Ivanhoe Electric (IE) — Stock Analysis 2026 [3.3]

Copper Base Metals Company Analysis
USD

Analysis as of 20 November 2026. Ivanhoe Electric stock analysis for a base-metals developer. The NYSE American close was $5.40. The base copper deck is $6/lb, the grid price closest to the trailing averages. The cases run deep bear $4/lb, bear $5/lb, base $6/lb, bull $7/lb and deep bull $8/lb. The market-implied deck is $6.00/lb. Funded NAV and blended fair value are both $5.40 a share, with implied 0.0% return. Quarterly updates also reflect material project news. Rating: ★★★½☆ Solid / Fairly valued (wide band).

Ivanhoe Electric is developing the Santa Cruz Copper Project in Arizona. The September study lays out a domestic cathode business with a defined reserve and a funding requirement that matters to each share. The near-term equity case turns on the terms of permanent finance and on how much of the remaining build shareholders must fund. Compare the project and its peers on Metal Pilot’s copper mining stock screener.

1. Snapshot & thesis

Figure 1. Ivanhoe Electric in numbers

$5.40
Share price, 20 Nov 2026
$861.98 m
Basic market capitalisation, 20 Nov
58.4 kt/yr
Copper cathode, PFS life average
1,519 kt
Probable copper, September 2026
$214.84 m
Consolidated cash, September 2026
$307.0 m
Residual funding gap, base case
$5.40
Funded NAV per share, 20 Nov
$5.40
Blended fair value, 20 Nov
3.3/5
Quality rating, Solid
Fairly valued
Valuation read (wide band)

Figure data: Santa Cruz PFS 2026, Q3 2026 Form 10-Q, market close and this analysis.

Ivanhoe Electric (AMEX:IE) lists on NYSE American and the Toronto Stock Exchange. By archetype it is a developer in base metals. It oversees a portfolio with one copper development project and exploration exposure in the United States and Saudi Arabia. Its Arizona project gives the company an entirely different earnings profile from a copper producer.

Thesis in brief. Santa Cruz has an engineered route to cathode, with room to extend the plan if Indicated copper converts. The stock already reflects the base case for the scheduled mine and the resulting equity issue. Full approval and better-than-modeled funding terms would support a re-rating. A lower copper price or a later schedule would reduce the equity value even if the resource estimate held.

Table 1. Ivanhoe Electric in numbers

Metric Value As of
Share price $5.40 20 Nov 2026
Basic market capitalisation $861.98 m 20 Nov 2026
Basic shares 159.63 m 5 Nov 2026
Service revenue $3.24 m FY2025
Gross margin 65.3% FY2025
Gross funding gap $326.0 m September 2026 PFS less conditional EXIM
NAV per share $5.40 20 Nov 2026, after modeled funding
Blended fair value $5.40 20 Nov 2026
Scenario range $3.22–$8.01 20 Nov 2026
Valuation read Fairly valued (wide band), implied 0.0% 20 Nov 2026
Market-implied copper deck $6.00/lb 20 Nov 2026
Quality rating 3.3/5, Solid 20 Nov 2026

Source: Market close, Q3 2026 Form 10-Q, FY2025 Form 10-K and this analysis.

How to read this analysis. The asset review and valuation give the operating and financial basis for the rating.

2. Assets & operations

The Copper Market Guide explains the market for the metal Santa Cruz would sell. The project targets refined cathode from Arizona, so its economics depend on copper prices and the domestic premium for the finished product.

2.1 Portfolio overview

Table 2. Ivanhoe Electric development and exploration portfolio

# Asset Country Stage Interest Study output Probable copper Mine life Study C1 Listing / operator
1 Santa Cruz United States Preliminary feasibility 100% 58.4 kt/yr 1,519 kt 24 yr $1.47/lb AMEX:IE / Mesa Cobre
2 Camp Grant, including Gleeson United States Drilling n/d n/a n/a n/a n/a AMEX:IE / Ivanhoe Electric
3 Maaden exploration JV Saudi Arabia Exploration 50% n/a n/a n/a n/a JV / Maaden and Ivanhoe Electric

Source: Santa Cruz PFS 2026, Tables 1-7 and 19-2, Q3 2026 Form 10-Q and Gleeson drilling release.

Santa Cruz supplies all the modeled mine value. The other holdings broaden the exploration pipeline and add some service revenue. This analysis assigns them no incremental base value because the available records provide neither executable mine plans nor usable current market values. A delay at Santa Cruz would therefore postpone the group’s only modeled mine cash flow.

2.2 Revenue split

There are no mine sales to allocate. The commodity view uses attributable mine and resource NAV before corporate claims. The asset view uses reported Indicated copper outside the reserve, because the base valuation gives that category partial credit.

Figure 2. Attributable mine and resource NAV by commodity

Copper
100%

Figure data: Valuation, before corporate claims. The domestic cathode premium remains copper revenue.

Figure 3. Attributable Indicated copper by asset

Santa Cruz
100%

Figure data: Santa Cruz PFS 2026, Table 11-14. The breakdown excludes reserves, Inferred material and undrilled or unclassified targets.

The two views show different exposures. Copper drives the modeled revenue, and Santa Cruz holds all the exclusive Indicated copper on which the valuation places separate resource value. Neither measure diversifies the other.

2.3 Santa Cruz

Santa Cruz near Casa Grande is Ivanhoe Electric’s one buildable study case [Table 2, row 1]. The September 2026 S-K 1300 PFS reports 1,519 kt of Probable copper at 1.08% using $4.00/lb to optimise the mine shapes. The eponymous deposit holds 1,477 kt of that copper. East Ridge contributes the remaining 42 kt. That concentration puts most of the production plan on access to the main deposit.

The study also reports 1,444 kt of exclusive Indicated copper at 0.79%. The Inferred estimate contains 3,332 kt at the same reported grade. The Texaco deposit holds 2,664 kt of that Inferred copper. It could extend the opportunity if drilling improves confidence, mine planning establishes access and economics support conversion. The current production schedule rests on the Probable reserve.

The September study puts initial capital at $1,426 m with reclamation, up from $1,236 m in the 2025 study. Ivanhoe Electric contracted for a $64.7 m tunnel-boring machine and paid $19.0 m by September. This analysis estimates $1,407 m of initial capital remaining after that equipment deposit, assuming the PFS already budgets for the machine. The deposit establishes an equipment commitment before full project funding.

The PFS schedules first cathode in 2029 and a three-year ramp [Figure 4]. It models $1.5 bn of sustaining capital with reclamation and estimates 1,401 kt of recovered cathode across the operating plan. The domestic cathode premium in the study is $0.14/lb. It improves realised copper prices if a buyer pays the modeled premium.

Deterra bought a royalty interest from a prior holder for $74.15 m. The amended net smelter return royalty is 1.68% through the sixth anniversary of commercial production and 1.57% thereafter, on about 84% of the reserve footprint. The notice gives the operator an option to repurchase 25% of the royalty. The public documents do not isolate the matching share of the original royalty in the study schedule, which limits the precision of a replacement estimate.

Early works have a path under the county dust and Class II air permits, construction reclamation plan, general aquifer permits and Casa Grande site plan. Full operations still require a Class II air revision, groundwater withdrawal and highway access approvals, and injection control and aquifer protection authorisations. The study cites grandfathered water rights of about 3,600 acre-feet a year. Rights and operating permissions affect different parts of the schedule.

2.4 Exploration and technology

The November Gleeson release identified a drill target at Camp Grant in Arizona. Hole CGD26-TR-003 cut 123.60 m, grading 0.91% copper. The same interval graded 0.44 g/t gold. The interval provides a target for step-out drilling. Its continuity and mineable geometry remain open.

The Maaden JV gives the company a second exploration region through a partner. Computational Geosciences adds near-term technology revenue, while the remaining Cordoba interest has a different source of risk from the Arizona project. Neither the technology holdings nor the unstudied exploration targets carry a base valuation.

2.5 Production, reserves & costs

The PFS projects average cathode production of 58.4 kt/yr over the mine life and 74.7 kt/yr in the first 15 years. The front-loaded schedule brings cash forward. The life-of-mine averages are $1.47/lb C1 and $2.28/lb all-in sustaining cost. The higher sustaining measure better reflects the cost of keeping the underground plan operating.

Figure 4. Santa Cruz scheduled copper ramp

Copper cathode (kt/yr)
80
60
40
20
0
10.4
60.3
79.4
2029
2030
2031

Figure data: Santa Cruz PFS 2026, Table 19-3. Recovered copper is reported in million pounds and converted at 2,204.62 lb/t.

The ramp puts most of the increase in the second year. A slip in access development or equipment commissioning would reduce early metal deliveries even if the reserve were unchanged. With one mine plan, historical production by asset would add no further comparison.

2.6 Peer positioning

The rating compares scale, stage and capital at Santa Cruz, Casino, Copper Creek and Warintza using the studies summarised in the peers’ FY2025 annual information forms.

Table 3. Copper developer peer positioning

Company Listing Project Country Study basis Study duration Initial capital
Ivanhoe Electric AMEX:IE Santa Cruz United States PFS, Probable reserves 24 yr $1.4 bn
Western Copper and Gold TSX:WRN Casino Canada Feasibility, Proven and Probable reserves 27 yr C$3.6 bn
Faraday Copper TSX:FDY Copper Creek United States PEA production schedule 31.7 yr $0.8 bn
Solaris Resources TSX:SLS Warintza Ecuador PFS, Proven and Probable reserves 22 yr $3.7 bn

Source: Santa Cruz PFS 2026, Casino feasibility study, Copper Creek PEA results and Warintza PFS results. Amounts are in study currencies.

Santa Cruz’s grade, cathode plan and U.S. location support a higher asset score than its middle-ranked study life alone would suggest.

3. Financials & balance sheet

The Ivanhoe Electric balance sheet can finance early work. Committing to the full mine requires a permanent capital package. The Commodity Financials Metrics Guide explains the distinction between cash available now and leverage the mine could support after it starts.

Table 4. Five-year financial summary

Metric FY2021 FY2022 FY2023 FY2024 FY2025
Revenue $4.65 m $8.44 m $3.90 m $2.90 m $3.24 m
Revenue y/y n/d +81.4% −53.8% −25.7% +11.8%
Cash margin, gross profit proxy 67.3% 62.9% 23.5% 64.9% 65.3%
Net income attributable to common −$59.32 m −$149.81 m −$199.38 m −$128.62 m −$105.87 m
Diluted EPS −$0.96 −$1.91 −$1.95 −$1.07 −$0.79
Operating cash flow −$47.83 m −$115.73 m −$150.52 m −$162.10 m −$89.20 m
Capex, sustaining / growth1 n/d / $18.39 m n/d / $44.41 m n/d / $82.09 m n/d / $13.57 m n/d / $2.31 m
Free cash flow1 −$66.22 m −$160.15 m −$232.60 m −$175.67 m −$91.51 m
Net debt, including leases2 $57.9 m −$81.9 m −$106.9 m $45.1 m −$128.3 m
Net debt / EBITDA n/a n/a n/a n/a n/a
Diluted weighted-average shares 61.50 m 78.53 m 102.49 m 120.38 m 133.58 m
Dividends per share $0.00 $0.00 $0.00 $0.00 $0.00

Notes to Table 4.

  1. Growth covers equipment, intangible and mineral property purchases. FCF deducts them from operating cash flow. The filings give no comparable sustaining split. FY2021 is the carve-out comparative.
  2. Net debt adds convertible debt, land financing notes, related-party borrowings and leases at carrying value. It deducts cash and equivalents available for general corporate use. Restricted cash, unavailable subsidiary cash and non-note deferred purchase consideration are excluded. Negative values indicate net cash.

Source: FY2025 Form 10-K, FY2024 Form 10-K, FY2022 Form 10-K and Q3 2026 Form 10-Q, Note 4 for FY2025 unavailable subsidiary cash. Margins, growth, free cash flow and net debt are derived.

FY2025 service revenue rose 11.8%, while operating cash use fell to $89.20 m from $162.10 m. The operating cash outflow was smaller than the common net loss that year.

Over the first nine months of 2026, the comparison reversed. The company used $90.51 m in operations versus a $13.73 m common net loss. The Alacrán sale illustrates why earnings from asset disposals need to be read alongside ongoing cash expenditure. A comparable adjusted-earnings and impairment series is n/d.

As of September, $192.44 m of the $214.84 m cash balance was available for general corporate needs. Subtracting $35.90 m of VRB convertible debt and $3.60 m of leases from available cash leaves $152.95 m of adjusted net cash. The VRB bond matures 31 December 2026 and converts into subsidiary equity on a qualifying transaction. Parent recourse on that bond is n/d. The consolidated debt amount includes accrued interest.

Mesa Cobre’s $200.0 m undrawn bridge has a two-year term, asset security and an Ivanhoe Electric guarantee. The guarantee requires $225.0 m of parent tangible net worth. EXIM’s preliminary letter sets a conditional ceiling of $1.1 bn. The $326.0 m difference from the PFS initial capital falls to $307.0 m after the tunnel-boring deposit. The bridge must be repaid, so the permanent funding estimate depends on EXIM or replacement finance.

The PFS cost deck uses the filed grade profile and real study dollars. Its royalty and severance charges move with the taxable or royalty revenue bases. The statutory combined income tax assumption is 25%, and the Arizona mineral severance rate is 2.5% on the eligible base.

The study schedules $119.0 m of net closure and salvage. A separate rehabilitation provision and a dependable date for using corporate tax losses are n/d. A lower copper price shrinks projected project cash flow while pre-production net debt / EBITDA remains n/a.

The filings disclose no copper hedges. Ivanhoe Electric has no mine cash yield or dividend base, and the balance-sheet priority is development. The Q3 cover counts 159,626,671 basic shares on 5 November. The valuation separates that count from weighted-average reporting shares and from the modeled financing dilution. Award-level option strikes at the valuation date remain n/d.

4. Management, strategy & structure

4.1 Management & governance

Ivanhoe Electric separates the executive chair and CEO roles. Taylor Melvin took the CEO job in November 2022 after corporate development work at Freeport-McMoRan. Executive chair Robert Friedland previously served as Ivanhoe Electric’s CEO. CFO Jordan Neeser previously led finance at Gold Standard Ventures. Michelle Lammers took the COO role in September 2026 as the company advanced its project work.

The 2026 proxy identifies five NYSE American-independent directors. They are Russell Ball, Yvonne de Margerie, Patrick Loftus-Hills, Priya Patil and Peter Vance. The board delegates to the Audit, Compensation and Nominating, and Health, Safety and Environmental committees. Friedland’s equity interest aligns him with the share price while his executive role gives him influence over project and funding decisions.

4.2 Strategy

Ivanhoe Electric has concentrated development capital on U.S. cathode production at Santa Cruz. It uses joint ventures to retain exploration exposure in regions where it can share the cost. Gleeson extends the Arizona copper-gold target pipeline, and Computational Geosciences supports a technology-services business before mine sales.

The current investment sequence runs through approvals, debt commitment and sanction ahead of the study’s 2029 first-copper date. Management’s equipment contract and applications advance that sequence. Formal sanction remains the point at which a study schedule would become a committed build.

4.3 Ownership & structure

Alacrán was the largest recorded disposal in the facts set, at $128.0 m on closing in 2026. The Pinaya Gold-Copper sale consideration was $11.0 m plus a retained royalty. The two disposals reduced the capital tied to other assets while preserving one direct royalty claim at Pinaya.

Ivanhoe Electric owns Mesa Cobre, holds 59.3% of Cordoba Minerals and owns 94.3% of Computational Geosciences. The Maaden JV is 50% owned. Maaden also held 7.46% of the parent at the proxy date, while FMR held 10.42%, T. Rowe Price 9.29% and Friedland 8.49%. Century Vision and BlackRock each disclosed more than 5% at that date.

Holders exercised 11.64 m warrants for $81.51 m in the first nine months of 2026. That raised cash and increased the outstanding share count. Outstanding options and restricted and performance awards can add further shares, with the valuation distinguishing award dilution from the equity needed to finish the project.

5. ESG & sustainability

The latest archived sustainability report uses the SASB Metals & Mining framework. Santa Cruz reported a FY2024 total recordable incident rate of 0.71 against a cited benchmark of 2.5. The company reported 800 hours of safety training. That is an early-work record and leaves operating-stage safety untested.

Water access is a practical condition for the project. The PFS identifies groundwater and aquifer permits still to be secured for operations. Consistent operating data on water and waste would make the licence-to-operate assessment more informative as the project advances. A comparable operating safety trend, project community spend and a quantified emissions target with a baseline are n/d in the reviewed facts.

6. Risks

Table 5. Risk register

Risk Type Likelihood Impact Exposure Mitigant
Equity funding gap Balance sheet High High Discounted issuance if senior debt closes on the assumed terms Binding debt and equity terms
Copper below the base deck Commodity High High Cathode receipts and project NAV decline Staged commitments and sensitivity to lower decks
Operating approvals Jurisdiction Medium High Full build and commissioning depend on operating permits Early permits and documented applications
Commissioning delay Operational Medium High A slip shifts early deliveries and receipts Staged underground access and equipment procurement
EXIM takeout Counterparty Medium High A preliminary letter may not translate into the assumed facility A committed takeout or other permanent funding
Water licence ESG Medium Medium Groundwater withdrawal, injection and aquifer permissions Grandfathered rights and application work
VRB convertible Counterparty Medium Medium A gross subsidiary claim can reduce parent equity value in downside Qualifying conversion or disclosed ring-fencing
Santa Cruz royalty allocation Commercial Medium Medium Substituting the revised royalty can lower or raise NAV Retain the filed royalty schedule and test replacement bounds pending a matching allocation

Source: Santa Cruz PFS 2026, Section 17 and Table 19-3, Q3 2026 Form 10-Q and Deterra royalty notice. Likelihood and impact are this analysis’s assessments.

Figure 5. Risk matrix

Impact
High
Medium
Low
Equity funding
Lower copper
Operating permits
EXIM
Ramp delay
Water
Royalty allocation
VRB bond
Low
Medium
High
Likelihood over the next three years

Figure data: Risk register. Positions distinguish exposures inside each rating band.

A permit delay extends the time interim funding must cover. Lower copper prices cut the value available to new and existing shareholders. The model tests those effects through stage risk, timing, dilution and the copper scenarios.

7. Valuation

Valuation as of 20 November 2026. LME cash copper averaged $6.48/lb over the 3-month period, $6.35/lb over the 6-month period and $6.05/lb over the 12-month period.

This analysis follows the commodity stock valuation guide and values Ivanhoe Electric against its 20 November 2026 NYSE American close. Santa Cruz is the single project with a mine plan and is wholly owned through Mesa Cobre. The valuation gives separate credit to the deposit’s Indicated resource beyond the reserve. It assigns no value to Inferred material or exploration without studies.

This analysis uses a $6/lb real copper deck and a fixed grid of $4 to $8/lb. The $6 base is the nearest grid price to all three averages and uses the lower end of the trailing observations. It is roughly 34% above the five-year average of $4.49/lb. This analysis holds the valuation anchors at their mid-cycle settings across the grid because recent prices are already elevated.

The project earns a separate $0.14/lb domestic cathode premium in the study. This analysis holds that premium across the grid. Copper is the mine plan’s only recovered commodity. Gold encountered in the Gleeson drilling contributes no cash flow or secondary deck value.

This analysis discounts Santa Cruz at 10% real after tax, using the single-asset base-metals convention. The PFS discount rate of 8% serves as a calibration check and a sensitivity. The cash flows use constant study dollars.

The model relies on the September 2026 PFS for copper production, mine costs, capital and closure, and on the September quarter for corporate balance-sheet claims. The funding case assumes the full conditional EXIM amount, paid equipment deposits and an equity issue for the remainder. Stage risk sits in the project value. This analysis uses the same signed corporate claims and funded share count for both weighted methods.

Table 6. Load-bearing inputs

Input Value Basis
Copper grid and base $4 / $5 / $6 / $7 / $8 per lb Fixed real grid. Base selected from LME cash average through 20 November 2026.
After-tax base discount rate 10.0% Single-asset base-metal convention
Domestic cathode premium $0.14/lb Santa Cruz PFS Table 19-2
Probable reserves 1,519 kt Contained copper, PFS Table 1-7
Indicated resource 1,444 kt Contained copper, exclusive of reserves, PFS Table 11-14
Life and annual cathode production 24 years / 58,385 t/y PFS Table 19-2, life-of-mine averages
Cash cost and AISC $1.47 / $2.28 per lb PFS Table 19-2
Initial and sustaining capital $1,426.0 m / $1,546.0 m PFS Table 19-2
Starting cash after unavailable cash $192.4 m Q3 2026 10-Q balance sheet and Note 4
Conditional EXIM ceiling $1,100.0 m Q3 2026 10-Q, Project Financing
Base project stage weight 0.42× Early authorisations in PFS §17.2
Anchors 1.00× P/NAV / $0.30 per reserve lb Already risked NAV and Probable copper

Source: This analysis using Santa Cruz PFS 2026, Q3 2026 Form 10-Q and Westmetall. Table 20 gives the full source register.

Metal Pilot Premium

Valuation workings — Premium

The workings behind this valuation — the method, the models, the sensitivity grids and the scenarios, 11 tables and 3 figures in all — are for Metal Pilot Premium members.

  • 7.1 Method selection
  • 7.2 Net asset value
  • 7.3 Target multiples
  • 7.4 Reserve valuation
  • 7.5 Scenarios & fair value

Want to see one first? The BHP Group (BHP) valuation is open to every reader.

Create a Metal Pilot accountLog in

See Premium plansRead a free example

You are signed in, and your plan does not include valuation workings. They come with Metal Pilot Premium.

Upgrade to Premium

The premium section could not be loaded right now.

Premium — unlocked

8. Near-term catalysts (1–3 years)

Table 18. Near-term catalysts

Catalyst Timing Why it matters
Binding Santa Cruz funding and sanction Unannounced Resolves the terms and size of the permanent debt and equity
Remaining construction and operating approvals Unannounced Clears work beyond the early authorisations and supports a higher stage weight
Tunnel boring and access development Summer 2027 target (PFS release) Tests the cost and schedule behind the equipment commitment
First cathode 2029 target (PFS release) Tests a saleable product and the domestic cathode premium
Gleeson follow-up drilling and assays 16,000 m cumulative target by year-end 2026 and pending assays expected in the coming weeks (19 November release) Tests continuity beyond the first reported intervals

Source: Santa Cruz PFS 2026, Q3 2026 Form 10-Q and Gleeson drilling release.

Binding financing terms would determine the dilution from the funding gap. The study schedule depends on financing, approvals and sanction.

8.1 Takeover optionality

Santa Cruz offers a prospective buyer one wholly owned U.S. copper asset with a PFS and a defined cathode plan. A buyer with a lower cost of capital could have different funding economics. The remaining permits, the size of the equity cheque and the royalty burden still apply to an acquisition.

Deterra’s purchase prices a partial royalty from a prior holder. It provides evidence of interest in the asset’s future sales without establishing a price for the whole project. The available evidence names no confirmed buyer for Santa Cruz. This analysis includes no takeover premium in the verdict.

9. Rating & verdict

Figure 9. Scorecard by dimension, 20 November 2026

Assets & scale★★★★☆15%
Reserves & life★★★☆☆15%
Balance sheet★★★☆☆15%
Management★★★☆☆15%
Cost & margins★★★☆☆8%
Growth★★★★☆8%
Capital allocation★★★☆☆8%
Jurisdiction★★★★☆8%
ESG★★★☆☆8%
Score by dimension Weighted composite ★★★½ (3.31)
Each ring is one star; the outer ring is ★★★★★. Weights in Table 19.

Figure data: Table 19. Each spoke prints its stars and weight; the dashed ring is the weighted composite, 3.31/5.

Table 19. Scorecard rationale

Dimension Weight Stars Rationale
Asset quality & scale 15% ★★★★☆ The September PFS reports 1,519 kt Probable copper at 1.08%. The peer set includes the earlier Copper Creek PEA, while Casino and Warintza require more study capital.
Reserves, life & replacement 15% ★★★☆☆ Santa Cruz’s 24-year Probable-only PFS sits between peer schedules at Warintza (22 years) and Casino (27 years), both Proven and Probable. Copper Creek’s 31.7 years come from a PEA schedule.
Balance sheet & liquidity 15% ★★★☆☆ The September quarter discloses a conditional $1.1 bn EXIM ceiling. The $307.0 m residual gap still equals 35.6% of basic market capitalisation. Peer projects Casino and Warintza have larger builds.
Management & governance 15% ★★★☆☆ The March proxy lists five NYSE American-independent directors and separates CEO and executive chair. Comparable peer governance rankings are n/d on the study basis.
Cost position & margins 8% ★★★☆☆ PFS C1 is $1.47/lb. Casino has a different by-product mix and Copper Creek is at PEA stage, limiting direct peer cost comparisons.
Growth & optionality 8% ★★★★☆ Santa Cruz has 1,444 kt of exclusive Indicated copper alongside a PFS reserve. Peer project Copper Creek’s long design life comes from an earlier engineering stage.
Capital allocation & returns 8% ★★★☆☆ The Q3 report records a $128.0 m Alacrán sale. Like Faraday at Copper Creek, Ivanhoe Electric still needs to prove a mine-level return.
Jurisdiction & geopolitics 8% ★★★★☆ Arizona matches peer project Copper Creek and avoids Warintza’s Ecuador exposure. Santa Cruz’s operating applications remain open in the PFS.
ESG & licence to operate 8% ★★★☆☆ Santa Cruz’s FY2024 recordable rate of 0.71 is below the issuer’s 2.5 benchmark. Its operating-stage record is untested, as it is at pre-production peers.
Composite 100% ★★★½☆ Solid

Source: Santa Cruz PFS 2026, Q3 2026 Form 10-Q, 2026 proxy statement, FY2024 sustainability report and peer FY2025 AIFs in Table 3.

Σ(weight × stars) = 3.31/5.

The two-axis verdict. On 20 November 2026 the stock is ★★★½☆ Solid and Fairly valued (wide band) at $5.40, or Priced about right. Funded NAV and blended fair value are each $5.40 a share, with implied 0.0% return across a $3.22–$8.01 scenario range. The market-implied deck is $6.00/lb, the same as the $6/lb base. The case for a better return needs more than a mine plan.

Asset quality and jurisdiction lift the target relative to the anchor. A shortfall against the peer study-life median and the equity requirement offset those lifts. The resulting targets remain 1.00× risked equity NAV and $0.30 per Probable reserve pound. The quality rating reflects the business and the wide band reflects the dispersion in value at different copper prices and project conditions.

A binding capital package on better terms would improve the funded share count. Faster permitting would also carry value, even if financing remained open. The lower case combines a weaker copper price with less credit for the project stage. A smaller cheque on firm terms would improve the per-share case more directly than a new exploration intercept. Compare the copper developers on Metal Pilot’s copper mining stock screener.

Terms in this post (57)
AISC (all-in sustaining cost)
The cost to produce an ounce or pound and keep the mine running: operating costs, royalties, sustaining capital and corporate overhead, net of by-product credits, on the World Gold Council’s non-GAAP definition. Lower is better. In depth: Gold market guide — How to value & screen gold miners
Asset quality & scale
Scorecard dimension 1, scored 1 to 5 against the peer set: the tier and size of the asset base, its grade or margin quality and how concentrated it is.
Balance sheet & liquidity
Scorecard dimension 5: financial resilience — leverage, liquidity, maturities and hedge cover; for a developer, the funding gap.
Blended fair value
The weighted average of the values per share the valuation methods give, on the method-selection weights: the post’s estimate of what a share is worth.
C1 / cash cost
The direct cost of producing a pound or ounce — mining, processing, site overhead and freight, net of by-product credits — before depreciation, royalties and sustaining capital. Lower is better. In depth: Copper market guide — How to value & screen copper miners
Capex (capital expenditure)
Cash spent on mines, wells, plant and equipment, split where the filing allows into sustaining and growth capital. In depth: The Oil & Gas Value Chain: Upstream — What a barrel costs
Capital allocation & returns
Scorecard dimension 6: discipline and the return on capital — returns on capital, the dividend and buyback record, reinvestment and acquisitions, judged per share.
Cash margin
Revenue less cash operating costs, before depreciation — as a share of revenue or per unit sold, as the label says. Higher is better.
Cost position & margins
Scorecard dimension 2: where the business sits on its sector’s cost curve and how durable its margins are.
Discount rate
The annual rate future cash flows are discounted at to value them today — real and after tax here; a higher rate gives a lower value.
Dividend
The cash the board declares for shareholders out of earnings, per share for the period the label names — a month, a quarter, a half or a year — unless the cell gives a total; it is paid some weeks later to the holders on the record date.
EBITDA
Earnings before interest, tax, depreciation and amortisation: operating profit before non-cash charges and financing. Adjusted EBITDA strips items the company treats as one-off (non-GAAP).
Enterprise NAV
The sum of the asset values before the balance sheet: NAV before cash, debt and the other claims are added or deducted.
EPS, diluted (earnings per share)
Net income attributable to shareholders divided by the share count including the shares options, warrants and convertibles would add.
Equity bridge
The step from enterprise NAV to equity NAV: cash and investments added, debt, provisions and the other claims on the assets deducted.
Equity NAV
Enterprise NAV after cash, debt and the other claims of the equity bridge — the NAV that belongs to shareholders.
ESG & licence to operate
Scorecard dimension 9: the safety, environmental, tailings and community record, and the social licence to keep operating.
EV (enterprise value)
Market capitalisation plus net debt, or less net cash, and any other claims ahead of shareholders: what the market values the whole business at.
FCF (free cash flow)
Operating cash flow less capital spending: the cash left for dividends, buybacks and debt. The label or its note says which capital is deducted.
FCF-yield support
A value per share from cash flow: forward free cash flow, after sustaining capital and cash tax, divided by a target free-cash-flow yield and the diluted share count.
FY (fiscal year)
The company’s twelve-month reporting year, named by the calendar year it ends in.
Gap register
The list of figures the filings do not disclose, each with the documents searched and the way it would move the value.
Growth & optionality
Scorecard dimension 4: the production and cash-flow growth ahead — funded projects, expansions and exploration upside.
Hedge
Contracts — swaps, forwards, options — that fix the price of future sales or set a floor under it, trading some upside for certainty.
Interest (ownership)
The company’s ownership share of an asset; its production, reserves and value are counted at that share. In depth: The Oil & Gas Value Chain: Upstream — Leases & tenure
Jurisdiction & geopolitics
Scorecard dimension 8: the country risk of where the assets and cash flows sit, and how stable permitting and fiscal terms are.
Management & governance
Scorecard dimension 7: the people and their alignment — track record, insider ownership, board independence and related-party conflicts.
Market capitalisation
The share price times the shares outstanding: what the market values the equity at.
Market-implied deck
The commodity price at which the valuation’s blended fair value equals today’s share price — the price the market is paying for.
Mlb (million pounds)
Million pounds — the unit uranium, as U₃O₈, and North American copper output and reserves are reported in.
NAV (net asset value)
The value today of the company’s assets — each mine’s or field’s future cash flows discounted to the present — plus cash, less debt and other claims.
NAV per share
Equity NAV divided by the fully diluted share count.
Net cash
Cash in excess of borrowings — the reverse of net debt.
Net debt
Borrowings — and, where the label says so, leases — less cash; a figure in brackets or shown as net cash means more cash than debt. Lower is stronger.
Net debt / EBITDA
Net debt divided by a year’s EBITDA: how many years of cash earnings would repay the debt. Below 1× is low; net cash means there is none. Lower is stronger. In depth: The Oil & Gas Value Chain: Upstream — How to read & screen a producer
Net income
Profit after every cost, interest and tax, attributable to the company’s shareholders, as reported under GAAP or IFRS — non-cash marks, impairments and one-off items included; also called net earnings.
NPV (net present value)
The value today of an asset’s future cash flows, each discounted back at the discount rate, less the capital still to spend. In depth: Copper market guide — How to value & screen copper miners
OCF (operating cash flow)
Cash the business generated in the year after working capital and tax, before capital spending.
P/NAV
The share price divided by NAV per share: below 1.00× the market prices the shares under the value of the assets, above it over. In depth: The Oil & Gas Value Chain: Upstream — How to read & screen a producer
Price deck
The commodity prices the valuation runs on: a base price and a fixed grid of prices around it, each run as a full scenario.
Probable reserves
The lower-confidence reserve category — economic in the plan, but on wider drilling or more estimation than proven; for oil and gas, about as likely as not to be produced. In depth: The Oil & Gas Value Chain: Upstream — Reserves vs resources
Production
The metal, oil or gas the company produced in the period at its own share of each mine or field — ounces, pounds or tonnes, or barrels of oil equivalent a day — before or after royalties as it reports; for a royalty or stream holder, its share of the operators’ output. In depth: The Oil & Gas Value Chain: Upstream — Units & reading a production number
Quality rating (composite)
The weighted average of the nine scorecard dimensions, each scored 1 to 5 against the peer set, rounded to the half-star: High quality from 4.5, Solid 3.5 to 4, Average 2.5 to 3, Low quality below 2.5.
Realized price
The average price the company actually received per unit sold, after quality and location differentials and, where stated, hedges. In depth: Oil market guide — How barrels are sold
Reclamation provision
The discounted cost of closing and rehabilitating mines and wells, booked as a liability and deducted from the value of the equity.
Reserve life
Years the reserves last at the current or guided production rate: reserves divided by a year’s output, on one reserve category. In depth: The Oil & Gas Value Chain: Upstream — How to read & screen a producer
Reserves
What a company can show it will produce at a profit from known deposits or fields, at stated prices and costs, estimated under a disclosure code — NI 43-101, JORC or S-K 1300 for mines; SEC rules or NI 51-101 for oil and gas. In depth: The Oil & Gas Value Chain: Upstream — Reserves vs resources
Reserves, life & replacement
Scorecard dimension 3: how long the reserves last and whether the company replaces what it produces.
Resource conversion
The value given to resources beyond the mine plan: exclusive measured and indicated ounces or pounds, counted at a factor below one for the share expected ever to be mined.
Revenue
The company’s top line: what it earned in the period from selling its output — metal, oil and gas, or its stream and royalty interests — and any other operating income, before costs. The label or its note says what it includes where that differs, as net of royalties or with purchased oil resold.
Royalty
A share of a mine’s or well’s revenue or profit paid to a government or a royalty holder, ahead of the operator’s own margin. In depth: The Oil & Gas Value Chain: Upstream — Fiscal regimes
Stage risk
The weight below 100% put on an undeveloped asset’s NPV for the chance it is never built or produces less than planned.
Stream
An upfront payment for the right to buy a share of a mine’s future metal at a fixed, low price: the operator gets capital now, the stream holder metal later. In depth: Silver market guide — Company archetypes along the value chain
Sustaining capital
Capital spent to keep existing production going — equipment, mine development, tailings — as opposed to growth capital for new output. In depth: The Oil & Gas Value Chain: Upstream — What a barrel costs
Unit cost
The cost to produce one unit of output — an ounce, a pound, a barrel — on the basis the company reports, named in the cell. Lower is better.
Value read
The five-point verdict on the implied return: Undervalued above +30%, Modestly undervalued +10% to +30%, Fairly valued within ±10%, Modestly overvalued −10% to −30%, Overvalued below −30%. “Wide band” flags a lowest scenario more than 25% below the price.
y/y (year on year)
The change from the same period a year earlier, in per cent.

10. Sources, methodology & disclaimer

10.1 Sources, methodology & data vintage

The analysis uses the September 2026 PFS, the September balance sheet and the 20 November close. The September reserve remains undepleted. Segments without a current cash-flow study enter only the discussion of potential future projects.

Methodology. The $6/lb real base comes from trailing LME cash averages on a fixed $4/$5/$6/$7/$8 per lb grid. The model weights risked P/NAV 55% and EV per Probable reserve pound 45%. It discounts project cash flows at 10% real after tax in the base case. All nine developer scorecard dimensions apply and the peer table uses each peer’s archived study basis. Copper prices and valuation are reviewed quarterly and after material funding, permitting or mine plan changes.

Re-run log. As of 20 November 2026, the $5.40 share price matches funded NAV and blended fair value of $5.40 per share. That implies 0.0% return and a Fairly valued (wide band) read. The market-implied deck is $6.00/lb and the modeled range is $3.22–$8.01 per share. The scorecard leaves both target multiples on their anchors.

On 21 November 2026, the Pinaya reclassification left funded NAV and blended fair value at $5.40 per share. The implied return remained 0.0% and the read remained Fairly valued (wide band).

The data gaps include an exact current option-strike schedule, a separate rehabilitation provision and the old share of the recalculated royalty. Current market marks for non-project holdings, comparable P/NAV history, mine FCF and a dated consensus capture are also n/d. The model tests the disclosed bounds where it can. An asset production ranking and the reserve stack are omitted because the company has no producing mines. A trend chart for Santa Cruz safety would require additional comparable observations.

The model workings carry the production schedule, other sensitivities and cross-checks. The source register below identifies the evidence behind the load-bearing inputs in Table 6.

Table 20. Full source register for the valuation

InputValueAs ofWhere §7 uses itSource
Santa Cruz PFS 2026
Santa Cruz Probable reserve140,129 kt ore at 1.08% copper, containing 1,519 kt copper23 Sep 2026Reserve tier and asset buildFiled | Santa Cruz PFS 2026 | Table 1-7 | "Total Probable" | p.39
Reserve optimisation copper price$4.00/lb23 Sep 2026Reserve basisFiled | Santa Cruz PFS 2026 | Table 1-7, Note 4 | "Underground mineable shapes optimization parameters" | p.39
Indicated resource, exclusive of reserves1,444 kt copper at 0.79% copper23 Sep 2026Resource tierFiled | Santa Cruz PFS 2026 | Table 11-14 | "All Deposits Indicated" | p.186
Inferred resource3,332 kt copper at 0.79% copper23 Sep 2026Resource tier and scenario boundaryFiled | Santa Cruz PFS 2026 | Table 11-14 | "All Deposits Inferred" | p.186
Santa Cruz after-tax PFS NPV$1,519 m at 8%23 Sep 2026Study calibrationFiled | Santa Cruz PFS 2026 | Table 19-2 | "After-tax Net Present Value (8%)" | p.305
Santa Cruz PFS copper price$4.75/lb23 Sep 2026Study calibrationFiled | Santa Cruz PFS 2026 | Table 19-2 | "Copper Price" | p.305
PFS domestic cathode premium$0.14/lb23 Sep 2026Study calibration and realised priceFiled | Santa Cruz PFS 2026 | Table 19-2 | "Domestic Cathode Premium" | p.305
Life of mine24 years23 Sep 2026Asset buildFiled | Santa Cruz PFS 2026 | Table 19-2 | "Mine Life" | p.305
Annual copper cathode58,385 t/y over mine life and 74,722 t/y in first 15 years23 Sep 2026Mine scale and study cross-checkFiled | Santa Cruz PFS 2026 | Table 19-2 | "Annual Copper Production" | p.305
Recovered copper cathode1,401 kt23 Sep 2026Mine planFiled | Santa Cruz PFS 2026 | Table 19-2 | "Total Copper Cathode Produced" | p.305
Initial capital with reclamation$1,426 m23 Sep 2026Project build and funding gapFiled | Santa Cruz PFS 2026 | Table 19-2 | "Initial Capital with Reclamation" | p.305
Sustaining capital with reclamation$1,546 m23 Sep 2026Mine cash flowsFiled | Santa Cruz PFS 2026 | Table 19-2 | "Sustaining Capital with Reclamation" | p.305
Net closure and salvage costsnegative $119 m over the mine life23 Sep 2026Mine cash flowsFiled | Santa Cruz PFS 2026 | Table 19-3 | "Net Closure" | p.308
Life-of-mine C1 cash cost$1.47/lb23 Sep 2026Mine cash costsFiled | Santa Cruz PFS 2026 | Table 19-2 | "C1 Cash Cost" | p.305
Life-of-mine all-in sustaining cost$2.28/lb23 Sep 2026Mine cash costs and forward cross-checkFiled | Santa Cruz PFS 2026 | Table 19-2 | "All-in-sustaining Cost" | p.305
Life-of-mine PFS royalties$964 m23 Sep 2026Operating royalty adjustmentFiled | Santa Cruz PFS 2026 | Table 19-3 | "Royalties" | p.308
Life-of-mine study tax$1,185 m23 Sep 2026Mine cash flowsFiled | Santa Cruz PFS 2026 | Table 19-3 | "Taxes" | p.308
First copper and ramp23, 133 and 175 m lb in 2029–203123 Sep 2026Mine cash flowsFiled | Santa Cruz PFS 2026 | Table 19-3 | "Recovered Copper" | p.308
Q3 2026 Form 10-Q
Tunnel boring machine purchase and deposit$64.7 m contracted and $19.0 m deposited30 Sep 2026Cash and remaining capex bridgeFiled | Q3 2026 Form 10-Q | Note 7 | "The total purchase price" | p.9
VRB Energy controlling interest90.0%30 Sep 2026Vehicle mapFiled | Q3 2026 Form 10-Q | Business Overview | "controlling interest in VRB Energy Inc." | p.19
Consolidated cash$214,844 thousand30 Sep 2026Equity bridgeFiled | Q3 2026 Form 10-Q | Balance sheet | "Cash and cash equivalents" | p.3
Cash unavailable for general corporate purposes$22.4 m30 Sep 2026Equity bridgeFiled | Q3 2026 Form 10-Q | Note 4 | "not available for the general corporate purposes" | p.8
Restricted cash$1,301 thousand30 Sep 2026Equity bridge and liquidityFiled | Q3 2026 Form 10-Q | Balance sheet | "Restricted cash" | p.3
VRB convertible principal plus accrued interest$35,898 thousand30 Sep 2026Equity bridge convertible claimFiled | Q3 2026 Form 10-Q | Balance sheet | "Convertible debt" | p.3
VRB convertible original face$24.0 m30 Sep 2026Convertible claim original termsFiled | Q3 2026 Form 10-Q | Note 9 | "issued a convertible bond for gross proceeds" | p.10
Current lease liabilities$694 thousand30 Sep 2026Equity bridge lease claimsFiled | Q3 2026 Form 10-Q | Balance sheet | "Lease liabilities, current" | p.3
Non-current lease liabilities$2,906 thousand30 Sep 2026Equity bridge lease claimsFiled | Q3 2026 Form 10-Q | Balance sheet | "Lease liabilities, net of current portion" | p.3
Accounts and other receivables$5,672 thousand30 Sep 2026Working capital and Pinaya disposal receivableFiled | Q3 2026 Form 10-Q | Balance sheet | "Accounts and other receivables, net of provision for expected credit loss" | p.3
Pinaya disposal receivable$4.0 m30 Sep 2026Non-operating receivableFiled | Q3 2026 Form 10-Q | Note 5 | "from the divestment of the Pinaya project" | p.8
Prepaids and other current assets$3,521 thousand30 Sep 2026Working capitalFiled | Q3 2026 Form 10-Q | Balance sheet | "Prepaid expenses, deposits and other current assets" | p.3
Accounts payable and accrued liabilities$13,874 thousand30 Sep 2026Working capitalFiled | Q3 2026 Form 10-Q | Balance sheet | "Accounts payable and accrued liabilities" | p.3
Deferred exploration liability$1,082 thousand30 Sep 2026Working capitalFiled | Q3 2026 Form 10-Q | Balance sheet | "Deferred exploration liability" | p.3
Non-controlling interests carrying value$4,217 thousand30 Sep 2026Equity bridge minority assessmentFiled | Q3 2026 Form 10-Q | Balance sheet | "Non-controlling interests" | p.3
Equity-method investments$61,041 thousand30 Sep 2026Equity bridge investmentsFiled | Q3 2026 Form 10-Q | Balance sheet | "Investments subject to significant influence" | p.3
Other investments$1,233 thousand30 Sep 2026Equity bridge investmentsFiled | Q3 2026 Form 10-Q | Balance sheet | "Other investments" | p.3
Basic shares outstanding159,626,6715 Nov 2026Equity bridge and market capFiled | Q3 2026 Form 10-Q | Cover page | "shares of common stock" | p.1
Options exercised in 9M 20261,745,61130 Sep 2026Treasury dilution inputFiled | Q3 2026 Form 10-Q | Statements of changes in equity | "Stock options exercised" | p.5
Stock-settled RSUs granted in March454,1126 Mar 2026Treasury dilution inputFiled | Q3 2026 Form 10-Q | Note 10 | "granted 454,112 stock settled RSU" | p.10
Stock-settled RSUs settled in 9M 2026391,76430 Sep 2026Treasury dilution inputFiled | Q3 2026 Form 10-Q | Statements of changes in equity | "Settlement of restricted share units" | p.5
2026 performance share unit target405,3606 Mar 2026Treasury dilution inputFiled | Q3 2026 Form 10-Q | Note 10 | "The total target number of PSU" | p.11
Remaining warrants exercised11,644,872 warrants for $81,514 thousand30 Sep 2026Equity issuance and liquidityFiled | Q3 2026 Form 10-Q | Statements of changes in equity | "Warrants exercised" | p.5
Nine-month 2026 operating cash use$90,512 thousand30 Sep 2026Financing runwayFiled | Q3 2026 Form 10-Q | Condensed Interim Consolidated Statements of Cash Flows | "Net cash used in operating activities" | p.6
Nine-month 2026 equipment deposits$27,890 thousand30 Sep 2026Project liquidityFiled | Q3 2026 Form 10-Q | Condensed Interim Consolidated Statements of Cash Flows | "Deposits paid for property, plant and equipment" | p.6
Nine-month 2026 reported G&A$26,273 thousand30 Sep 2026Corporate G&A bridgeFiled | Q3 2026 Form 10-Q | Statement of loss | "General and administrative expenses" | p.4
Nine-month 2026 G&A share-based compensation$6,548 thousand30 Sep 2026Corporate G&A bridgeFiled | Q3 2026 Form 10-Q | Note 10 | "General and administrative expenses" | p.10
Undrawn Mesa Cobre bridge$200.0 m30 Sep 2026Funding gap and liquidityFiled | Q3 2026 Form 10-Q | Cash Resources | "The Bridge Facility is currently undrawn" | p.25
Conditional EXIM PPL ceiling$1.1 bn30 Sep 2026Conditional financing scenarioFiled | Q3 2026 Form 10-Q | Project Financing | "potential debt financing of up to" | p.20
FY2025 Form 10-K
Options outstanding at prior year end6,679,206 at weighted exercise price $10.3831 Dec 2025Treasury dilution inputFiled | FY2025 Form 10-K | Note 13 | "Outstanding at December 31, 2025" | p.130
Stock-settled RSUs at prior year end1,181,69531 Dec 2025Treasury dilution inputFiled | FY2025 Form 10-K | Note 13 | "Outstanding at December 31, 2025" | p.131
2025 performance share unit target714,82231 Dec 2025Treasury dilution inputFiled | FY2025 Form 10-K | Note 13 | "The total target number of PSU" | p.131
Deferred tax assets on net operating losses$90,306 thousand31 Dec 2025Tax shield contextFiled | FY2025 Form 10-K | Note 20 | "Net operating losses" | p.136
Deferred tax valuation allowance$169,919 thousand31 Dec 2025Tax shield contextFiled | FY2025 Form 10-K | Note 20 | "Less: valuation allowance" | p.136
Deterra royalty notice
Deterra adjusted NSR1.68% until the sixth anniversary, then 1.57%29 Sep 2026Royalty schedule adjustmentFiled | Deterra royalty notice | Acquisition of Third-Party Royalty on Ivanhoe Electric’s Santa Cruz Copper Project | "at a rate of" | p.1
Deterra reserve footprint~84% of reserves29 Sep 2026Royalty schedule allocationFiled | Deterra royalty notice | Transaction highlights | "recently announced Reserves covered by the Royalty area" | p.2
Deterra purchase from prior holder$74.15 m29 Sep 2026Transaction cross-checkFiled | Deterra royalty notice | Acquisition of Third-Party Royalty on Ivanhoe Electric’s Santa Cruz Copper Project | "for US$74.15 million" | p.1
Market
NYSE American IE close$5.4020 Nov 2026Market cap and implied returnMarket | Yahoo Finance | "IE daily close" | 20 Nov 2026
LME copper trailing averages, 3-, 6- and 12-month$6.4835, $6.3519 and $6.0528/lb20 Nov 2026Copper price deckMarket | Westmetall | "LME Copper Cash-Settlement, daily" | 20 Nov 2026
LME copper trailing five-year average$4.4918/lb20 Nov 2026Mid-cycle multiple settingsMarket | Westmetall | "LME Copper Cash-Settlement, daily" | 20 Nov 2026
LME copper 12-month high and low$6.7358/lb on 17 Aug 2026 and $4.8469/lb on 21 Nov 202520 Nov 2026Copper scenario contextMarket | Westmetall | "LME Copper Cash-Settlement, daily" | 20 Nov 2026
Derived
Basic market capitalisation$861.98 m20 Nov 2026Funding gap thresholdDerived | share price × basic shares outstanding

Source: Santa Cruz PFS 2026, Q3 2026 Form 10-Q, Deterra royalty notice and the market and filing references above. Table 6 selects the load-bearing entries.

10.2 Disclaimer & disclosure

This analysis is for informational purposes and does not constitute investment advice. The facts and market inputs reflect the dates stated above. Scenario values depend on the assumptions for copper, project timing and funding. Actual outcomes can differ from the published cases and the base valuation.

The author used AI assistance to organise research, draft and check this analysis. Read the issuer’s filings and technical reports before relying on any project assumptions.

As of 19 November 2026, the author holds no position in the company this analysis covers.