Gold Royalty (GROY) — Stock Analysis 2026 [3.1]

Gold Precious Metals Company Analysis
USD

Analysis as of 14 August 2026 (market data at the 13 August 2026 close). Gold Royalty stock analysis. Price deck: base gold US$4,500/oz — the representative trailing average on the fixed US$3,000–5,000/oz grid — with every grid price run as a scenario (extreme bear US$3,000, deep bear US$3,500, bear US$4,000, bull US$5,000), copper held at US$6.00/lb, and the 2026 guidance-year cash flow as a 0% cross-check — no spot price. Rating: ★★★ Average / Modestly overvalued (wide band) — blended fair value US$2.71 against the US$3.10 close, an implied −12.4%; the price implies about US$5,124/oz gold. Fundamentals from the Form 20-F for 2025 and the Q2 2026 interim statements and MD&A; refreshed on each annual report and on material events. For information only, prepared with AI assistance — see the disclaimer at the end.

Gold Royalty holds royalties and one copper stream on mines run by Agnico Eagle, IAMGOLD, BHP, DPM Metals and Aura Minerals, and in 2026 it began to earn like a royalty company: US$13.9 m of first-half revenue and US$3.6 m of net income, after a net loss in every fiscal year from 2021 to 2025. The thesis in one line: a small, debt-free book whose value rests on a filed outlook of 28,000–34,000 GEOs in 2030 against 5,173 in 2025 — and at US$3.10 the shares already pay for most of it. Why now: the 2026 guidance of 7,500–9,300 GEOs is the first test of that ramp, and the first half delivered 3,677. For the company-level data behind it — every royalty and streaming name side by side on margin, growth and concentration — see Metal Pilot’s royalty & streaming stock screener.

1. Snapshot & thesis

Archetype: metals royalty / streaming · sector: royalties & streaming — Gold Royalty operates no mine.

Figure 1. Gold Royalty in numbers

US$3.10 /sh
Share price — NYSE American, 13 Aug 2026
US$718 m
Market capitalisation — 231.7 m shares
US$2.08 /sh
NAV per share — base deck
US$2.71 /sh
Blended fair value — base case
−12.4%
Implied return to the blend
3.1/5
Quality rating — Average
Modestly overvalued
Valuation read — wide band
US$13.9 m
Revenue — H1 2026
3,677
GEOs — H1 2026
72.8%
Adjusted EBITDA margin — H1 2026, on total revenue
US$11.3 m
Net cash — no borrowings
7.5–9.3 k
2026 GEO guidance

Figure data: Gold Royalty Q2 2026 interim financial statements and MD&A; market data at the 13 Aug 2026 close (Yahoo Finance, NYSE American GROY); valuation per Section 7, rating per Section 9. Gold Royalty filings (SEC EDGAR).

Gold Royalty Corp. (NYSE American: GROY) owns royalties and streams and operates nothing; it reports in US dollars. Its Form 20-F summarises 14 interests in Québec, Ontario, Nevada, Alaska, Brazil, Mexico and Bosnia and Herzegovina — nine at production stage — and its Q2 2026 MD&A lists nine revenue lines, led by Pedra Branca and Borborema in Brazil, Côté in Ontario and the Vareš copper stream. It buys with cash, shares and partner capital: the Dundee royalty on Borborema (January 2026) was shared with the Taurus Mining Royalty Fund through Borborema LP.

Thesis in brief. Bull: no debt since 2025, US$11.3 m of net cash and a US$125 m revolver undrawn; first-half adjusted EBITDA of US$12.6 m; and a filed path from 5,173 GEOs in 2025 to 28,000–34,000 in 2030, more than five times the base. Bear: at the base deck the producing interests are worth US$0.67 a share and the growth row US$1.41 — 65.7% of enterprise NAV is an outlook the company does not split by asset; shares outstanding are 60.1% above the FY2023 weighted count; no dividend since 2023; Brazil is 46.1% of first-half revenue. What tips it: delivery of the outlook — the growth row’s factor at 0.75 instead of 0.55 adds US$0.51 to NAV/share and lifts the read to Fairly valued; on today’s book the price implies about US$5,124/oz gold.

Table 1. Gold Royalty in numbers

Metric Value As of
Share price · market capitalisation US$3.10 · US$718.2 m on 231.681 m shares (US$788.0 m on 254.192 m fully diluted) 13 Aug 2026
Enterprise value US$706.9 m (market capitalisation less US$11.3 m cash; no debt) 13 Aug 2026
Revenue (IFRS) US$13.9 m in H1 2026 · US$15.6 m in FY2025 30 Jun 2026
Adjusted EBITDA · margin US$12.6 m · 72.8% of US$17.3 m total revenue, land agreement proceeds and interest H1 2026
Gold-equivalent ounces 3,677 in H1 2026 · 5,173 in FY2025 30 Jun 2026
2026 guidance · 2030 outlook 7,500–9,300 GEOs · 28,000–34,000 GEOs 19 Mar 2026
Net cash US$11.3 m (no borrowings; US$125 m revolver undrawn) 30 Jun 2026
Dividend none since 2023 30 Jun 2026
NAV per share · P/NAV US$2.08 · 1.49× base deck, 14 Aug 2026
Blended fair value US$2.71 (US$1.41 extreme bear – US$3.02 bull) base deck, 14 Aug 2026
Quality rating ★★★ Average 14 Aug 2026
Valuation read · implied return Modestly overvalued (wide band) · −12.4% base deck, 14 Aug 2026 · Fairly valued above ~US$4,622/oz gold

Source: Gold Royalty Q2 2026 interim financial statements and MD&A, Form 20-F 2025, 2026 guidance release (19 Mar 2026); Yahoo Finance (NYSE American GROY close); Sections 7 and 9. Gold Royalty filings (SEC EDGAR).

How to read this analysis: the statcards, Table 1 and the verdict in Section 9 carry the conclusion; Sections 2–6 hold the evidence and Section 7 the valuation.

2. Assets & operations

Gold sets the deck for almost everything Gold Royalty owns; the Gold Complete Market Guide covers the market behind it.

2.1 Portfolio overview

Table 2. Interests by value — base case

Interest Country Stage Royalty / stream Q2 2026 revenue (US$000s) Underlying reserves Life in the model Unit cost Operator (listing) NAV (US$ m)
Borborema Brazil (Rio Grande do Norte) Production 2.75% NSR held at 31 Mar 2026; gold-linked loan; 0.5% NSR after 725,000 oz 2,125 812 koz P&P (31 Jul 2023) to the 725,000 oz step-down n/d Aura Minerals (TSX: ORA) 57.2
Pedra Branca Brazil (Pará) Production 25.0% NSR (Au), 2.0% NSR (other), as filed 2,340 n/d 10 years (assumed) n/d BHP (ASX/NYSE: BHP) 52.6
Côté Canada (Ontario) Production 0.75% NSR 1,132 n/d 15 years (assumed) US$1,100–1,200/oz cash cost (2025 guidance) IAMGOLD (NYSE: IAG) 34.2
Vareš Bosnia and Herzegovina Production 100% copper stream (Rupice), 30% of LME copper paid 1,037 n/d 12 years (assumed) n/d DPM Metals (TSX: DPM) 18.3
Cozamin · Borden · Canadian Malartic · County Line · others Mexico · Canada · USA Production 0.5–3.0% NSR 1,299 n/d 5–15 years (assumed) n/d Capstone Copper (TSX: CS) · Discovery Silver (TSX: DSV) · Agnico Eagle (NYSE: AEM) 24.5
Growth to the 2030 outlook portfolio Development the filed GEO outlook, risked 0.55 — — ramp to 2030, held to 2040 — — 358.1
Exploration-stage royalties Canada · USA Exploration Fenelon, REN, South Railroad, Tonopah West, Whistler — — — — Wallbridge · Nevada Gold Mines · Orla · Blackrock Silver · U.S. GoldMining 0.0
Total 7,933 544.8

Source: Form 20-F 2025, Item 4 summary table (p.24–25) and reserve summary (p.32); Q1 2026 interim FS note 4; Q2 2026 MD&A, revenue by asset (p.8); Q3 2025 MD&A (Côté cost); NAV from Section 7 (Table 9). Revenue is total revenue, land agreement proceeds and interest (non-IFRS). Gold Royalty filings (SEC EDGAR).

Brazil carries the book today: Borborema and Pedra Branca earned 56.3% of second-quarter revenue and are 58.8% of the producing interests’ value. Two-thirds of enterprise NAV, though, is the growth row — ounces the company guides to but does not assign to assets.

2.2 Revenue split

Figure 2. Revenue by metal, Q2 2026

Gold interests
Copper (Vareš, Cozamin)
82.0%
18.0%
Share of Q2 2026 total revenue, land agreement proceeds and interest (US$7.9 m) by the metal each interest is decked on

Figure data: Q2 2026 MD&A, revenue by asset (p.8); Cozamin’s copper-silver royalty is counted with copper, as the valuation decks it. Gold Royalty filings (SEC EDGAR).

Figure 3. Revenue by asset, Q2 2026

Pedra Branca
Borborema
Côté
Vareš
Cozamin
Borden
County Line
Canadian Malartic
Other interests
29.5%
26.8%
14.3%
13.1%
4.9%
4.6%
1.7%
1.1%
4.0%
Share of Q2 2026 total revenue, land agreement proceeds and interest (US$7.9 m); other interests is the filed line

Figure data: Q2 2026 MD&A, revenue by asset (p.8). Gold Royalty filings (SEC EDGAR).

Total revenue, land agreement proceeds and interest rose 79.8% on Q2 2025 (US$7.9 m from US$4.4 m), led by Pedra Branca, bought in December 2025.

2.3 Borborema (Aura Minerals, Brazil)

Aura’s open-pit gold mine in Rio Grande do Norte produced 14,251 GEOs in Q2 2026. The 20-F lists 2.0% and 0.75% NSRs plus a royalty convertible (gold-linked) loan; the holding was 2.75% at 31 March 2026. The royalty steps down to 0.5% after 725,000 oz, and 0.5% can be bought back for US$2.5 m; a further step-down (1.0% after 1.5 Moz, ending after 2.0 Moz) is footnoted to the same row without saying which royalty it binds. In January 2026 Gold Royalty bought Dundee’s Borborema royalty for US$45 m (US$30 m cash and 3,571,429 shares) and placed it in Borborema LP, in which Taurus holds 49.9978%; the stake is equity-accounted at US$22.6 m. Reserves are 22,455 kt at 1.12 g/t for 812 koz proven and probable (effective 31 July 2023), with 1,178 koz measured and indicated and 394 koz inferred besides. Revenue was US$2.1 m in the quarter (US$1.2 m a year earlier). The asset risk is the step-down: at Aura’s rate it arrives in about thirteen years.

2.4 Pedra Branca (BHP, Brazil)

Bought from Blackrock World Mining Trust on 12 December 2025, Pedra Branca was already the largest payer in Q2 2026 at US$2.3 m. The 20-F prints the royalty as 25.0% NSR on gold and 2.0% on other metals; BHP’s reserves and mine life are not in Gold Royalty’s filings, so the model assumes ten years — the asset risk, worth US$0.07 a share if the life is fifteen.

2.5 Côté (IAMGOLD, Ontario)

A 0.75% NSR on IAMGOLD’s Côté Gold mine, which earned US$4.2 m in FY2025 (US$1.1 m in FY2024) and US$1.1 m in Q2 2026. IAMGOLD guided 2025 cash costs of US$1,100–1,200/oz. The model assumes fifteen years in the absence of a reserve statement in the filings.

2.6 Vareš (DPM Metals, Bosnia and Herzegovina)

A stream on 100% of the copper from the Rupice area, for which Gold Royalty pays 30% of the LME spot price; first-half cost of sales of US$0.6 m is that payment. Vareš produced about 35,000 GEOs in Q2 2026, including 1.3 M lb of copper; the stream earned US$3.2 m in FY2025 and US$1.0 m in the quarter. The asset risk is jurisdiction: it is Gold Royalty’s only interest in Bosnia and Herzegovina.

2.7 Other interests and the pipeline

Cozamin (Capstone Copper, Mexico; 1.0% NSR on copper and silver), Borden (Discovery Silver, Ontario; 0.5% NSR), County Line and the Canadian Malartic complex (Agnico Eagle, Québec; 2.0–3.0% NSRs on the open pit and 3.0% on the Odyssey underground) earned US$1.0 m between them in Q2 2026, Malartic only US$0.1 m — yet the 20-F puts the Malartic royalties at 38.6% of total assets at 31 December 2025. That value rests on Agnico’s ramp, guided to midpoints of 590,000, 655,000 and 735,000 oz in 2026–2028; Section 7 carries Odyssey’s share in the growth row. Granite Creek (i-80 Gold, 10.0% NPI) is at production stage; REN (Nevada Gold Mines; 1.5% NSR and 3.5% NPI, plus 0.1875% bought for US$6.25 m in June 2026), Fenelon (Wallbridge, 2.0%), South Railroad (Orla, 0.44%), Tonopah West (Blackrock Silver, 3.0%) and Whistler (U.S. GoldMining, 1.0%) are exploration-stage. The Sterling and Granite Creek pit royalties bought on 13 July 2026 for US$0.8 m fall after the balance-sheet date.

2.8 Production, reserves & costs

GEOs slipped from 5,462 in FY2024 to 5,173 in FY2025, then reached 3,677 in the first half of 2026 — 43.8% of the guidance midpoint. The realised price was US$4,515 per GEO in Q2 2026. Reserves are the operators’ and only Borborema’s is summarised in the 20-F; unit costs are the operators’ and not filed by Gold Royalty beyond Côté’s guidance.

Figure 4. GEOs, FY2024 to the 2030 outlook

GEOs
35,000
28,000
21,000
14,000
7,000
0
5,462
5,173
8,400
31,000
FY2024
FY2025
2026 guidance mid
2030 outlook mid
Fiscal year (ended 31 December); the last two columns are company guidance, not results

Figure data: Form 20-F 2025 (p.42); 2026 guidance release, 19 Mar 2026 (p.1). Gold Royalty filings (SEC EDGAR).

2.9 Peer positioning

Peers: OR Royalties (TSX/NYSE: OR), Triple Flag (TSX/NYSE: TFPM), Metalla (TSX/NYSE American: MTA) and, for margin, Altius (TSX: ALS) — royalty companies on precious and base metals, none in a pending takeover at the as-of date.

Table 3. Peer quality metrics, FY2025

Company Listing GEOs (change on FY2024) Adjusted EBITDA ÷ revenue Revenue from Canada, USA and Australia Credit facility
Gold Royalty NYSE American: GROY 5,173 (−5.3%) 62.5% 33.9% (H1 2026) US$125 m undrawn + US$25 m accordion
OR Royalties TSX/NYSE: OR 80,775 (+0.0%) n/d on this basis 73.9% US$650 m undrawn + US$200 m accordion
Triple Flag TSX/NYSE: TFPM 113,237 (+0.5%) 83.6% 49.5% US$0 m drawn of US$1.0 bn
Metalla TSX/NYSE American: MTA 3,436 (+38.5%) 39.7% n/d n/d
Altius TSX: ALS n/d (no GEOs) 65.6% 8 of 13 operating mines in Canada n/d

Source: Form 20-F 2025 (p.42, p.54); Q2 2026 interim FS note 8 and note 15; OR Royalties MD&A and FS 2025; Triple Flag MD&A, FS and AIF 2025; Metalla MD&A 2025; Altius MD&A 2025. Gold Royalty filings (SEC EDGAR).

Gold Royalty is the smallest producer but Metalla, and the only one whose GEOs fell in 2025; its margin sits mid-set and its revenue is the least North American.

3. Financials & balance sheet

Table 4. Five-year financial summary (US$ m)

Line FY Sep-2021 CY2022 FY2023 FY2024 FY2025 H1 2026
Revenue 0.2 4.0 3.0 10.1 15.6 13.9
YoY % — n/m (note 1) −23.7% +231.5% +54.5% n/d
Adjusted EBITDA margin (on total revenue) n/d n/d n/d (note 2) 37.2% 54.9% 72.8%
Net income (loss) (15.0) (12.7) (26.8) (3.4) (4.1) 3.6
EPS, basic and diluted (US$) (0.45) (0.09) (0.18) (0.02) (0.02) n/d
Operating cash flow n/d (note 3) (15.8) (6.9) 2.5 6.2 8.2
Capex: sustaining / growth (royalty purchases) nil / n/d nil / 19.4 nil / 28.7 nil / 46.1 nil / 73.0 nil / 36.9
FCF after royalty purchases n/d (35.2) (35.6) (43.6) (66.8) (28.7)
Net debt (cash) n/d n/d n/d n/d (12.4) (11.3)
ND/EBITDA n/d n/d n/d n/d net cash net cash
Weighted shares, diluted (m) n/d 136.8 144.7 159.5 175.0 239.3 (Q2)
Dividends paid (US$ m) nil 5.5 2.6 nil nil nil

Source: Form 20-F 2025 (p.42, p.54, p.106, p.108); Form 20-F 2023 (p.48, p.55, p.56); Q2 2026 MD&A (p.3) and interim FS (p.2, p.5, note 9). Notes: (1) the fiscal year-end moved from 30 September to 31 December in December 2022, so CY2022 is not compared with FY Sep-2021; (2) cash operating expenses exceeded total revenue in FY2023 (US$8.0 m against US$5.2 m) and CY2022; (3) only operating cash flow before working capital, (10.3), is printed. Gold Royalty filings (SEC EDGAR).

Revenue grew five-fold in two years as Côté, Borborema, Vareš and then Pedra Branca came into production, and the margin on total revenue rose from 37.2% to 72.8% in the first half of 2026. The net line lagged: FY2024’s loss includes a US$6.5 m deferred-tax recovery and FY2023’s a US$22.4 m impairment, while FY2025 operating cash flow of US$6.2 m set against a US$4.1 m net loss reflects depletion and deferred tax. Every year’s royalty purchases exceeded operating cash flow — the gap was funded with shares and, until 2025, debt.

Cost deck. A royalty holder carries no mine cost; the only cost of sales is the Vareš payment, 4.3% of first-half revenue. Corporate overhead was US$2.0 m in Q2 2026, 25.7% of the quarter’s total revenue. Current tax was US$0.1 m in the half; US$36.2 m of Canadian loss carryforwards run to 2040–2044, against a US$120.7 m deferred tax liability.

Net debt and liquidity. At 30 June 2026 Gold Royalty had US$11.3 m of cash, no borrowings and US$0.2 m of leases; the credit facility was repaid and the convertible debentures redeemed in 2025. The revolver, raised to US$125 m with a US$25 m accordion in February 2026, is undrawn at SOFR plus 2.25–3.25% to November 2028, with leverage and interest-cover covenants met. With net cash, the debt ratio holds at any deck on the grid. There is no rehabilitation provision and no hedge book — commodity or currency.

Capital returns. A quarterly dividend began in January 2022 (US$5.5 m paid in CY2022, US$2.6 m in FY2023) and stopped; no buybacks are recorded. Shares: 231,680,715 outstanding in August 2026, plus 1,825,335 RSUs, 6,043,279 options and 14,643,027 warrants — 254,192,356 fully diluted. The Financial Metrics guide explains the margin and cash-flow lines used here.

4. Management, strategy & structure

4.1 Management & governance

David Garofalo has led Gold Royalty since 2020 as Chairman and CEO; John Griffith, Chief Development Officer, added the President’s role on 6 May 2026. Andrew Gubbels, Senior Vice President of Corporate Development at Aris Gold from July 2020 to September 2022, has been CFO since 1 January 2023. The board has six directors — Garofalo, Warren Gilman, Robertson, Hair, Howlett and Johnson — five of them independent, with Audit, Compensation, and Nominating and Corporate Governance committees. The chair is not independent. Related party: Queen’s Road Capital, whose chairman and CEO is director Gilman, subscribed the US$30 m 2023 convertible debentures, redeemed in 2025.

4.2 Strategy

Gold Royalty grows by buying existing royalties and streams, paid in cash, shares and partner capital: the Taurus Mining Royalty Fund co-invests under a mutual cooperation agreement, as in Borborema LP. The dated targets are the 19 March 2026 guidance — 7,500–9,300 GEOs in 2026 — and the outlook of 28,000–34,000 GEOs in 2030.

4.3 Ownership & structure

Holders at 18 March 2026: Tether Investments 13.13% (30.3 m shares), GoldMining Inc. 9.33%, Queen’s Road Capital 6.97%, directors and officers 3.75%. Recent deals, largest first: Borborema (Dundee, January 2026, US$45 m in cash and shares); Pedra Branca (Blackrock World Mining Trust, December 2025); REN (June 2026, US$6.25 m); Sterling and Granite Creek pits (July 2026, US$0.8 m). The one joint venture is Borborema LP. The 14,643,027 warrants had 0.92 years to run at 30 June 2026. Shares trade on NYSE American.

5. ESG & sustainability

As a non-operator Gold Royalty files no safety rate, tailings or emissions figure; those records belong to Agnico Eagle, BHP, IAMGOLD and the other operators and are not reproduced here. It published its first sustainability report in 2023 and a 2025 Integrated Report in June 2025. No named program or target with a baseline is filed, so the ESG score rests on disclosure, not outcomes.

6. Risks

Table 5. Risk register

Risk Type Likelihood / impact Exposure Mitigant
Gold price reversion Commodity Med / High Base US$4,500/oz is 73% above the US$2,601 five-year average; each US$500 step moves the blend US$0.31 Royalties bear no operating cost
Growth outlook delivery Execution / counterparty Med / High Growth row 65.7% of enterprise NAV; at a 0.35 factor NAV/share falls US$0.51 Risked at 0.55; 2026 guidance is the first test
Operator lives Operational Med / Med Lives assumed for every interest but Borborema Large listed operators (BHP, IAMGOLD, DPM)
Brazil concentration Jurisdiction Med / Med Brazil 46.1% of H1 2026 revenue Two operators, Aura and BHP
Canadian Malartic / Odyssey ramp Single-asset concentration Med / Med Malartic royalties 38.6% of total assets (Form 20-F 2025, p.8) against US$0.1 m of Q2 2026 revenue; the ramp sits in the growth row Agnico Eagle’s guided ramp to 735,000 oz in 2028
Vareš jurisdiction Jurisdiction Low / Med Bosnia and Herzegovina 14.4% of H1 2026 revenue Operator DPM Metals
Dilution Dilution High / Med Shares 60.1% above the FY2023 weighted count; 14.6 m warrants Undrawn US$125 m revolver
Corporate overhead Balance sheet High / Low 25.7% of Q2 2026 total revenue; US$60.1 m capitalised in the NAV Revenue growth spreads it
Borborema step-down Contractual High / Low 0.5% NSR after 725,000 oz Reserve of 812 koz sits just above it
Operator ESG ESG Low / Med No influence over operators’ safety or tailings Established operators

Source: Sections 2–4 and 7 of this analysis; Q2 2026 interim FS and MD&A, Form 20-F 2025. Likelihood and impact are the author’s assessment. Gold Royalty filings (SEC EDGAR).

Section 7 prices the first four: the gold deck, the risked growth row, the assumed lives and, through the target multiples, the jurisdictions.

Figure 5. Risk matrix — likelihood against impact

Impact if it happens
High
Medium
Low
Gold reversion
Growth outlook
Operator lives
Brazil concentration
Malartic concentration
Vareš jurisdiction
Dilution
Corporate overhead
Borborema step-down
Operator ESG
Low
Medium
High
Likelihood →

Source: this analysis, per the risk register (Table 5). Gold Royalty filings (SEC EDGAR).

7. Valuation

Valuation as of 14 August 2026, in US dollars. Horizon: spot fair value. Gold deck: US$3,000, 3,500, 4,000, 4,500 and 5,000/oz, base US$4,500/oz — the trailing averages of the COMEX front-month gold price (3-month US$4,248.69, 6-month US$4,546.12, 12-month US$4,354.63, to 13 August 2026) snapped to the grid: the 6- and 12-month averages sit nearest US$4,500 and the 3-month on the midpoint. Second deck: copper US$6.00/lb (3-month US$6.3455, 6-month US$6.0968, 12-month US$5.6285, the same series), held in every scenario — 4.7% of enterprise NAV. Discount rate 5% real after-tax. Share basis 254.192 m fully diluted (shares, RSUs, options and warrants); market data at the 13 August 2026 close (US$3.10 on NYSE American).

Gold Royalty is valued as a metals royalty company with the method set of the commodity stock valuation guide: a portfolio net asset value at the target P/NAV (55%) and a forward P/CF (45%). The guide’s third method carries no weight in this version — yield support needs a dividend and Gold Royalty has paid none since 2023, and EV per GEO has no sourced anchor on file — so its share goes to the other two.

The portfolio is valued interest by interest. Each producing royalty and the Vareš copper stream starts from its second-quarter 2026 revenue in the revenue-by-asset table, annualised and moved to the deck — the gold interests from Gold Royalty’s own Q2 2026 realised price of US$4,515 per GEO, Vareš and Cozamin from the Q2 2026 COMEX copper average — with Vareš net of its 30% ongoing payment, then taxed at the 27% statutory Canadian rate with no shield and discounted over its mine’s life. Borborema’s life is derived from the 725,000 oz step-down in its royalty and Aura’s rate of about 57,000 oz a year; the other lives are stated assumptions, each bounded in the assumptions box. The growth the company files — 7,500–9,300 GEOs in 2026, rising to 28,000–34,000 in 2030 — is one development row: the ounces above the 7,028-GEO run-rate, ramped straight to the 2030 midpoint, held ten years and risked at 0.55 because the release does not split them by asset. That row carries two-thirds of enterprise NAV. The Borborema LP joint venture enters at its carrying value, and the exploration-stage royalties carry no value.

The base gold price sits 73% above the US$2,601 five-year average, so the target multiples are held at the same level in every scenario and only the deck moves.

Table 6. Load-bearing inputs — the filed figures the valuation moves on

Input Value Where §7 uses it Source
Revenue by asset, Q2 2026 (US$000s) Pedra Branca 2,340 · Borborema 2,125 · Côté 1,132 · Vareš 1,037 · Cozamin 391 Table 9 blocks 1–5: the revenue base Filed | Q2 2026 MD&A | Discussion of Operations | “Pedra Branca | 2,340” | p.8; Filed | Q2 2026 MD&A | Discussion of Operations | “Borborema | 2,125” | p.8; Filed | Q2 2026 MD&A | Discussion of Operations | “Côté | 1,132” | p.8; Filed | Q2 2026 MD&A | Discussion of Operations | “Vareš | 1,037” | p.8; Filed | Q2 2026 MD&A | Discussion of Operations | “Cozamin | 391” | p.8 — full register Table 19
Total revenue and GEOs, Q2 2026 US$7,933k · 1,757 GEOs Table 9: the realised price per GEO and the run-rate Filed | Q2 2026 MD&A | Discussion of Operations | “7,933 | 4,412” | p.8; Filed | Q2 2026 MD&A | Financial and Operating Highlights | “Gold Equivalent Ounces” | p.3 — full register Table 19
Vareš stream — ongoing payment 30% of LME spot copper Table 9 block 4: the stream cost Filed | Form 20-F 2025 | Item 4 | Summary Disclosure, note 6 | “The Vareš copper stream applies to 100% of copper production” | p.25 — full register Table 19
Borborema — Aura production, Q2 2026, and the royalty step-down 14,251 GEOs · step-down after 725,000 oz Table 9 block 2: the life Filed | Q2 2026 MD&A | Selected Asset Updates | “Borborema produced 14,251 gold equivalent ounces” | p.4; Filed | Form 20-F 2025 | Item 4 | Summary Disclosure, note 2 | “Royalty to decrease to a 0.5% NSR after 725,000 oz of gold production” | p.25 — full register Table 19
GEO guidance 2026 and outlook 2030 2026 7,500–9,300 · 2030 28,000–34,000 Table 9 block 10: the growth row Filed | 2026 guidance release | 2026 Guidance and Five-Year Outlook | “Total GEOs are currently expected to increase to 7,500-9,300 in 2026” | p.1; Filed | 2026 guidance release | 2026 Guidance and Five-Year Outlook | “GEOs are forecasted to increase to between 28,000 and 34,000 GEOs in 2030” | p.1 — full register Table 19
Cost of sales and revenue, H1 2026 (US$000s) cost of sales 603 · revenue 13,910 Table 9 block 10: the stream-cost share Filed | Q2 2026 interim FS | Statements of Income | “Cost of sales excluding depletion” | p.3; Filed | Q2 2026 MD&A | Financial and Operating Highlights | “Revenue | 6,732” | p.3 — full register Table 19
General and administrative, Q2 2026 (US$000s) 2,039 Table 11: capitalised G&A · Table 13 Filed | Q2 2026 MD&A | Discussion of Operations | “Corporate administrative costs” | p.8 — full register Table 19
Cash, 30 Jun 2026 (US$000s); no debt 11,333 Table 11: net cash line Filed | Q2 2026 interim FS | Statement of Financial Position | “Cash and cash equivalents” | p.2 — full register Table 19
Investments and the Borborema LP joint venture, 30 Jun 2026 (US$000s) 2,804 · 2,519 · 22,602 Table 11: investments line Filed | Q2 2026 interim FS | Statement of Financial Position | “Short-term investments” | p.2; Filed | Q2 2026 interim FS | Statement of Financial Position | “Long-term investments” | p.2; Filed | Q2 2026 interim FS | Statement of Financial Position | “Investment in joint venture” | p.2 — full register Table 19
Fully diluted count (shares, RSUs, options, warrants) 254,192,356 Table 11: per-share basis Derived | shares + RSUs + options + warrants — full register Table 19
Gold trailing averages, 3 / 6 / 12 months to 13 Aug 2026 US$4,248.69 · US$4,546.12 · US$4,354.63/oz the base deck Market | Yahoo Finance | “GC=F daily close” | 13 Aug 2026 — full register Table 19
Copper trailing averages, 3 / 6 / 12 months to 13 Aug 2026 US$6.3455 · US$6.0968 · US$5.6285/lb the copper deck (held) Market | Yahoo Finance | “HG=F daily close” | 13 Aug 2026 — full register Table 19
Gold five-year average (monthly) US$2,601/oz mid-cycle: multiples held Market | World Bank | “Pink Sheet monthly prices — Gold” | Aug 2021 – Jul 2026 — full register Table 19

Source: the filings and market series named in each row; the full source register is Table 19 in Section 10.1. Gold Royalty filings (SEC EDGAR).

Metal Pilot Premium

Valuation workings — Premium

The workings behind this valuation — the method, the models, the sensitivity grids and the scenarios, 10 tables and 3 figures in all — are for Metal Pilot Premium members.

  • 7.1 Method selection
  • 7.2 Net asset value
  • 7.3 Target multiples
  • 7.4 P/CF
  • 7.5 Scenarios & fair value

Want to see one first? The Newmont (NEM) valuation is open to every reader.

Create a Metal Pilot accountLog in

See Premium plansRead a free example

You are signed in, and your plan does not include valuation workings. They come with Metal Pilot Premium.

Upgrade to Premium

The premium section could not be loaded right now.

Premium — unlocked

8. Near-term catalysts (1–3 years)

The next three years test whether the filed ramp turns into reported ounces.

Table 17. Near-term catalysts (1–3 years)

Catalyst Expected timing Why it benefits Gold Royalty
2026 guidance delivery (7,500–9,300 GEOs) FY2026 results H1 2026 delivered 3,677 GEOs, 43.8% of the midpoint
Canadian Malartic ramp (Agnico Eagle) 2026–2028 Guided midpoints 590,000 → 655,000 → 735,000 oz; the 3.0% Odyssey NSR rises with the underground
Operators’ reserve statements (BHP, IAMGOLD, DPM Metals, Capstone, Discovery Silver) with their annual reports Replace the assumed lives; each longer life adds US$0.02–0.07 a share
Progress towards the 2030 outlook (28,000–34,000 GEOs) 2027–2030 An asset split would let the growth row’s 0.55 factor rise — at 0.75 NAV/share gains US$0.51
Nevada royalties bought 13 Jul 2026 (Sterling, Granite Creek pits) from 2026 Not in the valuation (after the balance-sheet date)
Warrant expiry (14.6 m warrants, 0.92 years left at 30 Jun 2026) by mid-2027 Exercise brings cash; the strike is n/d in the filings read

Source: 2026 guidance release (19 Mar 2026); Form 20-F 2025 (p.45); Q2 2026 MD&A (p.3) and interim FS note 9; Section 7 gap register (Table 16). Timing follows public guidance and is not guaranteed. Gold Royalty filings (SEC EDGAR).

9. Rating & verdict

Gold Royalty is a metals royalty / streaming company (royalties & streaming sector), scored on the royalty weighting — Dims 1, 4, 6 and 7 at 15% each, the other five at 8%, none N/A — against OR Royalties, Triple Flag, Metalla and Altius (Section 2.9).

Figure 9. Scorecard by dimension, 14 August 2026

Growth★★★★15%
Assets & scale★★★15%
Management★★★15%
Capital allocation★★15%
Balance sheet★★★★8%
Cost & margins★★★8%
Reserves & life★★★8%
Jurisdiction★★★8%
ESG★★★8%
Score by dimension Weighted composite ★★★ (3.08)
Each ring is one star; the outer ring is ★★★★★. Weights in Table 18.

Figure data: Table 18. Each spoke prints its stars and weight; the dashed ring is the weighted composite, 3.08/5.

Table 18. The Gold Royalty scorecard

Dimension Weight Score Weighted Rationale (metric · figure · peer reference · source, date)
Growth & optionality 15% ★★★★ 0.60 2026 guidance 7,500–9,300 GEOs (+45–80% on FY2025’s 5,173) and a 2030 outlook of 28,000–34,000; FY2025 GEOs fell 5.3% · FY2025 GEO growth Metalla +38.5%, Triple Flag +0.5%, OR +0.0% — the outlook leads the set but is not split by asset, so not five stars · guidance release 19 Mar 2026; Form 20-F 2025
Asset quality & scale 15% ★★★ 0.45 Royalties on mines run by Agnico Eagle, IAMGOLD, BHP, DPM Metals, Aura and Capstone; Pedra Branca and Borborema 56.3% of Q2 2026 revenue · 5,173 GEOs in FY2025 against OR’s 80,775 and Triple Flag’s 113,237, above Metalla’s 3,436 · Form 20-F 2025; Q2 2026 MD&A
Management & governance 15% ★★★ 0.45 David Garofalo Chairman and CEO since 2020 (President’s role passed to John Griffith, May 2026); five of six directors independent; QRC, a director’s company, held the US$30 m debentures redeemed in 2025; insiders 3.75% · peer boards n/d · Form 20-F 2025, 18 Mar 2026
Capital allocation & returns 15% ★★ 0.30 No dividend since 2023; shares 231.7 m in August 2026 against a 144.7 m FY2023 weighted count, alongside US$147.8 m of royalty purchases in FY2023–25; net losses every year to FY2025 · peers’ return records n/d · Form 20-F 2025; Q2 2026 MD&A
Balance sheet & liquidity 8% ★★★★ 0.32 No debt since 2025; net cash US$11.3 m; US$125 m revolver and US$25 m accordion undrawn to November 2028 · OR US$650 m and Triple Flag US$1.0 bn undrawn — debt-free like the seniors, with less cash behind it · Q2 2026 interim FS, 30 Jun 2026
Cost position & margins 8% ★★★ 0.24 Adjusted EBITDA 62.5% of revenue in FY2025; Vareš payment 4.3% of H1 2026 revenue; counterparties Agnico Eagle, BHP, IAMGOLD · Triple Flag 83.6%, Altius 65.6%, Metalla 39.7% — mid-set · Form 20-F 2025
Reserves, life & replacement 8% ★★★ 0.24 Borborema 812 koz proven and probable (31 Jul 2023); the other operators’ reserves not summarised in the 20-F; Malartic guided to 735,000 oz in 2028 · no peer portfolio life in the facts — scored on Gold Royalty’s own · Form 20-F 2025 p.32, p.45
Jurisdiction & geopolitics 8% ★★★ 0.24 H1 2026 revenue Brazil 46.1%, Canada 24.6%, Bosnia and Herzegovina 14.4%, USA 9.2%, Mexico 5.5% · Canada, USA and Australia 33.9% against OR 73.9% and Triple Flag 49.5% — the lowest, hence −0.01 in the target multiples · Q2 2026 interim FS note 15
ESG & licence to operate 8% ★★★ 0.24 2025 Integrated Report (June 2025), sustainability reporting since 2023; no safety, tailings or emissions figure (non-operator) · peer disclosure not compared · release 9 Jun 2025
Composite 100% ★★★ 3.08 Average

Σ(weight × stars) = 0.60 + 0.45 + 0.45 + 0.30 + 0.32 + 0.24 + 0.24 + 0.24 + 0.24 = 3.08/5 → rounded to the half-star, ★★★ Average.

Source: the Metal Pilot Company Scorecard, royalty / streaming weighting; evidence in Sections 2–7. Gold Royalty filings (SEC EDGAR).

The two-axis verdict (14 August 2026). Quality ★★★ Average × Value Modestly overvalued (wide band) → Full. The blended fair value of US$2.71 against the US$3.10 price is an implied return of −12.4%, US$0.08 under the Fairly valued edge, and the share price implies about US$5,124/oz gold on today’s book — just under the 12-month high of US$5,318.40. The target multiples carry the scorecard: Dim 5’s +0.02 against −0.02 for Dim 6 and −0.01 for Dim 8, a net −0.01 that sets them at 1.88 times NAV and 19.8 times cash flow. The bull case is a debt-free book whose cash flow has finally turned; the bear case is a price that already counts most of an outlook nobody has split by mine, after years of dilution. What tips it: gold above ~US$4,622/oz, or proof of the ramp — a 0.75 factor on the growth row lifts the read to Fairly valued; below ~US$3,617/oz it falls to Overvalued.

To screen Gold Royalty against every royalty and streaming company on margin, growth and diversification, use Metal Pilot’s royalty & streaming stock screener.

10. Sources, methodology & disclaimer

10.1 Sources, methodology & data vintage

Sources. Company filings: Form 20-F for 2025 (18 March 2026), 2024 and 2023; interim financial statements and MD&A for Q1 and Q2 2026 and the 2024–2025 quarters; the 2026 guidance and five-year outlook release (19 March 2026); the board release of 6 May 2026; the 2025 Integrated Report release (9 June 2025). Peers: OR Royalties, Triple Flag, Metalla and Altius FY2025 MD&As, financial statements and AIFs. Market: Yahoo Finance daily closes for GROY (NYSE American), COMEX gold (GC=F) and copper (HG=F) to 13 August 2026; World Bank Pink Sheet monthly prices; Bank of Canada USD/CAD.

Methodology. Data as of 14 August 2026, market data at the 13 August 2026 close. Gold deck on the fixed grid US$3,000, 3,500, 4,000, 4,500 and 5,000/oz, base US$4,500 from the 3-, 6- and 12-month COMEX averages; copper US$6.00/lb, held; 5% real after-tax. Weights: portfolio NAV at target P/NAV 55%, P/CF 45%; yield support and EV/GEO unweighted. Scorecard on the royalty weighting against OR Royalties, Triple Flag, Metalla and Altius. The deck sensitivity, P/NAV map, copper cases and cross-checks are in the model’s out file (claude/valuation-models/gold-royalty-groy.out.md). Refreshed on each annual report and on material events.

Re-run log. 14 August 2026: first published — 3.4/5 Solid, Fairly valued (wide band). 19 October 2026: rebuilt on the reset template with a per-interest valuation model, a US$4,500/oz gold base (from US$4,000), a 5% real rate, copper at US$6.00/lb and the filed 2030 outlook as one risked growth row; blended fair value US$2.71, implied −12.4%, read moved to Modestly overvalued (wide band) from Fairly valued (wide band); NAV/share US$2.08; market-implied gold ~US$5,124/oz; composite 3.1/5 Average (from 3.4 Solid). 19 October 2026 (pre-launch fixes): the Canadian Malartic concentration (38.6% of total assets) added to Section 2.7 and the risk register, peer figures moved out of Section 7, Borborema’s undeducted ounces stated as a bound, filing labels corrected; no model input moved — NAV/share US$2.08, blend US$2.71, implied −12.4%, read unchanged. The old portfolio count (~240 interests) and approximate peer figures were dropped as not in the filings read.

Omitted and open. The asset map is not built. Not in the documents checked: reserves, lives and unit costs at every mine but Borborema (and Côté’s 2025 cost guidance) — the operators’ YE2025 statements close them; the outlook’s split by asset; which Borborema royalty the second step-down binds; the Pedra Branca terms beyond the 20-F’s summary line; warrant and option strikes; the income-tax note’s rate; adjusted EBITDA before FY2024 and FY2024 net debt; analyst consensus; Royal Gold and Elemental as peers (not extracted). Table 6 lists the inputs the valuation moves on; Table 19 is the full register, in document order.

Table 19. Full source register for the valuation

InputValueAs ofWhere §7 uses itSource
Form 20-F 2025
Borden Mine — Discovery Silver, Ontario, Canada (Production Stage)0.5% NSR18 Mar 2026Filed | Form 20-F 2025 | Item 4 | Summary Disclosure | "Borden Mine" | p.24
Borborema Mine — Aura Minerals, Rio Grande do Norte, Brazil (Production Stage)2.0% NSR, 0.75% NSR and royalty convertible loan18 Mar 2026Filed | Form 20-F 2025 | Item 4 | Summary Disclosure | "Borborema Mine" | p.24
Canadian Malartic Property (open pit) — Agnico Eagle, Québec, Canada (Production Stage)2.0% - 3.0% NSR18 Mar 2026Filed | Form 20-F 2025 | Item 4 | Summary Disclosure | "Canadian Malartic Property (open pit)" | p.24
Canadian Malartic Property - Odyssey mine — Agnico Eagle, Québec, Canada (Production Stage)3.0% NSR (underground)18 Mar 2026Filed | Form 20-F 2025 | Item 4 | Summary Disclosure | "Canadian Malartic Property - Odyssey mine" | p.24
Côté Gold Mine — IAMGOLD, Ontario, Canada (Production Stage)0.75% NSR18 Mar 2026Filed | Form 20-F 2025 | Item 4 | Summary Disclosure | "Côté Gold Mine" | p.24
Cozamin Mine — Capstone Copper, Zacatecas, Mexico (Production Stage)1.0% NSR (Cu, Ag)18 Mar 2026Filed | Form 20-F 2025 | Item 4 | Summary Disclosure | "Cozamin Mine" | p.24
Pedra Branca Mine — BHP Group Limited, Pará, Brazil (Production Stage)25.0% NSR (Au), 2.0% NSR (other)18 Mar 2026Pedra Branca 25.0% kept as filed; valued on its revenueFiled | Form 20-F 2025 | Item 4 | Summary Disclosure | "Pedra Branca Mine" | p.25
Vareš Mine — DPM Metals Inc., Bosnia and Herzegovina (Production Stage)100% Stream (Cu)18 Mar 2026Filed | Form 20-F 2025 | Item 4 | Summary Disclosure | "Vareš Mine" | p.25
Borborema royalty step-down and buyback (20-F footnote 2)decrease to 0.5% NSR after 725,000 oz; 0.5% NSR buyback for US$2.5 m18 Mar 2026Filed | Form 20-F 2025 | Item 4 | Summary Disclosure, note 2 | "Royalty to decrease to a 0.5% NSR after 725,000 oz of gold production" | p.25
Vareš stream — coverage and ongoing payment100% of copper from the Rupice area; ongoing payment 30% of LME spot copper18 Mar 2026Filed | Form 20-F 2025 | Item 4 | Summary Disclosure, note 6 | "The Vareš copper stream applies to 100% of copper production" | p.25
Borborema Mineral Reserves, Proven + Probable (eff. 31 Jul 2023)22,455 kt @ 1.12 g/t Au (812 koz Au)31 Jul 2023Filed | Form 20-F 2025 | Item 4 | Mineral Resources and Mineral Reserves | "Borborema Mine (1)(2)" | p.32
Cash provided by (used in) operating activities, FY2025 / FY2024 / FY20236,170 · 2,543 · (6,876)31 Dec 2025Filed | Form 20-F 2025 | Item 5 | Selected Annual Information | "Cash provided by (used in) operating activities" | p.54
Weighted average common shares, basic and diluted, FY2025 / FY2024 / FY2023174,986,972 · 159,516,299 · 144,729,66231 Dec 2025Filed | Form 20-F 2025 | Consolidated Statements of Loss | "Weighted average number of common shares outstanding, basic and diluted" | p.106
Net operating loss carryforwards, 31 Dec 2025 — Canada (expire 2040–2044) / U.S.36,169 · 1,90031 Dec 2025Filed | Form 20-F 2025 | Note 10 | Income taxes | "Canadian net operating loss carryforwards of" | p.121
Form 20-F 2023
Cash used in operating activities, CY2022(15,769)31 Dec 2022Filed | Form 20-F 2023 | Consolidated Statements of Cash Flows | "Cash used in operating activities | (6,876) | (15,769)" | p.56
Q1 2026 interim FS
Borborema — royalty held at 31 Mar 2026 (incl. the Dundee royalty, 21 Jan 2026)2.75% NSR31 Mar 2026the additional royalty sits in Borborema LP, Taurus 49.9978%Filed | Q1 2026 interim FS | Note 4 | "Borborema Mine | 2.75% NSR" | p.8
Borborema LP — additional Borborema royalty contributed at fair valueUS$45.0 m contributed (45,000 in US$000s); Taurus 49.9978%31 Mar 2026equity-accounted from Q1 2026; Taurus paid US$22.5 m (Q1 2026 MD&A p.3)Filed | Q1 2026 interim FS | Note 6 | "established Borborema LP and contribute" | p.8
Q2 2026 interim FS
Cost of sales excluding depletion (Vareš stream payments), Q2 2026 / H1 2026(312) · (603)30 Jun 2026Filed | Q2 2026 interim FS | Statements of Income | "Cost of sales excluding depletion" | p.3
Current tax expense, Q2 2026 / H1 2026(128) · (144)30 Jun 2026Filed | Q2 2026 interim FS | Statements of Income | "Current tax expense" | p.3
Cash and cash equivalents, 30 Jun 202611,33330 Jun 2026Filed | Q2 2026 interim FS | Statement of Financial Position | "Cash and cash equivalents" | p.2
Short-term investments, 30 Jun 20262,80430 Jun 2026Filed | Q2 2026 interim FS | Statement of Financial Position | "Short-term investments" | p.2
Accounts receivable, 30 Jun 20266,14930 Jun 2026Filed | Q2 2026 interim FS | Statement of Financial Position | "Accounts receivable" | p.2
Prepaids and other receivables, 30 Jun 20262,92630 Jun 2026Filed | Q2 2026 interim FS | Statement of Financial Position | "Prepaids and other receivables" | p.2
Long-term investments, 30 Jun 20262,51930 Jun 2026Filed | Q2 2026 interim FS | Statement of Financial Position | "Long-term investments" | p.2
Investment in joint venture, 30 Jun 202622,60230 Jun 2026Filed | Q2 2026 interim FS | Statement of Financial Position | "Investment in joint venture" | p.2
Gold-linked loan, 30 Jun 202610,89630 Jun 2026Filed | Q2 2026 interim FS | Statement of Financial Position | "Gold-linked loan" | p.2
Accounts payable and accrued liabilities, 30 Jun 20264,83530 Jun 2026Filed | Q2 2026 interim FS | Statement of Financial Position | "Accounts payable and accrued liabilities" | p.2
Non-current portion of lease obligation, 30 Jun 20265430 Jun 2026Filed | Q2 2026 interim FS | Statement of Financial Position | "Non-current portion of lease obligation" | p.2
Deferred income tax liability, 30 Jun 2026120,72430 Jun 2026Filed | Q2 2026 interim FS | Statement of Financial Position | "Deferred income tax liability" | p.2
Debt, convertibles, inventories, derivatives, restricted cash, NCI, current tax liability — 30 Jun 2026none on the face30 Jun 2026Filed | Q2 2026 interim FS | Statement of Financial Position | "Condensed Interim Consolidated Statements of Financial Position" | p.2
GRC Warrants outstanding, 30 Jun 202614,643,027 (remaining life 0.92 yr)30 Jun 2026exercise price n/d in the filings readFiled | Q2 2026 interim FS | Note 9 | "GRC Warrants outstanding with a weighted average remaining contractual life of 0.92 years" | p.12
Q2 2026 MD&A
Total revenue, land agreement proceeds and interest — Borborema, Q2 2026 / Q2 2025Q2 2026 2,125 · Q2 2025 1,22830 Jun 2026Filed | Q2 2026 MD&A | Discussion of Operations | "Borborema | 2,125" | p.8
Total revenue, land agreement proceeds and interest — Borden, Q2 2026 / Q2 2025Q2 2026 367 · Q2 2025 28530 Jun 2026Filed | Q2 2026 MD&A | Discussion of Operations | "Borden | 367" | p.8
Total revenue, land agreement proceeds and interest — Canadian Malartic, Q2 2026 / Q2 2025Q2 2026 90 · Q2 2025 1830 Jun 2026Filed | Q2 2026 MD&A | Discussion of Operations | "Canadian Malartic | 90" | p.8
Total revenue, land agreement proceeds and interest — Côté, Q2 2026 / Q2 2025Q2 2026 1,132 · Q2 2025 1,05230 Jun 2026Filed | Q2 2026 MD&A | Discussion of Operations | "Côté | 1,132" | p.8
Total revenue, land agreement proceeds and interest — County Line, Q2 2026Q2 2026 13330 Jun 2026Filed | Q2 2026 MD&A | Discussion of Operations | "County Line | 133" | p.8
Total revenue, land agreement proceeds and interest — Cozamin, Q2 2026 / Q2 2025Q2 2026 391 · Q2 2025 29930 Jun 2026Filed | Q2 2026 MD&A | Discussion of Operations | "Cozamin | 391" | p.8
Total revenue, land agreement proceeds and interest — Pedra Branca, Q2 2026Q2 2026 2,34030 Jun 2026Filed | Q2 2026 MD&A | Discussion of Operations | "Pedra Branca | 2,340" | p.8
Total revenue, land agreement proceeds and interest — Vareš, Q2 2026 / Q2 2025Q2 2026 1,037 · Q2 2025 72030 Jun 2026Filed | Q2 2026 MD&A | Discussion of Operations | "Vareš | 1,037" | p.8
Total revenue, land agreement proceeds and interest — Others, Q2 2026 / Q2 2025Q2 2026 318 · Q2 2025 81030 Jun 2026Filed | Q2 2026 MD&A | Discussion of Operations | "Others | 318" | p.8
Total revenue, land agreement proceeds and interest by asset — total, Q2 2026 / Q2 2025Q2 2026 7,933 · Q2 2025 4,41230 Jun 2026Filed | Q2 2026 MD&A | Discussion of Operations | "7,933 | 4,412" | p.8
GEOs, Q2 2026 / H1 2026Q2 2026 1,757 · H1 2026 3,67730 Jun 2026Filed | Q2 2026 MD&A | Financial and Operating Highlights | "Gold Equivalent Ounces" | p.3
Borborema production (Aura), Q2 202614,251 GEOs30 Jun 2026Filed | Q2 2026 MD&A | Selected Asset Updates | "Borborema produced 14,251 gold equivalent ounces" | p.4
Revenue, Q2 2026 / H1 20266,732 · 13,91030 Jun 2026Filed | Q2 2026 MD&A | Financial and Operating Highlights | "Revenue | 6,732" | p.3
Adjusted EBITDA, Q2 2026 / H1 20265,599 · 12,59830 Jun 2026Filed | Q2 2026 MD&A | Financial and Operating Highlights | "Adjusted EBITDA (1)" | p.3
General and administrative, Q2 2026 (corporate admin / employee / professional fees / total)799 · 893 · 347 · 2,03930 Jun 2026Filed | Q2 2026 MD&A | Discussion of Operations | "Corporate administrative costs" | p.8
Common shares outstanding, MD&A date (Aug 2026)231,680,7155 Aug 2026Filed | Q2 2026 MD&A | Outstanding Share Data | "As at the date hereof, we have 231,680,715 GRC Shares" | p.17
RSUs and share options outstanding, MD&A date (Aug 2026)1,825,335 RSUs · 6,043,279 options5 Aug 2026Filed | Q2 2026 MD&A | Outstanding Share Data | "1,825,335 restricted share units and 6,043,279 share options outstanding" | p.17
2026 guidance release
GEO guidance, 20267,500–9,300 GEOs19 Mar 2026Filed | 2026 guidance release | 2026 Guidance and Five-Year Outlook | "Total GEOs are currently expected to increase to 7,500-9,300 in 2026" | p.1
GEO outlook, 203028,000–34,000 GEOs19 Mar 2026Filed | 2026 guidance release | 2026 Guidance and Five-Year Outlook | "GEOs are forecasted to increase to between 28,000 and 34,000 GEOs in 2030" | p.1
Derived and market inputs
Fully diluted shares (all instruments, before treasury method)254,192,3565 Aug 2026Derived | shares + RSUs + options + warrants
GROY share price — NYSE American close, 13 Aug 2026US$3.1013 Aug 202612 Aug US$3.17; 14 Aug US$3.14Market | Yahoo Finance | "GROY daily close (NYSE American)" | 13 Aug 2026
USD/CAD, 13 Aug 20261.393813 Aug 2026Market | Bank of Canada | "USD/CAD daily exchange rate" | 13 Aug 2026
Gold trailing averages, 3 / 6 / 12 months to 13 Aug 2026 (GC=F daily closes)US$4,248.69 · US$4,546.12 · US$4,354.63/oz13 Aug 2026the base deck: front-month futures, not LBMA PMMarket | Yahoo Finance | "GC=F daily close" | 13 Aug 2026
Gold 12-month high / low to 13 Aug 2026high US$5,318.40 (29 Jan 2026) · low US$3,358.70 (19 Aug 2025)13 Aug 2026Market | Yahoo Finance | "GC=F daily close" | 13 Aug 2026
Copper trailing averages, 3 / 6 / 12 months to 13 Aug 2026 (HG=F daily closes)US$6.3455 · US$6.0968 · US$5.6285/lb13 Aug 2026secondary-commodity deck (Vareš stream, Cozamin)Market | Yahoo Finance | "HG=F daily close" | 13 Aug 2026
Gold five-year average, high and low (monthly)average US$2,601 · high US$5,020 (Feb 2026) · low US$1,664 (Oct 2022)/ozJul 2026Market | World Bank | "Pink Sheet monthly prices — Gold" | Aug 2021 – Jul 2026
Copper Q2 2026 average — COMEX front month (HG=F daily closes)US$6.1618/lb30 Jun 2026Market | Yahoo Finance | "HG=F daily close" | 1 Apr – 30 Jun 2026
GROY year-end closes — FY2025 / FY2024 / FY2023 / CY2022 / FY Sep-2021US$4.04 · US$1.21 · US$1.47 · US$2.33 · US$5.0031 Dec 2025Market | Yahoo Finance | "GROY daily close (NYSE American)" | 31 Dec 2025, 31 Dec 2024, 29 Dec 2023, 30 Dec 2022, 30 Sep 2021

Source: the filings and market series named in each row. Gold Royalty filings (SEC EDGAR).

10.2 Disclaimer & disclosure

This analysis is for information only and is not investment advice; do your own research or consult a licensed adviser. It is a point-in-time snapshot as of 14 August 2026 — the price, the multiples and the read move with the market, and events after that date are not reflected. The two-axis verdict is an analytical read of quality and price, not an instruction to buy or sell. It was prepared with AI assistance (Claude Opus 5.5) from Gold Royalty’s filings and dated market data; check figures against the filings before relying on them. Verify every figure before acting on it. As of 18 November 2026, the author holds no position in the company this analysis covers.