Coeur Mining (CDE) — Stock Analysis 2026 [3.6]
Analysis as of 11 August 2026. Coeur Mining stock analysis. Price deck: base gold $4,000/oz — the representative of the 3-, 6- and 12-month trailing averages ($4,296, $4,581 and $4,311/oz) on the fixed $3,000–5,000 grid — with every grid price run as a scenario (deep bear $3,000 to deep bull $5,000/oz), silver $60/oz moving with gold on its $40–80 grid, copper held at $6.00/lb, and the analyst consensus as a 0% cross-check — no spot price. Market data: NYSE close on 10 August 2026, $18.15 a share; the market-implied gold deck is $4,091/oz. Refreshed on each quarterly report and on material events. Rating: ★★★½ Solid / Fairly valued (wide band).
Coeur Mining is a gold-silver-copper producer — archetype producer (mining), sector precious metals — that two all-stock deals turned into a seven-mine company across the United States, Mexico and Canada. The thesis in one line: the cash flow has caught up with the share count, and the price already counts it. The second quarter of 2026 was the first with all seven mines — record revenue of $1,085.6 million and $387.5 million of free cash flow — and the company is net cash and paying its first dividend. To screen Coeur against every listed gold and silver producer on reserves, cost and reserve life, go to Metal Pilot’s gold mining stock screener.
1. Snapshot & thesis
Figure 1. Coeur Mining in numbers
valued
Figure data: Table 1 and its sources; NAV/share, fair value and read per Section 7, rating per Section 9.
Coeur Mining, Inc. (NYSE: CDE) is headquartered in Chicago and runs seven mines, all 100%-owned: Palmarejo (Chihuahua) and Las Chispas (Sonora) in Mexico; Rochester (Nevada), Kensington (Alaska) and Wharf (South Dakota) in the United States; and New Afton (British Columbia) and Rainy River (Ontario) in Canada, acquired with New Gold in March 2026. Silvertip (British Columbia) is on care and maintenance and Wilco (Nevada) is an inferred-resource project. Units: koz and Moz are thousand and million troy ounces, Mlb million pounds; CAS is costs applicable to sales; P&P is proven and probable.
Thesis in brief. The bull case: a net-cash producer, almost unhedged, whose 2026 guidance year earns a 49% cash margin and funds a dividend and buybacks. The bear case: the share count tripled in three years, two of the seven mines are still ramping inside a nine-month guidance, and the shares trade at 1.47× NAV. What tips it is the ramp at New Afton and Rainy River into 2027 and gold holding near the $4,091/oz the price already assumes.
Table 1. Coeur Mining in numbers
| Metric | Value | As of |
|---|---|---|
| Share price / fully diluted market cap | $18.15 / $18.8 bn (1,033.1 m shares) | 10 Aug 2026 |
| Enterprise value | $18.4 bn | 10 Aug 2026 |
| 2026 production guidance | gold 630,000–750,000 oz; silver 18.7–21.9 Moz; copper 40–50 Mlb | 5 Aug 2026 |
| H1 2026 revenue / adjusted EBITDA / free cash flow | $1,941.8 m / $953.2 m / $654.3 m | 30 Jun 2026 |
| Cash margin (adjusted EBITDA ÷ revenue) | 49.1% (H1 2026); 49.6% (FY2025) | 30 Jun 2026 |
| P&P reserves (pro forma) | 7.4 Moz Au; 282.1 Moz Ag; 591 Mlb Cu | 31 Dec 2025 |
| Net cash / net leverage | $347.0 m / (0.2)× | 30 Jun 2026 |
| NAV per share (base deck, 5% real) / P/NAV | $12.37 / 1.47× | 11 Aug 2026 |
| Blended fair value (range) | $17.37 ($8.27–$26.98) | 11 Aug 2026 |
| Valuation read / implied return | Fairly valued (wide band) / implied −4.3% | 11 Aug 2026 |
| Market-implied gold deck | $4,091/oz (silver $62) | 11 Aug 2026 |
| Dividend / repurchases | $0.02 a share semi-annual (first, May 2026) / $121 m repurchased mid-May to 31 Jul 2026 | 31 Jul 2026 |
Source: Q2 2026 results release (guidance, H1 results, net debt, repurchases), Q2 2026 Form 10-Q, 2025 Form 10-K and the New Afton and Rainy River technical report summaries (reserves); price per Yahoo Finance, NYSE close 10 August 2026; NAV, fair value and read per Section 7.
How to read this analysis: the statcards, Table 1 and Section 9 carry the verdict; Sections 2 to 6 carry the evidence and Section 7 the valuation.
2. Assets & operations
Coeur’s value moves with the gold and silver prices; for the market behind them, see the Gold — Complete Market Guide. This section covers what Coeur owns.
2.1 Portfolio overview
Table 2. Coeur Mining asset portfolio, sorted by base-case value
| Asset | Country | Stage | Interest | 2026 output (guidance) | P&P reserves, 31 Dec 2025 | Life | Unit cost (2026 CAS) | Operator (entity) | Value ($ m) |
|---|---|---|---|---|---|---|---|---|---|
| Rochester | USA (Nevada) | Producing, heap leach | 100% | 70–90 koz Au; 6.4–7.8 Moz Ag | 1,332 koz Au; 181.8 Moz Ag | 14.7 yr | $1,350–1,550/oz Au; $23.00–25.00/oz Ag | Coeur Rochester | 2,793.8 |
| New Afton | Canada (BC) | Producing, block cave, ramp-up | 100% | 50–60 koz Au; 40–50 Mlb Cu (nine months) | 780 koz Au; 591 Mlb Cu | to 2032 | $1,300–1,600/oz Au; $2.00–2.30/lb Cu | New Gold Inc. | 2,435.8 |
| Rainy River | Canada (Ontario) | Producing, open pit and underground, ramp-up | 100% | 190–230 koz Au (nine months) | 2,226 koz Au; 5.6 Moz Ag | to 2035 | $2,700–3,000/oz Au | New Gold Inc. | 2,332.8 |
| Palmarejo | Mexico (Chihuahua) | Producing, underground | 100% | 95–105 koz Au; 6.25–7.0 Moz Ag | 928 koz Au; 64.3 Moz Ag | 8.0 yr | $700–900/oz Au; $21.50–23.50/oz Ag | Coeur Mexicana | 1,618.1 |
| Wharf | USA (South Dakota) | Producing, heap leach | 100% | 72–90 koz Au | 1,250 koz Au | to 2038 | $1,400–1,600/oz Au | Wharf Resources (U.S.A.) | 1,232.8 |
| Las Chispas | Mexico (Sonora) | Producing, underground | 100% | 55–65 koz Au; 5.5–6.3 Moz Ag | 296 koz Au; 28.3 Moz Ag | 4.2 yr | $750–950/oz Au; $12.50–14.50/oz Ag | Compañía Minera La Llamarada | 907.8 |
| Kensington | USA (Alaska) | Producing, underground | 100% | 98–110 koz Au | 546 koz Au | 4.5 yr | $1,750–1,950/oz Au | Coeur Alaska | 496.2 |
| Silvertip | Canada (BC) | Care and maintenance | 100% | — | none (M&I 57.6 Moz Ag) | — | — | Coeur Silvertip Holdings | 0.0 |
| Wilco | USA (Nevada) | Inferred resource only | 100% | — | none (inferred 531 koz Au) | — | — | Coeur Mining | 0.0 |
Source: 2026 guidance and CAS per the Q2 2026 results release; reserves (S-K 1300) per the 2025 Form 10-K and the New Afton, Rainy River and Wharf technical report summaries; life is recoverable reserve ÷ guided rate from 30 June 2026, or the study’s last year; value is the base-case mine row of Section 7 before the resource conversion rows. Every asset is held by Coeur Mining (NYSE: CDE).
Concentration. No mine row carries more than Rochester’s $2.8 billion of the $14.8 billion enterprise NAV, but the three largest — Rochester, New Afton and Rainy River — carry half of it. By metal the picture narrows: Rochester holds 181.8 Moz of the 282.1 Moz pro-forma silver reserve, 64%, and New Afton all 591 Mlb of the copper.
2.2 Revenue split
Figure 2. Revenue by metal, Q2 2026
Figure data: Q2 2026 Form 10-Q, Note 4 — gold $695.0 m, silver $321.6 m, copper $69.0 m.
Figure 3. Revenue by asset, Q2 2026
Figure data: Q2 2026 Form 10-Q, Note 4 — the first quarter with all seven mines. Rainy River’s quarter included its first full months under Coeur.
Gold leads, silver is the swing metal and copper is a by-product credit; no mine earns more than 28.1% of revenue.
2.3 New Afton (British Columbia)
A 100%-owned copper-gold block cave near Kamloops, held through New Gold Inc. since March 2026; no stream or royalty is filed against it. Probable reserves (S-K 1300, 31 December 2025) are 36.2 Mt at 0.67 g/t gold and 0.74% copper — 780 koz gold, 2.1 Moz silver and 591 Mlb copper — struck at $1,650/oz gold and $3.50/lb copper; there are no proven reserves. The C-Zone ramps from 13,750 t/d at the start of 2026 to about 16,000 t/d by year-end; the study plan runs 104 koz gold and 87.4 Mlb copper in 2026, 132 koz and 103.6 Mlb in 2027, and ends in 2032. Guidance for the nine Coeur months is 50,000–60,000 oz gold and 40–50 Mlb copper at CAS $1,300–1,600/oz, with $51–61 million of capital; outstanding approvals are n/d in the documents read. First-half output was 15,664 oz gold and 12.7 Mlb copper. The asset risk is the cave itself: a draw-control or dilution problem hits gold and every pound of the group’s copper at once.
2.4 Rainy River (Ontario)
A 100%-owned gold mine in northwestern Ontario, held through New Gold Inc. Royal Gold’s stream takes 6.5% of gold to 230,000 oz delivered, then 3.25%, and 60% of silver to 3.1 Moz, then 30%, paying 25% of the spot price. Reserves (31 December 2025) are 54.5 Mt at 1.27 g/t — 2,226 koz gold and 5.6 Moz silver, 240 koz of it proven stockpile — with the underground holding 1,613 koz. The study plan runs ten years: 339 koz gold in 2026, 280 koz in 2027, open-pit mining to 2029 and the underground to the end of 2035. Nine-month guidance is 190,000–230,000 oz at CAS $2,700–3,000/oz, which carries a $244 million non-recurring inventory step-up from the acquisition accounting, and $150–170 million of capital. First-half output was 76,536 oz. The risk is the hand-over from pit to underground: the mill stays full only if the underground ramp arrives on grade.
2.5 Palmarejo (Chihuahua)
A 100%-owned underground silver-gold complex held through Coeur Mexicana. Franco-Nevada’s stream takes 50% of gold from the streamed area at the lesser of $800/oz or spot ($22.0 million deposit); 40–50% of 2026 gold sales fall under it. Reserves are 19.1 Mt at 1.51 g/t gold and 104.93 g/t silver — 928 koz and 64.3 Moz — up 36% and 40% in 2025 on prices, conversion drilling and technical revisions. Guidance is 95,000–105,000 oz gold and 6.25–7.0 Moz silver at CAS $700–900/oz gold and $21.50–23.50/oz silver, with $35–41 million of capital; first-half output was 41,520 oz and 2,964 koz. The risk is Mexico’s permitting and tax setting.
2.6 Rochester (Nevada)
A 100%-owned open-pit heap leach held through Coeur Rochester, with the largest value in the portfolio. Reserves are 447.7 Mt at 0.09 g/t gold and 12.63 g/t silver — 1,332 koz and 181.8 Moz, two-thirds of the group’s silver — for 14.7 years at the guided rate. ASARCO’s net smelter return royalty runs up to 5% when silver averages $31.68/oz or more (indexed) and the mine is cash-positive; it cost $11.7 million in 2025. Guidance is 70,000–90,000 oz gold and 6.4–7.8 Moz silver at CAS $1,350–1,550/oz gold and $23.00–25.00/oz silver, with $96–110 million of capital. Silver recovery is 59.4% in the reserve: the risk is heap-leach recovery, which is slower and less certain than a mill.
2.7 Las Chispas (Sonora)
A 100%-owned high-grade underground silver-gold mine, held through Compañía Minera La Llamarada and bought with SilverCrest in February 2025. A 2% royalty applies on the Nuevo Lupena and Panuco II concessions above set grades. Reserves are 3.2 Mt at 2.86 g/t gold and 272.96 g/t silver — 296 koz and 28.3 Moz, down 17% and 16% in 2025 as mining outpaced additions — about 4.2 years at the guided rate. Guidance is 55,000–65,000 oz gold and 5.5–6.3 Moz silver at CAS $750–950/oz gold and $12.50–14.50/oz silver, the lowest silver cost in the group, with $71–84 million of capital. The risk is reserve replacement.
2.8 Kensington, Wharf & the pipeline
Kensington (Alaska, Coeur Alaska) holds 546 koz of gold at 5.99 g/t, up 9% in 2025, for about 4.5 years; guidance is 98,000–110,000 oz at CAS $1,750–1,950/oz with $54–63 million of capital, under Maverix (1.25%, rising to 1.50% from 2027) and Hyak (5%) royalties. Wharf (South Dakota) holds 1,250 koz at 0.71 g/t, up 65% in 2025, mining to 2037 and processing to 2038 in its study; guidance is 72,000–90,000 oz at CAS $1,400–1,600/oz and $17–23 million of capital under Royal Gold’s 0–2% sliding-scale royalty and two 3% royalties. Silvertip (57.6 Moz silver measured and indicated) sits on care and maintenance at $10.4 million of carrying cost in 2025 and about $14 million in 2026 ($7 million in the first half, doubled), and Wilco carries 531 koz of inferred gold; both are valued at nil.
2.9 Production, reserves & costs
Figure 4. Consolidated gold production, 2023–2026E
Figure data: per-mine production in the 2025 Form 10-K, Item 2, summed; 2026 guidance per the Q2 2026 results release. First-half 2026 output was 259,947 oz.
Pro-forma P&P reserves are 7.4 Moz gold, 282.1 Moz silver and 591 Mlb copper (S-K 1300, 31 December 2025). Coeur’s own mines are struck at $2,200/oz gold and $26.00/oz silver; New Afton at $1,650/oz and $3.50/lb copper. Reserve life is uneven: 14.7 years at Rochester, about 4 at Las Chispas and Kensington. Consolidated CAS was $1,355/oz gold and $17.83/oz silver in 2025; Coeur publishes no all-in sustaining cost.
Figure 5. Reserves and resources by mine, 31 December 2025 (gold-equivalent)
Figure data: 2025 Form 10-K, Item 2, “Summary Gold Mineral Reserves / Resources” and “Summary Silver Mineral Reserves / Resources” (pp.37–39), for the five Coeur mines; the New Afton and Rainy River technical report summaries for the two mines acquired with New Gold. Proven and probable reserves (as in Table 2) and measured and indicated resources, which Coeur and both summaries report exclusive of reserves; S-K 1300, effective 31 December 2025. Gold-equivalent is this analysis’s conversion: gold plus silver at the §7 base-deck ratio, $4,000/oz gold over $60/oz silver = 66.7:1, on contained ounces with no recovery or payability adjustment; New Afton’s copper (591 Mlb of reserve) is not on this scale. Not drawn: Silvertip (care and maintenance; 57.6 Moz of M&I silver) and Wilco (inferred only). Inferred resources are not drawn.
By mine (Figure 5), Rochester’s 182 Moz of silver makes it the largest reserve once both metals are on one scale — 4.1 Moz AuEq — with 1.1 Moz AuEq of M&I behind it. Rainy River and Palmarejo carry the most M&I beyond their reserves, about 1.7 and 1.9 Moz AuEq, and New Afton holds twice its gold reserve in M&I below the cave; Las Chispas is the thinnest, 0.16 Moz AuEq of M&I behind a 0.72 Moz reserve.
2.10 Peer positioning
The peer set behind every star in Section 9: four North American-listed gold-silver producers that compete with Coeur for the same capital.
Table 3. Peer positioning — quality metrics
| Company | Listing | Basis | Gold | Silver | Cost | Jurisdictions |
|---|---|---|---|---|---|---|
| Pan American Silver | NYSE: PAAS | 2026 guidance | 700–750 koz | 25.0–27.0 Moz | n/d | Americas |
| Coeur Mining | NYSE: CDE | 2026 guidance | 630–750 koz | 18.7–21.9 Moz | CAS $1,355/oz Au (2025) | USA, Mexico, Canada |
| Hecla Mining | NYSE: HL | 2025 delivered | 151 koz | 17.0 Moz | n/d | USA, Canada |
| First Majestic Silver | NYSE: AG | 2025 produced | 147 koz | 15.4 Moz | n/d | Mexico, USA |
| SSR Mining | NASDAQ: SSRM | 2025 produced | 447 koz gold-equivalent | in gold-equivalent | AISC $2,153/oz (2025) | USA, Türkiye, Canada, Argentina |
Source: Pan American Silver 2025 production release (20 January 2026); Hecla Mining and SSR Mining 2025 Forms 10-K; First Majestic Silver FY2025 MD&A; Coeur per Table 2. Cost is n/d where no comparable measure was on hand; valuation multiples belong to Section 7’s standalone method, not here.
Coeur is second to Pan American on gold and silver output, and only SSR Mining publishes a comparable all-in cost; its distinction is three countries, all in North America, and the only copper by-product in the set. For Coeur against Pan American, Hecla and First Majestic on one construction, see Silver Producers Compared; ranked on silver output and placed on five measures, the group lines up in Best Silver Stocks.
3. Financials & balance sheet
Table 4. Five-year financial summary (US$ m unless noted)
| Metric | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Revenue | 832.8 | 785.6 | 821.2 | 1,054.0 | 2,070.1 |
| Revenue YoY % | +6.0% | −5.7% | +4.5% | +28.3% | +96.4% |
| Cash margin (adjusted EBITDA ÷ revenue) | 25.9% | 17.7% | 17.3% | 32.2% | 49.6% |
| Net income | (31.3) | (78.1) | (103.6) | 58.9 | 585.9 |
| EPS, diluted (US$) | (0.13) | (0.28) | (0.30) | 0.15 | 0.95 |
| Operating cash flow | 110.5 | 25.6 | 67.3 | 174.2 | 886.9 |
| Capex (sustaining / growth not split) | 309.8 | 352.4 | 364.6 | 183.2 | 221.2 |
| Free cash flow | (199.3) | (326.7) | (297.3) | (9.0) | 665.7 |
| Net debt / (net cash) | 430.8 | 454.5 | 483.7 | 535.0 | (213.1) |
| Net debt / adjusted EBITDA | 2.0× | 3.3× | 3.4× | 1.6× | (0.2)× |
| Diluted weighted shares (m) | 250.0 | 275.2 | 343.1 | 397.4 | 614.7 |
| Dividend per share (US$) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Source: 2025 Form 10-K and the 2021–2024 Forms 10-K, Item 7 and the statements; YoY %, cash margin and leverage derived; 2021 YoY on 2020 revenue of $785.5 million, the comparative in the 2021 Form 10-K (p.64); 2021–2022 net debt derived from cash and total debt.
The turn came in 2025: revenue nearly doubled with Las Chispas and higher prices, and operating cash flow of $886.9 million ran ahead of net income of $585.9 million, which itself included a deferred-tax benefit — adjusted net income was $493.4 million. Capital fell from $364.6 million in 2023 to $221.2 million as the Rochester expansion finished; the filings give no sustaining/growth split before the 2026 guidance of $360–405 million sustaining and $160–200 million development. The first half of 2026 brought $1,941.8 million of revenue and $654.3 million of free cash flow, after a $140 million non-cash inventory charge in the second quarter from the New Gold purchase accounting.
Cost deck. Guided CAS runs from $700–900/oz gold at Palmarejo to $2,700–3,000/oz at Rainy River; the Rochester royalty and the Palmarejo stream rise with price. Taxes: Mexican income and mining tax was $162.9 million in the first half; U.S. losses of $522.6 million and Canadian losses of $480.6 million shelter part of the income.
Balance sheet. Net cash was $347.0 million at 30 June 2026 — $1,052.3 million of cash against $705.3 million of debt, finance leases included — for net leverage of (0.2)× on $1,643.2 million of trailing adjusted EBITDA. Net cash keeps the ratio below zero at any deck that keeps the mines cash-positive. Liquidity is $2.0 billion with $972.3 million undrawn on the $1.0 billion revolver to March 2031; the 5.125% notes mature in February 2029 and the 6.875% notes in April 2032. Covenant levels are n/d. The reclamation provision is $423.5 million. Hedges are token: swaps on 5,000 oz of gold at $4,779/oz and 4.0 Mlb of copper at $5.94/lb. For how to read these lines, see Financial Metrics for Commodity Investing.
Capital returns and dilution. A first $0.02 semi-annual dividend was paid in June 2026, and $121 million of shares was repurchased from mid-May to 31 July. Against that, weighted diluted shares rose from 343.1 million in 2023 to 1,034.4 million in Q2 2026; 1,027,934,998 shares were outstanding on 3 August 2026.
4. Management, strategy & corporate structure
4.1 Management & governance
Mitchell J. Krebs is Chairman, President and Chief Executive Officer — one person in all three roles; his tenure sits in the 2026 proxy statement, not in the source set. Thomas S. Whelan is Executive Vice President and Chief Financial Officer (10-K FY2025; unchanged in the 5 August 2026 release). The board works through five committees: Audit; Compensation and Leadership Development; Executive; Nominating and Corporate Governance; and Environmental, Health, Safety and Corporate Responsibility. Two New Gold directors joined under the arrangement (names n/d). Board size, independence, holders of 5% or more and related-party transactions are n/d in the filings read.
4.2 Strategy
The stated aim is a North American gold-silver senior built by acquisition and organic growth, held to a policy of net cash. The 2026 plan names its targets: 630,000–750,000 oz gold, 18.7–21.9 Moz silver and 40–50 Mlb copper; New Afton’s C-Zone at about 16,000 t/d by the end of 2026; and $147–169 million of exploration, aimed first at replacing Las Chispas and Palmarejo reserves.
4.3 Ownership & structure
Table 5. Material corporate events & structure
| Item | Detail |
|---|---|
| New Gold acquisition | Arrangement agreement 2 November 2025; closed March 2026; 392,682,578 shares issued at $17.67 — purchase price $6,938.7 m; added New Afton and Rainy River |
| SilverCrest acquisition | Closed 14 February 2025; 1.6022 Coeur shares per SilverCrest share; 239,331,799 shares issued; added Las Chispas |
| Debt | $291.2 m 2029 notes (5.125%); $396.6 m 2032 notes (6.875%), issued in exchange for $385.8 m of New Gold notes; $13.7 m New Gold 2032 notes; revolver undrawn |
| Streams | Franco-Nevada at Palmarejo; Royal Gold at Rainy River (Section 2) |
| Subsidiaries | Coeur Mexicana, Compañía Minera La Llamarada, Coeur Rochester, Coeur Alaska, Wharf Resources (U.S.A.), Coeur Silvertip Holdings, New Gold Inc. |
| Non-controlling interests | None — every mine is held 100% |
| Shares | 1,027,934,998 outstanding at 3 August 2026; 1,033.061 m fully diluted |
Source: 2025 Form 10-K, Item 1 and the notes; Q2 2026 Form 10-Q, the business-combination and debt notes and cover page; fully diluted count per Section 7.
Two all-stock deals in thirteen months issued 632 million shares — the source of both the scale and the dilution in Section 3.
5. ESG & sustainability
Coeur reports that it met its 35% net greenhouse-gas intensity reduction target by the end of 2024 (the base year is not named in the 10-K), has formalised a Tailings Management Policy with a commitment to the Global Industry Standard on Tailings Management, is implementing a Biodiversity Management Standard and discloses in line with TCFD. Socially, 60% of new hires since 2018 have come from local communities, Coeur Heroes offered over 110 positions to U.S. military veterans in 2025, and 40-plus apprenticeships ran that year. Safety rates by year are n/d (Exhibit 95.1 is not in the text copy). Heap-leach closure at Rochester and Wharf is the standing liability.
6. Risks
The register is set before the valuation; Section 7 prices R1 in the row weight of the two acquired mines and R2 in its scenarios.
Table 6. Risk register
| Risk | Type | Likelihood / impact | Exposure | Mitigant |
|---|---|---|---|---|
| R1 Ramp-up at New Afton and Rainy River | Operational | 4 / 4 (16) | Two mines worth $4.8 bn of the $14.8 bn enterprise NAV | Study plans; New Afton C-Zone to 16,000 t/d |
| R2 Gold and silver price fall | Commodity | 3 / 5 (15) | Every mine; almost no hedges | Net cash of $347.0 m |
| R3 Short reserve life | Operational | 3 / 4 (12) | Las Chispas 4.2 yr, Kensington 4.5 yr | $147–169 m 2026 exploration |
| R4 Mexico permitting and tax | Political | 3 / 3 (9) | Palmarejo and Las Chispas, $2.5 bn of value | United States and Canada carry the rest |
| R5 Block-cave performance | Operational | 2 / 4 (8) | New Afton, all of the copper | Established cave, C-Zone plan |
| R6 Heap-leach recovery | Operational | 2 / 3 (6) | Rochester, 64% of silver reserves | Expansion complete |
| R7 Cost and currency inflation | Commodity | 3 / 2 (6) | Canadian and Mexican costs | Copper credits |
| R8 Dilutive M&A | Balance-sheet | 2 / 2 (4) | Per-share value | Net-cash policy, buybacks |
Source: risk factors in the 2025 Form 10-K, Item 1A; exposures per Sections 2 and 7; likelihood and impact are this analysis’s scores, 1–5 each.
Figure 6. Risk matrix — likelihood × impact
Rare
Likely
Figure data: Table 6; each point prints its likelihood × impact score; the shaded zone is high likelihood and high impact.
The register’s top two are the ramp and the metal price; the balance sheet pushes the financial risks to the bottom.
7. Valuation
Valuation as of 11 August 2026, in US dollars (Coeur reports and trades in US dollars — no FX conversion). Horizon: spot fair value. Price deck: base gold $4,000/oz, the representative of the 3-, 6- and 12-month trailing averages of the World Bank monthly gold series (3-month $4,296.00, 6-month $4,580.83 and 12-month $4,310.67/oz, to July 2026), the series deck the Agnico Eagle, Alamos, Pan American and Hecla analyses carry on the same averages; every grid price from $3,000 to $5,000/oz is run as a scenario. Silver $60/oz (3-month $67.83, 6-month $73.20, 12-month $64.53) moves step for step with gold on its $40–80 grid; copper $6.00/lb (3-month $6.14, 6-month $5.98, 12-month $5.48) is held in every column. Discount rate 5% real after-tax. Share price $18.15 (NYSE close, 10 August 2026); 1,033.1 m fully diluted shares; balance sheet 30 June 2026.
Coeur is valued as a producer, sum of the parts, following the How to Value Commodity Stocks guide. Seven producing mines carry the net asset value: the five Coeur mines — Palmarejo and Las Chispas in Mexico, Rochester, Kensington and Wharf in the United States — on their 2026 guidance, first-half actuals and 31 December 2025 reserves, and the two New Gold mines, New Afton and Rainy River, year by year on their technical report summaries, re-priced from each study’s own deck to the base deck. Wharf is struck on its own study too. Each mine’s measured and indicated resource outside its plan adds a conversion row at a stated fraction of the in-plan value per ounce; Silvertip, suspended, and Wilco, inferred only, are carried at 0.0.
Two encumbrances sit in the rows on their filed terms — the Franco-Nevada gold stream at Palmarejo and the Royal Gold gold and silver stream at Rainy River — so neither is charged again in the bridge. The only stage risk is the ramp-up of the two acquired mines, charged once in their row weight. Mexican mines are taxed at the first-half 2026 rate of income and mining tax on their income from operations, U.S. mines at the statutory rate and the three studied mines on their studies’ own schedules. Net cash, the reclamation provision, capitalised corporate costs and working capital bridge the asset values to equity. The net asset value carries half the weight; forward EBITDA and an FCF-yield build on the 2026 guidance year carry the rest.
Enterprise NAV at the base deck is $14.8 billion. The seven mine rows carry $11.8 billion — Rochester the largest mine row at $2.8 billion, New Afton and Rainy River together 32% of the total after their ramp-up weight, the two Mexican mines 17% — and the conversion rows $3.0 billion, a fifth of the total. Counted with each mine’s conversion row, the basis of the driver line in Table 13, New Afton is the largest asset at 25% of enterprise NAV and Palmarejo and Las Chispas together are 20%. The bridge takes $2.2 billion off, most of it the capitalised corporate costs, for a NAV/share of $12.37 at 5%.
Table 7. Load-bearing inputs — the filed figures the valuation moves on (full source register: Table 21)
| Input | Value | Where §7 uses it | Source |
|---|---|---|---|
| 2026 guidance — Mexico | Palmarejo: gold 95,000–105,000 oz; silver 6,250–7,000 koz; CAS $700–900/oz Au and $21.50–23.50/oz Ag; capital $35–41 m; Las Chispas: gold 55,000–65,000 oz; silver 5,500–6,300 koz; CAS $750–950/oz Au and $12.50–14.50/oz Ag; capital $71–84 m · 5 Aug 2026 | Table 10, blocks 1 and 2 | Filed | Q2 2026 results release | 2026 Production Guidance | “Palmarejo” | p.17 |
| 2026 guidance — United States | Rochester: gold 70,000–90,000 oz; silver 6,400–7,800 koz; CAS $1,350–1,550/oz Au and $23.00–25.00/oz Ag; capital $96–110 m; Kensington: gold 98,000–110,000 oz; CAS $1,750–1,950/oz; capital $54–63 m; Wharf: gold 72,000–90,000 oz; silver 50–200 koz; CAS $1,400–1,600/oz; capital $17–23 m · 5 Aug 2026 | Table 10, blocks 3 to 5 | Filed | Q2 2026 results release | 2026 Production Guidance | “Rochester” | p.17 |
| 2026 guidance — Canada, nine months, and the step-up inside it | New Afton: gold 50,000–60,000 oz; silver 100–180 koz; copper 40–50 Mlb; CAS $1,300–1,600/oz Au and $2.00–$2.30/lb Cu; capital $51–61 m; Rainy River: gold 190,000–230,000 oz; silver 380–450 koz; CAS $2,700–3,000/oz; capital $150–170 m; Step-up in guided CAS — New Afton $20 m; Rainy River $244 m (non-recurring) · 5 Aug 2026 | Table 10, blocks 6 and 7; Table 14 | Filed | Q2 2026 results release | 2026 Production Guidance | “New Afton” | p.17 |
| H1 2026 production — Mexico and United States | Palmarejo: Q1 22,918 oz Au and 1,475 koz Ag; Q2 18,602 oz Au and 1,489 koz Ag; Las Chispas: Q1 15,031 oz Au and 1,481 koz Ag; Q2 15,518 oz Au and 1,503 koz Ag; Rochester: Q1 14,112 oz Au and 1,394 koz Ag; Q2 11,671 oz Au and 1,225 koz Ag; Kensington: Q1 20,525 oz Au; Q2 21,528 oz Au; Wharf: Q1 9,772 oz Au; Q2 18,070 oz Au · 30 Jun 2026 | Table 10, blocks 1 to 5 — H2 2026 stub | Filed | Q2 2026 results release | Operations, Palmarejo | “Tonnes milled | 485,614 | 441,721” | p.10 |
| H1 2026 production — Canada — and capital by segment | New Afton: Q1 1,605 oz Au and 1,322 klb Cu; Q2 14,059 oz Au, 29 koz Ag and 11,377 klb Cu; Rainy River: Q1 12,494 oz Au; Q2 64,042 oz Au and 127 koz Ag; Capital by segment: New Afton $11,826 k; Rainy River $63,515 k; Las Chispas $28,793 k; Palmarejo $15,650 k; Rochester $40,710 k; Kensington $21,296 k; Wharf $11,162 k; Silvertip $6,720 k · 30 Jun 2026 | Table 10, blocks 6 and 7 — H2 2026 stub and capital | Filed | Q2 2026 results release | Operations, New Afton | “Tonnes milled | 1,101,408 | 134,385” | p.5 |
| Reserves, recoveries and exclusive M&I | Reserves: Palmarejo 64,318 koz Ag at 87.1%; Las Chispas 28,266 koz Ag at 97.5%; Rochester 181,814 koz Ag at 59.4%; Kensington 546 koz Au at 94.5%; Exclusive M&I, primary metal: Palmarejo 56,505 koz Ag; Las Chispas 6,357; Rochester 51,503; Kensington 433 koz Au; Wharf 1,185; New Afton 1,545; Rainy River 1,630 · 31 Dec 2025 | Table 10, blocks 1 to 4 — reserve life; block 8 — the resource tier | Filed | 10-K FY2025 | Item 2, Mineral Reserves | “Palmarejo (4)" | p.37 |
| Study NPVs, price decks and price sensitivities | NPVs at 5% (pre-tax / after-tax): New Afton $3132 m / $2,484.6 m; Rainy River $3,180 m / $2,635.4 m; Wharf $1,170 m / $902 m; Study decks: gold $4,550 / $4,000 / $3,800 / $3,600 / $3,100 per oz; copper $5.00 then $4.50 per lb; silver $60.00 / $48.00 / $44.00 / $42.00 / $38.00 per oz; Price sensitivities (−10% / +10%): New Afton $2,048 m / $2,921 m; Rainy River $1,990 m / $3,281 m; Wharf $711 m / $1,093 m | Table 10, blocks 5 to 7 — the study cross-check, re-pricing and retention | Filed | New Afton TRS 2025 | Section 1.19.3, Table 1-6 | “NPV Pre-Tax/After-Tax @ 5%" | p.28 |
| Study annual free cash flow | New Afton: 2027 594.0; 2028 567.7; 2029 518.7; 2030 312.4; 2031 218.6; 2032 (15.4); Rainy River: 2027 435.3; 2028 231.7; 2029 329.8; 2030 220.9; 2031 143.4; 2032 170.0; 2033 202.2; 2034 300.0; 2035+ 154.1; Wharf: 2027 239.9; 2028 124.9; 2029 80.7; 2030 75.7; 2031 86.5; 2032 73.6; 2033 69.7; 2034 79.1; 2035 74.3; 2036 63.4; 2037 59.5 · US$ m | Table 10, blocks 5 to 7 | Filed | New Afton TRS 2025 | Section 19.4, Table 19-2 | “Free cash flow” | p.163 |
| Streams and royalties | Rainy River Royal Gold stream: 6.5% of gold to 230,000 oz then 3.25%; 60% of silver to 3.1 Moz then 30%; Royal Gold pays 25% of spot; Palmarejo Franco-Nevada stream: 50% of gold from the streamed area at the lesser of $800 or spot; 40%–50% of 2026 gold sales under it; Royalties: Rochester ASARCO NSR up to 5% at silver ≥ $31.68; Kensington Maverix 1.25% then 1.50% | Table 10, blocks 1, 3, 4 and 7 | Filed | Rainy River TRS 2025 | Section 3.8 | “Royal Gold is provided 6.5% of the Rainy River” | p.51 |
| Tax basis | Mexico H1 2026 tax $162,852 k; U.S. federal 21.0% + state 5.5%; U.S. NOLs $522,637 k; Canada NOLs $480,612 k | Table 10 — the tax basis | Filed | Q2 2026 10-Q | Note 10, Income and Mining Taxes | “United States” | p.18 |
| Balance sheet and bridge lines at 30 Jun 2026 | cash $1,052,274 k; total debt $705,291 k; net cash $346,983 k; Repurchases: $121 m repurchased since mid-May 2026 to 31 Jul; $110,422 k executed to 30 Jun; Open swaps: gold 5,000 oz at $4,779/oz; copper 4,044 klb at $5.94/lb; Reclamation provision: $423,463 k at 30 Jun 2026; Working capital: receivables $73,562 k; accounts payable $262,383 k; accrued liabilities and other $201,866 k | Table 12 — the bridge lines | Filed | Q2 2026 results release | Net Debt and Leverage Ratio | “Total debt” | p.27 |
| Corporate costs and share count | Guidance for 2026: G&A $90–100 m; exploration expensed $118–132 m; Shares outstanding: 1,027,934,998 shares issued and outstanding at 3 Aug 2026 (cover page), the basic base of the fully diluted count | Table 12 — capitalised corporate costs; every per-share figure in §7 | Filed | Q2 2026 results release | 2026 Capital, Amortization, Exploration, G&A and Income and Mining Tax Guidance | “General & Administrative Expenses” | p.18 |
| Decks — trailing averages and the guidance deck | Trailing averages to Jul 2026: gold 3M $4,296.00, 6M $4,580.83, 12M $4,310.67; silver 3M $67.83, 6M $73.20, 12M $64.53; copper 3M $6.14/lb; Guidance deck: gold $4,000/oz; silver $60.00/oz; copper $6.00/lb; CAD 1.38; MXN 18.00 | Opening block — decks and their grid prices; Table 15 | Market | World Bank | “Gold”, monthly average ($/troy oz), Pink Sheet | to Jul 2026 |
Source: each row’s filing as cited — the 2025 Form 10-K, the Q2 2026 Form 10-Q and the technical report summaries; deck rows per the World Bank Pink Sheet.
8. Near-term catalysts (1–3 years)
Table 19. Near-term catalysts (1–3 years)
| Catalyst | Timing (from guidance) | Why it benefits Coeur |
|---|---|---|
| New Afton C-Zone at about 16,000 t/d | End of 2026 | Lifts output toward the study’s 2027 year of 132 koz gold and 103.6 Mlb copper |
| Rainy River purchase-accounting step-up rolls off | 2027 | The $244 m non-recurring inventory step-up leaves guided CAS |
| Rainy River underground ramp | 2026–2029 | Carries the mill as open-pit mining ends in 2029 |
| Year-end 2026 reserves at Las Chispas and Palmarejo | With the FY2026 results, early 2027 | Tests whether $147–169 m of exploration replaces mined ounces |
| Semi-annual dividend and repurchases | H2 2026 | Returns free cash flow while net cash holds |
Source: Q2 2026 results release (guidance, step-up, exploration) and the New Afton and Rainy River technical report summaries (ramp and plan years); timing is guidance, not a commitment.
Every catalyst is operational; Coeur is a producer, so no takeover-optionality subsection applies.
9. Rating & verdict
Figure 10. Scorecard by dimension, 11 August 2026
Figure data: Table 20. Each spoke prints its stars and weight; the dashed ring is the weighted composite, 3.58/5.
Table 20. Scorecard rationale (ordered by weight)
| Dimension | Weight | Score | Sourced rationale |
|---|---|---|---|
| Asset quality & scale | 15% | ★★★★ | Seven producing mines in three countries; 2026 guidance 630–750 koz gold and 18.7–21.9 Moz silver, second to Pan American in the peer set; Rochester’s $2.8 bn is the largest of $14.8 bn of enterprise NAV (Q2 2026 release; Section 7) |
| Cost position & margins | 15% | ★★★ | 2025 CAS $1,355/oz gold and $17.83/oz silver; 2026 mine guidance from $700–900/oz (Palmarejo) to $2,700–3,000/oz (Rainy River); no AISC published, so only SSR Mining ($2,153/oz) compares — the peer median (10-K FY2025; Q2 2026 release) |
| Reserves, life & replacement | 15% | ★★★★ | 7.4 Moz gold, 282.1 Moz silver, 591 Mlb copper P&P (S-K 1300, 31 Dec 2025); 2025 gains at Palmarejo (+36% gold), Wharf (+65%), Kensington (+9%) against Las Chispas (−17%); life 14.7 yr at Rochester, about 4 at two mines — above the peer median on silver (10-K FY2025; TRS) |
| Balance sheet & liquidity | 15% | ★★★★ | Net cash $347.0 m and $972.3 m undrawn at 30 Jun 2026, leverage (0.2)× — among the strongest in the peer set, short of top decile with a $423.5 m reclamation provision (Q2 2026 10-Q) |
| Capital allocation & returns | 15% | ★★★ | Diluted shares 343.1 m (2023) to 1,034.4 m (Q2 2026) through SilverCrest and New Gold; first $0.02 dividend and $121 m repurchased in 2026 — a peer-median record, per-share value still to show (10-K FY2025; Q2 2026 release) |
| Growth & optionality | 6.25% | ★★★★ | New Afton to 16,000 t/d, Rainy River underground to 2035, $147–169 m of 2026 exploration; Silvertip idle — above the sector median, most of it bought (Q2 2026 release; TRS) |
| Management & governance | 6.25% | ★★★ | Combined Chairman, President and CEO; five named committees; independence, holders and related parties n/d — sector median (10-K FY2025) |
| Jurisdiction & geopolitics | 6.25% | ★★★★ | United States and Canada carry all but $2.5 bn of the mine value; Mexico is the exposed share — ahead of SSR Mining (Türkiye) and First Majestic (Mexico) (Section 7) |
| ESG & licence to operate | 6.25% | ★★★ | 35% GHG-intensity target met, GISTM commitment, TCFD-aligned disclosure; safety rates n/d — sector median (10-K FY2025) |
| Composite | 100% | ★★★½ | Solid |
Source: this analysis — each row’s filing as cited; peers per Table 3. Weighted average: 15% × (4 + 3 + 4 + 4 + 3) + 6.25% × (4 + 3 + 4 + 3) = 2.70 + 0.875 = 3.58/5 → ★★★½, Solid; producer weights, the five 15% dimensions leading.
The two-axis verdict. As of 11 August 2026, Coeur is Solid (★★★½) on quality and Fairly valued (wide band) on value — a blended fair value of $17.37 against $18.15, implied −4.3% — which reads Priced about right. The price implies gold at $4,091/oz with silver at $62, just above the $4,000 base deck; the target multiples carry asset scale, reserves, the balance sheet and jurisdiction (Dims 1, 3, 5 and 8, +0.08). The bull case is cash: a 49% margin, net cash and 7.8% free-cash-flow yield after all capital. The bear case is the 1.47× P/NAV and two mines still ramping. Gold above $4,300/oz or a clean 2027 at New Afton and Rainy River tips the read up; below $3,881/oz it turns Modestly overvalued. This is an analytical read, not a recommendation. To rank Coeur against its peers on these dimensions, screen the sector on Metal Pilot’s gold mining stock screener.
10. Sources, methodology & disclaimer
10.1 Sources, methodology & data vintage
Company filings: 2025 Form 10-K (filed 18 February 2026) and the 2021–2024 Forms 10-K; Q1 and Q2 2026 Forms 10-Q; the Q2 2026 results release (5 August 2026), the Q1 2026 and FY2025 results releases and the post-closing company update (23 March 2026). Technical reports: the New Afton, Rainy River and Wharf S-K 1300 technical report summaries, effective 31 December 2025. Market: Yahoo Finance (price), the World Bank Pink Sheet (decks), Bank of Canada and FRED (FX). Peers: as Table 3.
Methodology. Durable figures from the filings to 5 August 2026; market data at the NYSE close on 10 August 2026 ($18.15 a share, 1,033.1 m fully diluted shares); nothing dated after 11 August 2026 is used. Deck: gold $4,000/oz on the $3,000–5,000 grid, silver $60 on $40–80 co-moved, copper $6.00/lb held; 5% real after-tax. Weights: NAV at target P/NAV 50%, EV/EBITDA 30%, FCF yield 20%; cross-checks at 0%. Peer basis: Table 3. Cadence: each quarterly report and material events. The model’s full output — deck sensitivity, P/NAV map and cross-checks — is claude/valuation-models/coeur-mining-cde.out.md.
Re-run log. 11 August 2026: first published; read Modestly overvalued. 10 October 2026: re-aligned to the current template on the same as-of date; deck to $4,000 gold, $60 silver, $6.00 copper; New Afton and Rainy River valued on their technical reports; scorecard rescored to ★★★½ (3.6) — blend $17.37, implied −4.3%, read Fairly valued (wide band). Pre-launch gate fixes the same day: the New Gold sites’ closure charged once (the reclamation line carries the $284.3 million the study rows do not), current income and mining taxes split from working capital, enterprise value on diluted shares — NAV/share $12.23 → $12.37, blend $17.29 → $17.37, implied −4.7% → −4.3%; read unchanged.
Omitted figures and data gaps. The asset location map is not built. Not on hand: New Gold’s FY2025 40-F (New Afton and Rainy River 2025 actuals), Coeur’s 2026 proxy (board, holders, related parties), Exhibit 95.1 (safety) and the credit agreement (covenant levels) — each printed n/d where it would apply.
Table 21. Source register — the filed figures behind the valuation (load-bearing inputs: Table 7)
| Input | Value | As of | Where §7 uses it | Source |
|---|---|---|---|---|
| Form 10-K, year ended 31 December 2025 | ||||
| Palmarejo — silver reserves, 31 Dec 2025 | proven 5,138 kt at 117.11 g/t = 19,344 koz; probable 13,927 kt at 100.44 g/t = 44,973 koz; total 19,064 kt at 104.93 g/t = 64,318 koz | 31 Dec 2025 | NAV build — Palmarejo block (reserves) | Filed | 10-K FY2025 | Item 2, Mineral Reserves | "Palmarejo (4)" | p.37 |
| Las Chispas — silver reserves, 31 Dec 2025 | proven 981 kt at 442.91 g/t = 13,973 koz; probable 2,240 kt at 198.50 g/t = 14,293 koz; total 3,221 kt at 272.96 g/t = 28,266 koz | 31 Dec 2025 | NAV build — Las Chispas block (reserves) | Filed | 10-K FY2025 | Item 2, Mineral Reserves | "Las Chispas (8)" | p.37 |
| Rochester — silver reserves, 31 Dec 2025 | proven 402,556 kt at 12.81 g/t = 165,799 koz; probable 45,100 kt at 11.04 g/t = 16,014 koz; total 447,656 kt at 12.63 g/t = 181,814 koz | 31 Dec 2025 | NAV build — Rochester block (reserves) | Filed | 10-K FY2025 | Item 2, Mineral Reserves | "Rochester (5)" | p.37 |
| Kensington — gold reserves, 31 Dec 2025 | proven 1,539 kt at 5.92 g/t = 293 koz; probable 1,297 kt at 6.07 g/t = 253 koz; total 2,836 kt at 5.99 g/t = 546 koz | 31 Dec 2025 | NAV build — Kensington block (reserves) | Filed | 10-K FY2025 | Item 2, Mineral Reserves | "Kensington (6)" | p.37 |
| Palmarejo — Franco-Nevada gold stream | 50% of Palmarejo gold production at the lesser of $800 or spot per ounce; excludes certain properties acquired in 2015 | 31 Dec 2025 | NAV build — Palmarejo stream deduction | Filed | 10-K FY2025 | Item 2, Properties, Palmarejo, Other | "Coeur Mexicana is obligated to sell 50% of Palmarejo gold production" | p.30 |
| Rochester — ASARCO net smelter return royalty | NSR up to 5% when the average quarterly silver price is at or above $31.68/oz (inflation-indexed) and the mine has positive cash flow; maximum $250,000 if cash flow is negative; 2025 royalty expense $11.7 m vs nil in 2024 | 31 Dec 2025 | NAV build — Rochester royalty | Filed | 10-K FY2025 | Item 2, Properties, Rochester, Other | "Coeur Rochester is obligated to pay a net smelters return of up to 5% to ASARCO" | p.31 |
| Kensington — Maverix and Hyak royalties | Maverix net returns royalty 1.25% to 31 Dec 2026 then 1.50% until two million oz of gold; Hyak 5% net returns royalty with $231,000k advance minimum; 2025 royalty expense $4.9 m vs $3.2 m in 2024 | 31 Dec 2025 | NAV build — Kensington royalty | Filed | 10-K FY2025 | Item 2, Properties, Kensington, Other | "Coeur is obligated to pay Maverix a net returns royalty of 1.25%" | p.32 |
| Effective tax rate, FY2023–FY2025 | 2025 14.2%; 2024 53.4%; 2023 (51.4)%; US federal statutory rate 21.0%; Mexican mining taxes net of benefit $(27,276) k in 2025 | 31 Dec 2025 | Tax treatment — effective vs statutory rate | Filed | 10-K FY2025 | Note 11, Income and Mining Taxes | "Income and mining tax (expense) benefit" | p.94 |
| Net operating losses by jurisdiction at 31 Dec 2025 | US $522,637 k (2026–2037 and indefinite); Canada $480,612 k (2028–2044); Mexico $4,971 k (2029–2036); New Zealand $77,861 k (indefinite); other $787 k; total $1,086,868 k; US NOLs: $313.8 m pre-2018 (20-year) and $208.8 m indefinite | 31 Dec 2025 | Tax treatment — NOLs and expiry; pre-New Gold (New Gold’s own pools n/d in the 10-Q) | Filed | 10-K FY2025 | Note 11, tax attribute carryforwards | "Regular net operating losses" | p.96 |
| State income and mining taxes, net of federal benefit, FY2025 (% of pre-tax) | 5.5% | 31 Dec 2025 | NAV build — U.S. tax rate (21.0% + 5.5%) | Filed | 10-K FY2025 | Note 14, income tax reconciliation | "State income and mining taxes, net of federal benefit" | p.94 |
| Wharf Operations S-K 1300 technical report summary, effective 31 December 2025 | ||||
| Wharf TRS — NPV at 5%, pre-tax and after-tax | pre-tax $1,170 m and after-tax $902 m at a 5% discount rate, 100% basis, constant prices, valuation as at the 31 Dec 2025 report date | 31 Dec 2025 | NAV build — Wharf TRS cross-check | Filed | Wharf TRS 2025 | Section 1.19.3, Table 1-6 | "Pre-Tax/After-Tax NPV 5%" | p.28 |
| Wharf TRS — NPV sensitivity to metal price (US$ m) | -30% $317; -20% $517; -10% $711; -5% $807; base $902; +5% $998; +10% $1,093; +20% $1,284; +30% $1,474 | 31 Dec 2025 | NAV build — Wharf price sensitivity | Filed | Wharf TRS 2025 | Section 1.19.4, Table 1-7 | "Metal Price ($M) | $317" | p.29 |
| Wharf TRS — free cash flow by year, 2026–2039 (US$ m) | 2026 135.8; 2027 239.9; 2028 124.9; 2029 80.7; 2030 75.7; 2031 86.5; 2032 73.6; 2033 69.7; 2034 79.1; 2035 74.3; 2036 63.4; 2037 59.5; 2038 (8.0); 2039 (53.9) | 31 Dec 2025 | NAV build — Wharf re-struck year by year; the 2038–2039 closure outflows sit in the bridge provision | Filed | Wharf TRS 2025 | Section 19.4, Table 19-2 | "FCF" | p.148 |
| New Afton Operations S-K 1300 technical report summary, effective 31 December 2025 | ||||
| New Afton TRS — NPV at 5%, pre-tax and after-tax | pre-tax $3132 m and after-tax $2,484.6 m (text: $2,485 m) at a 5% discount rate on existing operations, reverting price curve, no federal income tax paid on historic losses | 31 Dec 2025 | NAV build — New Afton TRS cross-check | Filed | New Afton TRS 2025 | Section 1.19.3, Table 1-6 | "NPV Pre-Tax/After-Tax @ 5%" | p.28 |
| New Afton TRS — price forecast used in the cash flow | gold $4,550 (2026), $4,000 (2027), $3,800 (2028), $3,600 (2029), $3,100 (2030+) per oz; copper $5.00 (2026-2029), $4.50 (2030+) per lb | 31 Dec 2025 | NAV build — New Afton price deck vs the §7 deck | Filed | New Afton TRS 2025 | Section 1.19.3, Table 1-5 | "Commodity Price Forecast Used in Cashflow Analysis" | p.28 |
| New Afton TRS — free cash flow by year, 2026–2032 (US$ m) | 2026 543.8; 2027 594.0; 2028 567.7; 2029 518.7; 2030 312.4; 2031 218.6; 2032 (15.4) | 31 Dec 2025 | NAV build — New Afton re-struck year by year | Filed | New Afton TRS 2025 | Section 19.4, Table 19-2 | "Free cash flow" | p.163 |
| New Afton TRS — after-tax NPV sensitivity to metal price (US$ m) | -30% $1,176; -20% $1,612; -10% $2,048; -5% $2,267; base $2,485; +5% $2,703; +10% $2,921; +20% $3,357; +30% $3,793 | 31 Dec 2025 | NAV build — New Afton retention k | Filed | New Afton TRS 2025 | Section 19.5, Table 19-3 | "Metal price" | p.164 |
| Rainy River Operations S-K 1300 technical report summary, effective 31 December 2025 | ||||
| Rainy River TRS — NPV at 5%, pre-tax and after-tax | pre-tax $3,180 m and after-tax $2,635.4 m (text: $2,635 m) at a 5% discount rate on existing operations, reverting price curve; no federal income tax paid on historic losses | 31 Dec 2025 | NAV build — Rainy River TRS cross-check | Filed | Rainy River TRS 2025 | Section 1.19.3, Table 1-6 | "NPV Pre-Tax/After-Tax @5%" | p.32 |
| Rainy River TRS — metal price assumptions in the cash flow | gold $4,550 (2026), $4,000 (2027), $3,800 (2028), $3,600 (2029), $3,100 (2030+) per oz; silver $60.00, $48.00, $44.00, $42.00, $38.00 per oz | 31 Dec 2025 | NAV build — Rainy River price deck vs the §7 deck | Filed | Rainy River TRS 2025 | Section 1.19.2, Table 1-5 | "Metal Price Assumptions" | p.31 |
| Rainy River TRS — Royal Gold stream | $175 m upfront deposit (2015); Royal Gold receives 6.5% of gold up to 230,000 oz then 3.25%, and 60% of silver up to 3.1 Moz then 30%; pays 25% of the spot price per ounce delivered | 31 Dec 2025 | NAV build — Rainy River stream | Filed | Rainy River TRS 2025 | Section 3.8 | "Royal Gold is provided 6.5% of the Rainy River" | p.51 |
| Rainy River TRS — after-tax NPV sensitivity to metal price (US$ m), the cash-flow chapter's table | -30% $700; -20% $1,345; -10% $1,990; -5% $2,313; base $2,635; +5% $2,958; +10% $3,281; +20% $3,926; +30% $4,571 | 31 Dec 2025 | NAV build — Rainy River retention k; the base is the $2,635.4 m after-tax NPV | Filed | Rainy River TRS 2025 | Section 19.4, Table 19-4 | "Metal price" | p.173 |
| Rainy River TRS — free cash flow by year, 2026–2035 and after (US$ m) | 2026 856.5; 2027 435.3; 2028 231.7; 2029 329.8; 2030 220.9; 2031 143.4; 2032 170.0; 2033 202.2; 2034 300.0; 2035+ 154.1 | 31 Dec 2025 | NAV build — Rainy River re-struck year by year | Filed | Rainy River TRS 2025 | Section 19.4, Table 19-3 (continued) | "Free Cash Flow" | p.172 |
| Q2 2026 results release, 5 August 2026 | ||||
| Palmarejo — gold sold under the Franco-Nevada stream | 10,084 oz or about 51% of Q2 gold sales sold under the stream at $800/oz; about 40%-50% of 2026 gold sales expected under the stream | 30 Jun 2026 | NAV build — Palmarejo stream | Filed | Q2 2026 results release | Operations, Palmarejo, Other | "were sold under the gold stream agreement with Franco-Nevada" | p.11 |
| Price and FX deck behind the August 2026 guidance | updated: gold $4,000/oz, silver $60.00/oz, copper $6.00/lb, CAD 1.38, MXN 18.00; previous: gold $4,550/oz, silver $77.50/oz, copper $5.00/lb; excludes hedges | 30 Jun 2026 | NAV build — guidance deck vs the §7 deck | Filed | Q2 2026 results release | 2026 Guidance, note | "previous guidance figures assumed estimated prices of" | p.18 |
| Net debt and leverage | total debt $705,291 k; cash $(1,052,274) k; net debt $(346,983) k; LTM adjusted EBITDA $1,643,246 k; leverage ratio (0.2)x | 5 Aug 2026 | Bridge — net cash; liquidity | Filed | Q2 2026 results release | Net Debt and Leverage Ratio | "Total debt" | p.27 |
| Capital return since mid-May 2026 | repurchased $121 m of common stock, or 6.7 m shares, through 31 July 2026; inaugural $0.02 per share semi-annual dividend paid in June | 31 Jul 2026 | Capital returns — buyback executed to 31 Jul 2026 | Filed | Q2 2026 results release | Key Highlights | "Coeur has repurchased" | p.1 |
| 2026 production guidance — New Afton (nine months) | updated gold 50,000–60,000 oz; silver 100–180 koz; copper 40–50 Mlb; previous gold 60,000–80,000 oz; silver 130–180 koz; copper 50–65 Mlb | 5 Aug 2026 | Guidance — 2026 production by asset (five legacy mines unchanged; New Afton and Rainy River nine-month, refined) | Filed | Q2 2026 results release | 2026 Production Guidance | "New Afton" | p.17 |
| 2026 production guidance — Rainy River (nine months) | updated gold 190,000–230,000 oz; silver 380–450 koz; previous gold 230,000–275,000 oz; silver 350–450 koz | 5 Aug 2026 | Guidance — 2026 production by asset (five legacy mines unchanged; New Afton and Rainy River nine-month, refined) | Filed | Q2 2026 results release | 2026 Production Guidance | "Rainy River" | p.17 |
| 2026 production guidance — Las Chispas (unchanged) | gold 55,000–65,000 oz; silver 5,500–6,300 koz | 5 Aug 2026 | Guidance — 2026 production by asset (five legacy mines unchanged; New Afton and Rainy River nine-month, refined) | Filed | Q2 2026 results release | 2026 Production Guidance | "Las Chispas" | p.17 |
| 2026 production guidance — Palmarejo (unchanged) | gold 95,000–105,000 oz; silver 6,250–7,000 koz | 5 Aug 2026 | Guidance — 2026 production by asset (five legacy mines unchanged; New Afton and Rainy River nine-month, refined) | Filed | Q2 2026 results release | 2026 Production Guidance | "Palmarejo" | p.17 |
| 2026 production guidance — Rochester (unchanged) | gold 70,000–90,000 oz; silver 6,400–7,800 koz | 5 Aug 2026 | Guidance — 2026 production by asset (five legacy mines unchanged; New Afton and Rainy River nine-month, refined) | Filed | Q2 2026 results release | 2026 Production Guidance | "Rochester" | p.17 |
| 2026 production guidance — Kensington (unchanged) | gold 98,000–110,000 oz | 5 Aug 2026 | Guidance — 2026 production by asset (five legacy mines unchanged; New Afton and Rainy River nine-month, refined) | Filed | Q2 2026 results release | 2026 Production Guidance | "Kensington" | p.17 |
| 2026 production guidance — Wharf (unchanged) | gold 72,000–90,000 oz; silver 50–200 koz | 5 Aug 2026 | Guidance — 2026 production by asset (five legacy mines unchanged; New Afton and Rainy River nine-month, refined) | Filed | Q2 2026 results release | 2026 Production Guidance | "Wharf" | p.17 |
| 2026 adjusted CAS guidance — New Afton (co-product, nine months) | updated gold $1,300–1,600/oz; copper $2.00–2.30/lb; previous gold $1,000–1,200/oz; copper $1.20–1.35/lb | 5 Aug 2026 | Guidance — 2026 adjusted costs applicable to sales per unit by asset | Filed | Q2 2026 results release | 2026 Adjusted Costs Applicable to Sales Guidance | "New Afton (co-product)" | p.18 |
| 2026 adjusted CAS guidance — Rainy River (by-product, nine months) | updated gold $2,700–3,000/oz; previous gold $2,150–2,350/oz | 5 Aug 2026 | Guidance — 2026 adjusted costs applicable to sales per unit by asset | Filed | Q2 2026 results release | 2026 Adjusted Costs Applicable to Sales Guidance | "Rainy River (by-product)" | p.18 |
| 2026 adjusted CAS guidance — Las Chispas (unchanged) | gold $750–950/oz; silver $12.50–14.50/oz | 5 Aug 2026 | Guidance — 2026 adjusted costs applicable to sales per unit by asset | Filed | Q2 2026 results release | 2026 Adjusted Costs Applicable to Sales Guidance | "Las Chispas (co-product)" | p.18 |
| 2026 adjusted CAS guidance — Palmarejo (unchanged) | gold $700–900/oz; silver $21.50–23.50/oz | 5 Aug 2026 | Guidance — 2026 adjusted costs applicable to sales per unit by asset | Filed | Q2 2026 results release | 2026 Adjusted Costs Applicable to Sales Guidance | "Palmarejo (co-product)" | p.18 |
| 2026 adjusted CAS guidance — Rochester (unchanged) | gold $1,350–1,550/oz; silver $23.00–25.00/oz | 5 Aug 2026 | Guidance — 2026 adjusted costs applicable to sales per unit by asset | Filed | Q2 2026 results release | 2026 Adjusted Costs Applicable to Sales Guidance | "Rochester (co-product)" | p.18 |
| 2026 adjusted CAS guidance — Kensington (unchanged) | gold $1,750–1,950/oz | 5 Aug 2026 | Guidance — 2026 adjusted costs applicable to sales per unit by asset | Filed | Q2 2026 results release | 2026 Adjusted Costs Applicable to Sales Guidance | "Kensington" | p.18 |
| 2026 adjusted CAS guidance — Wharf (by-product, unchanged) | gold $1,400–1,600/oz | 5 Aug 2026 | Guidance — 2026 adjusted costs applicable to sales per unit by asset | Filed | Q2 2026 results release | 2026 Adjusted Costs Applicable to Sales Guidance | "Wharf (by-product)" | p.18 |
| 2026 exploration guidance — expensed and capitalized | expensed $118–132 m; capitalized $29–37 m | 5 Aug 2026 | Guidance — 2026 sustaining and growth capital, exploration, G&A, cash taxes, amortization (company level) | Filed | Q2 2026 results release | 2026 Capital, Amortization, Exploration, G&A and Income and Mining Tax Guidance | "Exploration, Expensed" | p.18 |
| 2026 general and administrative guidance (reaffirmed) | $90–100 m | 5 Aug 2026 | Guidance — 2026 sustaining and growth capital, exploration, G&A, cash taxes, amortization (company level) | Filed | Q2 2026 results release | 2026 Capital, Amortization, Exploration, G&A and Income and Mining Tax Guidance | "General & Administrative Expenses" | p.18 |
| 2026 capital — New Afton (prorated nine months) | $51–61 m | 5 Aug 2026 | Guidance — 2026 capital and exploration by asset | Filed | Q2 2026 results release | Operations — New Afton, Guidance | "Prorated capital expenditures reflecting nine months of ownership are expected to be $" | p.6 |
| 2026 capital — Rainy River (prorated nine months) | updated $150–170 m; previous $81–101 m; capitalized stripping $45 m | 5 Aug 2026 | Guidance — 2026 capital and exploration by asset | Filed | Q2 2026 results release | Operations — Rainy River, Guidance | "Prorated capital expenditures reflecting nine months of ownership are expected to be $" | p.8 |
| 2026 capital — Las Chispas | $71–84 m | 5 Aug 2026 | Guidance — 2026 capital and exploration by asset | Filed | Q2 2026 results release | Operations — Las Chispas, Guidance | "Capital expenditures in 2026 are expected to be $" | p.9 |
| 2026 capital — Palmarejo | $35–41 m | 5 Aug 2026 | Guidance — 2026 capital and exploration by asset | Filed | Q2 2026 results release | Operations — Palmarejo, Guidance | "Capital expenditures in 2026 are expected to be $" | p.11 |
| 2026 capital — Rochester | $96–110 m | 5 Aug 2026 | Guidance — 2026 capital and exploration by asset | Filed | Q2 2026 results release | Operations — Rochester, Guidance | "Capital expenditures in 2026 are expected to be $" | p.12 |
| 2026 capital — Kensington | $54–63 m | 5 Aug 2026 | Guidance — 2026 capital and exploration by asset | Filed | Q2 2026 results release | Operations — Kensington, Guidance | "Capital expenditures in 2026 are expected to be $" | p.14 |
| 2026 capital — Wharf | $17–23 m | 5 Aug 2026 | Guidance — 2026 capital and exploration by asset | Filed | Q2 2026 results release | Operations — Wharf, Guidance | "Capital expenditures in 2026 are expected to be $" | p.15 |
| Form 10-Q, quarter ended 30 June 2026 | ||||
| Common shares outstanding (cover page) | 1,027,934,998 shares issued and outstanding | 3 Aug 2026 | Bridge — basic share count; buyback-adjusted | Filed | Q2 2026 10-Q | Cover page | "shares of common stock, par value of $0.01, authorized of which" | p.2 |
| Open derivative positions at 30 Jun 2026 | provisional gold 16,030 oz at $4,244/oz; provisional copper 4,044 klb at $6.07/lb; gold swaps 5,000 oz at $4,779/oz; copper swaps 4,044 klb at $5.94/lb | 30 Jun 2026 | Hedge book — metals; all settle in 2026 | Filed | Q2 2026 10-Q | Note 13, Derivatives Not Designated as Hedging Instruments | "Notional ounces" | p.22 |
| Asset retirement obligation roll-forward, six months | beginning $277,511 k; accretion $10,927 k; additions and changes in estimates $139,159 k; settlements $(4,134) k; ending $423,463 k | 30 Jun 2026 | Bridge — reclamation line; the New Gold additions | Filed | Q2 2026 10-Q | Note 9, Reclamation | "Asset retirement obligation - Ending" | p.18 |
| Share repurchases executed, six months to 30 Jun 2026 | 5,982,312 shares for $110,422 k at an average $18.44 per share | 30 Jun 2026 | Capital returns — buyback to 30 Jun 2026 | Filed | Q2 2026 10-Q | Note 15, Net Income per Share | "Shares repurchased" | p.24 |
| Income and mining tax, six months to 30 Jun 2026 | United States $(70,676) k, Canada benefit $38,336 k, Mexico $(162,852) k; total expense $(195,192) k on pre-tax income $563,806 k | 30 Jun 2026 | Tax treatment — jurisdiction split; H1 effective rate | Filed | Q2 2026 10-Q | Note 10, Income and Mining Taxes | "United States" | p.18 |
| Market and price series | ||||
| Gold — trailing averages to Jul 2026 | 3-month $4,296.00; 6-month $4,580.83; 12-month $4,310.67; 2026 year-to-date (Jan–Jul) $4,605.43/oz | 31 Jul 2026 | § 7 opening — the gold base | Market | World Bank | "Gold", monthly average ($/troy oz), Pink Sheet | to Jul 2026 |
| Silver — trailing averages to Jul 2026 | 3-month $67.83; 6-month $73.20; 12-month $64.53; 2026 year-to-date (Jan–Jul) $75.90/oz | 31 Jul 2026 | § 7 opening — the silver base | Market | World Bank | "Silver", monthly average ($/troy oz), Pink Sheet | to Jul 2026 |
| Copper — trailing averages to Jul 2026 | 3-month $13,546.00/mt ($6.14/lb); 6-month $13,178.17/mt ($5.98/lb); 12-month $12,089.33/mt ($5.48/lb); 2026 year-to-date $13,154.43/mt ($5.97/lb) | 31 Jul 2026 | § 7 opening — the copper base | Market | World Bank | "Copper", monthly average ($/mt), Pink Sheet | to Jul 2026 |
Source: this analysis — each row’s document as cited; the valuation model’s working file is linked from this section.
10.2 Disclaimer & disclosure
This analysis is for informational purposes only and is not investment advice, a recommendation or an offer to buy or sell any security. It is a point-in-time snapshot as of 11 August 2026, with market data at the NYSE close on 10 August 2026; prices, the valuation and the rating move with markets and events, and reserves, NPVs and guidance are estimates. Do your own research and consult a licensed adviser before acting. This analysis was prepared with AI assistance from the primary filings cited; verify figures against the originals before relying on them. The author holds no position in Coeur Mining (CDE).