GoldMining (GLDG) — Stock Analysis 2026 [3.0]
Analysis as of 6 August 2026. GoldMining stock analysis. Fundamentals come from GoldMining Inc.’s interim statements and MD&A to 31 May 2026, its FY2025 audited statements, MD&A and Annual Information Form (year to 30 November 2025), and the São Jorge and La Mina preliminary economic assessments of 2026; market data is the 6 August 2026 close — C$1.35 on the TSX (US$0.96 on NYSE American) — and will move. Price deck: base gold US$4,000/oz — the representative trailing average on the fixed US$3,000–5,000/oz grid — with every grid price run as a scenario (deep bear US$3,000 / bear US$3,500 / base US$4,000 / bull US$4,500 / deep bull US$5,000) and the consensus forecast as a 0% cross-check — no spot price. The blend stays above the share price at every gold price from US$500 to US$9,000/oz, so no market-implied gold price exists. Figures are in Canadian dollars unless marked US$. Refreshed on each annual report and on material events. Rating: ★★★ Average / Undervalued.
GoldMining is a resource-stage gold company with 10.02 Moz of measured and indicated gold across seven projects in Brazil, Colombia, Peru and Canada — two of them studied in 2026 — plus 74.1% of U.S. GoldMining and stakes in Gold Royalty and NevGold. The thesis in one line: at C$1.35 the market pays little more than the listed stakes and net cash, C$1.10 a share, for two studied projects that lift NAV to C$2.52 a share even after an equity raise for São Jorge. Why now: São Jorge’s June 2026 study puts a US$202.2 million build in view, and how it is financed decides how much of that value stays with shareholders. To compare listed gold explorers, developers and producers side by side, use Metal Pilot’s gold mining stock screener.
1. Snapshot & thesis
GoldMining Inc. (TSX: GOLD; NYSE American: GLDG) is a gold explorer headquartered in Vancouver. By archetype it is an advanced explorer, a resource-stage holding company; its sector is precious-metal explorer (gold, with copper at La Mina). It holds two studied projects — São Jorge (Pará, Brazil) and La Mina (Antioquia, Colombia) — five unstudied resource projects — Titiribi and Yarumalito (Colombia), Cachoeira (Brazil), Crucero (Peru) and Yellowknife (Northwest Territories) — and listed stakes in U.S. GoldMining (74.1%, owner of Whistler in Alaska), Gold Royalty, NevGold, Australian Mines and Galleon Gold. (M&I = measured and indicated resources; PEA = preliminary economic assessment; NPV5% = net present value at a 5% discount rate; AISC = all-in sustaining cost; NAV = net asset value.)
Figure 1. GoldMining in numbers
Figure data: Table 1; net cash, investments, NAV per share and fair value per Section 7, rating per Section 9.
Table 1. GoldMining in numbers
| Metric | Value | As of |
|---|---|---|
| Share price (TSX / NYSE American) | C$1.35 / US$0.96 | 6 Aug 2026 |
| Market capitalisation (basic shares) | C$290.0 m | 6 Aug 2026 |
| Shares — basic / fully diluted | 214.8 m / 230.2 m | 14 Jul 2026 |
| Cash / listed investments / debt drawn | C$21.4 m / C$156.7 m / none | 31 May 2026 |
| M&I / inferred gold, ex Whistler | 10.02 Moz / 7.58 Moz | 30 Nov 2025 |
| São Jorge / La Mina PEA NPV5%, after tax | US$532.5 m / US$1,001.5 m | Jun / Apr 2026 |
| São Jorge margin at the base deck | US$2,526/oz over the study AISC | Section 7 |
| Cash used in operations | C$23.2 m | FY2025 |
| NAV per share / P/NAV | C$2.52 / 0.54× | 6 Aug 2026 (Section 7) |
| Base-case fair value / implied return | C$3.84 / +184.4% | 6 Aug 2026 (Section 7) |
| Quality rating / valuation read | 3.0/5 (Average) / Undervalued, implied +184.4% | 6 Aug 2026 |
Source: GoldMining’s Q2 2026 interim statements and MD&A and FY2025 Annual Information Form on SEDAR+; study figures per Table 2; closes per Yahoo Finance; valuation per Section 7.
Thesis in brief. Bull: the shares trade at 0.54× a NAV that already charges a C$182.8 million raise for São Jorge, and even the deep-bear blend — US$3,000/oz at a 9% rate — sits at C$3.35, above the price. Bear: neither study is permitted or financed, both sit in Brazil and Colombia, La Mina alone needs US$523.3 million of capital, and operations have used C$21.8–23.2 million a year since FY2023, part-funded by an at-the-market program. What tips it: the terms on which São Jorge is financed. The rating is in Section 9.
How to read this analysis: the statcards and Section 9 carry the verdict; Sections 2–7 carry the evidence.
2. Assets & operations
GoldMining produces nothing; its value is two studied gold projects, a wider resource base and a book of listed gold equities. For gold’s supply, demand and price backdrop see the Gold — A Complete Market Guide. This section covers the company.
2.1 Portfolio overview
Table 2. Asset and holdings portfolio, by value in Section 7
| Asset | Country | Stage | Interest | Output (study) | Resources (no reserves) | Life | Unit cost | Value in Section 7 | Listing / operator |
|---|---|---|---|---|---|---|---|---|---|
| La Mina | Colombia (Antioquia) | PEA, Apr 2026 | 100% | 125.8 koz/yr Au, years 1–5 | Ind. 0.79 Moz Au · Inf. 1.05 Moz Au | 11.2 years | AISC US$1,045/oz, by-product | C$437.6 m risked | GoldMining (TSX: GOLD), operator |
| São Jorge | Brazil (Pará) | PEA, Jun 2026 | 100% | 51.2 koz/yr Au, life of mine | Ind. 0.62 Moz Au · Inf. 0.13 Moz Au | 10.6 years | AISC US$1,464/oz | C$240.2 m risked | GoldMining (TSX: GOLD), operator |
| U.S. GoldMining (Whistler) | USA (Alaska) | PEA, Mar 2026 | 74.1% | — | M&I 3.93 Moz Au (100% basis) | — | — | C$118.7 m at market | NASDAQ: USGO |
| Gold Royalty | — | Listed holding | 21.5 m shares | — | — | — | — | C$86.6 m at market | NYSE American: GROY |
| NevGold | — | Listed holding, under lock-up | 19.1 m shares | — | — | — | — | C$33.4 m at market | TSX-V: NAU |
| Titiribi | Colombia | Resource | 100% | — | Meas. 1.06 · Ind. 4.49 · Inf. 3.16 Moz Au | — | — | EV/resource only | GoldMining (TSX: GOLD) |
| Crucero | Peru | Resource | 100% | — | Ind. 1.31 · Inf. 0.73 Moz Au | — | — | EV/resource only | GoldMining (TSX: GOLD) |
| Yellowknife | Canada (NWT) | Resource | 100% | — | Meas. 0.08 · Ind. 0.98 · Inf. 0.74 Moz Au | — | — | EV/resource only | GoldMining (TSX: GOLD) |
| Cachoeira | Brazil | Resource | 100% | — | Ind. 0.69 Moz Au · Inf. 0.54 Moz Au | — | — | EV/resource only | GoldMining (TSX: GOLD) |
| Yarumalito | Colombia | Resource | 100% | — | Inf. 1.23 Moz Au | — | — | EV/resource only | GoldMining (TSX: GOLD) |
Source: São Jorge PEA release (11 June 2026) and La Mina PEA release (28 April 2026); resources per the FY2025 Annual Information Form (NI 43-101, as of 30 November 2025; La Mina is its 2023 estimate); holdings per the Q2 2026 MD&A, valued at 6 August 2026 closes in Section 7. Listing: Public (TSX: GOLD; NYSE American: GLDG).
La Mina carries 64.6% of the C$677.8 million enterprise NAV and São Jorge 35.4%; the five unstudied projects enter the NAV at 0.0 and are valued only through EV/resource. Below the enterprise line sit C$243.1 million of investments at 6 August closes, U.S. GoldMining the largest at C$118.7 million — a quarter of the gross asset value, moving with three share prices. Colombia holds the larger study and three of the seven projects.
2.2 NAV and resource split
GoldMining has no revenue, so the two splits are where the value sits and where the ounces sit.
Figure 2. Gross asset value by component, base case (C$m)
Figure data: this analysis, Tables 10 and 11.
Figure 3. M&I gold resources by project, ex Whistler (Moz)
Figure data: the FY2025 Annual Information Form resource statement (p.14): measured plus indicated gold per project, summing to the 10.02 Moz aggregate.
2.3 La Mina, Antioquia, Colombia
La Mina is GoldMining’s largest studied project, 100%-owned in the Mid-Cauca belt and subject to a 2% net smelter return royalty to Gold Royalty Corp. plus Colombia’s 4.0% government royalty on precious metals (5.0% on base metals). The PEA released on 28 April 2026 puts after-tax NPV5% at US$1,001.5 million (pre-tax US$1,613.9 million), with a 32.2% IRR and a 2.7-year payback, at US$3,500/oz gold, US$4.70/lb copper and US$40/oz silver; at US$4,775/oz gold, US$5.75/lb copper and US$77/oz silver it rises to approximately US$1.8 billion. Years 1–5 average 125.8 koz of gold, 22.4 Mlb of copper and 152.4 koz AuEq a year at an AISC of US$1,045/oz on a by-product basis. Initial capital is US$523.3 million, with US$166.0 million sustaining and US$49.8 million closure. The resource in the AIF is the 2023 estimate — 33.77 Mt indicated holding 0.79 Moz of gold and 56.24 Mt inferred holding 1.05 Moz; no reserve is declared. The plan runs 11.2 years and produces 1,243.3 koz of gold (1.5 Moz AuEq); the approvals in hand and an annual schedule are not on record, and Section 7 assumes a construction start four years out, after São Jorge. The asset’s one risk is capital: US$523.3 million to raise in Colombia, after São Jorge.
2.4 São Jorge, Pará, Brazil
São Jorge is 100%-owned, with 1.0% net smelter return royalties to both Osisko Gold Royalties and Gold Royalty Corp. Its PEA, released on 11 June 2026, puts after-tax NPV5% at US$532.5 million (pre-tax US$645.7 million), a 42.4% IRR and a 2.83-year payback at US$3,500/oz, and US$836.8 million at US$4,400/oz. The plan mills 5,500 tpd at 0.91 g/t with 90.0% recovery, producing 51.2 koz a year over 10.6 years (53.4 koz in years 1–5; 543.2 koz in total) at an AISC of US$1,464/oz (cash cost US$1,344/oz). Initial capital is US$202.2 million including pre-strip and a 25% contingency; sustaining capital is US$53.0 million and closure US$12.0 million. The AIF resource is 19.42 Mt indicated at 1.00 g/t (0.62 Moz) and 5.56 Mt inferred at 0.72 g/t (0.13 Moz); no reserve is declared. Approvals in hand and a construction schedule are not on record; Section 7 assumes first gold four years out. The one asset risk is funding: the full US$202.2 million remains to be raised.
2.5 Listed stakes and other projects
GoldMining holds 10,000,751 U.S. GoldMining shares (74.1%), a consolidated subsidiary whose Whistler PEA (March 2026) shows an after-tax NPV5% of US$2.04 billion and a 33% IRR at US$3,200/oz on 294.17 Mt of M&I holding 3.93 Moz of gold, carried at C$118.7 million. It also holds 21,533,125 Gold Royalty shares (C$86.6 million at US$2.87) and 19,073,350 NevGold shares under a 27 August 2025 lock-up (C$33.4 million at C$1.75). The unstudied projects: Titiribi, 5.55 Moz measured and indicated (434.60 Mt) plus 3.16 Moz inferred; Crucero, 1.31 Moz indicated plus 0.73 Moz inferred; Yellowknife, 1.06 Moz measured and indicated plus 0.74 Moz inferred; Cachoeira, 0.69 Moz indicated and 0.54 Moz inferred; Yarumalito, 66.27 Mt inferred holding 1.23 Moz.
2.6 Resources, reserves and study costs
The aggregated statement, as of 30 November 2025 under NI 43-101, totals 10.02 Moz of M&I gold (13.15 Moz AuEq) and 7.58 Moz inferred (9.02 Moz AuEq), excluding Whistler; no mineral reserve is declared anywhere in the group. Study costs span US$1,045/oz at La Mina, a by-product figure, to US$1,464/oz at São Jorge.
Figure 4. Study gold output by project, years 1–5 (koz/yr)
Figure data: La Mina PEA release (28 April 2026, p.2) and São Jorge PEA release (11 June 2026, p.2).
2.7 Peer positioning
The peer set is three Americas gold companies at or near the resource-to-development stage, each read from its FY2025 annual filings: Collective Mining, Osisko Development and Integra Resources. Integra now also operates Florida Canyon, so it is the most advanced of the three.
Table 3. Peer positioning — quality metrics
| Company | Listing | Flagship and jurisdiction | Stage | M&I gold | Cash, latest year-end |
|---|---|---|---|---|---|
| GoldMining | Public (TSX: GOLD; NYSE American: GLDG) | São Jorge (Brazil); La Mina (Colombia) | Two PEAs, 2026 | 10.02 Moz, ex Whistler | C$24.9 m (30 Nov 2025) |
| Collective Mining | Public (TSX / NYSE: CNL) | Guayabales, Colombia | Pre-resource | none estimated | US$129.6 m (31 Dec 2025) |
| Osisko Development | Public (ODV; now Osisko Gold Group, OGG) | Cariboo, British Columbia | Developer | 1.61 Moz at 2.88 g/t | C$422.3 m (31 Dec 2025) |
| Integra Resources | Public (TSXV / NYSE American: ITRG) | DeLamar, Idaho; Florida Canyon, Nevada | Developer and producer | 1.60 Moz, DeLamar oxide | US$63.1 m (31 Dec 2025) |
Source: GoldMining per Table 2 and its FY2025 statements; each peer’s FY2025 Annual Information Form and audited statements filed with its Form 40-F on EDGAR. Quality metrics only.
GoldMining has the most ounces of the four by a wide margin but the lowest grade at its studied mine, the least cash, and the only portfolio that sits wholly outside Canada and the United States apart from Yellowknife.
3. Financials & balance sheet
GoldMining has reported no revenue in any period, so its financials are a spending, cash and dilution record (the Financial Metrics guide defines the lines).
Table 4. Five-year financial summary (C$ m, years to 30 November)
| Line | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
| Revenue | none | none | none | none | none |
| YoY % | n/m | n/m | n/m | n/m | n/m |
| Cash margin | n/m | n/m | n/m | n/m | n/m |
| Net income (loss) | 100.2 | (13.2) | (30.4) | (27.3) | (15.3) |
| EPS, diluted (C$) | 0.66 | (0.09) | (0.17) | (0.13) | (0.07) |
| Operating cash flow | (7.9) | (11.0) | (21.8) | (22.5) | (23.2) |
| Capex (E&E, equipment, camp) | (0.1) | (0.1) | (1.8) | (0.5) | nil |
| FCF | (8.0) | (11.1) | (23.7) | (23.1) | (23.2) |
| Net debt (no borrowings) | (11.7) | (8.3) | (21.6) | (11.9) | (24.9) |
| Cash and equivalents | 11.7 | 8.3 | 21.6 | 11.9 | 24.9 |
| ND/EBITDA | n/m | n/m | n/m | n/m | n/m |
| Diluted shares (m, weighted) | 152.5 | 154.0 | 171.9 | 187.8 | 199.1 |
| DPS | none | none | none | none | none |
Source: GoldMining audited annual statements FY2022–FY2025 (FY2021 from the FY2022 comparatives). n/m: not meaningful before revenue. Capex is cash invested in exploration-and-evaluation assets, equipment and camp; FCF is operating cash flow less capex; net debt in brackets is net cash.
Operating cash use tripled from C$7.9 million in FY2021 to C$21.8 million in FY2023 and has held near C$23 million since; it is consolidated, so it includes U.S. GoldMining’s own spending. FY2021’s C$100.2 million profit was a gain year, not operations. At 31 May 2026 the balance sheet held C$21.4 million of cash, C$60.2 million of short-term and C$96.5 million of long-term investments, C$0.25 million of leases and a C$1.3 million rehabilitation provision. There is no borrowing: a C$1.25 million Toronto-Dominion facility of 19 January 2026 is secured by a C$1.3 million deposit and undrawn on the face. ND/EBITDA is not meaningful. Cash alone covers under a year of the FY2025 burn, so the runway rests on the listed stakes and on equity. No cost guidance, capex split or hedge book is disclosed; the company is unhedged, its only cost lines are the study figures in Section 2, and C$14.8 million of non-capital losses (C$11.3 million of unrecognised deferred tax assets) sit off the balance sheet. No dividend or buyback is paid; the at-the-market program issued 4,770,576 shares for C$10.1 million gross in the six months to 31 May 2026, leaving 214.8 million basic and 230.2 million fully diluted shares at 14 July 2026.
4. Management, strategy & structure
4.1 Management & governance
Alastair Still is Chief Executive Officer and President; the AIF’s conflicts section notes he is also Director of Technical Services of Gold Royalty and a director of U.S. GoldMining. Pat Obara has been Chief Financial Officer since January 2011 and is Corporate Secretary. The board has two co-chairmen: founder Amir Adnani, also President and CEO of Uranium Energy Corp., and David Garofalo, Chairman, CEO and President of Gold Royalty since 2020 — the holder of the royalties on both studied projects. Paulo Pereira moved from President to Country Manager, Brazil, on 2 January 2026. The board runs three committees — Audit; Compensation; Nominating and Corporate Governance — with David Kong the audit committee financial expert. Board size and independence are not on record (the 2026 circular was not read). Directors and officers own 9,222,716 shares (4.3%). The shared officers across GoldMining, Gold Royalty and U.S. GoldMining are the related-party point to watch.
4.2 Strategy
The strategy is to acquire resource-stage gold projects, advance the best with studies, and realise value through spin-outs and stake sales rather than by building mines — the route that created Gold Royalty and U.S. GoldMining. In 2026 that meant two PEAs; the stated next step for São Jorge is a prefeasibility study, with no dated development target in the filings read.
4.3 Ownership & structure
Table 5. Ownership and corporate structure
| Holding / item | Listing | Detail | As of |
|---|---|---|---|
| GoldMining shares | TSX: GOLD; NYSE American: GLDG | 214,799,168 basic; 230,235,153 fully diluted (15,274,145 options, 161,840 RSRs) | 14 Jul 2026 |
| Directors and officers | — | 9,222,716 shares, 4.3% | 27 Feb 2026 |
| U.S. GoldMining | NASDAQ: USGO | 10,000,751 shares, 74.1%; consolidated subsidiary | 31 May 2026 |
| Gold Royalty | NYSE American: GROY | 21,533,125 shares | 31 May 2026 |
| NevGold | TSX-V: NAU | 19,073,350 shares; 26,670,250 (29.4%) at the 2025 investment | 31 May 2026 |
| Australian Mines / Galleon Gold | ASX / TSX-V | 84,429,563 / 100,000 shares | 31 May 2026 |
| Debt | — | Toronto-Dominion facility, C$1,250 k, secured by a deposit; undrawn | 31 May 2026 |
| At-the-market program | — | 4,770,576 shares, C$10.1 m gross, six months | 31 May 2026 |
Source: GoldMining Q2 2026 MD&A and interim statements and FY2025 AIF.
The most material deal on record is the NevGold strategic investment made with the exercise of the Almaden (Nutmeg Mountain) option in 2025. There is no controlling shareholder.
5. ESG & sustainability
No safety rate, emissions figure or named reporting framework appears in any GoldMining filing read, and no community program is quantified; the only environmental line is the C$1.3 million rehabilitation provision. As an explorer its footprint is drilling and studies, so the licence question is forward-looking: permits for La Mina in Colombia and São Jorge in Brazil, neither yet in hand on the record.
6. Risks
Table 6. Risk register
| Risk | Type | Likelihood / impact (1–5) | Exposure | Mitigant |
|---|---|---|---|---|
| São Jorge funding and dilution | Balance sheet / dilution | 4 / 4 | C$182.8 m gap, 63.0% of market cap | C$243.1 m of investments |
| Colombian permitting and social licence | Jurisdiction / ESG | 3 / 5 | La Mina, 64.6% of enterprise NAV | No capital committed yet |
| Listed-stake prices | Counterparty / market | 4 / 3 | C$243.1 m at 6 Aug 2026 closes | Five separate holdings |
| Gold price reversion | Commodity | 3 / 4 | Unhedged, pre-revenue | Deep-bear blend above the price |
| PEA-stage economics | Operational | 3 / 3 | No reserves; study-grade costs | Prefeasibility work |
| Development delay | Operational | 3 / 3 | One-year slip moves NAV/share to C$2.27 | Low São Jorge capital |
| Brazilian tax incentive | Jurisdiction | 2 / 3 | Full 34% rate moves NAV/share to C$2.24 | SUDAM regime |
Source: GoldMining FY2025 AIF risk factors; exposures per Section 7; scores are the author’s assessment.
Section 7 prices four of these: the raise for the gap, the grid, a one-year slip and the full Brazilian tax rate. The top two share a cause — the projects that carry the NAV are unfunded and outside tier-one jurisdictions.
Figure 5. Risk matrix — likelihood against impact
Rare
Likely
Figure data: Table 6. Each point prints its likelihood × impact score; the shaded region is the high-likelihood, high-impact quadrant (likelihood ≥ 3.5 and impact ≥ 3.5). Ratings are the author’s assessment, not disclosed figures.
7. Valuation
Valuation as of 6 August 2026, in Canadian dollars. Horizon: spot fair value. Price deck: base gold US$4,000/oz, the representative of the trailing averages of the COMEX front-month settle — US$4,271.1 (3-month), US$4,569.4 (6-month) and US$4,334.7 (12-month) to 6 August 2026 — snapped to the fixed US$3,000–5,000/oz grid and leaning low on the 2026 spike, with every grid price run as a scenario (deep bear US$3,000 to deep bull US$5,000). Discount rate 5% real; FX US$1 = C$1.4018 (Bank of Canada, 6 August 2026); share price C$1.35 (TSX close, 6 August 2026; NYSE American US$0.96). Study-stage risk sits in the row weights: São Jorge 0.30×, La Mina 0.30×.
GoldMining is valued as an advanced explorer and resource-stage holding company: its two 100%-owned projects with studies carry 2026 preliminary economic assessments — São Jorge in Brazil and La Mina in Colombia — and much of the rest of its value sits in listed stakes, chiefly 74.1% of U.S. GoldMining. The method follows the How to Value Commodity Stocks guide. São Jorge is built from its study lines at this deck; La Mina is struck between its two filed study cases; both are risked for their stage, the listed stakes enter at their closing prices, and the São Jorge funding gap is raised in equity before the per-share value is struck. Table 7 lists the inputs the result turns on; the full register is Table 19.
Table 7. Load-bearing inputs — the figures the valuation turns on (full source register: Table 19)
| Input | Value | Where §7 uses it | Source |
|---|---|---|---|
| São Jorge PEA — NPV5% after / pre tax at US$3,500/oz | US$532.5 m / US$645.7 m | Table 10, block 1 — calibration | Filed | São Jorge PEA release (11 Jun 2026) | Table 2 | “Net present value (NPV 5% ) – after-tax” | p.2 |
| São Jorge PEA — production and mine life | 51.2 koz/yr over 10.6 years | Table 10, block 1 | Filed | São Jorge PEA release (11 Jun 2026) | Table 1 | “Total gold produced” | p.2 |
| São Jorge PEA — AISC | US$1,464/oz | Table 10, block 1 — unit cost | Filed | São Jorge PEA release (11 Jun 2026) | Table 2 | “All-In Sustaining Costs (AISC)" | p.2 |
| São Jorge PEA — initial capital | US$202.2 m | Table 10, block 1; Table 11 — funding gap | Filed | São Jorge PEA release (11 Jun 2026) | Table 2 | “Initial capital expenditure (includes pre-strip)" | p.2 |
| São Jorge — Osisko and Gold Royalty NSRs | 1.0% + 1.0% NSR | Table 10, block 1 — deck × (1 − 2%) | Filed | São Jorge technical report 2026 | Royalties | “subject to a 1.0% net smelter return” | p.53 |
| La Mina PEA — after-tax NPV5% at US$3,500/oz | US$1,001.5 m | Table 10, block 2 | Filed | La Mina PEA release (28 Apr 2026) | Table 2 | “Net present value (NPV 5% ) – after-tax” | p.3 |
| La Mina PEA — after-tax NPV5% at US$4,775/oz | approx. US$1.8 bn | Table 10, block 2 — slope | Filed | La Mina PEA release (28 Apr 2026) | Highlights | “the after-tax NPV 5% increases to approximately” | p.1 |
| Aggregated M&I gold, all projects ex Whistler | 10.02 Moz Au | Table 14 | Filed | AIF 2025 | Resource statement | “Measured and Indicated Resources” | p.14 |
| Cash and cash equivalents, 31 May 2026 | C$21,442 k | Table 11 — net cash | Filed | Q2 2026 interim FS | Statement of financial position | “Cash and cash equivalents” | p.2 |
| U.S. GoldMining shares held (74.1%) | 10,000,751 shares | Table 11 — investments | Filed | Q2 2026 interim FS | Note 10 | “or approximately 74.1% of U.S. GoldMining’s outstanding common shares” | p.20 |
| Listed stakes — closes on 6 Aug 2026: USGO / GROY / NAU.V | US$8.47 / US$2.87 / C$1.75 | Table 11 — investments | Market | Yahoo Finance | “USGO, GROY, NAU.V daily close” (yahoo_usgo_daily_20261019.json, yahoo_groy_daily_20261019.json, yahoo_nauv_daily_20261019.json) | 6 Aug 2026 |
| Cash used in operating activities, FY2025 | C$(23,218) k | Table 11 — corporate costs | Filed | Annual FS 2025 | Statement of cash flows | “Cash used in operating activities” | p.6 |
| Shares, fully diluted | 230,235,153 | Table 11 — per share | Derived | f-shares-out + f-options (214,799,168 + 15,274,145 + 161,840); all options counted, in- or out-of-the-money |
| Gold, 3-, 6-, 12-month averages | US$4,271.1 · US$4,569.4 · US$4,334.7/oz | Figure 7, Table 15 — deck | Market | Yahoo Finance | “GC=F daily close” (yahoo_gc_f_daily_20261019.json; 62 / 126 / 251 sessions) | 6 Aug 2026 |
Source: each row’s filing as cited — GoldMining’s Q2 2026 and FY2025 filings and the São Jorge and La Mina PEA releases on SEDAR+; deck rows per the COMEX gold front-month daily series and the Bank of Canada USD/CAD daily rate.
8. Near-term catalysts (1–3 years)
Table 17. Near-term catalysts (1–3 years)
| Catalyst | Expected timing | Why it benefits GoldMining |
|---|---|---|
| São Jorge prefeasibility study | Not dated in the filings read | Moves the row from the 0.30× PEA weight toward 0.40× (NAV/share C$3.12, Section 7) |
| São Jorge financing terms | After the study | Sets the C$182.8 m raise and its dilution |
| Whistler advance at U.S. GoldMining | U.S. GoldMining’s own schedule | Moves the C$118.7 m stake |
Source: GoldMining Q2 2026 MD&A and the 2026 PEA releases; no timing is guided, so none is assumed.
The first two are the verdict’s hinge: the study sets the stage weight, the financing sets the dilution.
8.1 Takeover optionality
The target case is São Jorge on its own: a 100%-owned, US$202.2 million build producing 51.2 koz a year in an established Brazilian mining state is a size a mid-tier producer can absorb. The whole company is a harder target, because a buyer would inherit five listed holdings, including 74.1% of U.S. GoldMining, to unwind. The disqualifiers repeat the bear case: neither study is permitted, La Mina needs US$523.3 million in Colombia, and São Jorge’s study is a PEA. No acquirer is named — the filings read record no approach, process or strategic review, and a name without a sourced link would be speculation. Section 7 gives a takeover no weight (transaction comps at 0%), so it is optionality on top of the verdict, not part of it.
9. Rating & verdict
GoldMining is scored against the Section 2.7 peer set — Collective Mining (CNL), Osisko Development (ODV) and Integra Resources (ITRG) — on the advanced-explorer weights: asset quality, growth, balance sheet and management at 15% each; capital allocation, jurisdiction and ESG share the rest; cost position and reserves are not applicable and are reweighted.
Figure 9. Scorecard by dimension, 6 August 2026
Figure data: Table 18. Each spoke prints its stars and weight; the dashed ring is the weighted composite, 3.03/5.
Table 18. The GoldMining scorecard
| Dimension | Weight | Score | Weighted | Rationale |
|---|---|---|---|---|
| Asset quality & scale | 15% | ★★★★ | 0.600 | 10.02 Moz M&I gold ex Whistler against 1.61 Moz at Osisko Development’s Cariboo and 1.60 Moz oxide at Integra’s DeLamar; grade holds it below the top — São Jorge feeds 0.91 g/t against Cariboo’s 2.88 g/t |
| Growth & optionality | 15% | ★★★★ | 0.600 | Two 2026 PEAs (US$532.5 m and US$1,001.5 m after-tax NPV5%), five unstudied resource projects and 74.1% of U.S. GoldMining — more studied options than any peer; unfunded, so not top decile |
| Balance sheet & liquidity | 15% | ★★★ | 0.450 | No borrowing; C$21.4 m cash and C$156.7 m listed investments against a C$23.2 m FY2025 burn and a C$182.8 m São Jorge gap (63.0% of market cap); Osisko Development holds C$422.3 m and Collective US$129.6 m of cash |
| Management & governance | 15% | ★★★ | 0.450 | Co-chairmen Amir Adnani and David Garofalo; insiders 4.3%; the CEO also serves Gold Royalty and U.S. GoldMining; board independence not on record — the sector median |
| Capital allocation & returns | 13.4% | ★★★ | 0.402 | Two spin-outs worth C$205.3 m at 6 Aug 2026 closes, against an ATM-funded burn (4.77 m shares in six months); no dividend, as across the peer set |
| Jurisdiction & geopolitics | 13.3% | ★★ | 0.266 | Both studied projects in Brazil and Colombia; Osisko Development (British Columbia) and Integra (Idaho, Nevada) sit in tier-one jurisdictions; Collective shares the Colombian exposure |
| ESG & licence to operate | 13.3% | ★★ | 0.266 | No safety rate, emissions figure or named framework in any GoldMining filing read — below the sector’s disclosure norm |
| Cost position & margins | N/A | — | — | Advanced explorer, no operations — reweighted |
| Reserves, life & replacement | N/A | — | — | No reserve declared — reweighted |
| Composite | 100% | ★★★ | 3.034 | Average |
Σ(weight × stars) = 0.15 × 4 + 0.15 × 4 + 0.15 × 3 + 0.15 × 3 + 0.134 × 3 + 0.133 × 2 + 0.133 × 2 = 3.03/5 → ★★★, Average.
Source: this analysis — the Metal Pilot Company Scorecard; evidence in Sections 2–6; peer figures per Table 3 from each company’s FY2025 annual filings.
The two-axis verdict. As of 6 August 2026, GoldMining rates ★★★ Average × Undervalued — a base-case blend of C$3.84 against the C$1.35 share price, implied +184.4% — which reads as a re-rating candidate, the catalyst being São Jorge’s prefeasibility study and the terms of its financing. No market-implied gold price exists on US$500–9,000/oz: the blend stays above the price at every deck, because EV/resource alone carries C$2.49 of it. The target multiples were moved by asset scale (Dim 1, +0.02) and jurisdiction (Dim 8, −0.05). The bull case is a NAV that already charges the São Jorge raise and still sits at 1.9× the price; the bear case is that both studies are unfunded and unpermitted in Brazil and Colombia, and the EV/resource leg that lifts the blend values ounces no study has tested. What tips it is the financing. This is an analytical read, not a recommendation.
To see GoldMining beside every listed gold explorer, developer and producer on resources, grade and jurisdiction, screen the sector on Metal Pilot’s gold mining stock screener.
10. Sources, methodology & disclaimer
10.1 Sources, methodology & data vintage
Company filings (on SEDAR+ and EDGAR): GoldMining’s interim statements and MD&A for Q1 and Q2 FY2026 (to 28 February and 31 May 2026; Q2 filed 14 July 2026); audited annual statements FY2022–FY2025 and annual MD&A FY2024–FY2025; the FY2025 Annual Information Form and Form 40-F (filed 27 February 2026); the São Jorge PEA release (11 June 2026) and technical report; the La Mina PEA release (28 April 2026) and technical report. The Q3 statements (to 31 August 2026) post-date the as-of and are not used. Peers: the FY2025 Annual Information Forms and audited statements of Collective Mining, Osisko Development and Integra Resources (Form 40-F exhibits). Market: Yahoo Finance daily closes for GOLD.TO, GLDG, USGO, GROY, NAU.V and COMEX gold front-month (GC=F) to 6 August 2026; Bank of Canada USD/CAD for 6 August 2026 (1.4018).
Methodology. Data as of 6 August 2026: the C$1.35 TSX close, the balance sheet at 31 May 2026, resources at 30 November 2025. Base deck gold US$4,000/oz on the fixed US$3,000–5,000/oz grid, every grid price run as a scenario, at 5% real. Valuation weights: risked P/NAV 55%, EV/resource 45%, transaction comps n/d. Scorecard on the advanced-explorer weights against the Section 2.7 peer set. Refreshed on each annual report and on material events.
Re-run log. 6 August 2026, original analysis — 3.9/5 Solid, Undervalued. 19 October 2026, pipeline rework — the facts file and the model rebuilt on filed rows; the price moved to the 6 August 2026 close and the currency to C$; the valuation recast from a sum-of-the-parts to risked P/NAV and EV/resource; the scorecard re-scored (3.9 → 3.0: growth ★★★★★ → ★★★★, balance sheet ★★★★★ → ★★★, management ★★★★ → ★★★, jurisdiction and ESG ★★★ → ★★); blend C$3.78, implied +180.2%, Undervalued. 19 October 2026, gate fixes — EV/resource printed at US$72.75/oz; La Mina’s deck slope taken on gold’s 84.0% share with copper and silver held; U.S. GoldMining’s own cash, costs and liabilities taken out of the bridge; per-project resources, La Mina’s 11.2-year life and the five-year statement lines added. NAV/share C$2.39 → C$2.52, blend C$3.78 → C$3.84, implied +180.2% → +184.4%; read unchanged, Undervalued.
Omitted figures and data gaps. No asset map is built; the group profile uses a study-output bar chart (Figure 4) in place of a production column chart, since nothing is produced; there is no financial-line or safety-trend chart. Not on record: board size and independence (the 2026 circular), safety and emissions figures, La Mina’s mine life, approvals and schedules, EPS, capex and diluted share counts by year, an archived consensus target and an own P/NAV history. The model’s full cross-check, P/NAV map and deck-sensitivity tables are in claude/valuation-models/goldmining-gldg.out.md. The load-bearing inputs are Table 7; the full source register closes this section as Table 19.
Table 19. Full source register for the valuation
| Input | Value | As of | Where §7 uses it | Source |
|---|---|---|---|---|
| AIF 2025 | ||||
| Aggregated Measured and Indicated — all projects ex Whistler | 10.02 Moz Au · 13.15 Moz AuEq | 30 Nov 2025 | Table 14 — EV/resource | Filed | AIF 2025 | Resource statement | "Measured and Indicated Resources" | p.14 |
| Aggregated Inferred — all projects ex Whistler | 7.58 Moz Au · 9.02 Moz AuEq | 30 Nov 2025 | Table 14 — not counted | Filed | AIF 2025 | Resource statement | "Inferred Resources" | p.14 |
| Annual FS 2025 | ||||
| Cash used in operating activities, FY2025 | C$(23,218) k | 30 Nov 2025 | Table 11 — corporate costs | Filed | Annual FS 2025 | Statement of cash flows | "Cash used in operating activities" | p.6 |
| Non-capital losses carry-forward (unrecognized), 30 Nov 2025 | C$14,786 k | 30 Nov 2025 | Table 16, field 7 — not credited | Filed | Annual FS 2025 | Income taxes | "Non-capital losses carry-forward" | p.41 |
| U.S. GoldMining — cash used in operating activities, FY2025 | C$(8,114) k | 30 Nov 2025 | Table 11 — corporate costs ex U.S. GoldMining | Filed | Annual FS 2025 | Note 12 | "summarizes U.S. GoldMining's cash flow activities" | p.32 |
| Q2 2026 interim FS | ||||
| Interest in U.S. GoldMining, 31 May 2026 | 10,000,751 shares · approx. 74.1% | 31 May 2026 | Table 11 — investments | Filed | Q2 2026 interim FS | Note 10 | "or approximately 74.1% of U.S. GoldMining's outstanding common shares" | p.20 |
| Cash and cash equivalents, 31 May 2026 | C$21,442 k | 31 May 2026 | Table 11 — net cash | Filed | Q2 2026 interim FS | Statement of financial position | "Cash and cash equivalents" | p.2 |
| Restricted deposits, 31 May 2026 | C$1,309 k | 31 May 2026 | Table 11 — investments | Filed | Q2 2026 interim FS | Statement of financial position | "Restricted deposits" | p.2 |
| Investment in joint venture, 31 May 2026 | C$657 k | 31 May 2026 | Table 11 — investments | Filed | Q2 2026 interim FS | Statement of financial position | "Investment in joint venture" | p.2 |
| Accounts payable and accrued liabilities, 31 May 2026 | C$1,876 k | 31 May 2026 | Table 11 — working capital | Filed | Q2 2026 interim FS | Statement of financial position | "Accounts payable and accrued liabilities" | p.2 |
| Income taxes payable, 31 May 2026 | C$89 k | 31 May 2026 | Table 11 — working capital | Filed | Q2 2026 interim FS | Statement of financial position | "Income taxes payable" | p.2 |
| Rehabilitation provisions, 31 May 2026 | C$1,301 k | 31 May 2026 | Table 11 — provision | Filed | Q2 2026 interim FS | Statement of financial position | "Rehabilitation provisions" | p.2 |
| Deferred tax liability, 31 May 2026 | C$9,933 k | 31 May 2026 | Table 16, field 8 — bridge | Filed | Q2 2026 interim FS | Statement of financial position | "Deferred tax liability" | p.2 |
| Lease liabilities, 31 May 2026 (current / non-current) | C$104 k / C$146 k | 31 May 2026 | Table 11 — net cash after leases | Filed | Q2 2026 interim FS | Statement of financial position | "Lease liabilities" | p.2 |
| Debt — TD credit facility of a subsidiary (19 Jan 2026); no loan line on the 31 May 2026 face | C$1,250 k facility | 31 May 2026 | Table 11 — debt (undrawn) | Filed | Q2 2026 interim FS | Note 12 | "credit facility with The Toronto-Dominion Bank, secured by a one-year cashable" | p.12 |
| Presentation currency | thousands of Canadian dollars | 31 May 2026 | Table 16, field 5 — currency | Filed | Q2 2026 interim FS | Statement of financial position | "expressed in thousands of Canadian dollars" | p.2 |
| U.S. GoldMining — own cash, payables, rehabilitation provision and lease, 31 May 2026 | C$8,165 k · C$459 k · C$445 k · C$104 k | 31 May 2026 | Table 11 — net cash, provision and payables ex U.S. GoldMining | Filed | Q2 2026 interim FS | Note 10 | "The following table shows the assets and liabilities of U.S. GoldMining" | p.21 |
| Q2 2026 MD&A | ||||
| Equity holding — Gold Royalty Corp. (NYSE American) | 21,533,125 shares · fair value C$96.5 m | 31 May 2026 | Table 11 — investments | Filed | Q2 2026 MD&A | Liquidity risk | "Gold Royalty Corp." | p.22 |
| Equity holding — Australian Mines Limited (ASX) | 84,429,563 shares · fair value C$2.3 m | 31 May 2026 | Table 11 — investments at fair value | Filed | Q2 2026 MD&A | Liquidity risk | "Australian Mines Limited" | p.22 |
| Equity holding — Galleon Gold Corp. (TSX-V) | 100,000 shares · fair value C$0.1 m | 31 May 2026 | Table 11 — investments at fair value | Filed | Q2 2026 MD&A | Liquidity risk | "Galleon Gold Corp." | p.22 |
| NevGold Shares owned, 31 May 2026 (standstill/lock-up agreement of 27 Aug 2025) | 19,073,350 shares | 31 May 2026 | Table 11 — investments | Filed | Q2 2026 MD&A | Other investments | "the Company owned 19,073,350 common shares" | p.9 |
| GoldMining Shares outstanding at the Q2 MD&A date | 214,799,168 | 14 Jul 2026 | Table 11 — per share; market cap | Filed | Q2 2026 MD&A | Outstanding share data | "GoldMining Shares outstanding" | p.23 |
| Share options and restricted share rights outstanding at the Q2 MD&A date | 15,274,145 options · 161,840 RSRs | 14 Jul 2026 | Table 11 — fully diluted count | Filed | Q2 2026 MD&A | Outstanding share data | "restricted share rights to acquire 161,840 GoldMining Shares are outstanding" | p.23 |
| La Mina technical report 2026 | ||||
| La Mina — 2% NSR to Gold Royalty Corp.; Colombian GRR 4.0% precious / 5.0% base metals | 2% NSR · GRR 4.0% / 5.0% | 2026 | Table 10, block 2 — inside the filed NPV | Filed | La Mina technical report 2026 | Royalties | "subject to a 2% net smelter return royalty (NSR) payable to Gold Royalty Corp." | p.26 |
| São Jorge technical report 2026 | ||||
| São Jorge — 1.0% NSR to Osisko Gold Royalties and 1.0% NSR to Gold Royalty Corp. | 1.0% + 1.0% NSR | 2026 | Table 10, block 1 — royalties | Filed | São Jorge technical report 2026 | Royalties | "subject to a 1.0% net smelter return" | p.53 |
| São Jorge PEA release (11 Jun 2026) | ||||
| São Jorge PEA — after-tax NPV5%, base case US$3,500/oz | US$532.5 m | 11 Jun 2026 | Table 10, block 1 — calibration | Filed | São Jorge PEA release (11 Jun 2026) | Table 2 | "Net present value (NPV 5% ) – after-tax" | p.2 |
| São Jorge PEA — pre-tax NPV5% | US$645.7 m | 11 Jun 2026 | Table 10, block 1 — calibration | Filed | São Jorge PEA release (11 Jun 2026) | Table 2 | "Net present value (NPV 5% ) – pre-tax" | p.2 |
| São Jorge PEA — initial capital (incl. pre-strip, 25% contingency) | US$202.2 m | 11 Jun 2026 | Table 10, block 1; Table 11 — funding gap | Filed | São Jorge PEA release (11 Jun 2026) | Table 2 | "Initial capital expenditure (includes pre-strip)" | p.2 |
| São Jorge PEA — sustaining capital and closure | US$53.0 m sustaining · US$12.0 m closure | 11 Jun 2026 | Table 10, block 1 — sustaining and closure | Filed | São Jorge PEA release (11 Jun 2026) | Table 2 | "Sustaining capital expenditure" | p.2 |
| São Jorge PEA — gold production, LOM average and total | 51.2 koz/yr LOM (53.4 koz/yr years 1–5) · 543.2 koz total | 11 Jun 2026 | Table 10, block 1 — production | Filed | São Jorge PEA release (11 Jun 2026) | Table 1 | "Total gold produced" | p.2 |
| São Jorge PEA — mine life and plant rate | 10.6 years · 5,500 tpd | 11 Jun 2026 | Table 10, block 1 — mine life | Filed | São Jorge PEA release (11 Jun 2026) | Table 1 | "Mine life" | p.2 |
| São Jorge PEA — LOM AISC and total cash cost | US$1,464/oz AISC · US$1,344/oz cash cost | 11 Jun 2026 | Table 10, block 1 — unit cost | Filed | São Jorge PEA release (11 Jun 2026) | Table 2 | "All-In Sustaining Costs (AISC)" | p.2 |
| La Mina PEA release (28 Apr 2026) | ||||
| La Mina PEA — after-tax NPV5% at spot (US$4,775/oz Au, US$5.75/lb Cu, US$77/oz Ag) | approx. US$1.8 bn | 28 Apr 2026 | Table 10, block 2 — slope | Filed | La Mina PEA release (28 Apr 2026) | Highlights | "the after-tax NPV 5% increases to approximately" | p.1 |
| La Mina PEA — initial capital (incl. pre-strip) | US$523.3 m | 28 Apr 2026 | Table 10, block 2 — capital | Filed | La Mina PEA release (28 Apr 2026) | Financial metrics | "Initial capital expenditure (includes pre-strip)" | p.3 |
| La Mina PEA — production, years 1–5 | 125.8 koz Au/yr · 22.4 Mlb Cu/yr · 152.4 koz AuEq/yr | 28 Apr 2026 | Table 12 — Dim 1 driver | Filed | La Mina PEA release (28 Apr 2026) | Production metrics | "Average annual gold production" | p.2 |
| La Mina PEA — AISC (by-product basis) and total cash cost | US$1,045/oz Au AISC · US$872/oz cash cost | 28 Apr 2026 | Table 12 — cost basis (Dim 2 N/A) | Filed | La Mina PEA release (28 Apr 2026) | Financial metrics | "AISC (by-product basis)" | p.3 |
| La Mina PEA — after-tax NPV5% at base case US$3,500/oz Au, US$4.70/lb Cu, US$40/oz Ag | US$1,001.5 m (pre-tax US$1,613.9 m) | 28 Apr 2026 | Table 10, block 2 — base case | Filed | La Mina PEA release (28 Apr 2026) | Table 2 | "Net present value (NPV 5% ) – after-tax" | p.3 |
| La Mina PEA — sustaining capital and closure | US$166.0 m · US$49.8 m closure | 28 Apr 2026 | Table 10, block 2 — inside the filed NPV | Filed | La Mina PEA release (28 Apr 2026) | Table 2 | "Sustaining capital expenditure" | p.3 |
| La Mina PEA — mine life and LOM production | 11.2 years · 1,243.3 koz Au · 1,534.6 koz AuEq | 28 Apr 2026 | Table 10, block 2 — gold share of the slope | Filed | La Mina PEA release (28 Apr 2026) | Production metrics | "Mine life" | p.2 |
| La Mina PEA — LOM silver and copper | 2.6 Moz Ag · 195 Mlb Cu | 28 Apr 2026 | Table 10, block 2 — gold share of the slope | Filed | La Mina PEA release (28 Apr 2026) | Highlights | "total life of mine" | p.1 |
| Derived and market | ||||
| Fully-diluted shares (outstanding + options + RSRs) | 230,235,153 | 14 Jul 2026 | Table 11 — per share | Derived | f-shares-out + f-options (214,799,168 + 15,274,145 + 161,840); all options counted, in- or out-of-the-money |
| USD/CAD on the as-of (Bank of Canada daily average) | 1.4018 | 6 Aug 2026 | Every C$ conversion | Market | Bank of Canada | "FXUSDCAD" (boc_fxusdcad_to20260825_20261014.csv) | 6 Aug 2026 |
| Market capitalisation on the as-of (basic shares × TSX close) | C$290.0 m | 6 Aug 2026 | Table 16, field 10 — funding gap share | Derived | f-shares-out × g-close (214,799,168 × C$1.35) |
| Gold (GC=F) trailing averages to 6 Aug 2026 — 3 / 6 / 12 months | US$4,271.1 / 4,569.4 / 4,334.7/oz | 6 Aug 2026 | Figure 7, Table 15 — deck | Market | Yahoo Finance | "GC=F daily close" (yahoo_gc_f_daily_20261019.json; 62 / 126 / 251 sessions) | 6 Aug 2026 |
| Gold (GC=F) cycle high / low in the series held (from 1 Aug 2025) | US$5,318.4 (29 Jan 2026) / US$3,358.7 (19 Aug 2025) | 6 Aug 2026 | Table 16, field 2 — deck context | Market | Yahoo Finance | "GC=F daily close" (yahoo_gc_f_daily_20261019.json) | 6 Aug 2026 |
| Listed stakes — closes on the as-of: USGO / Gold Royalty (GROY) / NevGold (NAU.V) | US$8.47 / US$2.87 / C$1.75 | 6 Aug 2026 | Table 11 — investments | Market | Yahoo Finance | "USGO, GROY, NAU.V daily close" (yahoo_usgo_daily_20261019.json, yahoo_groy_daily_20261019.json, yahoo_nauv_daily_20261019.json) | 6 Aug 2026 |
Source: each row’s filing as cited — GoldMining’s Q2 2026 and FY2025 filings and the São Jorge and La Mina PEA releases on SEDAR+.
10.2 Disclaimer & disclosure
This analysis is for information only and is not investment advice; do your own research or consult a licensed adviser. It is a point-in-time snapshot as of 6 August 2026 — the share price, the listed holdings and the gold price move, and every figure is an estimate as of that date. GoldMining is pre-revenue: its value rests on resource estimates and preliminary economic assessments that may never be built, and on listed securities whose prices fluctuate. The rating and verdict are an analytical read of quality and price, not an instruction to buy or sell. This report was prepared with AI assistance from GoldMining’s filings and reviewed; verify before acting. The author holds no position in GoldMining Inc., U.S. GoldMining Inc. or Gold Royalty Corp. as of the date of writing.