz · 9,940 koz attributable | 31 Dec 2025 | group resources | Filed · FY2025 AIF · Inferred Mineral Resource Statement · "Inferred Mineral Resources" · p.27 |
| MD&A for the quarter ended 30 September 2026 (4 Nov 2026) | ||||
| Fekola recovery, Q3 2026 · 9M 2026 | 92.2% · 91.7% | 30 Sep 2026 | recovery | Filed · Q3 2026 MD&A · Fekola Complex · "Recovery" · p.5 |
| Sustaining capital expenditures, 9M 2026 — Fekola Mine · group (AISC reconciliation, four mines) | $135,319 k · $370,124 k | 30 Sep 2026 | sustaining line | Filed · Q3 2026 MD&A · For the nine months ended September 30, 2026 · "Sustaining capital expenditures (2)" · p.26 |
| Depreciation and depletion in cost of sales, Q3 · 9M 2026 | $119 m · $401 m | 30 Sep 2026 | EBITDA build | Filed · Q3 2026 MD&A · Review of financial results · "Depreciation and depletion expense" · p.13 |
| Condensed interim consolidated financial statements, 30 September 2026 | ||||
| Cash and cash equivalents | $293,589 k | 30 Sep 2026 | net debt; bridge | Filed · Q3 2026 interim FS · Condensed interim consolidated balance sheets · "Cash and cash equivalents" · p.5 |
| Receivables, prepaids and other | $89,374 k | 30 Sep 2026 | working capital | Filed · Q3 2026 interim FS · Condensed interim consolidated balance sheets · "Receivables, prepaids and other" · p.5 |
| Value-added and other tax receivables (current) · Value-added tax receivables (non-current) | $45,067 k · $329,593 k | 30 Sep 2026 | bridge; Mali VAT | Filed · Q3 2026 interim FS · Condensed interim consolidated balance sheets · "Value-added and other tax receivables" · p.5 |
| Long-term investments · Investments in associates | $249,058 k · $135,582 k | 30 Sep 2026 | bridge — investments | Filed · Q3 2026 interim FS · Condensed interim consolidated balance sheets · "Long-term investments (Note 7)" · p.5 |
| Accounts payable and accrued liabilities | $177,961 k | 30 Sep 2026 | working capital | Filed · Q3 2026 interim FS · Condensed interim consolidated balance sheets · "Accounts payable and accrued liabilities" · p.5 |
| Current income and other taxes payable | $306,625 k | 30 Sep 2026 | bridge — tax liability | Filed · Q3 2026 interim FS · Condensed interim consolidated balance sheets · "Current income and other taxes payable" · p.5 |
| Gold stream obligation, current · non-current | $30,400 k · $224,000 k | 30 Sep 2026 | bridge — stream (Goose) | Filed · Q3 2026 interim FS · Condensed interim consolidated balance sheets · "Gold stream obligation (Note 15)" · p.5 |
| Mine restoration provisions, current · non-current | $16,535 k · $129,588 k | 30 Sep 2026 | bridge — rehabilitation | Filed · Q3 2026 interim FS · Condensed interim consolidated balance sheets · "Mine restoration provisions" · p.5 |
| Debt by instrument at 30 Sep 2026: convertible notes · RCF · equipment loans · leases · total (carrying) | $386,469 · $90,355 · $19,772 · $49,607 · $546,203 k | 30 Sep 2026 | net debt | Filed · Q3 2026 interim FS · Note 11 Long-term debt · "Balance at September 30, 2026" · p.15 |
| MD&A for the quarter ended 30 September 2026 (4 Nov 2026) | ||||
| Convertible senior unsecured notes | $460 m at 2.75%, due 1 Feb 2030 (issued 28 Jan 2025); conversion shares in sh-dil | 30 Sep 2026 | bridge — convertibles at face; diluted count | Filed · Q3 2026 MD&A · Liquidity and capital resources · "convertible senior unsecured notes" · p.16 |
| Gold zero-cost collars outstanding 30 Sep 2026: 2026 · 2027 · total oz; floor; ceiling | 49,911 · 16,637 · 66,548 oz; floor $2,450; ceiling $3,294 | 30 Sep 2026 | hedge book; bridge | Filed · Q3 2026 MD&A · Derivative financial instruments · "Ounces" · p.16 |
| 2026 consolidated AISC guidance (reduced in Q3) | $2,230–2,410/oz sold (previously $2,370–2,550) | 30 Sep 2026 | unit-cost deck | Filed · Q3 2026 MD&A · Highlights · "Reduced consolidated all-in sustaining cost guidance range" · p.3 |
| Common shares outstanding, 4 Nov 2026 | 1,317,220,545 | 4 Nov 2026 | basic count; market cap | Filed · Q3 2026 MD&A · Outstanding share data · "common shares were outstanding" · p.31 |
| Dilutive instruments at 4 Nov 2026: convertible notes · options · RSUs · PSUs (approx.) | ≈ 145 m · 20 m · 4 m · 6 m | 4 Nov 2026 | fully-diluted count | Filed · Q3 2026 MD&A · Outstanding share data · "The Notes, if converted" · p.31 |
| Market data, 5 November 2026 | ||||
| Gold (COMEX front month) — 3-, 6- and 12-month averages of daily closes to 5 Nov 2026 | US$4,303.64; US$4,290.96; US$4,468.92/oz | 5 Nov 2026 | Opening block and Table 17, deck field (base US$4,500/oz) | Market · Yahoo Finance · "GC=F" daily closes to 5 Nov 2026 |
| Gold (COMEX front month) — average of daily closes 8 Nov 2021 – 5 Nov 2026 (five years); low; high | US$2,746.49/oz; US$1,630.90 (3 Nov 2022); US$5,318.40 (29 Jan 2026) | 5 Nov 2026 | Table 17, deck field; market-implied deck context (conclusion) | Market · Yahoo Finance · "GC=F" daily closes to 5 Nov 2026 |
| B2Gold share price — TSX close; USD/CAD | C$7.40; 1.3972 | 5 Nov 2026 | Table 11, current share price (US$5.30) | Market · Yahoo Finance · "BTO.TO" and "CAD=X" daily closes, 5 Nov 2026 |
Source: B2Gold’s filings on SEDAR+ and the Yahoo Finance market series named in each row; Table 6 is the load-bearing subset.
10.2 Disclaimer & disclosure
This analysis is for information only and is not investment advice, a recommendation or an offer to buy or sell any security. It is a point-in-time snapshot as of 5 November 2026: the price, the multiples and the valuation read all move. Reserve, resource and guidance figures are estimates on the codes stated beside each table. The Quality × Value verdict is an analytical read, never an instruction. This report was prepared with AI assistance (Claude Opus 5.5) from primary filings and the cited market data; check the filings before relying on any figure.