Capstone Copper (CS) — Stock Analysis 2026 [2.8]

Copper Base Metals Company Analysis
CAD

Analysis as of 20 November 2026. Capstone Copper stock analysis. This base-metals mining producer earns an Average quality rating. Price deck: base copper $6/lb, closest to the trailing twelve-month average on the fixed $4, $5, $6, $7 and $8/lb grid. The five scenarios span C$0.75 to C$22.64 per share. Analyst consensus carries 0% weight. At C$8.01 a share, the C$10.25 blend implies +27.9%. NAV is C$9.03 per share and the market-implied copper deck is $5.59/lb. Rating: ★★★☆☆ Average / Modestly undervalued (wide band). Refresh quarterly or after a material operating change.

Capstone Copper has tied a larger concentrator into its most valuable mine just as a crusher breakdown has curtailed production in Arizona. At the November close the stock prices copper below its trailing twelve-month average, leaving room for a higher valuation if the Chilean mill meets its target. Copper output, cash costs and reserve life for comparable producers appear on Metal Pilot’s copper mining stock screener.

1. Snapshot & thesis

Figure 1. Capstone Copper in numbers

C$8.01
TSX close on 20 November
C$6.14 bn
Basic market capitalization
224.8 kt
FY2025 copper production
3.89 Mt
Operating copper reserves
$2.44/lb
FY2025 C1 cost
C$9.03
NAV per diluted share
C$10.25
Blended fair value
+27.9%
Implied return
2.8/5
Quality rating — Average
Modestly undervalued
(wide band)
Valuation read

Source: Capstone operating results and annual filings.

Vancouver-based Capstone Copper is a base-metals mining producer listed in Toronto and Australia. Its four producing mines span Chile, Arizona and Mexico. Two contracts will change the portfolio if they close. One sells the Mexican mine to Luca Mining. The other brings Orion into a Chilean copper and iron project when Capstone commits to construction.

The near-term investment case rests on selling a larger share of low-cost sulphide copper from an expansion already tied into the mill. Mantoverde’s cathodes tell a different story. Processing low-grade material consumes enough acid to erode the margin on each extra pound. The mix of copper sold matters almost as much as the consolidated tonnage.

The valuation gap depends on copper prices. A return to the five-year average would put the commodity below the price implied by the shares. At the base copper price the development interest supplies more than a third of NAV. A further construction delay would therefore affect the shareholders who already paid for the producing business.

Table 1. Capstone Copper in numbers

Measure Figure Basis
Share price C$8.01 20 November 2026 TSX close
Market capitalization C$6.1 bn October basic share count
FY2025 revenue $2.4 bn Consolidated
FY2025 adjusted EBITDA margin 40.4% $952.7 m adjusted EBITDA
FY2025 copper output 224.8 kt Gross consolidated production
FY2025 C1 cost $2.44/lb After by-product credits
NAV per share C$9.03 $6/lb copper at 8% real
Fair value C$10.25 Five-scenario range C$0.75–22.64
Valuation read Modestly undervalued (wide band), implied +27.9% Market-implied copper deck $5.59/lb
Quality 2.8/5 Average Peer scorecard in Section 9

Source: Capstone operating results and annual filings.

How to read this analysis: Section 2 traces the copper through each mine, Section 7 prices the cash flows and Section 9 reconciles value with business quality.

2. Assets & operations

The Copper Market Guide explains why a tonne of copper in concentrate earns a different price from a tonne of finished cathode. At Capstone the distinction also changes costs. Mantoverde treats sulphides in a concentrator and leaches oxide ore with sulphuric acid. An expensive shipment of acid can make the leach route uneconomic even when the concentrator earns a substantial margin.

2.1 Portfolio overview

Table 2. Copper portfolio at 20 November 2026

# Asset Country Stage Interest FY2025 copper, kt P&P copper, Mt Plan horizon FY2025 C1, $/lb Forward C1 estimate, $/lb Listing / operator
1 Mantoverde Chile Operating, ramping 70% 95.1 2.223 Processing to 2049 2.35 1.25 / 5.75 TSX:CS / Mantoverde S.A.
2 Santo Domingo Chile Feasibility 100% before sanction — 1.435 19 operating years — — TSX:CS / Minera Santo Domingo SCM
3 Mantos Blancos Chile Operating 100% 61.9 0.619 2037 2.16 3.45 / 4.10 TSX:CS / Mantos Copper S.A.
4 Pinto Valley United States Operating, repair 100% 42.4 0.954 2039 3.72 4.00 TSX:CS / Pinto Valley Mining Corp.
5 Cozamin Mexico Operating, sale agreed 100% 25.3 0.093 2030 1.32 — TSX:CS / Capstone Gold S.A. de C.V.

Source: Capstone annual information form and FY2025 financial reports. Gross mine output and contained copper in proven and probable reserves at 31 December 2025. C1 is net of by-product credits per payable pound. Forward estimates split sulphides and cathodes at the Chilean mines.

The two Chilean mines supplied more than two thirds of gross copper output last year. The accounts consolidate every tonne from Mantoverde. Mitsubishi receives the economics of its interest, so the tonnes available to support Capstone equity are lower. The gap grows with the Chilean concentrator.

2.2 Revenue split

Figure 2. Gross revenue by commodity in FY2025

Copper
Gold
Silver
Molybdenum
92.8%
4.2%
2.8%
0.1%
Share of gross metal revenue in FY2025

Source: Capstone financial statements and management reports.

Copper concentrate and cathodes together supplied nearly all gross sales. Gold improves the economics of Mantoverde sulphides, but a higher silver price has less effect at Mantos Blancos because most silver goes to a streaming partner.

Figure 3. Mine revenue before group eliminations in FY2025

Mantoverde
Mantos Blancos
Pinto Valley
Cozamin
43.5%
26.2%
18.1%
12.3%
Share of the four mines’ combined net revenue before group eliminations

Source: Capstone financial statements and management reports.

The four mines booked about $2.4 bn before eliminations. Capstone removed $82.1 m to arrive at consolidated revenue. Using the mine total as the denominator preserves the contribution of each operation. On the consolidated denominator Mantoverde supplied 45.0% of net revenue.

2.3 Mantoverde

The expansion at Mantoverde changes the mix of copper Capstone sells. The sulphide reserve in Table 2, row 1 averages 0.48% copper. At the mine, additional mill capacity gives this ore a route to market without relying on leach acid. Management targets sustained processing of 45,000 tonnes of ore per day in early 2027. About $68.5 m of the approved optimization budget remained unspent at September.

This analysis assumes the mill delivers 95% of the study’s FY2027 payable sulphide schedule. That gives 100.4 kt for the year before Mitsubishi’s interest. The estimate allows for weaker recovery while the circuit settles. On the leach side, avoiding spot acid cuts cathode output by a guided 5–8 kt in 2026. Management expects similar cathode production next year.

Mitsubishi has a life-of-mine claim on 30% of copper sold in concentrate. Drawing its commercial facility adds concentrate deliveries over ten years. Boliden separately contracted for 75,000 tonnes of concentrate annually, subject to a cumulative delivery requirement. Those obligations apply to concentrate weight. Treating them as tonnes of copper would overstate the metal committed.

2.4 Mantos Blancos

Mantos Blancos relies on better grades to increase production without a larger mill. The sulphide reserve averages 0.61% copper. Management expects mill feed to improve from 0.70% in 2026 to 0.85% in 2027. On unchanged recovery and throughput, this analysis estimates 48.1 kt of payable sulphide copper next year. Interruptions to the concentrator or constraints on tailings capacity would reduce that gain.

The Southern Cross royalty takes 1.525% of net smelter returns through January 2035. The holder can extend it, and the operator can repurchase half.

The silver stream pays 8% of spot on all payable silver until cumulative deliveries reach 19.3 Moz, then covers 40%. By September deliveries had reached 8.2 Moz. Glencore’s original contract covered 75% of concentrate, with minimum deliveries that could extend the term. The remaining balance is undisclosed.

2.5 Pinto Valley

Pinto Valley’s crusher now limits output (Table 2, row 4). On 12 November Capstone estimated an additional 5 kt of lost copper and scheduled partial operations before mid-December recommissioning. The interim circuit could handle up to 40,000 tonnes of ore a day. The operating forecast starts below that limit and scales deliveries only after the scheduled repair.

The reserve averages 0.32% copper. At that grade a short interruption can lift unit costs sharply because payroll and plant maintenance continue. The next-year estimate assumes 40.6 kt of payable copper, well below the old mine plan.

A 2% royalty applies to claims outside that plan. Jetti receives a private share of incremental cathode profits under its leaching contract. The undisclosed rate prevents a separate valuation of the payment.

2.6 Cozamin

Cozamin leads the operating portfolio at 1.40% reserve grade. Narrow veins leave little room for waste dilution, and the filed production plan ends in 2030. The sale to Luca Mining would transfer the mine and the silver-stream obligations. The analysis carries the discounted purchase price, including only the earnouts supported by each scenario.

Wheaton receives half of payable silver until cumulative deliveries reach 10 Moz. Its share then falls to 33%, with cash consideration of 10% of spot. Grupo Bacis receives a 3% royalty on the original concessions. Separate claims start at 1.5% on the first million tonnes and step up with throughput and copper prices. These terms reduce the cash available to an owner who retains the mine.

2.7 Santo Domingo

The value of Santo Domingo depends on the investment decision. The permitted base project contains a 0.33% copper reserve and would sell magnetite alongside concentrate. Engineering changes still need environmental review, revised sectoral permits and an updated closure plan. Capstone aims to reach 60% engineering and arrange project debt before sanction. The 2024 study estimates $2.3 bn of initial investment.

The study puts payable copper at 88 kt in its first operating year and 137 kt in its second. Three years of pre-production spending precede those receipts. The prospective first production date depends on sanction and construction, and management has yet to publish a revised year-by-year ramp. The base case assigns a 55% chance of realization to Capstone’s conditional project interest.

Ecora holds a 2% royalty on applicable concessions. Capstone repurchased the ENAMI royalty over part of the deposit. Wheaton receives gold until cumulative deliveries reach 285 koz and then receives 67%. Its ongoing cash price rises from 18% to 22% of spot after Capstone credits the deposit. The feasibility cash flows already reflect the stream.

2.8 Production, reserves & costs

Figure 4. Group copper output and updated guidance floor

Copper, kt
0
50
100
150
200
250
184.5
224.8
195
FY2024
FY2025
FY2026 floor

Source: Capstone operating results and annual filings.

FY2025 output rose as the Mantoverde concentrator contributed a fuller year. The updated 2026 floor includes Cozamin for the full year. Forward continuing output excludes the mine from the date assumed for its sale. This distinction matters when comparing next year’s production with the consolidated history.

Figure 4a. Copper reserves and measured and indicated resources

Pinto Valley
Mantoverde
Santo Domingo
Mantos Blancos
Cozamin
0.954 Mt
3.897 Mt
2.223 Mt
3.418 Mt
1.435 Mt
1.704 Mt
0.619 Mt
1.231 Mt
0.093 Mt
0.226 Mt
Gross copper in Mt. First bar: P&P reserves. Second bar: reserves plus exclusive measured and indicated resources.

Source: FY2025 annual information form, NI 43-101, 31 December 2025. Excludes inferred copper. Reserve copper price assumptions in $/lb were 3.00 at Pinto Valley, 3.50 at Mantoverde, 3.75 at Santo Domingo and 3.55–3.75 at Cozamin. The historical Mantos Blancos shell used 2.90.

Pinto Valley has the largest copper inventory beyond reserves. Converting that material requires an economic mine plan at its low grade. Group operating reserves fell by 305 kt in 2025. Changes to cutoffs and geological estimates also affect that movement, so the year-end totals cannot establish how much depletion the company replaced.

2.9 Peer positioning

The peer set comprises First Quantum Minerals (TSX:FM), Lundin Mining (TSX:LUN) and Antofagasta (LSE:ANTO). Each operates large copper mines and publishes production, mine plans and group earnings. Table 3 compares FY2025 on each issuer’s reported operating basis. Lundin’s figures cover continuing operations. Adjusted EBITDA definitions vary, so small differences in margin carry little weight.

Table 3. Copper producer operating comparisons

Company Listing Copper, kt EBITDA margin Flagship exposure Flagship horizon Production outlook
Capstone Copper TSX:CS 224.8 40.4% Mantoverde, 45% of revenue 2049 processing 195 kt revised FY2026 floor
First Quantum TSX:FM 396.0 32.0% Two Zambian mines, 93% of production Kansanshi to 2050 375–435 kt in 2026
Lundin Mining TSX:LUN 322.3 47.3% Candelaria, 44% of revenue Permitted to 2040 310–335 kt in 2026
Antofagasta LSE:ANTO 653.7 60.3% Los Pelambres, 45% of production 2035 before extension Los Pelambres output fell 8% in 2025

Source: Capstone annual reports, First Quantum financial reports, Lundin Mining financial reports and Antofagasta annual reports.

Capstone produces less copper than every peer. Its largest mine has a processing horizon comparable to Kansanshi’s, but the smaller sites provide less protection against a failed ramp. The group’s EBITDA margin falls between First Quantum and Lundin. That spread supports a middle score on costs despite Mantoverde’s lower-cost sulphide production.

3. Financials & balance sheet

Operating cash flow recovered as Mantoverde sold more copper concentrate. In FY2025 it covered all cash additions to property and equipment for the first time since the Mantos combination. The Financial Metrics guide explains how the operating cash measure differs from earnings before interest, tax, depreciation and amortization. The latter excludes the capital needed to keep a mine producing.

Table 4. Five-year consolidated financial summary

Measure in US dollars, millions FY2021 FY2022 FY2023 FY2024 FY2025
Revenue 794.8 1,296.0 1,345.5 1,599.2 2,359.9
Revenue growth +75.2% 63.1% 3.8% 18.9% 47.6%
Cash margin before depreciation 57.9% 30.3% 24.6% 34.0% 45.4%
Adjusted EBITDA 437.3 356.7 260.3 496.1 952.7
Adjusted EBITDA margin 55.0% 27.5% 19.3% 31.0% 40.4%
Net income to owners 226.8 122.2 −101.7 82.9 315.9
Diluted EPS ($) 0.55 0.19 −0.15 0.11 0.41
Operating cash flow 553.3 87.4 116.8 398.6 685.2
Cash additions to property and equipment 133.4 559.8 616.7 448.0 519.1
Sustaining / growth capital 69.1 / 59.5 150.8 / 308.4 145.1 / 309.7 173.7 / 149.4 190 / 60
Free cash flow 419.9 −472.3 −499.9 −49.4 166.1
Net debt / (net cash) −264.4 483.1 927.2 742.0 780.1
Net debt / adjusted EBITDA −0.60× 1.35× 3.56× 1.50× 0.82×
Diluted weighted-average shares (million) 414.1 630.2 693.5 752.2 764.4
Dividend per share ($) 0 0 0 0 0

Source: Annual financial statements and management reports. FY2021 growth uses predecessor revenue of $794.769 m versus $453.763 m in the audited income statement, PDF p.55. Cash margin deducts production costs before depreciation. Free cash flow deducts cash additions to property and equipment. Capital classifications exclude stripping and exploration and do not reconcile directly to the cash additions.

The FY2021 predecessor received the Cozamin stream deposit in operating cash. The March 2022 Mantos combination expanded the group during the following year. Those two changes explain why the first two columns provide a weak baseline for organic growth. In FY2025 operating cash flow exceeded owner earnings by $369 m. Depreciation rose after commissioning, and operating cash includes the minority share of consolidated mine cash.

The first nine months of 2026 generated $726.8 m of operating cash against $275.2 m of owner earnings. The third quarter alone produced adjusted EBITDA of $358.3 m. The February capital plan separated sustaining equipment, mine development and capitalized stripping. In October management raised total spending to $830 m. That budget also includes exploration, so deducting only the sustaining column would overstate distributable cash.

Cost deck. The February consolidated C1 guidance was $2.45–2.75/lb. Rising acid and diesel costs and lost mill hours limit its usefulness as a forward rate. This analysis estimates next-year sulphide and cathode costs of $1.25 and $5.75/lb at Mantoverde.

Table 2 gives the estimates for all continuing mines.

Each estimate starts with the guidance by-product credits and adjusts only the change in metal prices. Capstone does not publish the share of spending indexed to fuel, wages or copper.

The cost forecast holds purchasing power constant. Chile’s announced corporate tax rates decline in stages, while the Arizona case uses a combined federal and state rate of 24.9%. Of $128.9 m in unrecognized non-capital losses, $47.1 m expires between 2031 and 2044. Mine-by-mine tax schedules would establish when the remaining pools can shelter income. The model gives those pools no separate upfront value.

Debt and liquidity. Management reported $564 m of consolidated net debt at September, alongside $1.1 bn of liquidity including the undrawn revolver. The model’s wider debt balance is $1.2 bn after cash. It includes leases, Mitsubishi financing and working-capital facilities.

It carries $249 m of closure obligations separately. Capstone reported covenant compliance but omitted the numerical thresholds, limiting any estimate of borrowing headroom.

At $5/lb copper the analysis estimates $744 m of continuing attributable EBITDA, down from $1.1 bn at base. Against that earnings base, the wider debt measure rises from 1.08× to 1.65×. This stress compares group claims with attributable earnings and includes completion risk at Pinto Valley. The revolver matures in May 2029. Senior unsecured notes carry a 6.75% coupon and mature in March 2033.

Hedges and distributions. Fourth-quarter copper collars cover 6,736 tonnes, with floors of $4.25–4.45/lb and ceilings of $6.00–6.70/lb. The 2027 collars protect 6,000 tonnes at $6.00/lb and surrender gains above $7.24/lb.

Gold collars and diesel swaps cover smaller exposures. Copper time spreads manage differences between shipment and final pricing. Peso collars and Canadian-dollar forwards reduce short-term currency exposure. Capstone paid no FY2025 dividend, and the share purchase trust acquired no shares during 2024 or 2025.

4. Management, strategy & structure

4.1 Management & governance

Cashel Meagher became chief executive in May 2025 after running operations at Capstone and previously at Hudbay. John MacKenzie moved from chief executive to nonexecutive chair that month. He previously chaired Mantos Copper and ran Anglo American’s copper division. Their mine operating experience matters during commissioning. The former chief executive’s continuing influence makes independent oversight particularly important when the board considers another large investment.

Peter Meredith serves as lead director. Six of the eight directors were independent in the March circular. The board assigns oversight to four committees: Audit, Human Resource & Compensation, Governance, Nominating & Sustainability, and Technical & Operational Performance. Raman Randhawa has served as chief financial officer since January 2019. Mitsubishi’s dual role as a lender and a minority mine owner gives the board a specific related-party exposure to oversee.

4.2 Strategy

Capstone is concentrating capital around Mantoverde and Santo Domingo. The existing mill expansion can increase copper deliveries before the group takes on the larger greenfield build. A separate paste agglomeration project would reduce acid consumption when treating difficult leach ore. Management expects $45 m of spending in 2027 and aims to expand treatment in early 2028. Its economics depend on the cost of both acid and copper.

The $25.3 m San Pietro acquisition adds nearby concessions. Proximity makes shared infrastructure possible, but no approved development plan assigns those concessions a separate cash flow. At Santo Domingo, securing project debt and updating the construction estimate matter more to shareholders than another increase in district resources. At the study capital cost, the modeled funding gap remains $227 m after available liquidity.

4.3 Ownership & structure

The Mantos combination brought both Chilean operating mines into Capstone in March 2022. Mitsubishi owns the minority interest in Mantoverde through the operating company.

Orion’s proposed Santo Domingo interest works differently. It would acquire 25% upon a final investment decision and pay $225 m at that point. The later matching contribution and contingent payments depend on separate conditions. Capstone retains the full project before sanction.

Luca Mining agreed to acquire Cozamin, along with its silver-stream obligations. Closing would provide $275 m in cash and $15 m in Luca shares. Another $35 m falls due one year later, with up to $60 m linked to copper prices in 2027–29. The sale shifts some risk from mine operations to the buyer’s ability to pay. Cozamin sale agreement.

At 29 October the group reported 766.3 m issued shares and 774.9 m fully diluted shares including options and treasury share units. Each common share carries one vote. The March circular identified no holder controlling 10%. November ownership data placed Hadrian Capital Partners at 6.62%. Orion holdings appear in separate vehicles, so the aggregate depends on the provider’s ownership classification.

5. ESG & sustainability

Capstone reduced injuries while processing more copper in 2025. Its lost-time injury rate fell to 0.23 per 200,000 hours from 0.48 a year earlier. Its total recordable injury rate fell to 0.69 from 0.91. Those figures measure reported injuries. They provide limited evidence on the consequences of a major tailings failure.

Capstone reported 80% conformance with the Global Industry Standard on Tailings Management, up from 48% in 2024. The remaining work matters at Mantos Blancos, where tailings capacity constrains operations.

Market-based greenhouse gas emissions stood 7% below the recalculated 2021 baseline. The 2030 target requires a 30% reduction. The sustainability update supplies these group measures, while a comparable community-spending figure for each mine is unavailable. Capstone FY2025 sustainability update.

6. Risks

Lower copper prices could coincide with construction spending. At a lower price, operating cash falls just as the company may need to finance construction. A later investment decision preserves cash initially but pushes project receipts further into the future. The scenario analysis therefore tests the copper price, timing, operating costs and chance of construction separately.

Table 5. Risk register

Risk Type Likelihood Impact Exposure Mitigant
Copper Commodity 3 5 Price below the through-cycle deck Collars protect a small share of deliveries.
Mill ramp Operational 4 4 Ore throughput or recovery misses plan Track payable tonnes and C1 separately.
Crusher Operational 4 3 Pinto Valley repair overruns Temporary crushing provides limited capacity.
Project funding Finance 3 4 Santo Domingo equity need increases Orion and project debt share the initial bill.
Chile permits Jurisdiction 2 4 Changes delay construction Existing approvals cover the original design.
Buyer credit Counterparty 2 3 Deferred sale proceeds arrive late Most fixed consideration falls due at closing.
Tailings Environmental 2 5 Storage interruption or containment failure Site plans and industry-standard reviews.
Acid price Operating cost 3 3 Leach margin contracts Limit acid-intensive feed, develop paste treatment.

Source: Capstone operating results and annual filings.

Figure 5. Likelihood and impact of the principal risks

Impact
1
2
3
4
5
Copper 15
Mill ramp 16
Crusher 12
Project funding 12
Chile permits 8
Buyer credit 6
Tailings 10
Acid price 9
1
2
3
4
5
Likelihood

Source: Capstone operating results and annual filings.

The matrix rates the possible consequence to shareholders. Two risks can have similar scores and different remedies. A crusher repair restores access to ore already in the mine plan. A tailings permit or project financing requires action beyond the plant. The model assigns a construction probability to Santo Domingo and tests shortfalls in mine cash flow separately.

7. Valuation

Valuation as of 20 November 2026. Copper averaged $6.47/lb over the 3-month window, $6.42/lb over the 6-month window and $6.10/lb over the 12-month window.

This analysis follows the commodity stock valuation guide and values Capstone at the 20 November 2026 TSX close of C$8.01. Mine cash flows are in US dollars. The equity bridge translates them at C$1.4325 per US dollar.

This analysis uses $6/lb copper and an 8% real after-tax discount rate. The fixed copper prices run from $4 to $8/lb in $1 steps. The copper deck sits 31% above its five-year mean, so this analysis holds the valuation multiples at their midcycle levels.

The analysis holds gold at $4,000/oz and silver at $60/oz. It prices 62% iron ore delivered to China at $100/t. Iron and gold enter independent sensitivity cases. The company’s C1 cash costs already recognize by-product sales. The model adjusts only for the difference from the commodity prices used in guidance.

Cozamin enters the valuation at discounted sale proceeds, assuming a December closing. Santo Domingo enters through its conditional project interest, after the study’s capital costs and a discount for the outstanding investment decision. The operating case assumes that Pinto Valley’s crusher returns to service on the November timetable.

The next twelve months straddle two different operating periods. Only 41 days fall in 2026. This analysis estimates the remainder from the mine plans and the latest operating update.

A tonne of ore entering a mill contains only a fraction of a tonne of copper. The Mantoverde calculation therefore starts from the study’s payable concentrate output. It allows for a ramp shortfall and estimates sulphuric-acid-constrained cathodes separately.

At Mantos Blancos, better head grade raises sulphide output at a constant throughput and recovery. At Pinto Valley, the estimate allows for partial operation before the crusher returns to service. Each estimate assumes that the mines sell the payable copper they produce.

The reserve estimate serves a different purpose. It limits how much copper the company can deliver through each operating plan. This analysis deducts an estimate of production since the reserve statement, applies a recovery and payability allowance, and assigns the remaining tonnes over the published mine life.

Beyond the first operating year, the model restricts annual output to the lower of the forward production estimate and the volume the remaining reserve can support. This matters most at Mantoverde. Extending the optimized mill’s early production rate through the entire reserve life would overstate its copper sales.

The Chilean sites pay sales-based royalties before the model estimates income tax. The continuing mines also need sustaining equipment and waste stripping. For operating NAV, this analysis deducts those costs before applying statutory tax to positive site cash flows.

For the forward earnings leg, depreciation reduces the estimated taxable profit. No value is assigned separately to tax pools whose site-level use the company has yet to disclose. This distinction affects a business that has reported substantial depreciation while bringing a new concentrator into production.

The Santo Domingo study measures value at the beginning of execution. Its construction years, stream proceeds and subsequent gold deliveries are already part of that cash-flow schedule.

This analysis moves the resulting project value from the assumed decision date to the valuation date. It adjusts the price of copper using the study’s sensitivity table. Above the highest published price, this analysis extends the final interval.

For iron and gold, it discounts disclosed concentrate volumes and retained gold receipts. The project’s printed iron sensitivity stays flat despite positive magnetite sales, which makes that published series unsuitable for adjusting the iron price.

Table 6. Load-bearing inputs from the source register in Table 18

Input Value Where used Source
Copper 3-, 6- and 12-month daily close averages 6.466 / 6.417 / 6.095 $/lb §1 and §7 market inputs Market | Yahoo Finance | “HG=F daily futures closes” | to 20 Nov 2026
62% Fe CFR China spot, three, six and twelve latest published monthly means ($/dry tonne) 94.933 / 98.733 / 101.200 §4 and §5 Market | World Bank | “Iron ore, cfr spot”, monthly Pink Sheet, published 3 Nov 2026 | through 31 Oct 2026, latest complete release as of 20 Nov
21 Nov 2026 through 20 Nov 2027 payable copper, same site order 97.154 / 20.000 / 47.136 / 8.876 / 40.063 / 2.396 kt §2 and §7 mine inputs Estimate | 41 remaining FY26 days + 324 FY27 days. FY26 annualized stub MV sulphides 74×(61,633−14,010)/49,300, cathode 20; MB sulphides 41×(35,769−6,657)/30,139, cathode 8.876. PV stub 24 days at assumed 35,000 ore tpd × .30% × 86.8% recovery × 26,223/27,115, then 17 days at 40.618 kt annual payables. CZ stub only at 22.5 kt × 16,798/17,720, assuming a 31 December close. Standalone FY27 CZ is excluded on that path.
FY2027/NTM C1 proxy, $/payable lb: MV sulphides / cathodes, MB sulphides / cathodes, PV, CZ 1.25 / 5.75 / 3.45 / 4.10 / 4.00 / 1.55 §3 and §7 financial inputs Estimate | Assumption anchored at February range endpoints 1.25, 4.95, 3.15, 3.10, 3.30, 1.55 with respective operating allowances 0, 0.80, 0.30, 1.00, 0.70, 0 for acid, diesel, overhead and utilization. Compare Q3 MD&A pp.13–21 and YTD realized costs. Before incremental changes to February by-product prices. No published FY27 unit-cost ranges.
Sustaining capital: MV, MB, PV, CZ and total 100 / 50 / 100 / 20 / 270 $ m §3 and §7 financial inputs Filed | 2026 guidance | 2026 Capital Expenditures Guidance | “Sustaining Capital” | p.3
Capitalized stripping: MV, MB, PV and total (February budget, $ m) 100 / 65 / 60 / 225 §3 and §7 financial inputs Filed | 2026 guidance | 2026 Capital Expenditures Guidance | “Capitalized Stripping” | p.3
Operating mines P&P copper (kt) at 100% and attributable, before Cozamin closes 3889 / 3222.1 §2, §3 and §7 Derived | 954 + 613 + 6 + 1,833 + 390 + 93 | Mantoverde at 70% attributable
Mantoverde optimized project capex estimate and incurred to Q3 176 / 107.5 $ m §2 and §7 mine inputs Filed | Q3 2026 MD&A | MV Optimized Brownfield Expansion Project | “capital cost estimate” | p.10
Santo Domingo study post-tax NPV8 in $ m 1,720 §2 and §7 mine inputs Filed | Santo Domingo feasibility study | Results of Economic Analysis | “Discounted at 8%" | p.513
Conditional Cozamin sale ($ m): cash on closing, shares, one-year deferred, maximum contingent 275 / 15 / 35 / 60 §2 and §7 mine inputs Filed | Cozamin sale agreement release | Capstone Copper Announces Sale of Cozamin | “total consideration” | p.1
Q3 spot consolidated net debt 564.0 $ m §3 and §7 financial inputs Filed | Q3 2026 MD&A | Reconciliation of Net (debt) / Net cash | “Net debt” | p.44
October 29 issued shares and fully diluted count 766,250,575 / 774,855,354 §3 and §7 financial inputs Filed | Q3 2026 MD&A | Outstanding Share Data and Dilution Calculation | “Issued and outstanding” | p.33

Source: Capstone annual and interim filings, project studies, market observations and analysis estimates, itemised in the issuer reports and Table 18.

Metal Pilot Premium

Valuation workings — Premium

The workings behind this valuation — the method, the models, the sensitivity grids and the scenarios, 11 tables and 3 figures in all — are for Metal Pilot Premium members.

  • 7.1 Method selection
  • 7.2 Net asset value
  • 7.3 Relative valuation
  • 7.4 Further weighted methods
  • 7.5 Cross-checks
  • 7.6 Scenarios & fair value

Want to see one first? The BHP Group (BHP) valuation is open to every reader.

Create a Metal Pilot accountLog in

See Premium plansRead a free example

You are signed in, and your plan does not include valuation workings. They come with Metal Pilot Premium.

Upgrade to Premium

The premium section could not be loaded right now.

Premium — unlocked

8. Near-term catalysts (1–3 years)

The next operating reports should establish whether Capstone can convert higher mill throughput into payable copper. At Santo Domingo, an updated capital budget and binding financing terms would give a clearer measure of what existing shareholders must fund.

Table 16. Near-term catalysts and evidence to watch

Event Expected timing at 20 November Effect on the investment case
Pinto Valley crusher recommissioning Mid-December 2026, 12 November operations update Restores ore feed and spreads fixed costs over more payable copper.
Cozamin sale Q4 2026, subject to closing conditions Converts the low-cost mine into cash, shares and a deferred receivable.
Mantoverde optimized throughput Early 2027 Tests whether concentrate output supports the lower sulphide cost.
Santo Domingo investment decision Q1 2027, conditional Determines the construction bill, Orion payment and required borrowing.
Mantoverde paste treatment expansion Early 2028 target Could improve leach economics when sulphuric acid is expensive.

Source: Capstone quarterly operating update and Cozamin transaction announcement.

9. Rating & verdict

Figure 9. Capstone Copper scorecard by dimension

Source: This analysis, based on the peer set in Table 3 and the issuer filings. Capstone filings.

Figure 10. Scorecard by dimension, 20 November 2026

Assets & scale★★☆☆☆15%
Cost & margins★★★☆☆15%
Reserves & life★★★☆☆15%
Balance sheet★★★☆☆15%
Capital allocation★★☆☆☆15%
Growth★★★★☆6.25%
Management★★★☆☆6.25%
Jurisdiction★★★☆☆6.25%
ESG★★★☆☆6.25%
Score by dimension Weighted composite ★★★ (2.76)
Each ring is one star; the outer ring is ★★★★★. Weights in Table 17.

Figure data: Table 17. Each spoke prints its stars and weight; the dashed ring is the weighted composite, 2.76/5.

Table 17. Scorecard rationale

Dimension Weight Score Rationale
1. Asset quality & scale 15% ★★☆☆☆ FY2025 output of 224.8 kt trails every peer. Mantoverde supplied 45% of revenue, similar to Lundin’s Candelaria exposure.
2. Cost position & margins 15% ★★★☆☆ FY2025 adjusted EBITDA margin of 40.4% sits above First Quantum at 32.0% and below Lundin at 47.3%.
3. Reserves, life & replacement 15% ★★★☆☆ Operating P&P copper of 3.89 Mt supports 17.3 years at FY2025 output before recovery. Mantoverde processing to 2049 versus First Quantum’s Kansanshi to 2050.
5. Balance sheet & liquidity 15% ★★★☆☆ FY2025 leverage of 0.82× and September 2026 liquidity of $1.1 bn support a sector-middle score given the prospective $227 m project funding gap.
6. Capital allocation & returns 15% ★★☆☆☆ Negative free cash flow in FY2022–24, no FY2025 payout and share growth place returns below the sector median in this assessment.
4. Growth & optionality 6.25% ★★★★☆ The early 2027 Mantoverde expansion and 19-year Santo Domingo project offer more growth relative to the base than peer First Quantum’s 2026–28 production outlook.
7. Management & governance 6.25% ★★★☆☆ Six of eight directors were independent in March 2026. A former CEO chairs the board, supporting a sector-middle governance assessment.
8. Jurisdiction & geopolitics 6.25% ★★★☆☆ Chile supplied 72.1% of FY2025 net revenue. Peer Antofagasta also has concentrated Chilean exposure, while Capstone retains an Arizona operation.
9. ESG & licence to operate 6.25% ★★★☆☆ FY2025 tailings-standard conformance reached 80%. Injury rates fell, but incomplete conformance limits the score against sector operating practice.
Composite 100% ★★★☆☆ Average

Source: Capstone annual filings and information circular, September 2026 quarterly results, the FY2025 sustainability update and peer reports in Table 3.

Weighted average. Σ(weight × stars) = 2.76/5, or ★★★☆☆ Average.

The two-axis verdict. At 20 November 2026, Average quality and Modestly undervalued (wide band) make Capstone a re-rating candidate if Mantoverde sustains its higher mill rate. The C$10.25 blend implies +27.9% against the C$8.01 close. NAV is C$9.03 per share at $6/lb copper. The market-implied copper deck is $5.59/lb.

Scale and the record of cash reinvestment pull the target multiples below their midcycle anchors. At a 0.96× NAV multiple, the asset method alone clears the share price by less than the blended figure suggests. The other two methods depend on selling more copper concentrate from Mantoverde. A lower copper price or a slower ramp would reduce both at the same time.

The potential reward rests on evidence that a new plant can earn its keep before the next one absorbs capital. A binding budget for Santo Domingo would clarify how much of that reward belongs to existing shareholders. Compare Capstone’s production and operating margins on Metal Pilot’s copper mining stock screener.

Terms in this post (54)
2P reserves (proven and probable)
Proven plus probable reserves: the reserve most miners and Canadian oil producers report and plan on. Proven is the higher-confidence part, probable the rest. In depth: The Oil & Gas Value Chain: Upstream — Reserves vs resources
Asset quality & scale
Scorecard dimension 1, scored 1 to 5 against the peer set: the tier and size of the asset base, its grade or margin quality and how concentrated it is.
Balance sheet & liquidity
Scorecard dimension 5: financial resilience — leverage, liquidity, maturities and hedge cover; for a developer, the funding gap.
Blended fair value
The weighted average of the values per share the valuation methods give, on the method-selection weights: the post’s estimate of what a share is worth.
C1 / cash cost
The direct cost of producing a pound or ounce — mining, processing, site overhead and freight, net of by-product credits — before depreciation, royalties and sustaining capital. Lower is better. In depth: Copper market guide — How to value & screen copper miners
Capex (capital expenditure)
Cash spent on mines, wells, plant and equipment, split where the filing allows into sustaining and growth capital. In depth: The Oil & Gas Value Chain: Upstream — What a barrel costs
Capital allocation & returns
Scorecard dimension 6: discipline and the return on capital — returns on capital, the dividend and buyback record, reinvestment and acquisitions, judged per share.
Cash margin
Revenue less cash operating costs, before depreciation — as a share of revenue or per unit sold, as the label says. Higher is better.
Collar
A hedge with a floor and a ceiling: below the floor the producer is paid the floor, above the ceiling it gives up the excess.
Cost position & margins
Scorecard dimension 2: where the business sits on its sector’s cost curve and how durable its margins are.
Discount rate
The annual rate future cash flows are discounted at to value them today — real and after tax here; a higher rate gives a lower value.
Dividend
The cash the board declares for shareholders out of earnings, per share for the period the label names — a month, a quarter, a half or a year — unless the cell gives a total; it is paid some weeks later to the holders on the record date.
EBITDA
Earnings before interest, tax, depreciation and amortisation: operating profit before non-cash charges and financing. Adjusted EBITDA strips items the company treats as one-off (non-GAAP).
EBITDA margin
EBITDA as a share of revenue — adjusted EBITDA where the label says so, EBITDAX for an oil and gas producer: how much of each dollar of sales is left as cash earnings before interest, tax and capital spending. Higher is better.
Enterprise NAV
The sum of the asset values before the balance sheet: NAV before cash, debt and the other claims are added or deducted.
EPS, diluted (earnings per share)
Net income attributable to shareholders divided by the share count including the shares options, warrants and convertibles would add.
Equity bridge
The step from enterprise NAV to equity NAV: cash and investments added, debt, provisions and the other claims on the assets deducted.
Equity NAV
Enterprise NAV after cash, debt and the other claims of the equity bridge — the NAV that belongs to shareholders.
ESG & licence to operate
Scorecard dimension 9: the safety, environmental, tailings and community record, and the social licence to keep operating.
EV (enterprise value)
Market capitalisation plus net debt, or less net cash, and any other claims ahead of shareholders: what the market values the whole business at.
EV/EBITDA
Enterprise value divided by EBITDA — here, forward EBITDA at the base deck: how many years of cash earnings the market pays for the whole business. Lower is cheaper.
FCF (free cash flow)
Operating cash flow less capital spending: the cash left for dividends, buybacks and debt. The label or its note says which capital is deducted.
FCF yield
Free cash flow per share divided by the share price: the cash return the business earns on today’s price. Higher is cheaper.
FCF-yield support
A value per share from cash flow: forward free cash flow, after sustaining capital and cash tax, divided by a target free-cash-flow yield and the diluted share count.
Forward EBITDA
EBITDA over the next twelve months at the valuation’s base price deck — the earnings the EV/EBITDA multiple is applied to.
Fully diluted shares
Shares outstanding plus every share options, warrants, rights and in-the-money convertibles would add — the count a value per share divides by.
FY (fiscal year)
The company’s twelve-month reporting year, named by the calendar year it ends in.
Growth & optionality
Scorecard dimension 4: the production and cash-flow growth ahead — funded projects, expansions and exploration upside.
Growth capital
Capital spent to add production: new mines, expansions and wells beyond what replaces decline. In depth: The Oil & Gas Value Chain: Upstream — What a barrel costs
Interest (ownership)
The company’s ownership share of an asset; its production, reserves and value are counted at that share. In depth: The Oil & Gas Value Chain: Upstream — Leases & tenure
Jurisdiction & geopolitics
Scorecard dimension 8: the country risk of where the assets and cash flows sit, and how stable permitting and fiscal terms are.
Liquidity
Cash plus undrawn committed credit lines: what the company can spend at short notice.
M&I resources (measured and indicated)
Mineralisation drilled closely enough to estimate tonnes and grade with confidence, not yet shown to be economic in a mine plan. Exclusive means the part not already counted as reserves.
Management & governance
Scorecard dimension 7: the people and their alignment — track record, insider ownership, board independence and related-party conflicts.
Market capitalisation
The share price times the shares outstanding: what the market values the equity at.
NAV (net asset value)
The value today of the company’s assets — each mine’s or field’s future cash flows discounted to the present — plus cash, less debt and other claims.
NAV per share
Equity NAV divided by the fully diluted share count.
Net debt
Borrowings — and, where the label says so, leases — less cash; a figure in brackets or shown as net cash means more cash than debt. Lower is stronger.
Net debt / EBITDA
Net debt divided by a year’s EBITDA: how many years of cash earnings would repay the debt. Below 1× is low; net cash means there is none. Lower is stronger. In depth: The Oil & Gas Value Chain: Upstream — How to read & screen a producer
NPV (net present value)
The value today of an asset’s future cash flows, each discounted back at the discount rate, less the capital still to spend. In depth: Copper market guide — How to value & screen copper miners
OCF (operating cash flow)
Cash the business generated in the year after working capital and tax, before capital spending.
P/NAV
The share price divided by NAV per share: below 1.00× the market prices the shares under the value of the assets, above it over. In depth: The Oil & Gas Value Chain: Upstream — How to read & screen a producer
Reclamation provision
The discounted cost of closing and rehabilitating mines and wells, booked as a liability and deducted from the value of the equity.
Reserves
What a company can show it will produce at a profit from known deposits or fields, at stated prices and costs, estimated under a disclosure code — NI 43-101, JORC or S-K 1300 for mines; SEC rules or NI 51-101 for oil and gas. In depth: The Oil & Gas Value Chain: Upstream — Reserves vs resources
Reserves, life & replacement
Scorecard dimension 3: how long the reserves last and whether the company replaces what it produces.
Resource conversion
The value given to resources beyond the mine plan: exclusive measured and indicated ounces or pounds, counted at a factor below one for the share expected ever to be mined.
Revenue
The company’s top line: what it earned in the period from selling its output — metal, oil and gas, or its stream and royalty interests — and any other operating income, before costs. The label or its note says what it includes where that differs, as net of royalties or with purchased oil resold.
Royalty
A share of a mine’s or well’s revenue or profit paid to a government or a royalty holder, ahead of the operator’s own margin. In depth: The Oil & Gas Value Chain: Upstream — Fiscal regimes
SOTP (sum of the parts)
A NAV built asset by asset — each mine, field, stake or business valued on its own, then added up.
Stage risk
The weight below 100% put on an undeveloped asset’s NPV for the chance it is never built or produces less than planned.
Stream
An upfront payment for the right to buy a share of a mine’s future metal at a fixed, low price: the operator gets capital now, the stream holder metal later. In depth: Silver market guide — Company archetypes along the value chain
Sustaining capital
Capital spent to keep existing production going — equipment, mine development, tailings — as opposed to growth capital for new output. In depth: The Oil & Gas Value Chain: Upstream — What a barrel costs
Target P/NAV
The P/NAV multiple the valuation applies to NAV per share: the archetype’s anchor, moved by the scorecard’s driver line.
Value read
The five-point verdict on the implied return: Undervalued above +30%, Modestly undervalued +10% to +30%, Fairly valued within ±10%, Modestly overvalued −10% to −30%, Overvalued below −30%. “Wide band” flags a lowest scenario more than 25% below the price.

10. Sources, methodology & disclaimer

10.1 Sources, methodology & data vintage

Company and project documents. The annual reports, financial statements and management analyses cover the FY2021 predecessor through FY2025. The FY2025 annual information form supplies reserves under NI 43-101 and operating-company interests. The 2024 feasibility studies supply the project schedules. The March proxy circular and FY2025 sustainability update cover oversight, safety and tailings.

The third-quarter report gives the financial position at 30 September. The 29 October share count and November operating update establish the latest capital and production information used here. The Cozamin announcement sets the sale consideration. The peer comparison uses the FY2025 reports in Table 3.

Market and model. The share price and copper futures data come from Yahoo Finance. The Bank of Canada supplies the 20 November exchange rate. The World Bank November commodity data supply the iron benchmark. A 17 November consensus snapshot provides the independent analyst comparison.

The copper grid steps by $1/lb from $4 to $8/lb. The base uses $6/lb and an 8% real after-tax rate. The analysis weighs finite mine NAV at 50%, forward attributable EBITDA at 30% and sustainable cash flow at 20%. It refreshes quarterly and after material changes to guidance, financing or the commodity deck.

Initial model, 21 November 2026. At the C$8.01 close, the base case gives C$9.06 NAV per diluted share and C$10.27 blended value, implied +28.3%. The read is Modestly undervalued (wide band) and the market-implied copper deck is $5.59/lb. The $5.74/lb downside and $6.02/lb upside rating thresholds hold other assumptions fixed.

Re-run log. 21 November 2026. Face debt adds $14.6 m to equity claims. NAV falls C$0.03 to C$9.03 per diluted share. The blend falls C$0.02 to C$10.25, implying +27.9% at C$8.01. The read stays Modestly undervalued (wide band). Market-implied copper is $5.59/lb, with rating thresholds of $5.74 and $6.03/lb.

Capstone has yet to publish FY2027 site cost guidance, a financed Santo Domingo construction plan or the annual use of tax pools by mine. An updated feasibility study and site budgets would narrow those estimates. The charts omit inferred resources and duplicate financial or safety measures. The valuation workings carry the full sensitivity tables. Table 6 selects the main inputs from Table 18.

Table 18. Source register

InputValueAs ofWhere usedSource
2026 guidance
Sustaining capital: MV, MB, PV, CZ and total ($ m)100 / 50 / 100 / 20 / 27017 Feb 2026§3 and §7 financial inputsFiled | 2026 guidance | 2026 Capital Expenditures Guidance | "Sustaining Capital" | p.3
Capitalized stripping: MV, MB, PV and total (February budget, $ m)100 / 65 / 60 / 22517 Feb 2026§3 and §7 financial inputsFiled | 2026 guidance | 2026 Capital Expenditures Guidance | "Capitalized Stripping" | p.3
AIF 2025
Pinto Valley P&P ore Mt, Cu grade %, contained Cu kt300.2 / 0.32 / 95431 Dec 2025§2 and §7 mine inputsFiled | AIF 2025 | Pinto Valley Mine Mineral Reserve | "Total P + P" | p.22
Mantos Blancos sulphide P&P ore Mt, Cu grade %, contained Cu kt100.1 / 0.61 / 61331 Dec 2025§2 and §7 mine inputsFiled | AIF 2025 | Mantos Blancos Mineral Reserves | "Flotation - Reserves" | p.33
Mantos Blancos oxide P&P ore Mt, soluble grade %, contained soluble Cu kt2.1 / 0.27 / 631 Dec 2025§2 and §7 mine inputsFiled | AIF 2025 | Mantos Blancos Mineral Reserves | "Reserves" | p.33
Mantoverde sulphide and mixed P&P ore Mt, Cu grade %, contained Cu kt (100%)384.2 / 0.48 / 1,83331 Dec 2025§2 and §7 mine inputsFiled | AIF 2025 | Mantoverde Mineral Reserves Statement | "Total Reserves" | p.43
Mantoverde heap and dump P&P ore Mt, soluble Cu grade %, soluble Cu kt (100%)195.8 / 0.20 / 39031 Dec 2025§2 and §7 mine inputsFiled | AIF 2025 | Mantoverde Mineral Reserves Statement | "Total Reserves" | p.43
Santo Domingo P&P ore Mt, Cu grade %, contained Cu kt436.1 / 0.33 / 1,43531 Dec 2025§2 and §7 mine inputsFiled | AIF 2025 | Santo Domingo Estimated Mineral Reserves | "Total Mineral Reserves" | p.71
Bank of Canada
CAD per US dollar1.432520 Nov 2026§1 and §7 market inputsMarket | Bank of Canada | "FXUSDCAD" | 20 Nov 2026
Cozamin sale agreement release
Conditional Cozamin sale ($ m): cash on closing, shares, one-year deferred, maximum contingent275 / 15 / 35 / 6021 Sep 2026§2 and §7 mine inputsFiled | Cozamin sale agreement release | Capstone Copper Announces Sale of Cozamin | "total consideration" | p.1
Cozamin contingent copper-price payments ($ m annually)10 at $7.00–7.75/lb, 15 at $7.76–8.50 and 20 from $8.51. Test annually in 2027–29, cap $60 m.21 Sep 2026§4 and §5Filed | Cozamin sale agreement release | Footnotes | "annual payment" | p.2
Derived
PV M&I copper beyond reserves, 100% (kt)294331 Dec 2025§2, §3 and §7Derived | 3,897 − 954 | cited AIF reserve and resource rows
MB M&I copper beyond reserves, 100% (kt)61231 Dec 2025§2, §3 and §7Derived | 1,075 + 156 − 613 − 6 | cited AIF reserve and resource rows
MV M&I copper beyond reserves, 100% (kt)119531 Dec 2025§2, §3 and §7Derived | 2,296 + 269 + 444 + 409 − 1,833 − 390 | cited AIF reserve and resource rows
SD M&I copper beyond reserves, 100% (kt)26931 Mar 2024§2, §3 and §7Derived | 1,704 − 1,435 | cited AIF reserve and resource rows
Operating mines P&P copper (kt) at 100% and attributable, before Cozamin closes3889 / 3222.120 Nov 2026§2, §3 and §7Derived | 954 + 613 + 6 + 1,833 + 390 + 93 | Mantoverde at 70% attributable
Filed 65% and 67% premiums over 62%, $/dmt25 / 3531 Jul 2024§2 and §7 mine inputsDerived | Santo Domingo feasibility study, economic analysis table 22-4: 110−85 and 120−85. Apply the same absolute move to all three grades, retain $25/t freight once.
Upper disclosed Cu-sensitivity segment at 8%, $ m per $/lb907.331 Jul 2024§2 and §7 mine inputsDerived | (2,658−2,100)/(4.10 × 0.15), 100% project. Filed data extend only to $5.125/lb. Any continuation above is an extrapolation.
Estimate
Santo Domingo independent eight-percent secondary metal sensitivity, 100% projectIron gross / after-tax $ m per $1/dmt: 28.37 / 19.05. Gold gross retained / after-tax $ m per $1,000/oz: 41.80 / 28.06.20 Nov 2026§2 and §7 mine inputsEstimate | PV of annual Fe quantities in feasibility study table 22-5, renormalized from rounded 66 to 68.4 Mt; gold annual study receipts / $1,800 per ounce. First operating cash year discounted 3.5 years. Incremental after-tax retention .73 × .936 × .9826; approximate incremental receipts only. Keep study’s original NPV and avoid applying the gold stream twice.
21 Nov 2026 through 20 Nov 2027 payable copper, same site order (kt)97.154 / 20.000 / 47.136 / 8.876 / 40.063 / 2.39620 Nov 2026§2 and §7 mine inputsEstimate | 41 remaining FY26 days + 324 FY27 days. FY26 annualized stub MV sulphides 74×(61,633−14,010)/49,300, cathode 20; MB sulphides 41×(35,769−6,657)/30,139, cathode 8.876. PV stub 24 days at assumed 35,000 ore tpd × .30% × 86.8% recovery × 26,223/27,115, then 17 days at 40.618 kt annual payables. CZ stub only at 22.5 kt × 16,798/17,720, assuming a 31 December close. Standalone FY27 CZ is excluded on that path.
FY2027/NTM C1 proxy, $/payable lb: MV sulphides / cathodes, MB sulphides / cathodes, PV, CZ1.25 / 5.75 / 3.45 / 4.10 / 4.00 / 1.5520 Nov 2026§3 and §7 financial inputsEstimate | Assumption anchored at February range endpoints 1.25, 4.95, 3.15, 3.10, 3.30, 1.55 with respective operating allowances 0, 0.80, 0.30, 1.00, 0.70, 0 for acid, diesel, overhead and utilization. Compare Q3 MD&A pp.13–21 and YTD realized costs. Before incremental changes to February by-product prices. No published FY27 unit-cost ranges.
Change from filed $4,300 Au / $55 Ag / $20 Mo guidance to $4,000 / $60 / $20MV FY27 gross EBITDA delta −$8.55 m. MB $0.350 m.20 Nov 2026§3 and §7 financial inputsEstimate | MV 30,000 payable gold oz × 95% ramp × −300; multiply by 70% for attributable results. MB 874,000 payable silver oz × 8% stream cash price × +5. No second by-product revenue on top of net C1. Gross MV bound from zero to full 30,000 oz is $0 to −9.0 m.
Pinto Valley annualized incremental by-product credit estimate, $ m0.9920 Nov 2026§3 and §7 financial inputsEstimate | Proxy: 8.853 m × 4/3 × (60/55−1) + .853 m × 4/3 × (4000/4300−1). Uses nine-month historical gross revenues as a sizing proxy; realized prices and forward site payables are unavailable. Mo deck unchanged. Flat credits or ±$1.2 m stress is a modelling convention.
Arizona and US corporate tax rates, combined marginal proxy and state mineral severance rate (%)Arizona 4.9% of Arizona taxable net income, US federal 21%; combined 24.871% if Arizona tax is federally deductible. State severance 2.5% of half the difference between statutory gross production value and production costs.20 Nov 2026§3 and §7 financial inputsEstimate | Arizona Revised Statutes, title 43 section 1111 and title 42 sections 5201, 5202 and 5204. IRS Form 1120 Schedule J. Profit proxy is an estimate; taxable income differs from EBITDA. Operating severance can already be in C1; confirm before any separate deduction.
FY2025 financial statements
Corporate G&A, 2025–2024 ($000)(32,724) / (31,533)31 Dec 2025§3 and §7 financial inputsFiled | FY2025 financial statements | Consolidated Statements of Income | "General and administrative expenses" | p.7
D&A, 2025–2024 ($000)481,677 / 316,15431 Dec 2025§3 and §7 financial inputsFiled | FY2025 financial statements | Consolidated Statements of Cash Flows | "Depletion and amortization" | p.9
MarketBeat
Pre-cutoff MarketBeat consensus mean 12-month target (C$)16.9417 Nov 2026§4 and §5Market | MarketBeat | "Capstone Copper (TSE:CS) Hits New 1-Year Low" | published 17 Nov 2026; independent 16 Nov snapshot corroborates. Use this point-in-time series for any analyst leg.
Q3 2026 MD&A
Mantoverde optimized project capex estimate and incurred to Q3 ($ m)176 / 107.529 Oct 2026§2 and §7 mine inputsFiled | Q3 2026 MD&A | MV Optimized Brownfield Expansion Project | "capital cost estimate" | p.10
Q3 spot consolidated net debt ($ m)564.029 Oct 2026§3 and §7 financial inputsFiled | Q3 2026 MD&A | Reconciliation of Net (debt) / Net cash | "Net debt" | p.44
Q3 total liquidity and undrawn RCF ($ m)1,089.4 / 826.029 Oct 2026§3 and §7 financial inputsFiled | Q3 2026 MD&A | Reconciliation of Available Liquidity | "Available liquidity" | p.44
October 29 issued shares and fully diluted count766,250,575 / 774,855,35429 Oct 2026§3 and §7 financial inputsFiled | Q3 2026 MD&A | Outstanding Share Data and Dilution Calculation | "Issued and outstanding" | p.33
2027 post-quarter copper collars: tonnes, weighted floor and ceiling $/lb6,000 / 6.00 / 7.2429 Oct 2026§3 and §7 financial inputsFiled | Q3 2026 MD&A | Outlook | "zero cost copper collars" | p.13
Long-term debt before deferred financing costs ($ m)782.030 Sep 2026§7 equity bridgeFiled | Q3 2026 MD&A | Reconciliation of Net (debt) / Net cash | "Long-term debt (per financials), excluding deferred financing costs" | p.44
Santo Domingo conditional Orion JV: interest (%), FID payment, six-month match, contingent maximum ($ m)25 / 225.0 / 75.0 / 60.029 Oct 2026§4 and §5Filed | Q3 2026 MD&A | Financial Capability | "ownership interest" | p.33
Q3 2026 financial statements
Q4 2026 copper collars: tonnes, put endpoints and call endpoints $/lb6,736 / 4.25 / 4.45 / 6.00 / 6.7030 Sep 2026§3 and §7 financial inputsFiled | Q3 2026 financial statements | Derivative instruments | "Commodity Copper" | p.11
Lease liabilities (filing note 13) at September 30 ($000)57,92330 Sep 2026§3 and §7 financial inputsFiled | Q3 2026 financial statements | Condensed Interim Consolidated Statements of Financial Position | "Lease liabilities" | p.2
Lease liabilities (filing note 13) at September 30 (noncurrent) ($000)181,65930 Sep 2026§3 and §7 financial inputsFiled | Q3 2026 financial statements | Condensed Interim Consolidated Statements of Financial Position | "Lease liabilities" | p.2
Marketable securities at September 30 ($000)5,69930 Sep 2026§3 and §7 financial inputsFiled | Q3 2026 financial statements | Other Assets | "Investments in marketable securities" | p.15
Minto current provision and non-current mine restoration ($000)3,204 / 205,76030 Sep 2026§3 and §7 financial inputsFiled | Q3 2026 financial statements | Provisions | "Balance, September 30, 2026" | p.20
Commercial offtake facility / Mitsubishi shareholder loan / total related-party debt ($000)45,406 / 210,595 / 256,00130 Sep 2026§3 and §7 financial inputsFiled | Q3 2026 financial statements | Non-Controlling Interest | "Balance, September 30, 2026" | p.16
Quarter-end short-term working capital facilities ($000)210,622; shown in other current liabilities and excluded from management net debt. Includes the receivables financing described in Q3 MD&A p.32. Avoid double counting the trade working-capital allowance.30 Sep 2026§3 and §7 financial inputsFiled | Q3 2026 financial statements | Other Liabilities | "Working capital facilities" | p.15
Commodity taxes payable ($000)15,92230 Sep 2026§7 equity bridgeFiled | Q3 2026 financial statements | Accounts Payable and Accrued Liabilities | "Commodity taxes payable" | p.16
Accrued interest ($000)1,58230 Sep 2026§7 equity bridgeFiled | Q3 2026 financial statements | Accounts Payable and Accrued Liabilities | "Accrued interest" | p.16
Santo Domingo feasibility study
Santo Domingo study post-tax NPV8 in $ m1,7202024§2 and §7 mine inputsFiled | Santo Domingo feasibility study | Results of Economic Analysis | "Discounted at 8%" | p.513
Santo Domingo study copper ($/lb) and gold ($/oz)4.1 / 1,8002024§2 and §7 mine inputsFiled | Santo Domingo feasibility study | Summary of Cash Flow | "Copper Price" | p.59
Santo Domingo initial / life-of-mine sustaining capex ($ m)2,315 / 1,3292024§2 and §7 mine inputsFiled | Santo Domingo feasibility study | Economic Analysis | "Initial capital costs" | p.58
Santo Domingo Payable copper (kt), life total or grade then years 1–191,243 / 88 / 137 / 111 / 114 / 95 / 92 / 81 / 54 / 45 / 62 / 68 / 64 / 45 / 40 / 59 / 32 / 20 / 18 / 192024§2 and §7 mine inputsFiled | Santo Domingo feasibility study | Cash Flow on Annualized Basis | "Cu Payable" | p.515
Santo Domingo Chile-to-China freight / tonne deducted from CFR to FOB ($)25.02024§2 and §7 mine inputsFiled | Santo Domingo feasibility study | Copper and Magnetite Concentrate Transport and Insurance Charges | "Freight Charge" | p.511
Santo Domingo after-tax NPV at discount rate 6% / 8% / 10% / 12% ($ m)2,199 / 1,720 / 1,335 / 1,0222024§2 and §7 mine inputsFiled | Santo Domingo feasibility study | Results of Economic Analysis | "Discounted at" | p.513
Stock Analysis / S&P Global Market Intelligence
Own fiscal year-end EV/EBITDA, FY2021 to FY20253.75 / 10.11 / 26.57 / 17.88 / 11.9120 Nov 2026§1 and §7 market inputsMarket | Stock Analysis / S&P Global Market Intelligence | "EV/EBITDA Ratio, FY2021–FY2025" | 21 Nov 2026 read
World Bank
62% Fe CFR China spot, three, six and twelve latest published monthly means ($/dry tonne)94.933 / 98.733 / 101.20020 Nov 2026§4 and §5Market | World Bank | "Iron ore, cfr spot", monthly Pink Sheet, published 3 Nov 2026 | through 31 Oct 2026, latest complete release as of 20 Nov
Yahoo Finance
Copper 3-, 6- and 12-month daily close averages ($/lb)6.466 / 6.417 / 6.09520 Nov 2026§1 and §7 market inputsMarket | Yahoo Finance | "HG=F daily futures closes" | to 20 Nov 2026
Five-year daily mean, low (14 Jul 2022) and high (9 Sep 2026), $/lb4.578 / 3.211 / 6.80420 Nov 2026§1 and §7 market inputsMarket | Yahoo Finance | "HG=F daily futures closes" | to 20 Nov 2026
Gold 3-, 6- and 12-month daily close averages ($/oz)4207.509 / 4228.035 / 4459.46320 Nov 2026§1 and §7 market inputsMarket | Yahoo Finance | "GC=F daily futures closes" | to 20 Nov 2026
Silver 3-, 6- and 12-month daily close averages ($/oz)58.797 / 61.357 / 68.97020 Nov 2026§1 and §7 market inputsMarket | Yahoo Finance | "SI=F daily futures closes" | to 20 Nov 2026

Source: Capstone financial statements and management reports.

10.2 Disclaimer & disclosure

This analysis is general information and does not constitute investment advice or a recommendation to buy or sell securities. The estimates use information available at the stated date and depend on future copper prices, mine performance and capital costs. Actual results may differ materially. Readers should consider their own financial circumstances and consult a qualified adviser when making investment decisions.

AI assisted with research, calculations and drafting. The source register identifies the basis for the figures and distinguishes company disclosures from analytical estimates.

As of 19 November 2026, the author holds no position in the company this analysis covers.