Barrick Mining (ABX) — Stock Analysis 2026 [3.2]
Analysis as of 18 October 2026. Barrick Mining stock analysis. Price deck: base gold US$4,500/oz — the grid price the 3-, 6- and 12-month trailing averages snap to on the fixed US$3,000–5,000/oz grid — with every grid price run as a scenario (extreme bear US$3,000, deep bear US$3,500, bear US$4,000, base US$4,500 and bull US$5,000) and the analyst consensus as a 0% cross-check — no spot price; copper held at US$6.00/lb. Share price US$40.68 (the TSX close of C$57.74 on 16 October 2026); blended fair value US$49.46, implied +21.6%; the market-implied gold deck is US$3,987/oz. Rebuilt on each annual report and material event. Rating: ★★★ Average / Modestly undervalued (wide band).
Barrick Mining mined 3,255 thousand ounces of attributable gold and 220 thousand tonnes of copper in 2025 and holds 85 Moz of gold reserves, anchored by its 61.5% of Nevada Gold Mines. The thesis in one line: a large, cash-generative miner whose costs sit near the top of its peers and whose African, Papua New Guinea and Pakistan exposure the market charges for, priced below what its assets are worth at US$4,500/oz. Why now: Loulo-Gounkoto is back in production after its 2025 suspension in Mali, the 17 August 2026 agreement with Newmont clears the way for a listing of the North American gold assets, and the buyback retired 1.7% of the shares in the first half. To compare Barrick with every listed gold producer on cost, reserve life and jurisdiction, use Metal Pilot’s gold mining stock screener.
1. Snapshot & thesis
Figure 1. Barrick Mining in numbers
Source: Barrick Q2 2026 MD&A and FY2025 MD&A; TSX close from Yahoo Finance, 16 October 2026; fair value, NAV and read from Section 7; rating from Section 9.
Barrick Mining Corporation (TSX: ABX; NYSE: B), headquartered in Toronto, is a producer (mining) in the gold sector with copper as a co-product. It runs eleven gold divisions — the four Nevada Gold Mines complexes (61.5%) in the United States, Pueblo Viejo (60%) in the Dominican Republic, Veladero (50%) in Argentina, Porgera (24.5%) in Papua New Guinea, Loulo-Gounkoto (80%) in Mali, Kibali (45%) in the DRC, and North Mara and Bulyanhulu (84%) in Tanzania — three copper mines (Lumwana, Zaldívar and Jabal Sayid) and two reserve-stage projects, Reko Diq (50%) in Pakistan and Norte Abierto (50%) in Chile.
Thesis in brief. The bull case is the asset base: 85 Moz of gold and 18 Mt of copper in reserves, net cash of US$1,245 m and a 9.8% free-cash-flow yield at the base deck, with Lumwana and Reko Diq lifting copper. The bear case is cost and country: 2026 AISC of $1,760–1,950/oz sits at the top of the peer set, Loulo-Gounkoto runs at $2,640–2,900/oz, and Mali showed in 2025 what a host state can take. What tips it is gold: the read turns Undervalued above about US$4,703/oz and Fairly valued below about US$4,223/oz.
Table 1. Barrick Mining in numbers
| Metric | Value | Basis |
|---|---|---|
| Share price | US$40.68 (C$57.74 ÷ 1.4193) | TSX close, 16 Oct 2026 |
| Market capitalisation · enterprise value | US$66,963 m · US$65,718 m | 1,646 m shares; net cash US$1,245 m |
| Revenue, 2025 | US$16,956 m (+31.2%) | FY2025 |
| Margin, 2025 (revenue less cost of sales) | US$8,691 m · 51.3% | FY2025 |
| Attributable EBITDA · free cash flow, 2025 | US$8,157 m · US$3,868 m | FY2025 |
| Gold guidance, 2026 | 2.90–3.25 Moz at $1,760–1,950/oz AISC | 2026 guidance |
| Reserves (P&P) | 85 Moz gold · 18 Mt copper | 31 Dec 2025 |
| NAV per share · P/NAV | US$44.88 · 0.91× | Section 7, base case |
| Blended fair value · implied return | US$49.46 · +21.6% | Section 7, base case |
| Valuation read · implied return | Modestly undervalued (wide band) · +21.6% | Section 7, base case |
| Quality rating | 3.2/5 Average | Section 9 |
Source: Barrick FY2025 MD&A p.6 and p.12, Q2 2026 MD&A (capital structure, financial position), FY2025 AIF pp.37–38; Yahoo Finance daily closes, 16 October 2026; Section 7 model.
How to read this analysis: Sections 2–6 set out the assets, finances, people and risks from the filings; Section 7 values them; Section 9 scores quality against four peers; Section 10 lists every source.
2. Assets & operations
The gold price backdrop is in the Gold — A Complete Market Guide.
2.1 Portfolio overview
Table 2. Asset base (attributable), sorted by Section 7 base-case value
| Asset | Country | Stage | Interest | 2026 guidance | P&P reserves | Life (yr) | 2026 AISC | Listing / partner |
|---|---|---|---|---|---|---|---|---|
| Carlin | United States | Producing | 61.5% | 600–670 koz | 8.8 Moz | 13.1 | $1,900–2,100/oz | NGM JV — Newmont (NYSE: NEM) 38.5% |
| Pueblo Viejo | Dominican Republic | Producing | 60% | 350–400 koz | 12 Moz | 31.2 | $1,590–1,760/oz | JV — Newmont (NYSE: NEM) 40% |
| Cortez | United States | Producing | 61.5% | 430–480 koz | 7.9 Moz | 16.6 | $1,690–1,870/oz | NGM JV |
| Turquoise Ridge | United States | Producing | 61.5% | 300–330 koz | 8.9 Moz | 27.5 | $1,490–1,650/oz | NGM JV |
| Kibali | DRC | Producing | 45% | 270–310 koz | 4.8 Moz | 15.8 | $1,330–1,470/oz | JV — AngloGold Ashanti (NYSE: AU) 45% |
| Reko Diq | Pakistan | Construction | 50% | — | 13 Moz Au · 7.3 Mt Cu | n/d | — | JV — Pakistan federal and Balochistan interests 50% |
| Lumwana | Zambia | Producing; expansion | 100% | 130–150 kt Cu | 8.1 Mt Cu | 57.1 | $3.40–3.75/lb | Subsidiary |
| North Mara | Tanzania | Producing | 84% | 200–230 koz | 3.2 Moz | 14.1 | $1,520–1,680/oz | Twiga JV — Government of Tanzania 16% |
| Loulo-Gounkoto | Mali | Producing (restarted) | 80% | 260–290 koz | 6.9 Moz | 24.3 | $2,640–2,900/oz | Subsidiary — State of Mali 20% |
| Bulyanhulu | Tanzania | Producing | 84% | 140–160 koz | 3.8 Moz | 24.5 | $1,870–2,070/oz | Twiga JV |
| Phoenix | United States | Producing | 61.5% | 80–100 koz | 2.0 Moz | 21.4 | $1,180–1,310/oz | NGM JV |
| Veladero | Argentina | Producing | 50% | 180–200 koz | 1.4 Moz | 6.6 | $1,460–1,620/oz | JV — Shandong Gold (SSE: 600547) 50% |
| Norte Abierto | Chile | Project | 50% | — | 11 Moz | n/d | — | JV — Newmont (NYSE: NEM) 50% |
| Porgera | Papua New Guinea | Producing | 24.5% | 80–100 koz | 1.4 Moz | 14.8 | $1,610–1,780/oz | New Porgera JV — PNG state interests 51% |
| Jabal Sayid | Saudi Arabia | Producing | 50% | 25–30 kt Cu | n/d | 10 (held) | $1.45–1.65/lb | JV — Ma’aden (Tadawul: 1211) 50% |
| Zaldívar | Chile | Producing | 50% | 30–35 kt Cu | 0.71 Mt Cu | 21.1 | $5.40–5.70/lb | JV — Antofagasta (LSE: ANTO) 50%, operator |
Source: Barrick FY2025 MD&A, Outlook for 2026, p.12 (guidance); FY2025 AIF pp.37–38 (attributable proven and probable reserves, 31 Dec 2025); lives = reserve ÷ guided rate less 0.80 year mined, from the Section 7 model.
Nevada’s four complexes carry 31.6% of the gross asset value in Section 7 and about 49% of the 2026 gold midpoint; Carlin, the largest single row, is 10.8%. The four African mines carry 19.0%, and the measured and indicated resource beyond the reserves another 18.4%.
2.2 Revenue split
Revenue by metal and by mine is not yet extracted from the FY2025 statements, so the two figures split the Section 7 gross asset value (US$81,451 m before project capital) instead (§10.1).
Figure 2. Gross asset value by tier, base case
Source: Section 7 model, Table 13 (base case, US$4,500/oz gold, US$6.00/lb copper, 8% real); inputs from the Barrick FY2025 MD&A p.12 and FY2025 AIF pp.37–42.
Figure 3. Gross asset value by asset, base case
Source: Section 7 model, Tables 11 and 13 (base case); inputs from the Barrick FY2025 MD&A p.12 and FY2025 AIF pp.37–42.
2.3 Nevada Gold Mines: Carlin, Cortez, Turquoise Ridge
Nevada Gold Mines is Barrick’s 61.5% joint venture with Newmont and its four complexes: Carlin (687 koz attributable in 2025 at $1,906/oz AISC), Cortez (454 koz at $1,513/oz), Turquoise Ridge (341 koz at $1,358/oz) and Phoenix (109 koz at $920/oz). 2026 guidance is 600–670, 430–480, 300–330 and 80–100 koz, with AISC higher at every complex; attributable proven and probable reserves are 27.6 Moz. The 17 August 2026 amendment to the venture agreement vends Barrick’s 100%-owned Fourmile and Newmont’s Mike and Fiberline into the venture, settles the partners’ disputes, gives Newmont’s consent to a listing of Barrick’s North American gold assets and brings a cash payment from Newmont within thirty days. The asset risk is cost: Carlin is guided at $1,900–2,100/oz.
2.4 Pueblo Viejo
Pueblo Viejo (60%; Newmont 40%) in the Dominican Republic produced 379 koz attributable in 2025 at $1,412/oz and is guided to 350–400 koz at $1,590–1,760/oz. Its 12 Moz reserve at 2.06 g/t gives the longest gold life in the group, about 31 years. Barrick’s share carries a gold and silver stream to Royal Gold, booked as deferred revenue ($36 m current); the stream percentages and ongoing price are not yet extracted, so that encumbrance — the asset’s main risk — sits in the gap register.
2.5 Loulo-Gounkoto
Loulo-Gounkoto (80%; the State of Mali 20%) produced only 29 koz attributable in 2025 while its operations were suspended, against 2026 guidance of 260–290 koz. Reserves are 6.9 Moz at 4.16 g/t, but 2026 AISC of $2,640–2,900/oz is the highest in the group; the 31 December 2025 balance sheet was revised for the provisional purchase price allocation relating to Loulo-Gounkoto, and a $210 m Loulo-Gounkoto item sits in the 2026 operating cash flow. The risk is the state: a second suspension would remove about 9% of group gold output.
2.6 Kibali
Kibali (45%) in the DRC, held with AngloGold Ashanti (45%), produced 303 koz attributable in 2025 at $1,337/oz, one of the group’s lowest costs, and is guided to 270–310 koz at $1,330–1,470/oz. Its 4.8 Moz reserve at 2.97 g/t lasts about 16 years, supported by a 2026 technical report. The risk is the DRC’s fiscal and permitting regime.
2.7 Lumwana and the copper mines
Lumwana (100%) in Zambia produced 151 kt of copper in 2025 at $3.05/lb and is guided to 130–150 kt at $3.40–3.75/lb; its 8.1 Mt reserve at 0.52% Cu supports about 57 years. The Super Pit expansion carries $750–850 m of 2026 growth capital, but its study capital, schedule and added output are not in the source set, so the model charges the capital without the extra copper. Zaldívar (50%, Chile) and Jabal Sayid (50%, Saudi Arabia) add 30–35 kt and 25–30 kt. The risk is the expansion’s capital.
2.8 Reko Diq
Reko Diq (50%) in Balochistan, Pakistan, is under construction, with 13 Moz of gold at 0.28 g/t and 7.3 Mt of copper at 0.48% in attributable reserves — the largest block in the reserve base. Barrick’s share of 2026 capital is $600–700 m. The feasibility study’s capital, schedule and first-production date are not among the filings read, so Section 7 carries the project at a 0.35 stage weight. The risk is country risk in Balochistan and the funding of the remaining build.
2.9 Other operations and projects
Veladero (50%, Argentina) produced 230 koz in 2025 and is guided to 180–200 koz, with the shortest life, about seven years. Porgera (24.5%, Papua New Guinea) produced 92 koz. North Mara and Bulyanhulu (84%, Tanzania) produced 249 and 153 koz, guided to 200–230 and 140–160 koz on 3.2 and 3.8 Moz of reserves. Norte Abierto (50%, Chile, with Newmont) holds 11 Moz at 0.65 g/t with no build decision in the filings read.
2.10 Production, reserves & costs
Figure 4. Group attributable gold production, 2021–2026
Source: Barrick FY2025 MD&A p.6 (2023–2025) and p.12 (2026 guidance midpoint); FY2023 MD&A p.6 (2021–2022).
Attributable gold output fell every year from 4,437 koz in 2021 to 3,255 koz in 2025, while AISC rose from $1,026/oz to $1,637/oz. The outlook turns volume back up: 3.30–3.65 Moz in 2027 and 3.40–3.75 Moz in 2028, with copper rising from 190–220 kt in 2026 to 255–285 kt in 2028. Proven and probable reserves (NI 43-101, effective 31 December 2025) are 85 Moz of gold at 0.98 g/t — North America 40 Moz, Africa and Middle East 19 Moz, South America and Asia-Pacific 26 Moz — and 18 Mt of copper at 0.46%; measured and indicated resources are 150 Moz of gold and 24 Mt of copper (inclusive or exclusive basis not yet confirmed), with 43 Moz of gold inferred.
Figure 5. Reserves and resources by gold mine, 31 December 2025 (attributable)
Figure data: Barrick FY2025 AIF, “Mineral Reserves and Mineral Resources” (pp.37–40) — attributable proven and probable gold reserves (as in Table 2) and attributable measured and indicated gold resources, NI 43-101, effective 31 December 2025. Barrick reports resources inclusive of reserves, so the second bar is the M&I as reported and the printed addition is derived as M&I less the reserve; figures are rounded to two significant digits in the AIF. The eleven operating gold mines only: the copper mines (Lumwana, Zaldívar, Jabal Sayid) and the projects (Reko Diq 13 Moz, Norte Abierto 11 Moz, Fourmile, Pascua-Lama) are not drawn; the eleven sum to 61.1 Moz of reserves and 93.8 Moz of M&I against the group’s 85 Moz and 150 Moz. Inferred resources (43 Moz group-wide) are not drawn.
By mine (Figure 5), Pueblo Viejo carries the largest attributable reserve, 12 Moz, but Carlin has the most resource beyond it — 15 Moz of M&I against 8.8 Moz of reserve — and Bulyanhulu and Phoenix carry close to twice their reserve in M&I. Veladero’s 1.4 Moz, about six years at its guided rate, is the shortest tail among the eleven.
2.11 Peer positioning
The peer set for every star in Section 9 is four senior gold producers, compared on filed FY2025 figures; none is in a pending deal.
Table 3. Peer positioning — quality metrics
| Company | Listing | 2025 gold AISC | P&P gold reserves, 31 Dec 2025 | Reserve regime | Main jurisdictions |
|---|---|---|---|---|---|
| Barrick Mining | TSX: ABX; NYSE: B | $1,637/oz | 85 Moz | NI 43-101 | US, Latin America, Mali, DRC, Tanzania, PNG, Pakistan |
| Agnico Eagle | NYSE: AEM | $1,339/oz | 55.4 Moz | NI 43-101 | Canada, Australia, Finland, Mexico |
| Gold Fields | NYSE: GFI | $1,645/oz | 48.3 Moz | SAMREC | Australia, Ghana, Peru, Chile, South Africa |
| Kinross Gold | NYSE: KGC; TSX: K | $1,539/oz | ≈ 20.9 Moz | NI 43-101 | US, Canada, Brazil, Mauritania, Chile |
| Newmont | NYSE: NEM | $1,408/oz | 118.2 Moz | S-K 1300 | US, Canada, Australia, Ghana, PNG, Latin America |
Source: each peer’s FY2025 filings, as registered in the Metal Pilot Newmont analysis; Barrick FY2025 MD&A p.6 and FY2025 AIF p.37. AISC bases differ between issuers (Newmont and Agnico Eagle by-product), so the comparison is indicative. Regimes: Barrick FY2025 AIF p.45; Agnico Eagle FY2025 AIF; Kinross FY2025 MD&A; Gold Fields 2025 Reserves Supplement; Newmont FY2025 10-K. Reserves under different regimes are not ranked.
Barrick carries the second-highest cost of the five and the riskiest jurisdiction mix.
3. Financials & balance sheet
Ratios follow the Financial Metrics guide.
Table 4. Five-year financial summary (US$m unless stated, years ended 31 December)
| Line | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Revenue | 11,985 | 11,013 | 11,397 | 12,922 | 16,956 |
| YoY % | — | −8.1% | +3.5% | +13.4% | +31.2% |
| Margin (revenue less cost of sales) | 4,896 (40.9%) | 3,516 (31.9%) | 3,465 (30.4%) | 4,961 (38.4%) | 8,691 (51.3%) |
| Net earnings (attributable) | 2,022 | 432 | 1,272 | 2,144 | 4,993 |
| EPS (US$) | 1.14 | 0.24 | 0.72 | 1.22 | 2.93 |
| Operating cash flow | 4,378 | 3,481 | 3,732 | 4,491 | 7,689 |
| Capex: sustaining / project | 1,673 / 747 | 2,071 / 949 | 2,076 / 969 | 2,217 / 924 | 1,896 / 1,870 |
| Free cash flow | 1,943 | 432 | 646 | 1,317 | 3,868 |
| Net debt (net cash) | (130) | 342 | 578 | 655 | (2,003) |
| Net debt / attributable EBITDA | net cash | 0.08× | 0.14× | 0.13× | net cash |
| Diluted shares (m) | 1,779 | 1,771 | 1,755 | 1,751 | 1,707 |
| Dividend per share (US$) | 0.36 | 0.65 | 0.40 | 0.40 | 0.525 |
Source: Barrick FY2025 MD&A, Financial and Operating Highlights, p.6 (2023–2025); FY2023 MD&A p.6 (2021–2022); dividends FY2025 MD&A p.53 (2023–2025) and FY2023 MD&A p.65 (2021–2022); margins and ratios derived. Notes: (1) dividends per share as declared and paid in each year; (2) EBITDA is attributable EBITDA as reported.
Figure 6. Free cash flow, 2021–2025
Source: Barrick FY2025 MD&A p.6 (2023–2025) and FY2023 MD&A p.6 (2021–2022), “Free cash flow”.
Revenue rose 31.2% to $16,956 m in 2025 on a realized gold price of $3,501/oz (2024: $2,397/oz), and the margin over cost of sales widened from 30.4% in 2023 to 51.3%. Operating cash flow of $7,689 m ran ahead of net earnings of $4,993 m; free cash flow reached $3,868 m after $3,821 m of capex, of which project capital was $1,870 m, double 2024’s $924 m. In the first half of 2026 operating cash flow was $4,258 m against $2,168 m of capex. Impairment and adjusted-earnings items are not yet extracted.
Cost deck. 2026 guidance is gold AISC $1,760–1,950/oz and total cash cost $1,330–1,470/oz, copper C1 $2.20–2.45/lb and AISC $3.45–3.75/lb; first-half gold AISC was $1,790/oz. AISC moves about $5/oz for each $100/oz of gold through price-linked costs. The expected 2026 effective tax rate is 24–28% at $4,500/oz; the cost-inflation basis and tax-loss pools are not yet extracted.
Net debt and liquidity. At 30 June 2026 debt was $4,682 m against cash of $5,927 m — net cash of $1,245 m on reported debt, down from $2,405 m at 31 March after buybacks and $1,295 m of first-half distributions to minorities. On the guided sensitivity of $300 m of attributable EBITDA per $100/oz, EBITDA at $3,000/oz would be about $6.5 bn and the group would still hold net cash. The $3.0 bn facility is undrawn under a 0.60:1 net-debt-to-capitalisation covenant, and none of the $4,630 m of principal falls in the next five years. Rehabilitation is $2,378 m undiscounted.
Hedge book. Zero-cost gold collars cover 25,000 oz a month from September 2025 to August 2028 (900,000 oz; $3,100/oz put, $4,310/oz call): 800,000 oz were outstanding at 31 December 2025, about 650,000 oz at 30 June 2026.
Capital returns. $1.209 bn of the $3 bn buyback is done, and shares outstanding fell from 1,675 m to 1,646 m in the first half. The dividend is a $0.175 base quarterly payment plus a year-end top-up, targeting 50% of attributable free cash flow.
4. Management, strategy & structure
4.1 Management & governance
Mark F. Hill, Barrick’s Group Chief Operating Officer, has been Interim President and Chief Executive Officer since September 2025; Helen Cai became Senior Executive Vice-President and Chief Financial Officer on 1 March 2026; John L. Thornton is Chairman. Six of the nine director nominees are independent. The board has three standing committees, each made up entirely of independent directors under a written mandate — the Audit & Risk Committee, the ESG & Nominating Committee and a third not yet extracted. Related-party transactions are limited to subsidiaries eliminated on consolidation.
4.2 Strategy
The 2026 frame is separation and copper. The 17 August 2026 amendment to the Nevada Gold Mines agreement gives Newmont’s consent to an IPO of Barrick’s North American gold assets; Reko Diq ($600–700 m of 2026 capital, Barrick’s share) and the Lumwana Super Pit ($750–850 m) carry copper toward the 255–285 kt outlook for 2028; and returns target 50% of attributable free cash flow. Total attributable capex is guided at $4,000–4,450 m for 2026.
4.3 Ownership & structure
Table 5. Capital structure and corporate events
| Item | Detail | Date | Counterparty / listing |
|---|---|---|---|
| Shares outstanding | 1,646 m (1,675 m at 31 Dec 2025) | 30 Jun 2026 | TSX: ABX; NYSE: B |
| Weighted diluted shares | 1,666 m (Q2 2026) | 30 Jun 2026 | — |
| Holders of 10% or more | None | 26 Mar 2026 | — |
| Share buyback | $1.209 bn of the $3 bn program | 30 Jun 2026 | — |
| Nevada Gold Mines amendment | Fourmile, Mike and Fiberline into NGM; disputes settled; IPO consent; Newmont cash payment due by 16 Sep 2026 (receipt not in the filings read) | 17 Aug 2026 | Newmont (NYSE: NEM) |
| Loulo-Gounkoto | 31 Dec 2025 balance sheet revised for the provisional purchase price allocation; $210 m cash-flow item | Q2 2026 | State of Mali (20%) |
| Non-controlling interests | $9,544 m | 30 Jun 2026 | NGM, Pueblo Viejo, Twiga, Loulo-Gounkoto partners |
| Equity in investees | $4,242 m | 30 Jun 2026 | Joint ventures not controlled |
Source: Barrick Q2 2026 MD&A and results release (capital structure, financial position, highlights p.1, note 4); 2026 management information circular p.11.
Barrick consolidates its controlled joint ventures, so partners’ shares sit in the $9,544 m of non-controlling interests and the joint ventures it does not control in $4,242 m of equity in investees; no holder controls 10% of the votes.
5. ESG & sustainability
Table 6. ESG snapshot
| Metric | 2023 | 2024 | 2025 |
|---|---|---|---|
| TRIFR (per million hours) | 1.14 | 0.91 | 0.71 |
| LTIFR | n/d | 0.12 | 0.09 |
| Fatalities | n/d | 3 | n/d |
Source: Barrick FY2025 AIF p.51, FY2024 AIF p.52, FY2023 AIF p.53.
Safety improved for a third year: TRIFR fell from 1.14 in 2023 to 0.71 in 2025, though three people died at Barrick operations in 2024. Tailings facilities are reviewed by an Independent Tailings Review Board or senior independent reviewer and signed off by an Accountable Executive under the GISTM; conformance by facility is not yet extracted. The undrawn $3.0 bn facility is sustainability-linked on Scope 1 and 2 emissions, among other metrics. Decarbonisation targets and community spend are not yet extracted, which Section 9 scores as thin disclosure.
6. Risks
The three risks Section 7 prices come first: the gold price (each US$500/oz moves NAV by about US$8.1 a share), jurisdiction (a 3% premium in every discount rate for Mali, the DRC, Tanzania, Papua New Guinea and Pakistan) and cost (10% higher unit costs take NAV to US$41.02).
Table 7. Risk register
| Risk | Type | Likelihood / impact | Who or what is exposed | Mitigant |
|---|---|---|---|---|
| Resource nationalism / another Mali | Jurisdiction | High / High | Loulo, Kibali, Tanzania, Reko Diq, Veladero | Attributable accounting; state partnerships; the planned breakup |
| Gold price falls toward ~$3,000/oz | Commodity | Medium / Very high | The whole equity; unhedged | Net cash, 26-yr reserve life, copper diversification |
| Reko Diq execution & Balochistan security | Development | Medium / High | The largest growth asset | Phased build; 50% state-partnered; long-dated |
| Cost inflation; AISC guiding higher | Operational | High / Medium | Group margin; Nevada refractory ores | Copper margin; scale; conservative reserve prices |
| Breakup under-delivers or stalls | Corporate | Medium / High | The re-rating thesis | Clear plan; buyback support; tier-1 core |
| Copper price retreats from record | Commodity | Medium / Medium | ~10% of revenue, rising | Low C1 cost ($2.14/lb); structural demand |
| Management transition | Governance | Medium / Medium | Execution and continuity | Chair continuity; deep operating bench |
| Tailings / community incident | ESG | Low-medium / High | Licence to operate; balance sheet | Board oversight; partnership model |
Source: risk categories drawn from the Barrick Mining 2025 Annual Information Form risk factors and the disclosures in the Q1 2026 results. Likelihood and impact ratings are the author’s assessment on a 1–5 scale, not disclosed figures.
Figure 7. Risk matrix — likelihood against impact
Rare
Likely
Figure data: Table 7. Each point prints its likelihood × impact score; the shaded region is the high-likelihood, high-impact quadrant. Ratings are the author’s assessment, not disclosed figures.
The register’s shape is the opposite of Agnico’s: where the low-risk major’s dominant exposure is price and multiple, Barrick’s single largest risk is jurisdiction — the recurring possibility that a host government does what Mali just did. The 2025 Mali episode is not an abstraction here; it is the base rate. The whole breakup is, in part, an attempt to quarantine that risk in a separate vehicle so the tier-1 assets can be valued without it.
7. Valuation
Valuation as of 18 October 2026, in US dollars. Horizon: spot fair value. Price deck: base gold US$4,500/oz — the representative trailing average on the fixed US$3,000–5,000/oz grid: the 3-month, 6-month and 12-month averages (US$4,317.08, US$4,356.67 and US$4,470.12, COMEX daily settles to 16 October 2026) all sit between the US$4,000 and US$4,500 grid prices and each is nearer US$4,500, the price they snap to; the base stands 65.4% above the five-year average of US$2,720.56, so the target multiples are held at mid-cycle and only the deck moves — with every grid price run as a scenario (extreme bear US$3,000 to bull US$5,000) and the analyst consensus as a 0% cross-check; no spot deck. Copper, a co-product, is held at US$6.00/lb on the US$4–8/lb grid (3-, 6- and 12-month averages US$6.55, US$6.39 and US$5.97). Discount rate 8% real after tax on the gold mines and 11% on the copper mines — the 5% and 8% producer rows plus a 3% jurisdiction premium. Share price US$40.68 — the TSX close of C$57.74 on 16 October 2026 at US$1 = C$1.4193. Value read: Modestly undervalued (wide band).
Barrick is valued on the producer (mining) archetype as a sum-of-the-parts — eleven gold operations across Nevada, the Dominican Republic, Argentina, Papua New Guinea, Mali, the DRC and Tanzania, three copper mines in Zambia, Chile and Saudi Arabia, the Reko Diq and Norte Abierto reserves outside those mines, and a measured and indicated resource beyond the reserves — with the method of the How to Value Commodity Stocks guide. The blend is US$49.46/share at the US$4,500/oz base, US$38.24 at US$4,000 and US$57.91 at US$5,000; each US$500/oz step moves net asset value by about US$8.1 a share. The deck-sensitivity table, the P/NAV price map, the copper deck table and the cross-checks print to the model’s out file rather than here.
Each mine is valued on its 2026 forecast rather than its 2025 output. The year-end MD&A gives every operating division’s attributable production and all-in sustaining cost guidance for 2026, and the model runs the midpoints at the base deck for as long as the 31 December 2025 reserve lasts at that rate, less the 0.80 of a year already mined by the valuation date. The forecast is used because Loulo-Gounkoto produced only 29 thousand ounces in 2025 while its operations were suspended in Mali; 2026 guidance puts it back at 260–290 thousand ounces, at a cost of US$2,640–2,900/oz that is still the highest in the group.
Nevada Gold Mines’ four complexes together carry the largest value, US$25,777.6 m of the US$75,459.1 m enterprise value, with Carlin the largest single row at US$8,806.6 m and Lumwana the largest copper row at US$4,750.6 m. The risked tranche — Reko Diq at a 0.35 stage weight, Norte Abierto at 0.20 and the measured and indicated resource beyond the reserves at a 0.25 conversion factor — is 29.5% of enterprise value, and three years of project capital at the 2026 guided rate take US$5,991.6 m back out. After net cash, rehabilitation and other provisions, capitalised corporate costs and working capital (together −US$1,589.5 m), equity value is US$73,869.6 m, or US$44.88 a share, and the stock trades at 0.91× that.
Table 8. Load-bearing inputs — the filed figures the valuation moves on (full source register: Table 22)
| Input | Value | Where §7 uses it | Source |
|---|---|---|---|
| 2026 forecast attributable gold production — Carlin; Cortez; Turquoise Ridge; Phoenix (61.5% each); Pueblo Viejo 60%; Veladero 50%; Porgera 24.5%; Loulo-Gounkoto 80%; Kibali 45%; North Mara 84%; Bulyanhulu 84% (koz) | 600–670; 430–480; 300–330; 80–100; 350–400; 180–200; 80–100; 260–290; 270–310; 200–230; 140–160 | Table 11, blocks 1–11 (midpoints) | Filed | FY2025 MD&A | Outlook for 2026 — Operating Division Guidance | “Carlin” | p.12 |
| 2026 forecast AISC — same order (US$/oz) | $1,900–2,100; $1,690–1,870; $1,490–1,650; $1,180–1,310; $1,590–1,760; $1,460–1,620; $1,610–1,780; $2,640–2,900; $1,330–1,470; $1,520–1,680; $1,870–2,070 | Table 11, margin rows (midpoints) | Filed | FY2025 MD&A | Outlook for 2026 — Operating Division Guidance | “Carlin” | p.12 |
| 2026 forecast attributable copper production; AISC — Lumwana 100%; Zaldívar 50%; Jabal Sayid 50% (kt; US$/lb) | 130–150 kt, $3.40–3.75; 30–35 kt, $5.40–5.70; 25–30 kt, $1.45–1.65 | Table 11, blocks 12–14 (midpoints) | Filed | FY2025 MD&A | Outlook for 2026 — Operating Division Guidance | “Lumwana” | p.12 |
| P&P gold reserves, 31 Dec 2025, attributable — the eleven gold rows in the same order; Reko Diq 50%; Norte Abierto 50% (Moz) | 8.8; 7.9; 8.9; 2.0; 12; 1.4; 1.4; 6.9; 4.8; 3.2; 3.8; 13; 11 | Table 11, lives of blocks 1–11; blocks 16–17 | Filed | FY2025 AIF | Gold Mineral Reserves — based on attributable ounces | “Carlin (61.50%) total” | p.37 |
| P&P copper reserves, 31 Dec 2025, attributable — Lumwana; Reko Diq 50%; Zaldívar 50%; total (Mt Cu) | 8.1; 7.3; 0.71; 18 | Table 11, lives of blocks 12–13; blocks 16 and 18 | Filed | FY2025 AIF | Copper Mineral Reserves — based on attributable tonnes | “Lumwana surface (100%)" | p.38 |
| Group P&P gold reserves; gold M+I; copper M+I, 31 Dec 2025 | 85 Moz; 150 Moz; 24 Mt Cu | Table 11, block 18 | Filed | FY2025 AIF | General development of the business — reserves | “total proven and probable gold reserves” | p.33 (reserves); p.34 (measured and indicated) |
| 2026 guidance — group gold AISC; gold sustaining capital; copper AISC; copper sustaining capital | $1,760–1,950/oz; $1,100–1,250 m; $3.45–3.75/lb; $400–450 m | Tables 13 (corporate cost), 15 and 17 | Filed | Q2 2026 MD&A | Company Guidance — 2026 Estimate | “AISC ($/oz)" |
| 2026 guidance — gold project capital; copper project capital; exploration and project expenses; gold depreciation (US$/oz); net finance costs | $900–1,000 m; $1,400–1,500 m; $450–500 m; $470–520; $230–250 m | Table 11, block 15; Tables 15 and 17 | Filed | Q2 2026 MD&A | Company Guidance — 2026 Estimate | “Attributable project”; net finance costs: Outlook for 2026 | “guidance range for net finance costs of” | p.15 |
| 2027 outlook — attributable gold production; copper production | 3.30–3.65 Moz; 195–225 kt | Table 15, the next-twelve-months weights | Filed | FY2025 MD&A | Three Year (2026-2028) Production Outlook | “2027 Outlook” | p.15 |
| Net cash (debt, net of cash), 30 Jun 2026 | $1,245 m | Table 13, net cash | Filed | Q2 2026 MD&A | Key performance indicators — financial position | “Debt, net of cash” |
| Gold collars — ounces per month to August 2028; put strike; call strike | 25,000 oz; $3,100/oz; $4,310/oz | Table 13, collars marked per column | Filed | FY2025 financial statements | Notes — derivative instruments | “zero cost gold collars that mature every month between” |
| Provisions, non-current, 30 Jun 2026; rehabilitation provision, current, 31 Dec 2025 (US$ m) | $1,815; $181 | Table 13, rehabilitation and other provisions | Filed | Q2 2026 MD&A | Consolidated Balance Sheets | “Provisions”; rehabilitation current: FY2025 financial statements | other current liabilities | “Provision for environmental rehabilitation (note 27b)" |
| Accounts receivable; current inventories; accounts payable; current income tax liabilities — 30 Jun 2026 (US$ m) | $856; $2,090; $2,084; $571 | Table 13, working capital | Filed | Q2 2026 MD&A | Consolidated Balance Sheets | “Accounts receivable” |
| Total common shares outstanding, 30 Jun 2026 | 1,646 m | Table 13, shares | Filed | Q2 2026 MD&A | Capital structure | “Total common shares outstanding (millions of shares)" |
Source: the Barrick filings on EDGAR named in each row; the full register closes §10.1 as Table 22.
8. Near-term catalysts (1–3 years)
Table 20. Near-term catalysts
| Catalyst | Timing (from guidance or agreement) | Why it benefits Barrick |
|---|---|---|
| IPO of the North American gold assets | Consent given 17 Aug 2026; timing not guided | Prices Nevada, 32% of gross asset value, on its own |
| Loulo-Gounkoto back to guidance | 2026: 260–290 koz | Restores about 9% of group gold output |
| Buyback completion | $1.791 bn of the $3 bn program left at 30 Jun 2026 | Retires shares below the base-case fair value |
| Gold volume recovery | 2027: 3.30–3.65 Moz · 2028: 3.40–3.75 Moz | About 16% above the 2026 midpoint by 2028 |
| Copper growth — Lumwana Super Pit, Reko Diq | 2028 outlook: 255–285 kt | Up from 190–220 kt in 2026 |
Source: Barrick Q2 2026 results release p.1; FY2025 MD&A pp.12 and 15; Q2 2026 MD&A (buyback).
Each catalyst is in a signed agreement or the three-year outlook; the IPO’s timing and the copper projects’ first-production dates are not in the filings read.
9. Rating & verdict
Barrick is scored as a producer (mining) against the four gold peers of Table 3.
Figure 11. Scorecard by dimension, 18 October 2026
Figure data: Table 21. Each spoke prints its stars and weight; the dashed ring is the weighted composite, 3.24/5.
Table 21. Scorecard rationale
| Dimension | Weight | Stars | Metric and evidence | Source |
|---|---|---|---|---|
| Asset quality & scale | 15% | ★★★★ | 3,255 koz attributable gold and 220 kt copper in 2025, above the peers’ ≈ 2.9 Moz median (attributable gold: Newmont ≈ 6 Moz; payable gold: Agnico Eagle 3.45 Moz; attributable gold-equivalent: Gold Fields 2.44 and Kinross 2.01 Moz); Nevada Gold Mines’ four complexes; no mine above 10.8% of gross value | FY2025 MD&A p.12; Newmont 10-K p.7; Agnico Eagle MD&A p.11; Kinross MD&A p.4; Gold Fields annual report; Section 7 |
| Cost position & margins | 15% | ★★ | 2025 AISC $1,637/oz against Agnico Eagle $1,339, Newmont $1,408, Kinross $1,539 and Gold Fields $1,645; 2026 guided $1,760–1,950/oz | FY2025 MD&A p.6; peers’ FY2025 filings |
| Reserves, life & replacement | 15% | ★★★★ | 85 Moz P&P ÷ 3,255 koz = 26 years of reserve life on Barrick’s own NI 43-101 basis; 18 Mt Cu; not ranked against the peers across reporting regimes (Table 3); replacement not yet extracted | FY2025 AIF pp.37–38, 45 |
| Balance sheet & liquidity | 15% | ★★★★ | Net cash $1,245 m (30 Jun 2026); $3.0 bn undrawn; no principal due within five years; still net cash at $3,000/oz; in line with Newmont’s $3,411 m net cash, at the peer median | Q2 2026 MD&A; FY2025 MD&A |
| Capital allocation & returns | 15% | ★★★ | $1.209 bn of a $3 bn buyback; $0.175 base quarterly dividend, 50% of attributable FCF; FCF $432 m (2022) to $3,868 m (2025); Loulo-Gounkoto lost for most of 2025; the peer median | FY2025 MD&A p.6; Q2 2026 MD&A |
| Growth & optionality | 6.25% | ★★★★ | Gold outlook 3.40–3.75 Moz for 2028 from 2.90–3.25 Moz; copper to 255–285 kt; Reko Diq, Lumwana Super Pit, Fourmile; above the peer median | FY2025 MD&A p.15 |
| Management & governance | 6.25% | ★★ | Interim CEO since September 2025, CFO since March 2026; six of nine nominees independent; below the peer median | 2026 circular pp.27, 104 |
| Jurisdiction & geopolitics | 6.25% | ★★ | About half the 2026 gold midpoint from Nevada, the rest across Mali, the DRC, Tanzania, PNG, Argentina, the Dominican Republic and Pakistan; Loulo-Gounkoto’s 2025 suspension; the riskiest mix of the peer set | FY2025 MD&A p.12 |
| ESG & licence to operate | 6.25% | ★★★ | TRIFR 1.14 to 0.71 (2023–2025); three fatalities in 2024; GISTM reviews; sustainability-linked facility; no targets in the filings read; the peer median | FY2025 AIF pp.9, 50–51 |
| Composite | 100% | ★★★ | Average against the peer set (Table 3) |
Source: Barrick FY2025 AIF, FY2025 MD&A and Q2 2026 MD&A at the pages named; peers’ FY2025 filings as registered in the Metal Pilot Newmont analysis.
Σ(weight × stars) = 0.15 × (4 + 2 + 4 + 4 + 3) + 0.0625 × (4 + 2 + 2 + 3) = 2.55 + 0.69 = 3.24/5, which rounds to ★★★, Average.
Two-axis verdict. As of 18 October 2026, Barrick rates ★★★ Average and Modestly undervalued (wide band) — Re-rating candidate: a blended fair value of US$49.46 against US$40.68, implied +21.6%, with the listing of the North American gold assets the catalyst that would price Nevada on its own. The market-implied gold deck is US$3,987/oz, below all three trailing averages. Dims 1, 3 and 5 lifted the target multiples and Dim 2 cut them, a net +0.03; Dim 8 is charged as a 3% premium in the discount rate instead. The bull case is the reserve base, net cash and copper growth; the bear case is cost at the top of the peer set and the host states. What tips it: gold below about US$4,223/oz turns the read Fairly valued and above about US$4,703/oz Undervalued. This is an analytical read, not a recommendation. Screen the gold peer set on Metal Pilot’s gold mining stock screener.
10. Sources, methodology & disclaimer
10.1 Sources, methodology & data vintage
Company filings. Barrick’s Q2 2026 MD&A, interim statements and results release (11 August 2026); Q1 2026 MD&A (11 May 2026); the FY2025 Annual Information Form, MD&A and financial statements (40-F, 27 February 2026); the FY2024 and FY2023 AIFs, MD&As and statements; the 2026 management information circular; the Pueblo Viejo and Kibali technical reports (27 February 2026); and the 17 August 2026 Nevada Gold Mines amendment — all on EDGAR.
Market data and peers. Yahoo Finance daily history read 18 October 2026 (TSX:ABX, NYSE:B, USD/CAD, COMEX gold and copper); analyst consensus from an archived quote page of 6 October 2026; peers’ FY2025 filings as registered in the Metal Pilot Newmont analysis.
Methodology. Data as of 18 October 2026: price at the 16 October close, balance sheet at 30 June 2026, reserves and resources effective 31 December 2025, US dollars under IFRS. Gold US$4,500/oz on the fixed US$3,000–5,000/oz grid (version 2026-09), the snap of the 3-, 6- and 12-month trailing averages, and copper US$6.00/lb on the US$4–8/lb grid; 8% real on the gold rows and 11% on the copper rows, each including the 3% jurisdiction premium; weights NAV 50% · EV/EBITDA 30% · FCF yield 20%; peers compared on filed FY2025 AISC and reserves. Rebuilt on each annual report and material event.
Re-run log. 18 October 2026 — rebuilt on the Q2 2026 filings and the 16 October close: 3.2/5 Average (8 August 2026: 3.7/5 Solid); fair value US$49.46, implied +21.6%, Modestly undervalued (wide band) (8 August 2026: Modestly undervalued). Gate fixes (citations, the bridge’s tax line, the five-year table, peer comparisons) left NAV/share US$44.88, the blend and the read unchanged.
Omitted figures and data gaps. Figures 2 and 3 split the Section 7 gross asset value because revenue by metal and by mine is not yet extracted from the FY2025 statements; no asset map is built. Still open in the documents: operators and approvals by asset, the Pueblo Viejo stream terms, the Reko Diq and Lumwana Super Pit technical reports (February 2025), the rehabilitation split (FY2025 statements, note 27b), the dividend record and reserve replacement (FY2025 MD&A pp.53 and 71) and the fully diluted share count. The deck sensitivity, P/NAV map, copper deck table and cross-checks are in the model’s out file, claude/valuation-models/barrick-mining-abx.out.md. Table 8 opens Section 7 and the register below closes this section.
Table 22. Full source register for the valuation
| Input | Value | As of | Where §7 uses it | Source |
|---|---|---|---|---|
| Annual Information Form, year ended 31 Dec 2025 | ||||
| Total proven and probable gold reserves, 31 Dec 2025 | 85 Moz at 0.98 g/t | 31 Dec 2025 | §1 statcard; §2 reserves; Dim 3 | Filed | FY2025 AIF | General development of the business — reserves | "total proven and probable gold reserves" | p.33 |
| P&P gold reserves (attributable), Carlin (61.50%) total | 75 Mt at 3.66 g/t · 8.8 Moz | 31 Dec 2025 | §2 reserves; Table 11 life; V41 | Filed | FY2025 AIF | Gold Mineral Reserves — based on attributable ounces | "Carlin (61.50%) total" | p.37 |
| P&P gold reserves (attributable), Cortez (61.50%) total | 90 Mt at 2.75 g/t · 7.9 Moz | 31 Dec 2025 | §2 reserves; Table 11 life; V41 | Filed | FY2025 AIF | Gold Mineral Reserves — based on attributable ounces | "Cortez (61.50%) total" | p.37 |
| P&P gold reserves (attributable), Turquoise Ridge (61.50%) total | 46 Mt at 6.07 g/t · 8.9 Moz | 31 Dec 2025 | §2 reserves; Table 11 life; V41 | Filed | FY2025 AIF | Gold Mineral Reserves — based on attributable ounces | "Turquoise Ridge (61.50%) total" | p.37 |
| P&P gold reserves (attributable), Phoenix surface (61.50%) | 110 Mt at 0.58 g/t · 2.0 Moz | 31 Dec 2025 | §2 reserves; Table 11 life; V41 | Filed | FY2025 AIF | Gold Mineral Reserves — based on attributable ounces | "Phoenix surface (61.50%)" | p.37 |
| P&P gold reserves (attributable), Pueblo Viejo surface (60.00%) | 190 Mt at 2.06 g/t · 12 Moz | 31 Dec 2025 | §2 reserves; Table 11 life; V41 | Filed | FY2025 AIF | Gold Mineral Reserves — based on attributable ounces | "Pueblo Viejo surface (60.00%)" | p.37 |
| P&P gold reserves (attributable), Veladero surface (50.00%) | 62 Mt at 0.69 g/t · 1.4 Moz | 31 Dec 2025 | §2 reserves; Table 11 life; V41 | Filed | FY2025 AIF | Gold Mineral Reserves — based on attributable ounces | "Veladero surface (50.00%)" | p.37 |
| P&P gold reserves (attributable), Porgera (24.50%) total | 14 Mt at 3.15 g/t · 1.4 Moz | 31 Dec 2025 | §2 reserves; Table 11 life; V41 | Filed | FY2025 AIF | Gold Mineral Reserves — based on attributable ounces | "Porgera (24.50%) total" | p.37 |
| P&P gold reserves (attributable), Reko Diq surface (50.00%) | 1,400 Mt at 0.28 g/t · 13 Moz | 31 Dec 2025 | §2 reserves; Table 11 life; V41 | Filed | FY2025 AIF | Gold Mineral Reserves — based on attributable ounces | "Reko Diq surface (50.00%)" | p.37 |
| P&P gold reserves (attributable), Norte Abierto surface (50.00%) | 520 Mt at 0.65 g/t · 11 Moz | 31 Dec 2025 | §2 reserves; Table 11 life; V41 | Filed | FY2025 AIF | Gold Mineral Reserves — based on attributable ounces | "Norte Abierto surface (50.00%)" | p.37 |
| P&P gold reserves (attributable), Loulo-Gounkoto (80.00%) total | 51 Mt at 4.16 g/t · 6.9 Moz | 31 Dec 2025 | §2 reserves; Table 11 life; V41 | Filed | FY2025 AIF | Gold Mineral Reserves — based on attributable ounces | "Loulo-Gounkoto (80.00%) total" | p.37 |
| P&P gold reserves (attributable), Kibali (45.00%) total | 50 Mt at 2.97 g/t · 4.8 Moz | 31 Dec 2025 | §2 reserves; Table 11 life; V41 | Filed | FY2025 AIF | Gold Mineral Reserves — based on attributable ounces | "Kibali (45.00%) total" | p.37 |
| P&P gold reserves (attributable), North Mara (84.00%) total | 43 Mt at 2.32 g/t · 3.2 Moz | 31 Dec 2025 | §2 reserves; Table 11 life; V41 | Filed | FY2025 AIF | Gold Mineral Reserves — based on attributable ounces | "North Mara (84.00%) total" | p.37 |
| P&P gold reserves (attributable), Bulyanhulu (84.00%) total | 17 Mt at 6.98 g/t · 3.8 Moz | 31 Dec 2025 | §2 reserves; Table 11 life; V41 | Filed | FY2025 AIF | Gold Mineral Reserves — based on attributable ounces | "Bulyanhulu (84.00%) total" | p.37 |
| P&P copper reserves (attributable), Lumwana surface (100%) | 1,600 Mt at 0.52% Cu · 8.1 Mt Cu | 31 Dec 2025 | §2 reserves; V53 copper | Filed | FY2025 AIF | Copper Mineral Reserves — based on attributable tonnes | "Lumwana surface (100%)" | p.38 |
| P&P copper reserves (attributable), Reko Diq surface (50.00%) | 1,500 Mt at 0.48% Cu · 7.3 Mt Cu | 31 Dec 2025 | §2 reserves; V53 copper | Filed | FY2025 AIF | Copper Mineral Reserves — based on attributable tonnes | "Reko Diq surface (50.00%)" | p.38 |
| P&P copper reserves (attributable), Zaldívar surface (50.00%) | 180 Mt at 0.40% Cu · 0.71 Mt Cu | 31 Dec 2025 | §2 reserves; V53 copper | Filed | FY2025 AIF | Copper Mineral Reserves — based on attributable tonnes | "Zaldívar surface (50.00%)" | p.38 |
| P&P copper reserves (attributable), TOTAL | 3,900 Mt at 0.46% Cu · 18 Mt Cu | 31 Dec 2025 | §2 reserves; V53 copper | Filed | FY2025 AIF | Copper Mineral Reserves — based on attributable tonnes | "TOTAL" | p.38 |
| Gold mineral resources, 31 Dec 2025 — M+I contained; inferred tonnes, grade, contained (inclusive/exclusive basis per the AIF note — not yet read) | 150 Moz M+I · 1,300 Mt at 1.0 g/t · 43 Moz inferred | 31 Dec 2025 | §2 resources; V41 conversion row | Filed | FY2025 AIF | Gold Mineral Resources | "TOTAL" | p.41 |
| Copper mineral resources, 31 Dec 2025 — M+I contained; inferred tonnes, grade, contained (basis as above) | 24 Mt Cu M+I · 1,400 Mt at 0.3% · 4.2 Mt Cu inferred | 31 Dec 2025 | §2 resources; V53 | Filed | FY2025 AIF | Copper Mineral Resources | "TOTAL" | p.42 |
| MD&A, year ended 31 Dec 2025 (40-F Ex. 99.4) | ||||
| Carlin (61.5%) — FY2025 gold production; FY2025 AISC; 2026 forecast production; 2026 forecast AISC | 687 koz · $1,906/oz · 600–670 koz · $1,900–2,100/oz | 31 Dec 2025 | §2 asset table; Table 11 blocks; V27 per-asset rows | Filed | FY2025 MD&A | Outlook for 2026 — Operating Division Guidance | "Carlin" | p.12 |
| Cortez (61.5%) — FY2025 gold production; FY2025 AISC; 2026 forecast production; 2026 forecast AISC | 454 koz · $1,513/oz · 430–480 koz · $1,690–1,870/oz | 31 Dec 2025 | §2 asset table; Table 11 blocks; V27 per-asset rows | Filed | FY2025 MD&A | Outlook for 2026 — Operating Division Guidance | "Cortez" | p.12 |
| Turquoise Ridge (61.5%) — FY2025 gold production; FY2025 AISC; 2026 forecast production; 2026 forecast AISC | 341 koz · $1,358/oz · 300–330 koz · $1,490–1,650/oz | 31 Dec 2025 | §2 asset table; Table 11 blocks; V27 per-asset rows | Filed | FY2025 MD&A | Outlook for 2026 — Operating Division Guidance | "Turquoise Ridge" | p.12 |
| Phoenix (61.5%) — FY2025 gold production; FY2025 AISC; 2026 forecast production; 2026 forecast AISC | 109 koz · $920/oz · 80–100 koz · $1,180–1,310/oz | 31 Dec 2025 | §2 asset table; Table 11 blocks; V27 per-asset rows | Filed | FY2025 MD&A | Outlook for 2026 — Operating Division Guidance | "Phoenix" | p.12 |
| Pueblo Viejo (60%) — FY2025 gold production; FY2025 AISC; 2026 forecast production; 2026 forecast AISC | 379 koz · $1,412/oz · 350–400 koz · $1,590–1,760/oz | 31 Dec 2025 | §2 asset table; Table 11 blocks; V27 per-asset rows | Filed | FY2025 MD&A | Outlook for 2026 — Operating Division Guidance | "Pueblo Viejo (60%)" | p.12 |
| Veladero (50%) — FY2025 gold production; FY2025 AISC; 2026 forecast production; 2026 forecast AISC | 230 koz · $1,450/oz · 180–200 koz · $1,460–1,620/oz | 31 Dec 2025 | §2 asset table; Table 11 blocks; V27 per-asset rows | Filed | FY2025 MD&A | Outlook for 2026 — Operating Division Guidance | "Veladero (50%)" | p.12 |
| Porgera (24.5%) — FY2025 gold production; FY2025 AISC; 2026 forecast production; 2026 forecast AISC | 92 koz · $1,630/oz · 80–100 koz · $1,610–1,780/oz | 31 Dec 2025 | §2 asset table; Table 11 blocks; V27 per-asset rows | Filed | FY2025 MD&A | Outlook for 2026 — Operating Division Guidance | "Porgera (24.5%)" | p.12 |
| Loulo-Gounkoto (80%) — FY2025 gold production; FY2025 AISC; 2026 forecast production; 2026 forecast AISC | 29 koz · $1,603/oz · 260–290 koz · $2,640–2,900/oz | 31 Dec 2025 | §2 asset table; Table 11 blocks; V27 per-asset rows | Filed | FY2025 MD&A | Outlook for 2026 — Operating Division Guidance | "Loulo-Gounkoto" | p.12 |
| Kibali (45%) — FY2025 gold production; FY2025 AISC; 2026 forecast production; 2026 forecast AISC | 303 koz · $1,337/oz · 270–310 koz · $1,330–1,470/oz | 31 Dec 2025 | §2 asset table; Table 11 blocks; V27 per-asset rows | Filed | FY2025 MD&A | Outlook for 2026 — Operating Division Guidance | "Kibali" | p.12 |
| North Mara (84%) — FY2025 gold production; FY2025 AISC; 2026 forecast production; 2026 forecast AISC | 249 koz · $1,333/oz · 200–230 koz · $1,520–1,680/oz | 31 Dec 2025 | §2 asset table; Table 11 blocks; V27 per-asset rows | Filed | FY2025 MD&A | Outlook for 2026 — Operating Division Guidance | "North Mara" | p.12 |
| Bulyanhulu (84%) — FY2025 gold production; FY2025 AISC; 2026 forecast production; 2026 forecast AISC | 153 koz · $1,795/oz · 140–160 koz · $1,870–2,070/oz | 31 Dec 2025 | §2 asset table; Table 11 blocks; V27 per-asset rows | Filed | FY2025 MD&A | Outlook for 2026 — Operating Division Guidance | "Bulyanhulu" | p.12 |
| Lumwana (100%) — FY2025 copper production; FY2025 AISC; 2026 forecast production; 2026 forecast AISC | 151 kt · $3.05/lb · 130–150 kt · $3.40–3.75/lb | 31 Dec 2025 | §2 asset table; V53 copper co-product rows | Filed | FY2025 MD&A | Outlook for 2026 — Operating Division Guidance | "Lumwana" | p.12 |
| Zaldívar (50%) — FY2025 copper production; FY2025 AISC; 2026 forecast production; 2026 forecast AISC | 37 kt · $4.75/lb · 30–35 kt · $5.40–5.70/lb | 31 Dec 2025 | §2 asset table; V53 copper co-product rows | Filed | FY2025 MD&A | Outlook for 2026 — Operating Division Guidance | "Zaldívar" | p.12 |
| Jabal Sayid (50%) — FY2025 copper production; FY2025 AISC; 2026 forecast production; 2026 forecast AISC | 32 kt · $1.46/lb · 25–30 kt · $1.45–1.65/lb | 31 Dec 2025 | §2 asset table; V53 copper co-product rows | Filed | FY2025 MD&A | Outlook for 2026 — Operating Division Guidance | "Jabal Sayid (50%)" | p.12 |
| Three-year outlook — gold 2027; gold 2028; copper 2027; copper 2028 | 3.30–3.65 Moz · 3.40–3.75 Moz · 195–225 kt · 255–285 kt | 31 Dec 2025 | §7 volume path; five-year FCF profile | Filed | FY2025 MD&A | Three Year (2026-2028) Production Outlook | "2027 Outlook" | p.15 |
| Net finance costs guidance, 2026 | $230–250 m | 31 Dec 2025 | §7 corporate line | Filed | FY2025 MD&A | Outlook for 2026 | "guidance range for net finance costs of" | p.15 |
| Consolidated financial statements, year ended 31 Dec 2025 (40-F Ex. 99.3) | ||||
| Zero-cost gold collars entered 2025 — ounces per month; total ounces (monthly, September 2025 to August 2028) | 25,000 oz/month · 900,000 oz total | 31 Dec 2025 | V43 hedge book | Filed | FY2025 financial statements | Notes — derivative instruments | "zero cost gold collars that mature every month between" |
| Gold collars — purchased put strike; sold call strike | $3,100/oz put · $4,310/oz call | 31 Dec 2025 | V43 hedge book | Filed | FY2025 financial statements | Notes — derivative instruments | "call options with strike prices of" |
| Provision for environmental rehabilitation, current (in other current liabilities), 31 Dec 2025 and 2024 | $181 m (2024: $226 m) | 31 Dec 2025 | Table 13 bridge — rehabilitation current; V43 | Filed | FY2025 financial statements | Note — Other Current Liabilities | "Provision for environmental rehabilitation (note 27b)" |
| Q2 2026 MD&A and interim financial statements | ||||
| Accounts receivable | $856 m | 30 Jun 2026 | Table 13 — working-capital line | Filed | Q2 2026 MD&A | Consolidated Balance Sheets | "Accounts receivable" |
| Inventories, current / non-current portion | $2,090 m · $2,829 m | 30 Jun 2026 | Table 13 — working-capital line | Filed | Q2 2026 MD&A | Consolidated Balance Sheets | "Inventories" |
| Accounts payable | $2,084 m | 30 Jun 2026 | Table 13 — working-capital line | Filed | Q2 2026 MD&A | Consolidated Balance Sheets | "Accounts payable" |
| Current income tax liabilities | $571 m | 30 Jun 2026 | Table 13 — bridge, current income tax liabilities | Filed | Q2 2026 MD&A | Consolidated Balance Sheets | "Current income tax liabilities" |
| Provisions, non-current (rehabilitation and other; split not read) | $1,815 m | 30 Jun 2026 | Table 13 — bridge, rehabilitation | Filed | Q2 2026 MD&A | Consolidated Balance Sheets | "Provisions" |
| Debt, net of cash, 30 Jun 2026 / 31 Mar 2026 — net cash | $1,245 m net cash · $2,405 m net cash | 30 Jun 2026 | Table 13 — bridge cross-check; §3 leverage | Filed | Q2 2026 MD&A | Key performance indicators — financial position | "Debt, net of cash" |
| Total common shares outstanding, 30 Jun 2026 / 31 Dec 2025 | 1,646 m · 1,675 m | 30 Jun 2026 | §1 market layer; V15 per-share | Filed | Q2 2026 MD&A | Capital structure | "Total common shares outstanding (millions of shares)" |
| Gold AISC guidance, 2026 | $1,760–1,950/oz | 30 Jun 2026 | §7 cost row; V20 | Filed | Q2 2026 MD&A | Company Guidance — 2026 Estimate | "AISC ($/oz)" |
| Gold depreciation guidance, 2026 | $470–520/oz | 30 Jun 2026 | §7 tax row | Filed | Q2 2026 MD&A | Company Guidance — 2026 Estimate | "Depreciation ($/oz)" |
| Gold attributable minesite sustaining capital, 2026 | $1,100–1,250 m | 30 Jun 2026 | §7 sustaining line | Filed | Q2 2026 MD&A | Company Guidance — 2026 Estimate | "Attributable minesite sustaining" |
| Gold attributable project capital, 2026 | $900–1,000 m | 30 Jun 2026 | §7 growth line | Filed | Q2 2026 MD&A | Company Guidance — 2026 Estimate | "Attributable project" |
| Copper AISC guidance, 2026 | $3.45–3.75/lb | 30 Jun 2026 | §7 cost row | Filed | Q2 2026 MD&A | Company Guidance — 2026 Estimate | "AISC ($/lb)" |
| Copper attributable minesite sustaining capital, 2026 | $400–450 m | 30 Jun 2026 | §7 sustaining line | Filed | Q2 2026 MD&A | Company Guidance — 2026 Estimate | "Attributable minesite sustaining" |
| Copper attributable project capital, 2026 | $1,400–1,500 m | 30 Jun 2026 | §7 growth line | Filed | Q2 2026 MD&A | Company Guidance — 2026 Estimate | "Attributable project" |
| Exploration and project expenses guidance, 2026 | $450–500 m | 30 Jun 2026 | §7 corporate cost line | Filed | Q2 2026 MD&A | Company Guidance — 2026 Estimate | "Exploration and project expenses" |
| Market data (series saved in Metal Pilot Data/Market/) | ||||
| Closing price, TSX:ABX (primary listing), Fri 16 Oct 2026 — the as-of close (18 Oct 2026 is a Sunday) | C$57.74 | 16 Oct 2026 | §1 statcard; V1 price (Tier 1) | Market | Yahoo Finance | "ABX.TO daily close" | 16 Oct 2026 (Metal Pilot Data/Market/yahoo_ABX.TO_20261018.json, chart API daily history, read 18 Oct 2026 11:02 UTC) |
| USD/CAD, close 16 Oct 2026 | C$1.4193 per US$1 | 16 Oct 2026 | V1 C$→US$ conversion (Tier 1) | Market | Yahoo Finance | "USDCAD=X daily close" | 16 Oct 2026 (Metal Pilot Data/Market/yahoo_USDCAD=X_20261018.json, chart API daily history, read 18 Oct 2026 11:02 UTC) |
| Gold, COMEX front-month (GC=F) — 3-, 6- and 12-month trailing averages of daily settles to 16 Oct 2026 | US$4,317.08 · US$4,356.67 · US$4,470.12/oz (64 · 126 · 251 sessions from 20 Jul 2026 · 20 Apr 2026 · 17 Oct 2025) | 16 Oct 2026 | Deck — 3/6/12-month trailing | Derived | mean of the GC=F daily closes in Yahoo Finance | "GC=F daily close" | 16 Oct 2026 (Metal Pilot Data/Market/yahoo_GC=F_20261018.json, chart API daily history, read 18 Oct 2026 11:02 UTC) |
| Copper, COMEX front-month (HG=F) — 3-, 6- and 12-month trailing averages to 16 Oct 2026 | US$6.5505 · US$6.3948 · US$5.9713/lb (64 · 126 · 251 sessions) | 16 Oct 2026 | Deck — secondary 3/6/12-month trailing | Derived | mean of the HG=F daily closes in Yahoo Finance | "HG=F daily close" | 16 Oct 2026 (Metal Pilot Data/Market/yahoo_HG=F_20261018.json, chart API daily history, read 18 Oct 2026 11:02 UTC) |
Source: Barrick filings on EDGAR as named in each row; market rows from Yahoo Finance, read 18 October 2026; the load-bearing subset opens Section 7 as Table 8.
10.2 Disclaimer & disclosure
This analysis is for information only and is not investment advice, a recommendation or an offer to buy or sell any security. It is a point-in-time snapshot as of 18 October 2026: the price, market value, multiples and valuation read all move, and mining equities are volatile. Reserve, resource and forecast figures are estimates on the bases stated beside each table, and the proposed corporate transactions are not completed results. The analysis was prepared with AI assistance (Claude Opus 5.5) from the filings listed above.