Ivanhoe Mines (IVN) — Stock Analysis 2026 [2.8]

Copper Base Metals Company Analysis
CAD

Analysis as of 20 November 2026. Ivanhoe Mines stock analysis. Mining producer, copper. The base copper price is $6.00/lb. The fixed grid of $4, $5, $6, $7 and $8/lb runs each price as a scenario. Management guidance informs output and costs. The March 2026 reserve study also tests the price needed to support mine economics. The TSX closed at C$6.30 a share. The market-implied copper deck is $7.19/lb. Rating: ★★★☆☆ Average / Overvalued (wide band). The analysis is updated quarterly and after a material mine-plan change.

Ivanhoe Mines depends on Kamoa-Kakula for most of its asset value and has cut the mine’s output expectations for 2027. The copper operation also has to fund more underground development before it can bring higher-grade ore back into the mine plan. Kipushi’s zinc sales help, while Platreef needs more capital before its expansion pays back. Compare copper producers on Metal Pilot’s copper mining stock screener.

1. Snapshot & thesis

Figure 1. Ivanhoe Mines in numbers

C$6.30
Share price on 20 November
C$9.0 bn
Market capitalisation on 20 November
$441.6 m
Consolidated revenue in FY2025
3.8%
Consolidated gross margin in FY2025
388.8 kt
Kamoa-Kakula copper in FY2025
13.13 Mt
Kamoa-Kakula probable copper reserves
2.26×
Pro-rata net debt / EBITDA in September
1,432.9 m
Fully diluted shares on 11 November
C$4.59
NAV per share (Section 7)
C$3.67
Blended fair value (Section 7)
2.8/5
Quality rating (Average)
Overvalued
(wide band)
Valuation read (Section 7)

Source: November 2026 investor presentation, Q3 2026 MD&A, FY2025 audited financial statements, TSX close and the Section 7 model.

Ivanhoe Mines Ltd. is a Vancouver-headquartered mining producer listed in Toronto (TSX:IVN) and traded over the counter in the US (OTC:IVPAF). The company operates in the Democratic Republic of the Congo (DRC) and South Africa. Its portfolio comprises three producing mines, including the early-stage Platreef ramp, and the Western Foreland exploration project. The company reports in US dollars. Share figures use Canadian dollars.

The Ivanhoe Electric stock analysis covers Santa Cruz, a copper mine under development in Arizona.

The recovery has to pay for itself. A safer mine sequence and more reliable power would help Kamoa-Kakula turn throughput into copper sales at lower cost. But slower underground development or heavier pre-stripping would keep project cash inside the joint venture. The relevant measure for shareholders is cash left after growth spending and financing commitments.

Table 1. Ivanhoe Mines in numbers

Metric Value Basis
Share price C$6.30 November 20 TSX close
Market capitalisation C$9.0 bn 1,426.5 m basic shares
FY2025 consolidated revenue $441.6 m Consolidated IFRS basis
FY2025 consolidated gross margin 3.8% Gross profit divided by revenue
FY2025 Kamoa-Kakula copper production 388.8 kt Full mine basis
Pro-rata net debt / EBITDA 2.26× September 2026
NAV per share C$4.59 Section 7 base case
Blended fair value C$3.67 Section 7 base case
Valuation read Overvalued (wide band) Implied −41.8%
Quality rating 2.8/5 Average Nine-dimension scorecard

Source: FY2025 audited financial statements, FY2025 MD&A, Q3 2026 MD&A, November 2026 investor presentation, TSX close and Section 7.

How to read this analysis. Sections 1 and 9 give the decision figures. Sections 2 and 3 explain the operations and funding, and Section 7 shows what the stock price implies.

2. Assets & operations

The Copper Market Guide covers industry supply and demand. For Ivanhoe, the decisive questions are how quickly Kamoa-Kakula can restore throughput and how much of the resulting cash the joint venture can distribute.

2.1 Portfolio overview

Table 2. Asset base, sorted by value in the Section 7 build

# Asset Country Stage Interest Output Contained reserves Mine life Unit cost Operator
1 Kamoa-Kakula DRC Producing 39.6% 388.8 kt Cu1 13.13 Mt Cu2 26 years2 $2.16/lb Cu1 Kamoa Copper SA
2 Platreef South Africa Phase 1 ramp, Phase 2 construction 64% 4,552 oz 3PE+Au3 17.62 Moz 3PE+Au4 35 years4 $599/oz 3PE+Au4 Ivanplats
3 Kipushi DRC Producing 62% 203.2 kt Zn1 3.45 Mt Zn5 14 years5 $0.85–$0.95/lb Zn6 Kipushi Corporation SA
4 Western Foreland DRC Exploration 54–100% — — — — Ivanhoe and licence partners

Notes to Table 2.

  1. FY2025 gross mine output. Copper C1 is per payable pound.
  2. NI 43-101 probable reserve effective December 31, 2025, at $4.50/lb copper. The remaining life is the Q3 impairment-model horizon.
  3. Nine months to September 2026. 3PE+Au is platinum, palladium, rhodium and gold.
  4. February 2025 NI 43-101 Phase 2 study. The reserve is probable and the by-product-adjusted cost is a feasibility estimate.
  5. February 2022 NI 43-101 proved and probable reserve at $1.10/lb zinc. The life is the historical study schedule.
  6. FY2026 guidance per payable pound. A dash denotes a measure that does not apply.

Source: FY2025 MD&A, Q3 2026 MD&A, Kamoa-Kakula reserve study, Kipushi feasibility study and Platreef feasibility study.

The growth portfolio still depends on copper. Kamoa-Kakula accounts for about two-thirds of the three base-case project values before the model adds resource conversion or deducts corporate claims. Platreef ranks ahead of Kipushi on estimated asset value, even as Kipushi generates cash today. The timing difference means revenue concentration understates the role of Platreef in financing decisions.

2.2 Revenue split

Figure 2. FY2025 attributable revenue by main metal

Copper
Zinc
82.6%
17.4%
Share of attributable mine revenue (%)

Source: this analysis of FY2025 MD&A segment sales. Kamoa-Kakula copper and Kipushi zinc revenue are proxies for the main metals of those mines. The split uses project sales times economic ownership and excludes Platreef’s pre-commercial sales.

Figure 3. FY2025 attributable revenue by mine

Kamoa-Kakula
Kipushi
82.6%
17.4%
Share of attributable mine revenue (%)

Source: this analysis of FY2025 MD&A segment sales: about $1.3 bn from Kamoa-Kakula and $273.4 m from Kipushi after ownership.

The two figures describe the same economic exposure. Kamoa-Kakula sales are recorded in the joint venture. The consolidated income statement therefore gives Kipushi too much weight as a measure of Ivanhoe’s exposure to metal prices.

2.3 Kamoa-Kakula

The recovery hinges on underground development. See Table 2, row 1, for the stake, output, reserves, mine life and C1 cost. Feed averaged 2.22% copper in Q3 2026, below the reserve grade of 2.82%. The 2026 guidance of about 290 kt of copper in saleable products uses a different convention from FY2025 gross output.

The quarter’s 76.4 kt copper included anode, blister, slag concentrate and fines. Timing of conversion and shipment can cause sales and mine output to diverge.

Management guides to 300–350 kt of saleable copper for 2027 at $2.50–$3.00/lb per payable pound. The existing three concentrators target 400–450 kt/yr once the mines supply enough ore. The model uses 325 kt in 2027, 375 kt in 2028 and 425 kt/yr after that. It holds the 2027 cost midpoint after guidance ends. The schedule is an estimate pending the new mine plan.

Kamoa-Kakula’s 2027 plan calls for $450–500 m of sustaining capital and $500–650 m of expansion capital, plus $100–200 m of pre-stripping. The valuation uses the midpoints and carries the 2027 expansion midpoint into 2028. Q3 reporting puts payable volume at roughly 94% of saleable copper and production taxes and royalties at 5.6% of sales. Q3 2026 MD&A, pp. 16, 41.

Phase 4 would target about 500 kt/yr at $9,000–$12,000 per incremental annual tonne of capacity. Engineering is due to start in Q1 2027. Approval and funding are outstanding, with delivery estimated at 18–24 months after approval.

Existing phases need mine access, ventilation, dewatering and joint-venture approval of new mine plans. The joint venture uses term loans and offtake advances. The MD&A gives no separate Phase 4 financing commitment. Q3 2026 MD&A, pp. 36–37.

2.4 Kipushi

Kipushi adds current cash flow at a lower cost per pound of payable metal. Table 2, row 3, puts the stake and historical reserve basis beside current cost guidance. The mine produced 77.1 kt of zinc in concentrate in Q3 2026 at a 41.6% feed grade and 96% recovery. The high grade helps defend margin when the zinc price falls. It also makes ore sequencing and dependable electricity material to the business.

The November outlook points to 270–290 kt of contained zinc in 2026. The model uses 280 kt at $0.90/lb payable. It applies 85% standard payability and royalties and production taxes of about 10.9% of sales. Guided sustaining capital is $60 m in 2026 and $35 m in 2027.

CITIC Metal buys concentrate under a July 2024 agreement and provides a linked advance. The debottlenecking is complete, and the November capital plan shows sustaining spending only. Concentrate shipments support liquidity through the offtake. Q3 2026 MD&A, pp. 21, 41.

2.5 Platreef

Platreef’s earnings sit behind the construction schedule. The feasibility reserve grades 4.22 g/t combined precious metals. First concentrate came in November 2025. Management expects Phase 2 completion in Q4 2027 and full ramp-up in Q4 2028.

The design case is over 450 koz/yr of combined precious metals. It adds about 9 kt/yr of nickel and 6 kt/yr of copper.

Phase 2 spent $275 m through September, against 2026 guidance of $415–445 m. That leaves $155 m at the September midpoint, before $455–495 m guided for 2027. Table 9 rolls the balance to November.

Ivanplats closed its expanded $700 m senior facility in April 2026 and had drawn $207 m of the $600 m expansion by September. Further funding depends on draw availability and project cash flow. Q3 2026 MD&A, p. 41, Q3 2026 financial statements, pp. 14–15.

The gold stream takes 80% of production at $100/oz initially. The share falls to 64% after deliveries of 350 koz, subject to a 685.3 koz cap. The platinum and palladium stream covers 4.2% initially, stepping to 2.4% after delivery of 350 koz. The cap is 485.1 koz and payments are 30% of the prevailing metal price. The study incorporates both streams.

The existing mine has its mining right and environmental, waste and water authorisations. The March AIF lists Phase 2 amendments for dry-stack tailings, the pipeline and two ventilation shafts as pending. The Q3 MD&A reports tailings earthworks without confirming the amendments. FY2025 AIF, p. 68, Q3 2026 MD&A.

Existing approvals, construction progress and financing support the 0.82× weight. Approvals, draws and commissioning still matter. At 0.75×, the valuation workings show C$4.48 NAV/share.

2.6 Western Foreland

The exploration project remains an option on a mine plan. The reported indicated inventory across Makoko and Kiala totals 42 Mt of ore at 2.66% copper. Excluding Kiala, Makoko has about 0.9 Mt of indicated contained copper and 11.0 Mt in the inferred category. The Q3 source does not establish a financed mine schedule. The base valuation gives Western Foreland no deterministic asset value.

2.7 Production, reserves & costs

The gap between FY2025 and near-term guidance is the immediate threat to copper cash flow. Kipushi and Platreef produce different metals, so their volumes are reported separately in Table 2. Figure 4 uses the disclosed Kamoa-Kakula figures with the change in production basis identified.

Figure 4. Kamoa-Kakula copper output and guidance

Copper (kt)
400
300
200
100
0
388.8
290
325
FY2025 actual
FY2026 guidance
FY2027 guidance midpoint
Fiscal year

Source: FY2025 MD&A and Q3 2026 MD&A. FY2025 is gross mine output. The FY2026 estimate and FY2027 midpoint are copper in saleable products.

Figure 5. Reserves and measured and indicated resources by mine

Kamoa-Kakula
Platreef
Kipushi
13.13 Mt Cu
35.00 Mt Cu
17.62 Moz 3PE+Au
41.90 Moz 3PE+Au
3.45 Mt Zn
n/d
Index (reserve = 100 for each mine)
ReserveReserve plus exclusive measured and indicated resource

Source: Kamoa-Kakula reserve study, Kipushi feasibility study and Platreef feasibility study. Amounts are at the full-mine NI 43-101 basis and filing vintages in Table 2. Copper and zinc masses and Platreef’s precious-metal ounces have separate units. Indexing each reserve to 100 compares relative resource size. Inferred resources are excluded. Kipushi’s 2022 resource is shown separately in the study and the figure omits its second bar pending reconciliation of the reserve and resource bases. Platreef reserve prices follow its study basket.

Kamoa-Kakula and Platreef have more metal in their reserve and resource inventory than their mine plans book as reserves. The excess needs conversion, approvals and capital before it becomes mineable output. Section 7 values conversion separately and at a lower weight.

2.8 Peer positioning

First Quantum, Lundin Mining and Hudbay are the scorecard comparators. FY2025 output follows each company’s convention. Ivanhoe’s row shows gross Kamoa-Kakula output, with 39.6% attributable. Hudbay reports its consolidated cash cost per produced pound after by-product credits.

Table 3. Peer positioning

Company Listing FY2025 copper output FY2025 copper C1 Main comparison
First Quantum (TSX:FM) 396.0 kt $2.02/lb Zambia-led operating scale
Ivanhoe Mines (TSX:IVN) 388.8 kt $2.16/lb Single copper complex on gross basis
Lundin Mining (TSX:LUN) 331.2 kt $1.87/lb Multi-mine copper scale
Hudbay (TSX:HBM) 118.2 kt −$0.22/lb after credits Smaller copper output across several regions

Source: First Quantum FY2025 reporting, Lundin Mining FY2025 MD&A, p. 7, Hudbay FY2025 MD&A, p. 12 and Ivanhoe FY2025 MD&A.

3. Financials & balance sheet

Table 4. Five-year financial summary

Metric FY2021 FY2022 FY2023 FY2024 FY2025
Revenue $0.0 m $0.0 m $0.0 m $40.8 m $441.6 m
Revenue y/y n/m n/m n/m n/m +982%
Cash margin n/d n/d n/d n/d n/d
Gross margin n/m n/m n/m −26.3% 3.8%
Net income $45.3 m $434.1 m $302.9 m $193.3 m $228.0 m
Diluted EPS $0.05 $0.33 $0.26 $0.17 $0.19
Operating cash flow −$7.1 m $177.0 m −$31.6 m −$152.4 m −$127.5 m
Capital expenditure $52.0 m $158.7 m $472.5 m $457.7 m $337.7 m
Free cash flow −$59.1 m $18.3 m −$504.1 m −$610.1 m −$465.2 m
Consolidated net debt −$132.4 m −$91.3 m $61.7 m $241.1 m $371.0 m
Net debt / EBITDA n/d n/d n/d n/d n/d
Diluted weighted-average shares 1,221.7 m 1,228.1 m 1,233.4 m 1,324.5 m 1,379.8 m
Dividends per share $0.00 $0.00 $0.00 $0.00 $0.00

Notes to Table 4.

  1. Consolidated free cash flow deducts cash PP&E purchases from operating cash flow, and net debt excludes leases. Project PP&E schedules split Kamoa’s FY2023–FY2025 additions and Kipushi’s FY2025 additions. A split is unavailable for FY2021–FY2022 and for the consolidated five-year cash line, which excludes equity-accounted Kamoa. FY2024 MD&A, p. 35, FY2025 MD&A, pp. 37–38.
  2. Revenue growth from a zero base and gross margin on no sales are n/m. A consistent five-year consolidated cash-margin series and like-for-like pro-rata leverage series are n/d.

Source: FY2025, FY2024, FY2023 and FY2022 audited financial statements, including prior-year comparatives.

The income statement overstates the cash the parent can use for expansion. The company earned $228.0 m in FY2025 while consolidated operations used $127.5 m of cash. It recognises its share of joint-venture earnings through equity accounting. Distributions and loan settlements determine when joint-venture cash reaches the group. Use the Financial Metrics guide to distinguish that accounting profit from operating cash.

In the Q3 2026 results, consolidated revenue reached $263.8 m and operating cash flow was negative $7.5 m. Reported adjusted EBITDA was $241.0 m including the attributable joint-venture contribution. The impairment assessment tests the copper asset at $5.02/lb and a 12.5% real after-tax discount rate. It uses a longer-term schedule than the near-term cash model. The equity bridge uses neither an impairment-model asset value nor the joint venture’s book equity.

The cost deck leaves little protection against a slower recovery. The model uses the C1 cost, payability and production taxes in Section 2 and holds unit costs in real dollars once guidance ends. A return to higher grades could improve recovered copper per tonne. Slower access and increased power or development spending could keep costs higher. The statutory cash-tax estimate gives no credit for the disclosed loss carryforwards because mine-level utilisation dates are unavailable.

At September 2026, pro-rata net debt was $1.7 bn and reported leverage 2.26×. Consolidated lease liabilities of $12.3 m and rehabilitation of $22.0 m are recognised separately in the equity bridge. At $5.00/lb copper, the same pro-rata net debt would be about 3.4× estimated forward EBITDA, before new financing.

The September filing reported $1.2 bn in pro-rata liquidity and a 2.02× current ratio. The $750.0 m senior notes are due in 2030. The $700.0 m revolving facility adds access to liquidity, subject to its terms. The model does not assume additional borrowing or covenant headroom.

Q3 statements carry a $23.2 m copper and zinc hedge liability. The statements and MD&A lack the portfolio’s contract strikes, volumes and maturities, so the bridge holds the filed mark. A separate −$29.8 m sensitivity reprices 61,958 t of provisional copper at Ivanhoe’s share if all remained open. There were no dividends in the periods shown. Q3 statements, pp. 3, 24, Q3 operating release, p. 3.

4. Management, strategy & structure

4.1 Management & governance

Operating continuity matters as the company revises its largest mine plan. Marna Cloete became CEO in 2025 after serving as president from 2020. She joined in 2006 and previously held the CFO role. David van Heerden has been CFO since 2021 after overseeing finance, treasury and tax. Robert Friedland is executive co-chair and Weibao Hao is non-executive co-chair.

The 2026 circular named seven independent directors among eleven nominees and identified Tadeu Carneiro as lead independent director. It documents independent oversight through the nomination and corporate governance and compensation and human resources committees. The remaining committee rosters are outside the source register. CITIC’s equity and Kipushi financing make related-party oversight important. 2026 circular, pp. 18, 20–21.

4.2 Strategy

Capital is allocated through project partnerships and staged expansions. The Q3 MD&A shows the largest near-term builds are the Kamoa-Kakula mine recovery and Platreef Phase 2. Copper expansion phases require engineering and approvals before construction. The Western Foreland programme prioritises drilling and engineering on the existing licence package. Its $86.0 m share of the $127.0 m exploration budget makes it the largest named exploration commitment in the 2026 guidance.

4.3 Ownership & structure

Ivanhoe shares control of its major assets with strategic partners. Kamoa Copper operates through Kamoa Holding. Ivanhoe’s operating stake and interests in related holding entities differ. Kipushi Corporation operates alongside the state-owned partner on the DRC asset, while Ivanplats holds the South African operation. Table 8 shows how those relationships enter the valuation.

CITIC Metal is the largest shareholder. The November presentation lists CITIC at 21.2% and Zijin Mining at 12.2%. It puts Robert Friedland at 11.5% and Capital Group at 10.0%. The 2025 AIF gives Zijin a board appointment right above a 10% holding and an anti-dilution limit of 13.88%.

The November share count was 1,426.5 m basic and 1,432.9 m fully diluted. The dilution bridge already captures the outstanding instruments reflected in the published total.

5. ESG & sustainability

The recovery puts safety and water management at the centre of operating risk. The FY2025 sustainability report records 1.26 total recordable injuries and 0.37 lost-time injuries per million hours. Those are group frequencies. Underground water control at Kakula remains a condition for access to ore and reliable production. Group injury rates give a baseline for judging the recovery programme as development accelerates.

The same report records a 44% reduction in malaria incidence at Kamoa-Kakula in 2025. The November operating update says the 60 MW solar and storage expansion is operating, with another 60 MW planned by Q1 2028. Lower diesel use supports operating reliability as well as emissions. The source register lacks comparable mine-level tailings and safety series across all peers, limiting the scorecard’s ability to give credit for relative performance.

6. Risks

Mine access and copper prices dominate the risk ranking. The first can cut near-term delivered tonnes while development spending continues. The second can reduce cash available to fund that spending. Section 7 reflects execution through the operating schedule and the Platreef weight. It reflects jurisdiction through discount rates.

Project liquidity, joint-venture distribution rights, site safety and counterparty terms remain relevant outside the mechanical valuation inputs.

Table 5. Risk register

Risk Type Likelihood / impact Exposure Mitigant
Kakula recovery slips Operating 4 / 5 Fewer high-grade stopes and more development Separate open-pit ore and revised underground plan
Copper falls Commodity 3 / 5 Lower Kamoa-Kakula margins Kipushi zinc diversifies revenue
Platreef commissioning slips Operating 4 / 4 More capital before cash generation Staged shaft and concentrator build
DRC terms change Jurisdiction 2 / 5 Approvals, taxes and partner cash flows Established state and strategic partners
Cash shortfall drives dilution Financing 3 / 4 Reduced value per share Revolver and project liquidity
Counterparty payment is delayed Counterparty 2 / 3 Kipushi cash conversion Contracted sales and advance facility
Safety or water incident ESG 2 / 4 Site shutdown and loss of access Dewatering and safety monitoring
Zinc falls Commodity 3 / 3 Kipushi margin, Table 17 field 3 and secondary-deck workings High-grade ore and copper sales
Platreef basket weakens Commodity 3 / 2 Cash available after the streams, Table 17 field 3 and secondary-deck workings Revenue across several metals
Canadian dollar strengthens Currency 4 / 2 Lower CAD value for US-dollar mine cash, Table 17 field 5 USD pricing and debt partly align operating and financing cash flows
Hedges or provisional prices move Pricing 2 / 2 Filed hedge liability and open copper receivables, Table 17 field 8 and Section 3 Hedge mark held, provisional copper stressed separately

Source: risk factors in the FY2025 AIF, Q3 2026 MD&A and FY2025 sustainability report. Likelihood and impact are analytical judgments on a five-point scale.

Figure 6. Risk matrix by likelihood and impact

Impact (1–5)
5
4
3
2
1
Kakula recovery 20
Copper price 15
Platreef ramp 16
DRC terms 10
Funding gap 12
Counterparty 6
Water or safety 8
Zinc price 9
Platreef basket 6
CAD 8
Hedges/pricing 4
1
Rare
2
3
4
5
Likely
Likelihood (1–5)

Source: this analysis, Table 5.

7. Valuation

This commodity stock valuation builds each mine on Ivanhoe’s economic interest and tests whether near-term cash generation supports the asset value.

Valuation as of 20 November 2026. Copper base $6.00/lb on the $4, $5, $6, $7 and $8/lb grid. The 3-month LME average was $6.48, the 6-month average was $6.35 and the 12-month average was $6.05/lb. Zinc stays at $3,600/t in the copper cases. The 3-month, 6-month and 12-month LME cash zinc averages through 20 November were $3,901/$3,759/$3,520 per tonne. The zinc grid is $2,800/$3,200/$3,600/$4,000/$4,400 per tonne. Platreef uses its feasibility economic basket, including $8.50/lb nickel and a $4.25/lb copper starting point for the uplift. LME zinc series, Platreef feasibility study, p. 94. Real after-tax discount rates are 12% for the DRC mines and 10% for Platreef. Per-share amounts use C$1.4325 per $1 and 1,432.9 m fully diluted shares. The TSX closed at C$6.30.

At $6.00 copper, the blend is C$3.67 a share. Kamoa-Kakula’s lower guidance reduces the value of the existing mine schedule. Platreef adds long-dated cash flows while its expansion consumes capital. The base case carries Kamoa-Kakula’s existing three phases and keeps Phase 4 outside the forecast. A favourable March 2027 mine plan could change both volume and costs.

Table 6. Load-bearing inputs — the filed figures the valuation moves on (full source register: Table 20)

Input Value Where §7 uses it Source
Kamoa-Kakula stake 39.6% Table 8 interest Filed | Q3 2026 MD&A | Company overview | “an indirect 39.6% interest in the Kamoa-Kakula Copper Complex” | p.6
Kamoa-Kakula copper output, FY2026 and FY2027 guidance ≈290,000 t; 300,000–350,000 t Tables 9 and 13 volume Filed | Q3 2026 MD&A | Copper production, cash cost and capital expenditure guidance | “Contained copper in saleable products (tonnes)" | p.16
Kamoa-Kakula C1 cost, FY2026 and FY2027 guidance $2.60–3.00/lb; $2.50–3.00/lb Tables 9 and 13 unit cost Filed | Q3 2026 MD&A | Copper production, cash cost and capital expenditure guidance | “Cash cost (C1) ($ per lb.)" | p.16
Kamoa-Kakula probable reserve 466 Mt ore at 2.82% Cu, 13.13 Mt contained Cu Table 9 reserve life Filed | Kamoa-Kakula technical report Mar 2026 | Table 1.2, 100% basis | “Total” | p.16
Kamoa-Kakula remaining mine life and combined reserved throughput 26 years; 17 Mt/yr Table 9 life Filed | Q3 2026 MD&A | Recoverability of assets | “at a combined capacity of 17 Mtpa over an estimated remaining mine life of approximately 26 years” | p.51
Kipushi contained zinc production, FY2026 guidance 270,000–290,000 t Tables 9 and 13 volume Filed | Q3 2026 MD&A | Kipushi 2026 guidance | “Contained zinc in concentrate (tonnes)" | p.20
Kipushi C1 payable zinc cost, FY2026 guidance $0.85–0.95/lb Tables 9 and 13 unit cost Filed | Q3 2026 MD&A | Kipushi 2026 guidance | “Cash cost (C1) ($ per pound)" | p.20
Kipushi standard zinc payability 85% Tables 9 and 13 payability Filed | Q3 2026 MD&A | Kipushi operating data note | “Payable zinc in concentrate sold is net of standard 85% payability” | p.17
Platreef Phase 2 feasibility after-tax NPV8 $1,393 m Table 9 NPV reference Filed | Platreef technical report Feb 2025 | Table 1.14 | “After-Tax NPV8%" | p.97
Filed pro-rata net debt $1,690.7 m Table 11 financing Filed | Q3 2026 MD&A | Pro-rata financial ratios | “Pro-rata net debt” | p.43
Restricted cash included in cash $22,089 k Table 11 cash Filed | Q3 2026 financial statements | Note 6 | “Cash - guarantee accounts” | p.13
Consolidated non-current rehabilitation provision $21,961 k Table 11 claims Filed | Q3 2026 financial statements | Statement of financial position | “Rehabilitation provision” | p.3
Fully diluted shares outstanding 1,432.9 m Tables 11 and 14 per-share denominator Filed | Presentation Nov 2026 | Ivanhoe at a glance | “Diluted Shares” | p.3
Bank of Canada USD/CAD C$1.4325 per $1 Tables 9–17 currency conversion Market | Bank of Canada | “FXUSDCAD” | 20 Nov 2026

Source: Q3 2026 MD&A, Kamoa-Kakula reserve update and Platreef feasibility study.

Metal Pilot Premium

Valuation workings — Premium

The workings behind this valuation — the method, the models, the sensitivity grids and the scenarios, 11 tables and 3 figures in all — are for Metal Pilot Premium members.

  • 7.1 Method selection
  • 7.2 Net asset value
  • 7.3 Relative valuation
  • 7.4 Further weighted methods
  • 7.5 Cross-checks
  • 7.6 Scenarios & fair value

Want to see one first? The BHP Group (BHP) valuation is open to every reader.

Create a Metal Pilot accountLog in

See Premium plansRead a free example

You are signed in, and your plan does not include valuation workings. They come with Metal Pilot Premium.

Upgrade to Premium

The premium section could not be loaded right now.

Premium — unlocked

8. Near-term catalysts (1–3 years)

Table 18. Near-term catalysts

Catalyst Timing What would improve the case
Kamoa-Kakula updated life-of-mine plan March 2027 Geotechnical and mining schedules support the planned ramp and spending
Kamoa starter-pit ore Q3 2027 Open-pit feed offers more flexibility while Kakula develops underground
Platreef Phase 2 completion Q4 2027 Commissioning reduces the risk on projected cash flows
Platreef Phase 2 full ramp Q4 2028 Commercial volumes finance more of the group’s investment needs

Source: Q3 2026 MD&A and the November operating update. Dates are management expectations.

The March plan carries the most weight because it brings underground access, grade, capital and later expansion into one schedule. The open-pit start tests whether management can supply the concentrators while Kakula development advances. A Platreef commissioning update matters most when it includes saleable volumes and a cash-cost basis.

9. Rating & verdict

Figure 10. Scorecard by dimension, 20 November 2026

Assets & scale★★★★☆15%
Cost & margins★★☆☆☆15%
Reserves & life★★★★☆15%
Balance sheet★★☆☆☆15%
Capital allocation★★☆☆☆15%
Growth★★★★☆6.25%
Management★★★☆☆6.25%
Jurisdiction★☆☆☆☆6.25%
ESG★★★☆☆6.25%
Score by dimension Weighted composite ★★★ (2.79)
Each ring is one star; the outer ring is ★★★★★. Weights in Table 19.

Figure data: Table 19. Each spoke prints its stars and weight; the dashed ring is the weighted composite, 2.79/5.

Table 19. Scorecard rationale

Dimension Weight Score Rationale
1. Asset quality & scale 15% ★★★★☆ Kamoa-Kakula’s 388.8 kt FY2025 gross copper output exceeds Lundin and Hudbay, near First Quantum. The 39.6% interest tempers the scale credit. Table 3 and FY2025 MD&A.
2. Cost position & margins 15% ★★☆☆☆ Kamoa-Kakula’s FY2025 C1 of $2.16/lb exceeded First Quantum and Lundin’s $1.87/lb group cost. The $2.75/lb 2027 midpoint widens the gap. Hudbay’s produced-pound result includes by-product credits. Table 3 and Q3 2026 MD&A.
3. Reserves, life & replacement 15% ★★★★☆ The 26-year Kamoa-Kakula horizon gives Ivanhoe a long core asset against a group of operating peers. The March 2026 reserve study reports 13.13 Mt of probable contained copper. Table 2 and Q3 2026 MD&A.
5. Balance sheet & liquidity 15% ★★☆☆☆ At $5.00/lb copper, the modeled 3.4× forward leverage and the new mine funding burden put Ivanhoe below a self-funded peer benchmark. Q3 2026 MD&A and Section 3.
6. Capital allocation & returns 15% ★★☆☆☆ Estimated forward cash flow after growth is −$329.9 m. The weak near-term per-share return compares poorly with peers that can fund projects from operations. Q3 2026 MD&A and Table 15.
4. Growth & optionality 6.25% ★★★★☆ Platreef’s Phase 2 expansion and Kamoa-Kakula recovery give two construction or restart paths in the peer set. Funding and approvals cap the upside credit. November 2026 operating update.
7. Management & governance 6.25% ★★★☆☆ Seven of eleven 2026 nominees were independent. Related offtake and holding-company rights balance strong alignment against the peer benchmark. 2026 circular and FY2025 AIF.
8. Jurisdiction & geopolitics 6.25% ★☆☆☆☆ Two DRC mines carry most base project value. The concentration ranks worse than the assets spread across the comparison companies’ principal operating regions. Q3 2026 MD&A and Table 2.
9. ESG & licence to operate 6.25% ★★★☆☆ The 1.26 FY2025 recordable injury rate and disclosures give evidence for a middle peer score. Comparable site rates and tailings series are incomplete. FY2025 sustainability report.
Composite 100% ★★★☆☆ Average

Source: this analysis. Table 3 defines the peer set, and the row evidence comes from the filings listed in Section 10.

Weighted average. Σ(weight × stars) = 2.79/5, or ★★★☆☆ Average.

The two-axis verdict. As of 20 November 2026, ★★★☆☆ Average quality and Overvalued (wide band) give the verdict Full. The blend of C$3.67 against C$6.30 gives an implied −41.8% return. The market-implied copper deck is $7.19/lb with multiples held.

The asset and reserve scores support the target multiples. Cost, leverage and capital allocation pull the combined adjustment to −3%. Jurisdiction already affects the valuation through the discount rates.

The bull case requires better mine access and operating costs at Kamoa-Kakula as Platreef starts to contribute cash. If the revised plan delivers a lower-cost schedule, the positive exposure to higher copper prices matters more. The bear case is a longer ramp with weaker copper prices, leaving less cash to fund capex and claims. Cash after growth spending determines which case the stock supports. Compare the operating and funding profiles on Metal Pilot’s copper mining stock screener.

Terms in this post (59)
Asset quality & scale
Scorecard dimension 1, scored 1 to 5 against the peer set: the tier and size of the asset base, its grade or margin quality and how concentrated it is.
Balance sheet & liquidity
Scorecard dimension 5: financial resilience — leverage, liquidity, maturities and hedge cover; for a developer, the funding gap.
Blended fair value
The weighted average of the values per share the valuation methods give, on the method-selection weights: the post’s estimate of what a share is worth.
C1 / cash cost
The direct cost of producing a pound or ounce — mining, processing, site overhead and freight, net of by-product credits — before depreciation, royalties and sustaining capital. Lower is better. In depth: Copper market guide — How to value & screen copper miners
Capex (capital expenditure)
Cash spent on mines, wells, plant and equipment, split where the filing allows into sustaining and growth capital. In depth: The Oil & Gas Value Chain: Upstream — What a barrel costs
Capital allocation & returns
Scorecard dimension 6: discipline and the return on capital — returns on capital, the dividend and buyback record, reinvestment and acquisitions, judged per share.
Cash margin
Revenue less cash operating costs, before depreciation — as a share of revenue or per unit sold, as the label says. Higher is better.
Cost position & margins
Scorecard dimension 2: where the business sits on its sector’s cost curve and how durable its margins are.
Discount rate
The annual rate future cash flows are discounted at to value them today — real and after tax here; a higher rate gives a lower value.
Dividend
The cash the board declares for shareholders out of earnings, per share for the period the label names — a month, a quarter, a half or a year — unless the cell gives a total; it is paid some weeks later to the holders on the record date.
EBITDA
Earnings before interest, tax, depreciation and amortisation: operating profit before non-cash charges and financing. Adjusted EBITDA strips items the company treats as one-off (non-GAAP).
Enterprise NAV
The sum of the asset values before the balance sheet: NAV before cash, debt and the other claims are added or deducted.
EPS, diluted (earnings per share)
Net income attributable to shareholders divided by the share count including the shares options, warrants and convertibles would add.
Equity bridge
The step from enterprise NAV to equity NAV: cash and investments added, debt, provisions and the other claims on the assets deducted.
Equity NAV
Enterprise NAV after cash, debt and the other claims of the equity bridge — the NAV that belongs to shareholders.
ESG & licence to operate
Scorecard dimension 9: the safety, environmental, tailings and community record, and the social licence to keep operating.
EV/EBITDA
Enterprise value divided by EBITDA — here, forward EBITDA at the base deck: how many years of cash earnings the market pays for the whole business. Lower is cheaper.
FCF (free cash flow)
Operating cash flow less capital spending: the cash left for dividends, buybacks and debt. The label or its note says which capital is deducted.
FCF yield
Free cash flow per share divided by the share price: the cash return the business earns on today’s price. Higher is cheaper.
FCF-yield support
A value per share from cash flow: forward free cash flow, after sustaining capital and cash tax, divided by a target free-cash-flow yield and the diluted share count.
Forward EBITDA
EBITDA over the next twelve months at the valuation’s base price deck — the earnings the EV/EBITDA multiple is applied to.
Fully diluted shares
Shares outstanding plus every share options, warrants, rights and in-the-money convertibles would add — the count a value per share divides by.
FY (fiscal year)
The company’s twelve-month reporting year, named by the calendar year it ends in.
Growth & optionality
Scorecard dimension 4: the production and cash-flow growth ahead — funded projects, expansions and exploration upside.
Growth capital
Capital spent to add production: new mines, expansions and wells beyond what replaces decline. In depth: The Oil & Gas Value Chain: Upstream — What a barrel costs
Hedge
Contracts — swaps, forwards, options — that fix the price of future sales or set a floor under it, trading some upside for certainty.
Interest (ownership)
The company’s ownership share of an asset; its production, reserves and value are counted at that share. In depth: The Oil & Gas Value Chain: Upstream — Leases & tenure
Jurisdiction & geopolitics
Scorecard dimension 8: the country risk of where the assets and cash flows sit, and how stable permitting and fiscal terms are.
Life of mine (LOM)
The mine plan’s full production schedule, from today until the reserve is exhausted — the basis of a mine’s NPV.
Liquidity
Cash plus undrawn committed credit lines: what the company can spend at short notice.
M&I resources (measured and indicated)
Mineralisation drilled closely enough to estimate tonnes and grade with confidence, not yet shown to be economic in a mine plan. Exclusive means the part not already counted as reserves.
Management & governance
Scorecard dimension 7: the people and their alignment — track record, insider ownership, board independence and related-party conflicts.
Market capitalisation
The share price times the shares outstanding: what the market values the equity at.
NAV (net asset value)
The value today of the company’s assets — each mine’s or field’s future cash flows discounted to the present — plus cash, less debt and other claims.
NAV per share
Equity NAV divided by the fully diluted share count.
Net debt
Borrowings — and, where the label says so, leases — less cash; a figure in brackets or shown as net cash means more cash than debt. Lower is stronger.
Net debt / EBITDA
Net debt divided by a year’s EBITDA: how many years of cash earnings would repay the debt. Below 1× is low; net cash means there is none. Lower is stronger. In depth: The Oil & Gas Value Chain: Upstream — How to read & screen a producer
Net income
Profit after every cost, interest and tax, attributable to the company’s shareholders, as reported under GAAP or IFRS — non-cash marks, impairments and one-off items included; also called net earnings.
NPV (net present value)
The value today of an asset’s future cash flows, each discounted back at the discount rate, less the capital still to spend. In depth: Copper market guide — How to value & screen copper miners
OCF (operating cash flow)
Cash the business generated in the year after working capital and tax, before capital spending.
P/NAV
The share price divided by NAV per share: below 1.00× the market prices the shares under the value of the assets, above it over. In depth: The Oil & Gas Value Chain: Upstream — How to read & screen a producer
Price deck
The commodity prices the valuation runs on: a base price and a fixed grid of prices around it, each run as a full scenario.
Probable reserves
The lower-confidence reserve category — economic in the plan, but on wider drilling or more estimation than proven; for oil and gas, about as likely as not to be produced. In depth: The Oil & Gas Value Chain: Upstream — Reserves vs resources
Production
The metal, oil or gas the company produced in the period at its own share of each mine or field — ounces, pounds or tonnes, or barrels of oil equivalent a day — before or after royalties as it reports; for a royalty or stream holder, its share of the operators’ output. In depth: The Oil & Gas Value Chain: Upstream — Units & reading a production number
Quality rating (composite)
The weighted average of the nine scorecard dimensions, each scored 1 to 5 against the peer set, rounded to the half-star: High quality from 4.5, Solid 3.5 to 4, Average 2.5 to 3, Low quality below 2.5.
Reclamation provision
The discounted cost of closing and rehabilitating mines and wells, booked as a liability and deducted from the value of the equity.
Reserve life
Years the reserves last at the current or guided production rate: reserves divided by a year’s output, on one reserve category. In depth: The Oil & Gas Value Chain: Upstream — How to read & screen a producer
Reserves
What a company can show it will produce at a profit from known deposits or fields, at stated prices and costs, estimated under a disclosure code — NI 43-101, JORC or S-K 1300 for mines; SEC rules or NI 51-101 for oil and gas. In depth: The Oil & Gas Value Chain: Upstream — Reserves vs resources
Reserves, life & replacement
Scorecard dimension 3: how long the reserves last and whether the company replaces what it produces.
Resource conversion
The value given to resources beyond the mine plan: exclusive measured and indicated ounces or pounds, counted at a factor below one for the share expected ever to be mined.
Revenue
The company’s top line: what it earned in the period from selling its output — metal, oil and gas, or its stream and royalty interests — and any other operating income, before costs. The label or its note says what it includes where that differs, as net of royalties or with purchased oil resold.
SOTP (sum of the parts)
A NAV built asset by asset — each mine, field, stake or business valued on its own, then added up.
Stage risk
The weight below 100% put on an undeveloped asset’s NPV for the chance it is never built or produces less than planned.
Stream
An upfront payment for the right to buy a share of a mine’s future metal at a fixed, low price: the operator gets capital now, the stream holder metal later. In depth: Silver market guide — Company archetypes along the value chain
Sustaining capital
Capital spent to keep existing production going — equipment, mine development, tailings — as opposed to growth capital for new output. In depth: The Oil & Gas Value Chain: Upstream — What a barrel costs
Target P/NAV
The P/NAV multiple the valuation applies to NAV per share: the archetype’s anchor, moved by the scorecard’s driver line.
Unit cost
The cost to produce one unit of output — an ounce, a pound, a barrel — on the basis the company reports, named in the cell. Lower is better.
Value read
The five-point verdict on the implied return: Undervalued above +30%, Modestly undervalued +10% to +30%, Fairly valued within ±10%, Modestly overvalued −10% to −30%, Overvalued below −30%. “Wide band” flags a lowest scenario more than 25% below the price.
y/y (year on year)
The change from the same period a year earlier, in per cent.

10. Sources, methodology & disclaimer

10.1 Sources, methodology & data vintage

Company reporting. FY2025 audited financial statements, MD&A and AIF; Q3 2026 financial statements, MD&A and November operating update; 2026 circular, 2025 sustainability report and November investor presentation. FY2021–FY2024 comparatives are sourced under Table 4.

Assets and market. Kamoa-Kakula’s March 2026 reserve study, Kipushi’s February 2022 feasibility study and Platreef’s February 2025 feasibility study. TSX closing history, Bank of Canada for exchange rates, and LME cash copper settlements via Westmetall. The mid-cycle comparison uses the World Bank Pink Sheet copper series.

Methodology. The date is November 20, 2026, at C$6.30 a share. The company reports in US dollars. Per-share valuation translates at C$1.4325 per $1 on 1,432.9 m diluted shares. The $6.00/lb copper base runs on a $4, $5, $6, $7 and $8/lb grid. The base case discounts DRC cash flows at 12% real and Platreef at 10% real. The scorecard applies mining producer weights against the peer set in Table 3. The analysis is updated quarterly and when a material mine plan changes.

Re-run log. The November 21 run applies the scorecard to the model using the November 20 close. NAV/share is C$4.59 and the C$3.67 blend implies a −41.8% return. The read is Overvalued (wide band) across C$0.04–C$10.22. The market-implied copper deck is $7.19/lb. The upper rating flip is $6.33/lb. The forward yield before growth at current enterprise value is 3.2%.

21 November 2026 gate re-run. The disclosed cash schedules and peer cost corrections leave NAV/share at C$4.59, the blend at C$3.67 and the read at Overvalued (wide band), with an implied −41.8% return.

Data gaps. The 2027 mine plan can replace the post-guidance Kamoa-Kakula schedule. The Platreef feasibility case supplies long-run economics, with a site-by-site forward cash-flow schedule still unavailable. The sources lack a comparable five-year multiples history, archived analyst consensus, mine-level tax pools and a complete hedge book. The consolidated history cannot supply comparable pro-rata leverage. An asset map and separate financial and safety charts are omitted. The detailed deck sensitivities, P/NAV map and cross-checks are in the valuation workings, claude/valuation-models/ivanhoe-mines-ivn.out.md. Table 6 shows the load-bearing assumptions. Table 20 traces their source rows.

Table 20. Source register — the filed figures behind the valuation (load-bearing inputs: Table 6)

InputValueAs ofWhere §7 uses itSource
AIF 2025
Platreef gold stream, initial, drop, trigger, cap80% then 64% at 350,000 oz; capped at 685,280 oz31 Dec 2025Tables 8 and 9 encumbrancesFiled | AIF 2025 | Platreef Stream Financing Agreements | "80% of contained gold in concentrate" | p.149
Platreef platinum and palladium stream, initial, drop, trigger, cap and payment4.2% then 2.4% at 350,000 oz; capped at 485,115 oz; payment 30% of spot31 Dec 2025Tables 8 and 9 encumbrancesFiled | AIF 2025 | Platreef Stream Financing Agreements | "4.2% of contained palladium and platinum in concentrate" | p.150
Kamoa-Kakula technical report Mar 2026
Kamoa-Kakula probable reserve466 Mt ore at 2.82% Cu, 13.13 Mt contained Cu31 Dec 2025Table 9 reserve lifeFiled | Kamoa-Kakula technical report Mar 2026 | Table 1.2, 100% basis | "Total" | p.16
Kamoa-Kakula reserve copper price$4.50/lb31 Dec 2025Table 17 reserve basisFiled | Kamoa-Kakula technical report Mar 2026 | Table 1.2 note | "long-term copper price used for calculating Mineral Reserves" | p.16
Kamoa-Kakula remaining reserve-plan capital including sustaining$17.11 bn31 Mar 2026Table 9 LOM capitalFiled | Kamoa-Kakula technical report Mar 2026 | Section 1.20.1 | "total capital cost to implement the Mineral Reserve plan" | p.25
Kipushi FS Feb 2022
Kipushi proved and probable reserve, historical study basis10.82 Mt at 31.9% Zn, 3,445 kt Zn14 Feb 2022Table 9 reserve lifeFiled | Kipushi FS Feb 2022 | Table 1.7, 100% basis | "Total" | p.46
Kipushi after-tax NPV8 and feasibility zinc price$941 m at $1.20/lb Zn14 Feb 2022Table 9 NPV referenceFiled | Kipushi FS Feb 2022 | Tables 1.8–1.9, 100% basis | "Net Present Value" | p.62
Kipushi feasibility study mine life before depletion14 years14 Feb 2022Table 9 lifeFiled | Kipushi FS Feb 2022 | Economic analysis | "over a period of 14 years" | p.30
Platreef technical report Feb 2025
Platreef Phase 2 probable reserve129.7 Mt at 4.22 g/t, 17.62 Moz 3PE+Au15 Feb 2025Table 9 reserve lifeFiled | Platreef technical report Feb 2025 | Tables 1.4 and 1.5 | "Probable" | p.51
Platreef Phase 2 feasibility life35 years15 Feb 2025Table 9 lifeFiled | Platreef technical report Feb 2025 | Table 1.14 | "Life-of-Mine" | p.97
Platreef Phase 2 feasibility after-tax NPV8$1,393 m15 Feb 2025Table 9 NPV referenceFiled | Platreef technical report Feb 2025 | Table 1.14 | "After-Tax NPV8%" | p.97
Platreef feasibility cash cost after by-product credits$599/oz recovered 3PE+Au15 Feb 2025Table 9 cost referenceFiled | Platreef technical report Feb 2025 | Table 1.14 | "Total Cash Costs After Credits" | p.97
Q3 2026 financial statements
Consolidated cash and cash equivalents$642,693 k30 Sep 2026Table 11 cashFiled | Q3 2026 financial statements | Statement of financial position | "Cash and cash equivalents" | p.3
Restricted cash included in cash$22,089 k30 Sep 2026Table 11 cashFiled | Q3 2026 financial statements | Note 6 | "Cash - guarantee accounts" | p.13
Consolidated non-current rehabilitation provision$21,961 k30 Sep 2026Table 11 claimsFiled | Q3 2026 financial statements | Statement of financial position | "Rehabilitation provision" | p.3
Consolidated commodity derivative liability$23,223 k30 Sep 2026Table 11 hedgesFiled | Q3 2026 financial statements | Statement of financial position | "Financial derivative liability" | p.3
Consolidated deferred tax asset$199,103 k30 Sep 2026Table 17 taxFiled | Q3 2026 financial statements | Statement of financial position | "Deferred tax asset" | p.3
Consolidated non-current investments$93,090 k30 Sep 2026Table 11 investmentsFiled | Q3 2026 financial statements | Statement of financial position | "Investments" | p.3
Consolidated Q3 and 9M 2026 general and administrative expense$17,026 k and $52,000 k30 Sep 2026Tables 9 and 13 corporate chargesFiled | Q3 2026 financial statements | Statement of comprehensive income | "General and administrative expenditure" | p.4
Q3 2026 MD&A
Kamoa-Kakula stake39.6%30 Sep 2026Table 8 interestFiled | Q3 2026 MD&A | Company overview | "an indirect 39.6% interest in the Kamoa-Kakula Copper Complex" | p.6
Kipushi stake62%30 Sep 2026Table 8 interestFiled | Q3 2026 MD&A | Company overview | "Ivanhoe Mines holds a 62% interest in Kipushi" | p.6
Platreef stake64%30 Sep 2026Table 8 interestFiled | Q3 2026 MD&A | Company overview | "Ivanhoe Mines holds a 64% interest in Platreef" | p.6
Kamoa-Kakula copper output, FY2026 and FY2027 guidance≈290,000 t; 300,000–350,000 t2 Nov 2026Tables 9 and 13 volumeFiled | Q3 2026 MD&A | Copper production, cash cost and capital expenditure guidance | "Contained copper in saleable products (tonnes)" | p.16
Kamoa-Kakula C1 cost, FY2026 and FY2027 guidance$2.60–3.00/lb; $2.50–3.00/lb2 Nov 2026Tables 9 and 13 unit costFiled | Q3 2026 MD&A | Copper production, cash cost and capital expenditure guidance | "Cash cost (C1) ($ per lb.)" | p.16
Kamoa pre-stripping excluded from 2027 guided capital$100–200 m2 Nov 2026Tables 9 and 15 growth capitalFiled | Q3 2026 MD&A | Capital expenditure guidance note | "Capital expenditure excludes capitalized pre-stripping" | p.16
Kamoa-Kakula remaining mine life and combined reserved throughput26 years; 17 Mt/yr30 Sep 2026Table 9 lifeFiled | Q3 2026 MD&A | Recoverability of assets | "at a combined capacity of 17 Mtpa over an estimated remaining mine life of approximately 26 years" | p.51
Kamoa-Kakula impairment test, copper deck and post-tax real discount rate$5.02/lb Cu; 12.50%30 Sep 2026Table 17 discount benchmarkFiled | Q3 2026 MD&A | Recoverability of assets | "Copper price" | p.51
Kipushi contained zinc production, FY2026 guidance270,000–290,000 t2 Nov 2026Tables 9 and 13 volumeFiled | Q3 2026 MD&A | Kipushi 2026 guidance | "Contained zinc in concentrate (tonnes)" | p.20
Kipushi C1 payable zinc cost, FY2026 guidance$0.85–0.95/lb2 Nov 2026Tables 9 and 13 unit costFiled | Q3 2026 MD&A | Kipushi 2026 guidance | "Cash cost (C1) ($ per pound)" | p.20
Platreef Phase 2 design outputover 450,000 oz 3PE+Au; ≈9,000 t Ni and 6,000 t Cu annually2 Nov 2026Table 9 rampFiled | Q3 2026 MD&A | Platreef overview | "450,000 ounces of platinum, palladium, rhodium, and gold" | p.5
Kipushi standard zinc payability85%30 Sep 2026Tables 9 and 13 payabilityFiled | Q3 2026 MD&A | Kipushi operating data note | "Payable zinc in concentrate sold is net of standard 85% payability" | p.17
Revised Kamoa-Kakula existing concentrator capacity400,000–450,000 t Cu in saleable products annually2 Nov 2026Table 9 steady-state rampFiled | Q3 2026 MD&A | Revised operating plan | "has been lowered to 400,000 to" | p.10
Kamoa-Kakula Phase 4 prospective output≈500,000 t Cu annually2 Nov 2026Table 9 expansion optionFiled | Q3 2026 MD&A | Phase 4 expansion | "The Phase 4 expansion is expected to sustain" | p.13
Makoko District indicated contained Cu (excluding Kiala)34 Mt ore at 2.66% Cu with 0.9 Mt contained Cu8 Sep 2026Table 9 resource optionFiled | Q3 2026 MD&A | Western Forelands | "Makoko District’s Mineral Resources are now" | p.24
Filed pro-rata total debt$2,475.7 m30 Sep 2026Table 11 debtFiled | Q3 2026 MD&A | Pro-rata financial ratios | "Pro-rata total debt" | p.43
Filed pro-rata cash and short-term investments$785.0 m30 Sep 2026Table 11 cashFiled | Q3 2026 MD&A | Pro-rata financial ratios | "Pro-rata cash and cash equivalents and short-term investment" | p.43
Filed pro-rata net debt$1,690.7 m30 Sep 2026Table 11 financingFiled | Q3 2026 MD&A | Pro-rata financial ratios | "Pro-rata net debt" | p.43
Kamoa FY2026 and FY2027 sustaining capital guidance$500–525 m and $450–500 m2 Nov 2026Tables 9 and 15 sustainingFiled | Q3 2026 MD&A | Capital expenditure | "Sustaining capital" | p.41
Kamoa FY2026 and FY2027 expansion capital guidance$600–675 m and $500–650 m2 Nov 2026Table 9 expansionFiled | Q3 2026 MD&A | Capital expenditure | "Expansion capital" | p.41
Kipushi FY2026 and FY2027 sustaining capital guidance$60 m and $35 m2 Nov 2026Tables 9 and 15 sustainingFiled | Q3 2026 MD&A | Capital expenditure | "Sustaining capital" | p.41
Platreef FY2026 and FY2027 Phase 2 capital guidance$415–445 m and $455–495 m2 Nov 2026Tables 9 and 15 expansionFiled | Q3 2026 MD&A | Capital expenditure | "Phase 2 capital" | p.41
FY2026 guidance for total and Western Forelands exploration$127 m total; $86 m Western Forelands2 Nov 2026Table 13 corporate chargesFiled | Q3 2026 MD&A | Liquidity and capital resources | "Ivanhoe’s exploration budget for 2026 was set to approximately" | p.41
Presentation Nov 2026
Basic shares outstanding1,426.5 m11 Nov 2026Table 11 shares and market capFiled | Presentation Nov 2026 | Ivanhoe at a glance | "Basic Shares" | p.3
Fully diluted shares outstanding1,432.9 m11 Nov 2026Tables 11 and 14 per-share denominatorFiled | Presentation Nov 2026 | Ivanhoe at a glance | "Diluted Shares" | p.3
Derived
Kamoa-Kakula indicated resource exclusive of reserves, approximate21.87 Mt Cu31 Dec 2025Table 9 resource conversionDerived | kk-mii contained Cu minus kk-res contained Cu
Consolidated net debt, including reported cash$796.641 m30 Sep 2026Table 11 financingDerived | debt-lt and debt-st less cash
Incremental pro-rata Kamoa debt less cash$894.059 m30 Sep 2026Table 11 financingDerived | pro-rata-net-debt less net-debt-company
Dated market inputs
TSX:IVN closing priceC$6.3020 Nov 2026Tables 14 and 17 priceMarket | Stock Analysis / EODData | "TSX IVN closing price" | 20 Nov 2026
Bank of Canada USD/CADC$1.4325 per $120 Nov 2026Tables 9–17 currency conversionMarket | Bank of Canada | "FXUSDCAD" | 20 Nov 2026
LME cash copper average, 3, 6 and 12 months$6.48/lb; $6.35/lb; $6.05/lb20 Nov 2026Table 17 price deckMarket | Westmetall via Metal Pilot weekly data | "LME Copper Cash Settlement Price; daily means converted at 2,204.62262 lb/t" | 20 Nov 2026
LME cash copper low and high over 12 months$4.85/lb on 21 Nov 2025; $6.74/lb on 17 Aug 202620 Nov 2026Table 17 price range sanity checkMarket | Westmetall via Metal Pilot weekly data | "LME Copper Cash Settlement Price" | 20 Nov 2026

Source: FY2025 filings, Q3 2026 filings, the technical studies linked above and the dated market sources in the register.

10.2 Disclaimer & disclosure

This analysis is general information as of the date stated. It is not investment advice or a recommendation to buy, sell or hold securities. Commodity prices, exchange rates, operating performance and the cost of financing can move estimated values materially. Company guidance and report estimates may differ from realised results.

Metal Pilot prepared this analysis with AI assistance using the filings and market data identified above. Market data and scenario assumptions are dated.

As of 19 November 2026, the author holds no position in the company this analysis covers.